HomeMy WebLinkAbout1983-07-21i
Town of Dryden July 21st, 1983
Planning Board j
The Planning Board met on July 21st at 8:00 pm. Members present were.B.'Lavine,
OSB. Caldwell, E. Dollaway, representative from the Town Bd, C. Evans, and Z,0
tewart. d I
Corrections to the June 16th minutesiwere made by J. Hunt saying that C. Evans
is not a member of the P1. Bd., but, the. representat ive from the Town Bd. to the Pl.
Bd. J. Hunt moved that the minutes be accepted as amended. Second by'E. Dollaway.
Vote- all yes.
I
Old Business If
The Bd. continued working on the wording of the site plan review procedure for
cooperatives and condominiums. B. Lavine asked if there is a definition for the word
residential as in 4line 4 page:l of the drdit,',They discussed what they would like it
to mean. A question was asked of'how many units do we want to be concerned with. B.
Lavine pointed out where it says "60% of the use shall be... ", and wondered what is
the unit being used for percentage.
i
pg. 1, line 4- define residential,with a side question about mixed usage and
size threshold of concern.
Concern on lines 5 and 60 If the ownership ! pattern on the site changes, three
peoples backyards are going to be commonly owned space. Don't we need it graphic-
ally presented?
Line 5, the word building(s) or another term to include land.
Line 6, Zoning Enforcement Officer should be Planning Board. The P1. Bd. is re-
quiring it. The ZEO will inform the applicant.
Lines 6 thru 9- use the sub - division sketch plan submission wording and amend.
Lines 9, 10, and 11 as is.
Lines 21 and 22 combined- a sketch of,the site including A. topography, B. build-
ings location, improvements and C. major natural features.
Line 25 pg. 1- Change ZEO to Planning Board. In writing to the Pl. Bd. chairman
or to-.,the Town Clerk at least 24 hrs. befor the P1. Bd. meeting. The meeting itself
is the formal time of submission.
Line
28-
all codes
have to
be
revised, sub - division,
zoning.
pg 2,
no
location,
disign,
and
construction material
of all energy distribution
facilities.
pg 3, to all features relating to solar access of this and adjacent sites.
pg. 3, u., wording of old to
Lines 1 to 3 are ok.
Lines 4 to 6- omit.
pg. 3, line 26- the adequacy of 'usable open space for play areas and informal
recreation.
pg 4, 1. solar access. j
pg. 4, line 6- ZEO'instead of building inspector.
pg. 4, line 7- strike conservation council; highway commissioner instead of com-
mission of public works. .
Line 13- .'..preliminary site plan and if so a $25.00 fee will be paid ;to._the Town
Cl a
erk ten days before the public hering.
Line 21- either a. receipt of an application or b. conclusioni�of
ing, whichever is later.
pg. 5, line 4;.. of the site plan and it's resubmission
pg. 5, line 11- site plan and or if the applicant is unable
ailed site plan, the continuation of his application requires
al from the Pl. Bd. The P1. Bd. may grant an extension up to
pg. 5, line 21- ...permits.
Line 27- strike county bureau of planning
Question for Mahlon Perkins on reference to sec. 239 and what
pg. 6, line 5, 11, and 13- change building [inspector to ZEC
the public hear-
to complete a final
that he request ap -.
six months.
is required.
I
1
I
I 1
1 I
pg. 6, line 24 (twice) guarantee if allowed
pg. 6, line 25 -. determined by the Town Board.
pg. 7, line 1- ZEO instead of Building Inspector
pg. 7, line 3- Highway Commissioner for!Commissioner of Public Works
pg 7, line 11- L. Estimated Project Construction Schedule
If the estimated construction schedurd is not met!with in the variance of six
months they have to come back and ask for approval again.
Line 25, pg. 5- Mahlon Perkins please help with the writing of an estimated pro
ject schedule. Concern is garding against a paper project.
pg. 4, line 14- The Pl. Bd..may conduct a public hearing and if so a fee of $25.00
will be assessed, payable to the Town Clerk ten working days before the public hear-
ing.
i •
i
I
I I I
1
I
I
I .
I
I I
1 I I
I,
1
1
I
I I
I
i
1 I I
I
C
ti
I,
1
I
C
ti
I I'
1
I
I,
I I'
1
I