HomeMy WebLinkAbout04-03-2013APRIL 03, 2013 5:00 P.M.
PUBLIC HEARING NO. 1
SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT
ECONOMIC DEVELOPMENT APPLICATION
A Public Hearing was held by the Town Board of the Town of Cortlandville at the
Raymond G. Thorpe Municipal Building, 3577 Terrace Road, Cortland, New York, concerning
submitting an application to the New York State Office of Community Renewal for funding under
the federal Small Cities Community Development Block Grant Program.
Members present: Supervisor, Richard C. Tupper
Councilman, Theodore V. Testa
Councilman, Ronal L. Rocco
Councilman, John C. Proud
Councilman, Gregory K. Leach
Town Clerk, Karen Q. Snyder, RMC
Others present were: Town Attorney, John Folmer; Highway Sup't. Carl Bush; Town
Zoning Board of Appeals Member, David Alexander; Ann Hotchkin from Thoma Development;
Paul Heider; Barb Leach; Jim Gosier and Nick Marselli from Byrne Dairy; Steven Moffitt; News
Reporters: Catherine Wilde from the Cortland Standard, Eric Mulvihill from WXHC, and
Sharon Stevans for Channel 2, Access TV.
Supervisor Tupper called the Public Hearing to order.
Town Clerk, Karen Q. Snyder, read aloud the published, posted and filed legal notice.
Supervisor Tupper offered privilege of the floor to Ann Hotchkin.
Ann Hotchkin, from Thoma Development Consultants noted that they were assisting the
Town with submitting a Community Development Block Grant (CDBG). During the first public
hearing the Town only has to tell what is eligible through the CDBG Program with respect to
economic development. However in this case, protocol was being broken because it was known
that the Town would be applying on behalf of Byrne Dairy.
Mrs. Hotchkin provided the Board with a handout explaining the breakdown of what the
Town was asking for. Under the CDBG Program, the maximum amount that could be applied
for was $750,000. Typically the money would go towards purchasing furniture, fixtures, and
equipment acquisition. She explained that the application was a mix of a $734,000 CDBG grant
and a $180,000 loan. The loan would be repaid to the Town.
Councilman Rocco questioned the time frame for repayment of the $180,000 loan. Mrs.
Hotchkin explained that the $180,000 loan was federal funds that would be repaid to the Town in
the form of a low interest bearing loan. She was not sure what the amortization schedule of the
equipment would be, but projected that the loan would be repaid in 7-10 years.
Supervisor Tupper offered privilege of the floor to those in attendance.
Jim Gosier, General Counsel for Byrne Dairy, Inc., thanked the Town for sponsoring the
CDBG application on Byrne Dairy's behalf. He mentioned that Byrne Dairy received final
approval for the project from the Town Planning Board.
No further comments or discussions were heard.
The Public Hearing was closed at 5:10 p.m.
1
1
1
a6e
APRIL 03, 2013
PUBLIC HEARING NO.2
5:10 P.M.
AQUIFER PROTECTION PERMIT
BYRNE DAIRY, INC., APPLICANT
CORTLAND COUNTY IDA, OWNER OF RECORD
FINGER LAKES EAST DRIVE AND OSBECK LANE
TAX MAP #105.00-03-15.000, 105.00-03-16.000, 105.00-03-17.000,
105.00-03-18.000, 105.00-03-19.000, 105.00-03-20.000, 105.00-03-21.000
105.00-03-24.000, 105.00-03-25.000, 105.00-03-26.000, 105.00-03-27.000
A Public Hearing was held by the Town Board of the Town of Cortlandville at the
Raymond G. Thorpe Municipal Building, 3577 Terrace Road, Cortland, New York, concerning
an application for an Aquifer Protection Permit permitting the construction of a 40,000 sq. ft.
yogurt manufacturing facility, a 10,000 sq. ft. cheese manufacturing facility, a 10,000 sq. ft.
cafe/visitors center, an outdoor amphitheater, a 4,500 sq. ft. executive lodge/meeting center, and
to develop ancillary agriculture/entertainment facilities using existing structures on site, for
property located on both sides of Finger Lakes East Drive and Osbeck Lane, tax map #105.00-
03-15.000, 105.00-03-16.000, 105.00-03-17.000, 105.00-03-18.000, 105.00-03-19.000, 105.00-
03-20.000, 105.00-03-21.000, 105.00-03-24.000, 105.00-03-25.000, 105.00-03-26.000, 105.00-
03-27.000.
Members present: Supervisor, Richard C. Tupper
Councilman, Theodore V. Testa
Councilman, Ronal L. Rocco
Councilman, John C. Proud
Councilman, Gregory K. Leach
Town Clerk, Karen Q. Snyder, RMC
Others present were: Town Attorney, John Folmer; Highway Sup't. Carl Bush; Town
Zoning Board of Appeals Member, David Alexander; Ann Hotchkin from Thoma Development;
Paul Heider; Barb Leach; Jim Gosier and Nick Marselli from Byrne Dairy; Steven Moffitt; News
Reporters: Catherine Wilde from the Cortland Standard, Eric Mulvihill from WXHC, and
Sharon Stevans for Channel 2, Access TV.
Supervisor Tupper called the Public Hearing to order.
Town Clerk, Karen Q. Snyder, read aloud the published, posted and filed legal notice.
Supervisor Tupper offered privilege of the floor to those in attendance.
Councilman Rocco questioned whether everything proposed would be constructed during
Phase I. Supervisor Tupper explained that everything noted would be completed in the Phase I,
however there are other phases planned for the future.
Supervisor Tupper offered privilege of the floor to Jim Gosnier.
Jim Gosnier, General Counsel for Byrne Dairy, Inc., stated that they were very pleased to
be at this point. Most of the development of Phase I of the project was in Zone B for aquifer
purposes. The project meets the density and greenspace requirements as the project has 135
acres of land to work with. Attorney Gosnier explained that the geotechnical testing was
completed on the site; they were pleased with the results which showed permeable material such
as sand and gravel.
Councilman Rocco stated that he spoke with many people, including representatives from
the Lime Hollow Nature Center who were pleased about working with Byrne Dairy and the
protection of the Bog. He questioned whether there were any problems with the DEC and
moving the project along.
Attorney Gosnier explained that up to this point they have not had many questions for the
DEC. He explained that Byrne Dairy has had a great relationship working with the Lime Hollow
Nature Center. The Lime Hollow Nature Center had an application pending with the DEC for
the past few years to reclassify the Bog from a Class 2 Wetland to a Class 1 Wetland. Attorney
Gosnier stated that Byrne Dairy asked questions about what the reclassification would mean for
them. He was able to walk through the Bog with two representatives from the DEC and Glen
Reisweber from Lime Hollow and had all of his questions answered. Attorney Gosnier was not
overly concerned that a reclassification would have a detrimental effect on Byrne Dairy.
Ann Hotchkin from Thoma Development Consultants apprised the Board she made a
mistake with regard to the CDBG public hearing. In addition to the grant that was being
APRIL 03, 2013 PUBLIC HEARING NO. 2 PAGE 2
requested, the Town would be providing $180,000 of its Community Development Block Grant
funds for the Byrne Dairy project, which the Town had on hand. The Town would have the
ability to amortize the loan based on the developer's ability to pay and the Town's contract with
them regarding the money. Supervisor Tupper thanked Mrs. Hotchkin for the clarification.
No further comments or discussions were heard.
The Public Hearing was closed at 5:15 p.m.
1
1
APRIL 03, 2013
5:15 P.M.
ao7
7
U
1
LJ
TOWN BOARD MEETING
The Regular Meeting of the Town Board of the Town of Cortlandville was held at the
Raymond G. Thorpe Municipal Building, 3577 Terrace Road, Cortland, New York, with
Supervisor Tupper presiding.
Members present: Supervisor, Richard C. Tupper
Councilman, Theodore V. Testa
Councilman, Ronal L. Rocco
Councilman, John C. Proud
Councilman, Gregory K. Leach
Town Clerk, Karen Q. Snyder, RMC
Others present were: Town Attorney, John Folmer; Highway Sup't. Carl Bush; Town
Zoning Board of Appeals Member, David Alexander; Ann Hotchkin from Thoma Development;
Paul Heider; Barb Leach; Jim Gosier and Nick Marselli from Byrne Dairy; Steven Moffitt; News
Reporters: Catherine Wilde from the Cortland Standard, Eric Mulvihill from WXHC, and
Sharon Stevans for Channel 2, Access TV.
Supervisor Tupper called the meeting to order.
Councilman Proud made a motion, seconded by Councilman Leach, to approve the Draft
Town Board Minutes of February 20, 2013. All voting aye, the motion was carried.
Councilman Proud made a motion, seconded by Councilman Leach, to approve the Draft
Town Board Minutes of March 6, 2013. All voting aye, the motion was carried.
Councilman Leach made a motion, seconded by Councilman Proud, to receive and file
the Cortlandville Zoning Board of Appeals Minutes of February 26, 2013. All voting aye, the
motion was carried.
Councilman Leach made a motion, seconded by Councilman Proud, to receive and file
the Cortlandville Planning Board Minutes of February 26, 2013. All voting aye, the motion was
carried.
RESOLUTION #77 AUTHORIZE SUPERVISOR TO SIGN
PURCHASE ORDER #1186
Motion by Councilman Leach
Seconded by Councilman Proud
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby authorize and direct the Supervisor to sign
Purchase Order #1186 submitted by Highway Sup't. Bush to be paid to Tracey Road Equipment for
the one -month rental of a Schwarze Vacuum Sweeper to clean Town roads for the total amount of
$9,800.00.
RESOLUTION #78 AUTHORIZE PAYMENT OF VOUCHERS — APRIL
Motion by Councilman Proud
Seconded by Councilman Leach
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the vouchers submitted have been audited and shall be paid as follows:
Funds A, B, DA, DB Voucher #260-312:
General Fund A
$
19,753.40
General Fund B
$
5,503.05
Highway Fund DA
$
0.00
Highway Fund DB
$
25,056.41
Funds CD I, CD3, CD4 Voucher #10
BMills Rehab CD1
$
0.00
Town Wide Rehab CD3
$
0.00
Business Devl C134
$
28.18
EM
APRIL 03, 2013 TOWN BOARD MEETING PAGE 2
Fund CD2 Voucher #0
Senior Rehab CD2 $ 0.00
Fund HC, SS, SW Voucher 999-115
NYS Rt 13 Sewer Rehab HC $ 29.39
Sewer SS $ 1,765.29
Water SW $ 2,375.22
Funds SF, TA, TE Voucher #(none)
C' Ville Fire District SF $ 0.00
Trust & Agency TA $ 0.00
Expendable Trust TE $ 0.00
Supervisor Tupper offered privilege of the floor to those in attendance. No requests were
made.
The monthly report of the Town Justice for the month of February 2013, and for the
Town Clerk, Tax Collector, Supervisor, Code Enforcement Officer, and the Water & Sewer
Department for the month of March 2013, were on the table for review and are filed in the Town
Clerk's Office.
Councilman Rocco apprised the Board he met with the Town's auditors last week and
answered questions they had, which was a routine part of the audit.
With regard to the Aquifer Protection Permit application of Byrne Dairy, Inc., Attorney
Folmer explained that the Board's SEQR process would be different than what is ordinarily
done, and that the SEQR process tonight only related to Phase I of the proposed project. There
would be additional items as the build -out of the facility continues over a period of years.
Attorney Folmer stated that someone may consider this to be "a segmented SEQR process".
However, he stated that was not accurate under the SEQR regulations because as the additional
projects come forward the Town can amend the SEQR determinations that would be made this
evening so there is a "consistent and building-block approach to the SEQR process". Overall,
the Board would be approving several different entities of several different project build -outs.
They would be one big project at the conclusion.
Attorney Folmer reminded the Board that the site was originally developed by the
Cortland County IDA as an industrial park. In connection with the development the IDA
conducted a SEQR review as lead agency. In December 2005 the IDA prepared a Draft and
Final GEIS (Generic Environmental Impact Statement). In February 2006 the IDA filed its
Findings Statements in which they completed their SEQR review. Attorney Folmer asked the
Board to adopt a resolution to receive, file, and adopt the findings statement that was signed by
the IDA on February 24, 2006.
RESOLUTION #79 RECEIVE AND FILE AND ADOPT THE SEQRA FINDINGS
STATEMENT AS SIGNED BY THE CORTLAND COUNTY
IDA ON FEBRUARY 24, 2006
Motion by Councilman Proud
Seconded by Councilman Testa
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby receive and file and adopt the SEQRA
Findings Statement (dated February 16, 2006) as signed by the Cortland County Industrial
Development Agency (IDA) on February 24, 2006 with regard to the Finger Lakes East Business
Park project.
Attorney Folmer apprised the Board that according to the recommendations from the
Cortland County Planning Board, they suggested the Town Board complete the SEQR review.
The County Planning Board categorized the action as an unlisted action, which meant that a Full
Environmental Assessment Form (EAF) should be completed by the Town Board. Attorney
Folmer reviewed and completed Part 2 of the Full EAF with the Board, and reminded the Board
that the impacts referred to negative impacts that affect the environment. Since the Board did not
identify any potentially -large impacts it was not necessary to complete Part 3 of the Full EAF.
1
1
0
APRIL 03, 2013 TOWN BOARD MEETING PAGE 3
RESOLUTION #80 DECLARE NEGATIVE IMPACT FOR AQUIFER
PROTECTION PERMIT #2 OF 2013 SUBMITTED BY BYRNE
DAIRY, INC. FOR PHASE I OF THE PROJECT FOR
PROPERTY LOCATED ON FINGER LAKES EAST DRIVE
AND OSBECK LANE
Motion by Councilman Rocco
Seconded by Councilman Proud
VOTES: ALL AYE ADOPTED
WHEREAS, an Aquifer Protection Permit application was submitted by Byrne Dairy, Inc. for Phase
I of its project to permit the construction of a 40,000 sq. ft. yogurt manufacturing facility, a
10,000 sq. ft. cheese manufacturing facility, a 10,000 sq. ft. cafe/visitors center, an outdoor
amphitheater, a 4,500 sq. ft. executive lodge/meeting center, and to develop ancillary
agriculture/entertainment facilities using existing structures on site, for property located on both
sides of Finger Lakes East Drive and Osbeck Lane, tax map #105.00-03-15.000, 105.00-03-
16.000, 105.00-03-17.000, 105.00-03-18.000, 105.00-03-19.000, 105.00-03-20.000, 105.00-03-
21.000, 105.00-03-24.000, 105.00-03-25.000, 105.00-03-26.000, 105.00-03-27.000, and
WHEREAS, the Town Board as Lead Agent, duly reviewed and completed Part 2 of the Full
Environmental Assessment Form, therefore
BE IT RESOLVED, the Town Board as Lead Agent, does hereby declare the proposed project of
Byrne Dairy, Inc., Phase I, Aquifer Protection Permit #2 of 2013, shall have no significant
environmental impact.
RESOLUTION #81 AUTHORIZE SUPERVISOR TO SIGN SEQRA
APPLICATION OF AQUIFER PROTECTION
PERMIT #2 OF 2013
Motion by Councilman Rocco
Seconded by Councilman Proud
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Supervisor is hereby authorized and directed to sign the SEQRA
application relating to Aquifer Protection Permit #2 of 2013, submitted by Byrne Dairy, Inc. for
Phase I of its project.
Councilman Rocco made a motion, seconded by Councilman Testa, to receive and file
correspondence from the Cortland County Planning Department to the Cortland County Planning
Board, dated March 15, 2013, regarding the Aquifer Protection Permit application of Byrne
Dairy, Inc. All voting aye, the motion was carried.
Councilman Proud made a motion, seconded by Councilman Leach, to receive and file
Cortland County Planning Board Resolution #13-08, dated March 20, 2013, regarding the
Aquifer Protection Permit Application of Byrne Dairy, Inc. All voting aye, the motion was
carried.
Attorney Folmer indicated that at the last Planning Board Meeting counsel for the
applicant was present. The applicant had no discussion or concern over any of the conditions
that were set forth in the recommendation from the County Planning Board. Attorney Folmer
also noted that in addition to the conditions, there were three notes from the County Planning
Board that the Town Board should undertake as they plan for the future development of the
project. Councilman Proud questioned whether the Board should include the three notes in
addition to the thirteen conditions. Councilman Rocco questioned what the Town Planning
Board suggested the Board do.
Attorney Folmer stated that the additional notes were merely suggestions as to activities
that ought to be undertaken as the Town continues the planning process in the future. The Town
Planning Board discussed including the notes in their recommendation to the Town Board and
decided not to. Councilman Rocco stated the Board usually follows what the Planning Board
suggests, and suggested the Board leave the three notes out. Supervisor Tupper agreed.
a7a
APRIL 03, 2013
TOWN BOARD MEETING
PAGE 4
RESOLUTION #82 APPROVE AQUIFER PROTECTION PERMIT #2 OF 2013
SUBMITTED BY BYRNE DAIRY, INC. FOR PHASE I OF THE
PROJECT FOR PROPERTY LOCATED ON FINGER LAKES
EAST DRIVE AND OSBECK LANE SUBJECT TO
CONDITIONS
Motion by Councilman Proud
Seconded by Councilman Testa
VOTES: ALL AYE ADOPTED
WHEREAS, the Cortland County Planning Department and the Town Planning Board have
reviewed and recommended approval of this Aquifer Protection Permit application, and
WHEREAS, a Public Hearing was duly held by this Town Board, therefore
BE IT RESOLVED, the Town Board does hereby approve Aquifer Protection Permit #2 of 2013,
submitted by Byrne Dairy, Inc. for Phase I of its project, permitting the construction of a 40,000
sq. ft. yogurt manufacturing facility, a 10,000 sq. ft. cheese manufacturing facility, a 10,000 sq.
ft. cafe/visitors` center, an outdoor amphitheater, a 4,500 sq. ft. executive lodge/meeting center,
and to develop ancillary agriculture/entertainment facilities using existing structures on site, for
property located on both sides of Finger Lakes East Drive and Osbeck Lane, tax map #105.00-
03-15.000, 105.00-03-16.000, 105.00-03-17.000, 105.00-03-18.000, 105.00-03-19.000, 105.00-
03-20.000, 105.00-03-21.000, 105.00-03-24.000, 105.00-03-25.000, 105.00-03-26.000, 105.00-
03-27.000, subject to the following conditions from the Town and County Planning Boards:
1. The applicant securing driveway permits from the Town Highway Superintendent for
each of the proposed new driveway entrances (nine on Finger Lakes East Drive and
two on Osbeck Lane) to Town roads.
2. The regrading of the amphitheater area and its impact on stormwater runoff
being addressed in the stormwater plan for the site.
3. The modified stormwater plan for the site which incorporates the proposed
development into the existing stormwater facility on site being approved by the Town
and the NYS Department of Environmental Conservation (DEC).
4. The applicant obtaining approval of the public water and sewer connections from the
Town/County Health Department including the installation of a backflow prevention
device for the public water connection.
5. The applicant obtaining a SPDES permit from the DEC for the disposal of the waste
generated by the yogurt and cheese plants.
6. The applicant receiving written confirmation from the City's Wastewater Treatment
Plant Operator that the wastewater treatment plant can handle the waste generated by
this facility and that this proposal falls under the City's industrial treatment program.
7. The applicant obtaining a food service permit from the County Health Department for
the operation of the proposed cafe.
8. That "lawn parking" areas be inspected after events that require lawn parking and that
any stormwater impacts as a result of the lawn parking be addressed by the applicant.
9. The applicant providing a written narrative to the Town providing more detail as to
the nature of events to be held at the amphitheater, which should include the
following:
a. Traffic control measures during periods of heavy traffic volumes at the
beginning and end of an event.
b. Anticipated number of events to be held per year with anticipated timeframe
(beginning and end time) of events.
10. The applicant providing information regarding the height of the white board fence to
the Town to insure compliance with Town regulations.
all
APRIL 03, 2013
TOWN BOARD MEETING
PAGE 5
11. The applicant submitting a lighting plan for the amphitheater area, lodge/meeting
center, farmstead area, and the building/pedestrian areas at the plant/visitors center to
the Town for review and approval.
12. The applicant providing more information as to the lighting of the windmill blades
(duration, lit while the blades are turning or only while stationary, etc.) to allow the
Town to adequately assess any potential impacts that illumination of the windmills
may have on NYS Route 13 and/or neighboring properties.
13. Compliance with SEQR requirements.
AND IT IS FURTHER RESOLVED, the Supervisor is hereby authorized to sign the permit.
Neither Town Clerk Snyder nor Attorney Folmer had anything to report.
RESOLUTION #83 REFER AQUIFER PROTECTION PERMIT APPLICATION
SUBMITTED BY LIME HOLLOW NATURE CENTER TO THE
TOWN AND COUNTY PLANNING BOARDS FOR REVIEW
AND RECOMMENDATIONS
Motion by Councilman Rocco
Seconded by Councilman Leach
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby refer the Aquifer Protection Permit application
submitted by Lime Hollow Nature Center for property located on Gracie Road, tax map #105.05-
01-12.110 and 105.05-01-13.110, to the Town and County Planning Boards for review and
recommendations.
Attorney Folmer excused himself from the meeting at this time.
Councilman Leach made a motion, seconded by Councilman Proud, to receive and file
correspondence from the New York State Homes & Community Renewal, dated March 18,
2013, regarding the Concurrence of Determination of Categorical Exclusion for the NYS CDBG
— Precision Eforming, LLC. All voting aye, the motion was carried.
RESOLUTION #84 AUTHORIZE SUPERVISOR TO SIGN CONTRACT WITH
THOMA DEVELOPMENT CONSULTANTS FOR
ADMINISTRATIVE AND PROGRAM DELIVERY SERVICES
FOR THE 2012 COMMUNITY DEVELOPMENT BLOCK
GRANT FOR PRECISION EFORMING, LLC
Motion by Councilman Proud
Seconded by Councilman Testa
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town does hereby authorize and direct the Town Supervisor to sign the
contract with Thoma Development Consultants, 34 Tompkins Street, Cortland, New York for
Administrative and Program Delivery Services for the 2012 Community Development Block
Grant for Precision Eforming, LLC, in an amount not to exceed $6,750.
Councilman Leach made a motion, seconded by Councilman Proud, to receive and file
correspondence from the New York State Homes & Community Renewal, dated March 18,
2013, regarding the Grant Agreement Completion Notice for the NYS Community Development
Block Grant for Pall Corp, and the remaining project balance of $359.48. All voting aye, the
motion was carried.
a -7o
1, APRIL 03, 2013 TOWN BOARD MEETING PAGE 6
Councilman Leach made a motion, seconded by Councilman Proud, to receive and file
the Executed 2011-12 Urban & Community Forestry Grant Round 11 Contract for tree planting
at Ted Testa Park. All voting aye, the motion was carried.
There was discussion regarding the tree planting grant that the Town received for the Ted
Testa Park. Supervisor Tupper explained that 56 trees of different varieties would be planted in
2013 and 2014. Highway Sup't. Bush was in the process of obtaining bids for the project.
RESOLUTION 485 AUTHORIZE THE CORTLAND CITY SCHOOL DISTRICT
USE OF THE TOWN MEETING ROOM TO CONDUCT THEIR
ANNUAL SCHOOL BOARD ELECTION ON MAY 21, 2013
Motion by Councilman Leach
Seconded by Councilman Proud
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby authorize the Cortland City School District
use of the Town meeting room in the Raymond G. Thorpe Municipal Building, to conduct their
annual Budget Vote and School Board Elections on Tuesday, May 21, 2013 from 11:30 a.m. -
9:30 p.m.
RESOLUTION #86 AUTHORIZE SUPERVISOR TO SIGN THE OWNER -
OCCUPIED LOAN AGREEMENT BETWEEN THE TOWN AND
JONI L. GREENE AND FERN A. CRANDALL FOR THE
TOWN'S 2011 COMMUNITY DEVELOPMENT BLOCK
GRANT HOUSING REHABILITATION PROGRAM
Motion by Councilman Rocco
Seconded by Councilman Leach
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby authorize the Supervisor to sign the Owner -
Occupied Loan Agreement between the Town of Cortlandville and Joni L. Greene and Fern A.
Crandall, 11 North Street, McGraw, New York, for a 100% deferred loan for the 2011 Community
Development Block Grant Housing Rehabilitation Program in the amount of $23,235.00.
RESOLUTION #87 AUTHORIZE SUPERVISOR TO SIGN THE PROPERTY
REHABILITATION AGREEMENT AND BUYER -OCCUPIED
LOAN AGREEMENT BETWEEN THE TOWN AND RITA
ROGERS, KARL J. ROGERS AND ANDREW STILES FOR THE
TOWN'S 2011 COMMUNITY DEVELOPMENT BLOCK
GRANT HOUSING REHABILITATION PROGRAM
Motion by Councilman Proud
Seconded by Councilman Testa
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby authorize the Supervisor to sign the Property
Rehabilitation Agreement and the Buyer -Occupied Loan Agreement between the Town of
Cortlandville and Rita Rogers, Karl J. Rogers and Andrew Stiles (who has a 2008 Land Contract),
with regard to property located at 4154 North Road, McGraw, New York and a 100% deferred loan
for the 2011 Community Development Block Grant Housing Rehabilitation Program in the
amount of $27,490.00.
a73
APRIL 03, 2013
TOWN BOARD MEETING
PAGE 7
RESOLUTION #88
AUTHORIZE SUPERVISOR TO SIGN THE ANNUAL
PERFORMANCE REPORT REGARDING THE COMMUNITY
DEVELOPMENT BLOCK GRANT FOR PYROTEK
Motion by Councilman Leach
Seconded by Councilman Rocco
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby authorize and direct the Supervisor to sign the
Annual Performance Report for 2012 regarding the Community Development Block Grant
(CDBG) for Pyrotek and the completion of the project activities as proposed.
RESOLUTION #89 REFER ZONE CHANGE REQUEST SUBMITTED BY JAMES
AND MIKE REENERS TO THE TOWN AND COUNTY
PLANNING BOARDS FOR REVIEW AND
RECOMMENDATIONS
Motion by Councilman Proud
Seconded by Councilman Testa
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby refer the Zone Change Request submitted by
James and Mike Reeners for property located off of Kinney Gulf Road and Route 281 from R-1
to R-3, tax map #86.09-01-21.000 and #86.09-01-22.200, to the Town and County Planning
Boards for review and recommendations, and it is further
RESOLVED, the correspondence from James and Mike Reeners requesting the zone change for
the purpose of developing Westmoreland Heights, an Independent Senior Living Community,
received March 21, 2013, is hereby received and filed.
Councilman Proud made a motion, seconded by Councilman Leach, to receive and file
correspondence from Christina Cerio, USDA Rural Development, dated March 27, 2013,
regarding acceptance of the revised Preliminary Engineering Report for the Route 13 Sewer
Project. All voting aye, the motion was carried.
Supervisor Tupper indicated that the Town's application packet to the USDA was now
complete with regard to the Route 13 Sewer Rehabilitation Project. He anticipated that the Town
would be hearing from the EFC with regard to funding soon. The USDA would not respond
until after the EFC did.
RESOLUTION #90 AUTHORIZE SUPERVISOR TO TRANSFER FUNDS FROM
THE SEWER OPERATING FUND TO THE CAPITAL
PROJECT FUND FOR THE NYS ROUTE 13 SEWER
REHABILITATION PROJECT
Motion by Councilman Rocco
Seconded by Councilman Leach
VOTES: ALL AYE ADOPTED
WHEREAS, the Supervisor requested the Town Board authorize him to transfer funds from the
Sewer Operating Fund to the Capital Project Fund for the NYS Route 13 Sewer Rehabilitation
Project, therefore
BE IT RESOLVED, the Town Board does hereby authorize and direct the Supervisor to transfer
$9,129.10 from the Sewer Operating Fund to the Capital Project Fund for the NYS Route 13
Sewer Rehabilitation Project, and it is further
RESOLVED, the Sewer Operating Fund will be reimbursed when the Town receives bonding for
the NYS Route 13 Sewer Rehabilitation Project.
74 APRIL 03, 2013 TOWN BOARD MEETING PAGE 8
Supervisor Tupper informed the public that he, Councilman Testa and Councilman Proud
would not be able to attend the Town Board Meeting scheduled for April 17, 2013. Since there
would not be a quorum the Regular Meeting was rescheduled to Wednesday, April 24, 2013 at
5:00 p.m. Members of the media were in attendance and were therefore notified.
RESOLUTION #91-Q RESCHEDULE REGULAR TOWN BOARD MEETING OF
APRIL 17, 2013 TO WEDNESDAY, APRIL 24, 2013
Motion by Councilman Testa
Seconded by Councilman Proud
VOTES: ALL AYE ADOPTED
BE IT RESOLVED, the Town Board does hereby reschedule the Regular Town Board Meeting
of April 17, 2013 to Wednesday, April 24, 2013 at 5:00 p.m. at the Raymond G. Thorpe
Municipal Building, 3577 Terrace Road, Cortland, New York.
With regard to wind farms, Councilman Rocco apprised the Board he -learned some new
information from Reuters magazine that he wanted to share. British Petroleum (BP), which is
one of the largest wind turbine businesses in the world is moving from wind to oil and gas, and
are selling their largest U.S. wind farm operation. He stated that oil and gas projects offer BP
larger returns. Councilman Rocco apprised the Board that this was a big deal and suggested they
read the article from Reuters.
No further comments or discussion were heard.
Councilman Testa made a motion, seconded by Councilman Rocco, to adjourn the
Regular Meeting. All voting aye, the motion was carried.
The meeting was adjourned at 5:45 p.m.
Respectfully submitted,
el
"?�r
Karen Q. Snyder, RMC
Town Clerk
Town of Cortlandville