-1-
Bill from Modjesky &.Masters J
By Comm. MacInnes: Seconded by Comm. Walker //0 0
RESOLVED, That a bill from Modjesky & Masters for engineering services in
connection with the .rehabilitation of the East Clinton Street Bridge, be
approved in the amount of $1,075.00.
Carried Unanimously
Bill of Modjeski & Masters
By Comm. Maclnnes: Seconded by Comm. Schickel A/40_
RESOLVED, That a bill from Modjeski & Masters for engineering
services in connection with the design and rehabilitation of the
East Clinton Street Bridge over Six Mile Creek, be approved in the
amount of $2,915.00.
Carried Unanimously
Bill from Modjeski and Masters
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That a bill from Modjeski and Masters for engineering services
in connection with the preparation of plans, specifications and bidding
documents for the rehabilitation of the East Clinton Street Bridge, be
approved in the amount of $8,750.46.
Discussion followed on the floor. 410
A vote on the resolution resulted as follows:
Carried Unanimously
City Engineer Cox announce hat East Clinton Street Bridge will be
closed June 2,.1980 for.approximately 85 days. Pedestrian traffic will'
be allowed at all times.
Bill from Modjeski and Masters
By Comm. Ditzell: Seconded by Comm. Cleveland
RESOLVED, That a payment request from Modjeski and Masters for
services performed through June 1, 1980, in connection with. the East
Clinton Street Bridge, be approved in the amount of $1,991.87.
Carried Unanimously
Bill- rlodjeski & Masters By Comm. Varricchio: Sec. by Comm. Ditzell
RESOLVED, That a bill from Modjeski & Masters for engineering services
in connection with the East Clinton Street Bridge, be approved in the
amount of $149.10. ��}_�l�,L�
Carried Unanimously
Bill Modjeski and Masters . .E.. Clinton Street Bridge
By Comm. Varricchio: Seconded by Comm. Walker 040
RESOLVED, That a bill from Modjeski and Masters for consulting
services in connection with the rehabilitation of the East Clinton
Street Bridge over Six Mile Creek, be approved in the amount of
$475.16.
Carried Unanimously
IP/ Bill--Modjeski and Masters
By Comm. Varricchio: Seconded by Comm. Schickel
RESOLVED, That a final bill from Modjeski and Fasters for services during the recon-
struction of the East Clinton Street Bridge, be approved in the amount of $542.69.
/L /j74' 49
Carri d Unanimously
_2_
Grocery Carts
Mayor Bordoni commented that a Fall Creek resident had called his
attention to the large number of grocery carts in Cascadilla and Fall
Creeks --32 which he could see. ,hy/ yL
Shopping Carts in Cascadilla and Fall Creeks ?-'13/r0
Alderman David Banfield reported that he had taken the shopping
cart recommendation to Common Council and that the matter had been
referred to the appropriate Committee. The Committee will check
into the shopping cart matter and report back to the Mayor.
•
•
-4 -
Adams Street Bridge rroblem
Phil Cox reported that several weeks ago the Mayor had directed that
the Engineering Division look into the possibility of a wheel chair
ramp at the Adams Street foot bridge. A preliminary design and cost
estimate has been completed on this project and the Mayor will be
advised of the costs in a memo.
A:danis 'Street' Foot Bridge 07*By Comm.. Varricch.io : Seconded by CoMm. Walker
RESOLVED, That the Superintendent be directed to proceed with. the
reconstruction of the approach to the Adam Street foot bridge over
Cascadilla Creek in the 1980 construction season using existing funds.
Carried Unanimously
Invoice - V. Giordano Construction & Supply Corp.
By Comm. Walsh: Seconded by Comm. Brown
RESOLVED, that an invoice of V. Giordano Construction & Supply Corp., for construc-
tion of a ramp on the east side of the Adams Street bridge over Cascadilla Creek be
approved for payment in the amount of $2,920.00. U/g/g°
Carried
•
-5-
Claim for Damage to Automobile
Gertrude Pete, 215 Elmira Road, addressed the Board, stating she
had hit a storm sewer with her car, causing extensive damage and
asking for reimbursement of same. She provided a diagram showing
the scene and location of the storm sewer, in addition to a
receipt for the damage to her car and description of same., Supt.
Dingman advised her to procure a claim form from the City Clerk's
Office and file with the insurance company representing the City.
Resolution
1 By Comm. Maclnnes: Seconded by C
RESOLVED, That the matter of the
Pete. be referred to .the Bridges,
•
omm. Schickel ?I13 Via.
storm sewer describe by Gertrude
Creeks and. Storm Drain Committee.
Carried Unanimously.
Storm Sewer
Comm. Ditzell reported that at the regular me
Mrs. Gertrude Pete. of 215 Elmira Road appeare
car caused by an improperly set storm sewer s
of Elmira Road and Meadow Street in the drive
Station.. The department, having determined th
dangerous,has'caused it to be repaired.
eting'on February 13 a
d to protest damage to her
tructure at the intersects
area of the Rotary Gas
at the storm sewer is -
,9 7/g0
Cfleg/GD //N /jN%�r1ouSLC
-6 -
Change Order #1 Les Strong, Inc.
By Comm. Ditzell: Seconded by Comm. Cleveland 4As-A0
IIIRESOLVED, That Change Order #1 from Les Strong, Inc. to rebuild the
abutment tops on the East Clinton Street Bridge be approved in the
amount of $500.00.
•
•
Carried Unanimously
Requisition #1 - Les Strong, Inc.
By Comm. Ditzell: Seconded by Comm. Cleveland
RESOLVED, That requisition #1 from Les Strong, Inc. for construction
services in connection with the East Clinton Bridge repairs,. be ,�,j,,
approved in the amount of $56,267.41.
30
Carried Unanimously
Requisition #'2 Le.s .Strong,' -Tnc.
By Comm. Varricchio: Seconded by Comm. Cleveland . .%f'/7/(0
RESOLVED, That requisition #22(final) from "Les" Strong, Inc.. for
• Clinton Street Bridge over Six Mile 'Creek, be approved in the amount
of $23,024.84.
Carried Unanimously
-7 -
By Comm. Walsh: Seconded by Comm. Walker
RESOLVED, that an invoice of the St. Lawrence
for the painting of the Stewart Avenue Bridge
in the amount of $26,600.00.
•
•
Steel Painting and Maintenance Company
over Fall Creek be approved for payment
Carried
•
•
•
E. Clinton St. Bridge - Request for payment - Modjeski & Masters 1
11 11
- Report of specifications (See Bids - pg. 1)
Grocery Carts - in Creeks - Referred to Common Council for action 2
Dredging of Lagoon - Not budgeted - Suggested for next budget process -(See Parks - pg.3)
Adams St. Bridge - Possibly of wheel chair ramp re cost estimate 4
G.Pete-215 Elmira Rd. -Claim for storm sewer damage to automobile 5
E. Clinton St. Bridge - Change Order /Requisitions - Les Strong, Inc. 6
Ithaca Center Development - Approval of resolutions on bridges, parking
spaces, storm drains on site and Home Dairy alley (See B/G-pgs. 30-30a)
Stewart Ave. Bridge over Fall Creek - Payment request - St. Lawrence Steel
Painting & Maintenance Co. 7
Adams St. Bridge - Payment request - V. Giordano Construction & Supply Corp. 4