HomeMy WebLinkAboutJ - 06(a) Resource Associates Recommendation for AwardRESOURCE RECEIVED DEC 1 9 2023 A S S O C I A T H S RECOMMENDATION FOR AWARD Gutchess Lumber Park Development - Phase 2 Construction of Concessions Building DATE: December 19, 2023 Pursuant to the public bidding process for the above project: 1. Bids were received and opened on December 18, 2023 2. Two (2) bids were received as described below: a. Complete Construction Conception, LLC i. Base bid ............................................. $190,000 ii. Option 1 Concrete floor ................................. $30,750 ... rrr. Option 2 Wall insulation .................................. $8,275 iv. Option 3 Ceiling and roof insulation ....................... $23,150 V. Option for metal roof................................... -$3,500 b. Economy Paving Co, Inc. i. Base bid ............................................. $280,000 ii. Option 1 Concrete floor ................................. $50,000 iii. Option 2 Wall insulation ................................. $30,000 iv. Option 3 Ceiling and roof insulation ....................... $40,000 3. BID DOCUMENT REVIEWS a. No discrepancies found in either bidders submittals. b. All bidding criteria were met. C. Both contractors qualifications meet minimums required. d. Bid Bond and Non- collusive statements were included e. Evidence of insurance included. 4. RECOMMENDATION a. Based on the above review it is recommended to make the award to: i. Complete Construction Concepts, LLC.. being the low bidder and meeting all bid requirements. b. The amount of the award is recommended to include Optionsl, 2, and 3 as stated above in the total amount of : i. Two hundred fifty two thousand, one hundred seventy-five dollars ($252,175) Respectfully submitted, Resources Associates � �; v i //r ' Charles R Feiszli, P.E. Page 1 of 1 GUTCHESS PARK CONCESSION BLDG Bidder Ad Ad Base 1 2 Bid Complete Construction Concepts X X $190,000 Economy Paving X X $280,000 BID SUMMARY -TOTAL Opt Opt Opt 1 2 3 Floor Insulation ceiling $30,750 $8,275 $23,150 $50,000 $30,000 $40,000 12/19/2023 Total Sub with all Work Contr options Non Bid Qual Comp act Bus Board WBE Securi State Resol MBE Coll ty ment Affid List Type (corp) INFO $252,175 x x x x x x $400,000 x x x x x x