September 20, 2023
Mr. Tom Williams, Supervisor
Town of Cortlandville
Raymond G. Thorpe Municipal Building
3577 Terrace Road
Cortland, New York 13045
RE: Extra Work Authorization No. 6- Additional Sampling during 2024 Post-Closure Monitoring for the
South Hill Dump Site
CHA Project No.: 034236; CHA Proposal No.: X85021
Dear Supervisor Williams,
CHA Consulting, Inc. (CHA) is pleased to submit this Extra Work Authorization (EWA) to provide professional
engineering services in connection with post-closure monitoring in accordance with the procedures and protocols
included in the approved revised SMP dated June 2021 and prepared by CHA.
As you are aware, NYSDEC has requested additional sampling for emerging contaminants in all eleven (11) of
the wells, as outlined in the Periodic Review Report (PRR) Response letter from the NYSDEC dated June 27,
2023. Based upon further correspondence with NYSDEC, it was agreed that NYSDEC would only require
additional sampling for emerging contaminants at five (5) of the monitoring wells, per their August 10, 2023
response letter.
Therefore, this extra work authorization provides for the additional sampling required during the 2024
groundwater monitoring event, and our Scope of Services, Schedule, and F ee are summarized in the following
section.
EXHIBIT A - SCOPE OF SERVICES
Task 1: Additional Sampling during 2024 Bi-Annual Groundwater Monitoring Event
Five (5) existing monitoring wells on the landfill site will be sampled for emerging contaminants include 1,4-
Dioxane via EPA Method 8270SIM and per- and polyfluoroalkyl substances (PFAS) via EPA Draft Method 1633.
The hydrasleeves installed at each monitoring well do not contain sufficient water to collect these additi onal
samples. CHA will utilize disposable PFAS-free bailers or a peristaltic pump with disposable high density
polyethylene tubing to purge and sample the requested wells for emerging contaminants.
The NYSDEC has requested samples collected from MW-1B, MW-4S, MW-4B, MW-3SR2, and MW-3BR2.
The results of the emerging contaminants sampling will be included in the 2024 Periodic Review Report.
Assumptions:
CHA offers the following assumptions relative to this Scope of Work. The assumptions are not intended to limit
our proposal but are provided to clarify our understanding of the work required.
Supervisor Williams Page 2 September 20, 2023
34236 EWA 6-Additional Sampling
• CHA will be granted free and easy access to the Site.
• Groundwater samples will be analyzed on a standard turn-around schedule which can be up to 60 days for
PFAS compounds depending on laboratory availability.
• The additional sampling will occur during our scheduled 2024 annual inspection and bi-annual
groundwater monitoring event, as outlined in EWA #5 dated 9/9/2022.
EXHIBIT B - SCHEDULE
CHA will perform the additional groundwater sampling during the September 2024 event.
EXHIBIT C – FEES
CHA proposes to be compensated for the lump sum fees as shown below:
Task 1: Additional Sampling during 2024 Bi-Annual Groundwater Monitoring Event..............$ 4,500.00
Prior to the start o f any new work or additional work that may be required for the completion of this project, CHA
will identify a scope of services with associated tasks and submit a cost estimate and proposed work schedule for
your approval. CHA will not complete the additional work until a signed extra work authorization is received by
our office.
Upon review and acceptance of the proposal, please sign and return a fully executed agreement. Please note that
the exhibits in the proposal correspond to the exhibits in the agreement.
We appreciate the opportunity to continue to provide the Town of Cortlandville these services. If you should have
any questions, please do not hesitate to contact me.
Sincerely,
Laura C. Cassalia, P.E.
Senior Project Manager
KE/
Date: September 20, 2023
Project No. 34236
Extra Work No. 6
EXTRA WORK AUTHORIZATION
In accordance with the written Municipal Consulting Agreement, dated January 1, 2023, between the parties
designated below for:
THE PROJECT: South Hill Dump Cortlandville – 2024 Additional Environmental Services
THE CLIENT: Town of Cortlandville
hereby authorizes the Engineer to proceed with additional services as f ollows:
SCOPE OF SERVICES:
See attached EWA 6, CHA Proposal No.: X85021, dated 9/20/2023
SCHEDULE:
See attached EWA 6, CHA Proposal No.: X85021, dated 9/20/2023
FEE:
See attached EWA 6, CHA Proposal No.: X85021, dated 9/20/2023
Upon return of a fully-executed authorization, this Supplement shall become a part of the Agreement
identified above.
APPROVED BY: ENGINEER APPROVED BY: CLIENT
NAME: Laura C. Cassalia, P.E. NAME:
SIGNATURE:
SIGNATURE:
TITLE: Senior Project Manager TITLE:
DATE: 9/20/2023 DATE: