Loading...
HomeMy WebLinkAboutMN-IURACDC-1979-05-09 ( • ITHACA URBAN RENEWAL AGENCY NOTICE OF MEETING The special meeting of the IURA will be held May 9, 1979 at 3:30 p.m. in the Mayor's Conference Room. AGENDA • 1 . Neighborhood Improvement proposals 2. Parks Contract with Robert Leathers Olt • May 9, 1979 ' APPENDIX A SCOPE OF SERVICES: I. Project Narrative: Park improvements are to take place in the neighborhood parks, Wood St. Park and Conway Park. Wood St. Park has a play structure for younger children and ball fields. this project would be to complete the park for use by older youth and the elderly. This will include basketball court, possibly a skating area, landscaping, walkways and park furniture. Earthwork to alleviate the high groundwater problems is required for major portions of the site., The consultant is responsible for the final design, preparation of the specifications and supervision of the construction of these features. Conway Park has a ball field and basketball court, but no equipment for the younger children in the area. This project would provide a play structure for this age group and landscaping. The consultant is responsible for developing alternative design and site plans and final design plans, preparing the specifications and acting as construction superintendent for the play structure. II. Evaluation: The consultant will provide opportunity for community input on the design plans. The consultant will provide the IURA/CDA with preliminary and final design plans according to the following schedule: CONTRACT APPROVAL - IURA/CDA May 9 1979 PRELIMINARY DESIGN APPROVAL -Planning & Devel . June 10, 1979 DESIGN REVIEW - Community Meeting June 13, 1979'(Approx) WORKING DRAWINGS (Final Design) - IURA/CDA June 18, 1979 BIDDING FOR WOOD ST. GRADING - BPW • START CONSTRUCTION July 1 , 1979 FINISH CONSTRUCTION October 1 , 1979 4 f III. Budget: Preliminary Breakdown of Costs (All Costs Assume 4 Learning Web Workers Full Time) A. Wood Street Park Sub-Contract Work Basketball Area: (including 12" gravel) Grading for Basketball (4,000 sq. ft. @ .80) . 3,200 Asphalt - Basketball Area (4,000 sq. ft. @ 1.20) 4,800 Basketball Backstops (2 at 450) 900 Concrete 100 Total Basketball $9,000 Grading/Fill : Fill (250 w.yds. at $6) 1 ,500 Grading 500 Seeding 300 Temporary Fencing 300 Total Grading/Fill $2,600 TOTAL: Sub-Contract $11 ,600 Consultant Work Materials: Pressure Treated Lumber (1 ,000 B.F.) 500: ( Utility Poles 100 Misc. Connectors 100 Trees (8 at $1 .50) 1 ,200 Shrubs (20 at $50) 1 ,000 TOTAL Materials $2,900 Labor Design Development Drawings (30hrs @ $18/hr) 540 Working Drawings (50hrs @ 18/hr) 900 On Site Construction - Superintendent (80hrs @ $18/hr) 1 ,440 - Carpenter (70hrs @ $8/hr) 560 TOTAL Labor $3,440 TOTAL Consultant $6,340 TOTAL LABOR & MATERIALS 17,940 10% CONTINGENCY 1 ,790 Ar TOTAL PROJECT COST $19,730 TOTAL CONSULTANT COST (Includes Contingency) $ 8,130 I •• ;r B. Conway Park Materials - Play Equipment Pressure Treated Lumber (4,500 B.F. @ .50) $2,250 Metal (Slide, etc. ) 120 Tire Swing 240 Utility Poles (500 L.F. 1 .40) 150 R.R. Ties (40 at $12) 480 Gravel (40 w. yds. @ 5.00) 200 Plywood 50 Concrete 80 Connectors (Lags, Nails) 100 TOTAL Materials/ Play Equipment $4,420 Materials - Landscaping Fencing (1 ,000 B.F. @ .50) 500 Benches,Tables (800 B.F. @ .50) 400 Trees (6 @ $150) 900 Shrubs (10 @ $50) 500 Misc. 200 TOTAL Materials/ Landscaping $2,500 Labor Design Development Drawings (40hrs @ $18/hr) 720 Working Drawings (40 hrs @ $10/hr) 720 On Site Construction - Superintendent (150hrs @ $18/hr) 2,700 - Carpenter (200hrs @ $8/hr) 1 ,600 TOTAL Labor $5,740 TOTAL MATERIALS & LABOR 12,660 • 15% CONTINGENCY 1 ,900 TOTAL PROJECT COST $14,560 TOTAL CONSULTANT COSTS FOR BOTH WOOD ST. AND CONWAY PARKS $22,690 fi WHEREAS, the Small Cities program has been approved by HUD, and WHEREAS, a budget of $20,000 each for the Wood Street and Conway Parks is included in the 1st year Small Cities and WHEREAS, improvement of these parks in the 1979 construction season is desired, and WHEREAS, the funds have to be spent in the fiscal year, L��1 'e THEREFORE, be it resolved that the IURA o a contract with Bob Leathers to design, prepare specifications, supervise the construction of Wood Street and Conway Parks. # a t ITHACA URBAN RENEWAL AGENCY NOTICE OF MEETING The special meeting of the IURA will be held May 9, 1979 at 3:30 p.m. in the Mayor's Conference Room. AGENDA 1. Neighborhood Improvement proposals 2. Parks Contract with Robert Leathers • IL• May 9, 1979 pfd 58/7/9 NEIGBORHOOD TECHNICAL ASSISTANTS , JOB DESCRIPTIONS Responsible for providing technical assistance to residents in the Northside and Southside neighborhoods, under the direction of the Director of Planning and Development. This assistance includes: organizing civic associations, a merchant's association on West State Street, and an overall community organization; increasing the citizen input into the Community Development process; developing information linkages with public and private agencies providing services in the area; and assisting residents in developing block by block strategies for neighborhood revitalization. TRAINING AND EXPERIENCE Candidate should have at least a year's experience in community organ- izing and/or social services outreach work. r. • APPENDIX A SCOPE OF SERVICES: I. Project Narrative: Park improvements are to take place in the neighborhood parks, Wood St. Park and Conway Park. Wood St. Park has a play structure for younger children and ball fields. This, project would be to complete the park for use by older youth and the elderly. This will include basketball court, possibly a skating area, landscaping, walkways and park furniture. Earthwork to alleviate the high groundwater problems is required for major portions of the site. The consultant is responsible for the final design, preparation of the specifications and supervision of the construction of these features. Conway Park has a ball field and basketball court, but no equipment for the younger children in the area. This project would provide a play structure for this age group and landscaping. The consultant is responsible for developing alternative design and site plans and final design plans, preparing the specifications and acting as construction superintendent for the play structure. • II. Evaluation: The consultant will provide opportunity for community input on the design plans. The consultant will provide the IURA/CDA with preliminary and final design plans according to the following schedule: CONTRACT APPROVAL - IURA/CDA May9 1979 PRELIMINARY DESIGN APPROVAL -Planning & Devel . June 10, 1979 DESIGN REVIEW - Community Meeting June 13, 1979'(Approx) • WORKING DRAWINGS (Final Design) - IURA/CDA June 18, 1979 BIDDING FOR WOOD ST. GRADING - BPW START CONSTRUCTION July 1 , 1979 FINISH CONSTRUCTION October 1 , 1979 • III. Budget: Preliminary Breakdown of Costs (All Costs Assume 4 Learning Web Workers Full Time) A. Wood Street Park Sub-Contract Work Basketball Area: (including 12" gravel) Grading for Basketball (4,000 sq. ft. @ .80) 3,200 . Asphalt - Basketball Area (4,000 sq. ft. @ 1 .20) 4,800 Basketball Backstops (2 at 450) 900 Concrete 100 Total Basketball $9,000 . .Grading/Fill : Fill (250 w.yds. at $6) 1 ,500 Grading 500 Seeding 300 Temporary Fencing 300 Total Grading/Fill $2,600 TOTAL: Sub-Contract $11 ,600 Consultant Work Materials: Pressure Treated Lumber (1 ,000 B.F.) 500 Utility Poles 100 s Misc. Connectors 100 Trees (8 at $1 .50) 1 ,200 Shrubs (20 at $50) 1,000 • TOTAL Materials $2,900 Labor Design Development Drawings (30hrs @ $18/hr) 540 Working Drawings (50hrs @ 18/hr) 900 On Site Construction ' V - Superintendent (80hrs @ $18/hr) 1 ,440 - Carpenter (70hrs @ $8/hr) 560 TOTAL Labor $3,440 TOTAL Consultant $6,340 TOTAL LABOR & MATERIALS 17,940 10% CONTINGENCY 1,790 TOTAL PROJECT COST $19,730 • TOTAL CONSULTANT COST (Includes Contingency) $ 8,130 ir B. Conway Park Materials - Play Equipment Pressure Treated Lumber (4,500 B.F. @ .50) $2,250 Metal (Slide, etc. ) 120 Tire Swing 240 Utility Poles (500 L.F. 1 .40) 150 R.R. Ties (40 at $12) 480 Gravel (40 w. yds. @ 5.00) 200 • Plywood 50 Concrete 80 Connectors (Lags, Nails) 100 TOTAL Materials/ Play Equipment $4,420 Materials - Landscaping Fencing (1 ,000 B.F. @ .50) 500 Benches,Tables (800 B.F. @ .50) 400 Trees (6 @ $150) 900 Shrubs (10 @ $50) 500 Misc. 200 • TOTAL Materials/ Landscaping $2,500 . Labor • • Design Development Drawings (40hrs @ $18/hr) 720 Working Drawings (40 hrs @ $10/hr) 720 On Site Construction - Superintendent (150hrs @ $18/hr) 2,700 - Carpenter (200hrs @ $8/hr) 1 ,600 TOTAL Labor $5,740 TOTAL MATERIALS & LABOR 12,660 • 15% CONTINGENCY 1 ,900 TOTAL PROJECT COST $14,560 • TOTAL CONSULTANT COSTS FOR BOTH WOOD ST. AND CONWAY PARKS $22,690 • Z.0'S56'L O'9ti6 98'TI5 TT'6T5 8 $ 1:0 8L/S/5-00'LL6'6 $ 'TAM S �:• -- IZ'ZSt'9 — 00'008'9 $ N 8L/9/6-00'008'9 $ '-i %S SOZ OE'688'Z- 00'L£.0`£ $ 2I 8L OZ ?.-00'LEO E $ '.I ST S_ ':161 00'8TS'T 00'ZT D 8L/9T/T-00'0£S'I $ (alOU `38I 00 86Z £ $ _ 21 LL/6/TT-00 86Z E $ 2AOZ %E 'aLI xagot00 TTn3 00'Z£Z'Z $ U LL/6/0T-00'Z£Z'Z $ '."0Z %S '39T' IT piad uPOU TO'tZt'T V S8T'Z 98'0Z 00'SZS'I $ 21/0 LL/ET/6-00'TEL'E $ '1KSI (6E 'ZSTI t ' auattbuTlap 8L'806'1 00'80I'Z $ 21 LL/£T/6-00'80T'Z S 'J AE %E 'HVE st. uoui ET'OL6't ZE'SZE'9 [ SO'L08 E9'Z9t'S 21/0 LL/T/8-00'S6S'ZT$ 'a/COZ oS 'aEII '/AST %S 'AZT; V89116 Z6VIL OS' 00`£L6 6 $ 2170 LL/6/TT-Z6 889 OT$ EO'9L8'TT 86'OTT 8L•SZ i�L'TS£'ZT$ d/0 LL/L/ZI-00'88fi�'ZI$ 'JicOZ %S 'aIT I 00'L96'91$ 9S'6TL'ZT ZS'898'E 8t0901 00'SL6'£+ �[uPq ��3 00'Z66'ZTS • 21/0 LL/T/8-00'Z66'Z1$ '.AOZ %E 'SOT' k d ZZ'TTZ'T 00'005'T $ 21 LL/I/8-00'00S'I $ '1i9 %;18 'S6 LE'L88'E 00'6Eb'I S 21 LL/T/8-00'6E17'I7 $ '.1c0Z %E ,' 38 I Z6'LSL 00'000'T $ U LL/T/8-00'000'I $ '1A9 %4 L • OT'E88'b . 00'8LT'S $ H LL/6/0I-00'8LT'S $ '/A8I %E ;29 OT'OLV'Z 00'£8L'Z $ 2I LL/T/8-00'£8CZ $ '1AOT %S i i':'s I - 99'69Z'6 OS'L9S'6 $ U LL/OE/9-OS'L9S'6 $ 'JA07. % 'St pO}.1azxp lou •aE ■ ST't86 05'6EZ'T $ 21 LL/Z/S-OS'6£Z'T S 'JAM %£ 'SZ S6'f'ZS'L 00'666'L S 2i LL/E/S-00'666'L $ 'JAW % '.aT 44 * J I MJ3 cONEIVI S;4U X 1d hYJLJS 1 MU Area . SNHWAVdad Ln D LL iU 'HA % 71WN # ' NACU NI 'MOO OO SONV'1VU SINOU UL SSS23 X 1d 'JLAW NVOU SW2iaL NV( I rTT# . ,,TT*F 79m o, %-lptf r ' •J O �I . . . ! CxNr. AMT. TRANS. #114 #113 col 3AN TERMS L0AN AMT. PROGRESS TO MANS BALANCE CONT.. IN LOAN # r NAME % YR. DATE XM. REPAYMENT RECEIVABIS ESCROW PROGRESS BALANCE C:ONMENrS • ?E 5% 2. . $ 7,850.00-5 5/78 R $ 7,850.00 7 .72 6. 3E 5% Syr. $ 2,214.00-5/31/78 R $ 2,214.00 1,184.95 tE 3% igyr; $11,972.00-5/31/78 C/R $ 5,606.00 3,168.93 3,197.07 5,575.98 iE 3% 30yr. $10,300.00-5/31/78 R $10,300.00 10,172.76 iE 5% 20yr. $ 6,340.00-5/31/78 C/R $ 5,901.87 359.97 , 78.16 5,884.62 4 months nE , 81/2% 5yr. $ 1,630.00-7/24/78 R $ 1,630.00 1,608.05 delinquent $30,750.00-7/24/78 $30,750 paid it 03 81%10yr. $ 2,522.00-1/25/79 C/R $32,874.50 397.50 -0- 2,124.50 full 3/6 )E 5% 15yr. $ 6,052.00-7/24/78 C/R 5,605.55 446.45 -0- 5,547.09 )E 5% 25yr., $15,107.00-7/24/78 C/R $12,692.00 279.67 2,135.33 12,555.17 _E 3% 25yr. $ 7,750.00-1/3/79 • C 5,302.89 2,447.11 ?E 5% 20yr. $ 9,360.00-12/7/78 C 2,278.24 7,081.76 1$ )E � 20yr. 1 .$ 4,575.00-2/5/79 C 3,017.58 1,557.42 GE 5% 20yr. $12,082.00-1/25/79 C 4,519.50 7,562.50 iE 5% 20yr. $ 7,560.00-1/25/79 C 4,361.29 3,198.71 iE 5% 20yr. $13,087.00-1/25/79 C 699.50 12,387.50 'E. 3% 30yr. $15,097.00-1/25/79 C/R $ 3,242.46 11,854.54 -0- 3,186.86 _ E. 5% 20yr. $16,102.00-1/25/79 C 5,931.16 ,10,170.84 )E. L5% l5yr. $10,350.00-3/5/79, 5% l0yr. $ 3,540.00-3/5/79 C 3,463.23 _ 76.77 )S. C 10,338.00 12.00 _S. 5% 20yr. $ 4,462.00-3/5/79 C 4,450.00 12.00 $317,859.42 $189,920.86 .62,352.98 565,585.58 $149,541.9c A I B + C f D rr`r MINUTES IURA/CDA May 21 , 1979 PRESENT: Edward J. Conley, Mayor, Chairman IURA/CDA Anne Jones, IURA/CDA Stuart Stein, IURA/CDA ALSO: Ron Osher, 312 Program Sharon Brown, 312 Program Tom Hoard, 312 Program Amy South, CD Staff Roz Williams, CD Staff Kathe Evans, CD Staff Thys Van Cort, Planning Art Pearce, INHS Press The meeting was called to order at 4:00 P.M. I. Approval of Minutes 4E' Stein MOVED to approve the minutes of the Jan. 15, 1979 and April 25, 1979, regular meetings and the special meeting held May 9, 1979. Jones SECONDED and the MOTION PASSED unanimously. II. Small Cities - 2nd year application: Williams explained that the 2nd year application was the same as the original 3 year Small Cities Application. It includes INHS rehabili-- tation services, rehabilitation loans and grants, 312 administration, neighborhood improvements, mini-repair program, West State Street renovation,and rehabilitation of GIAC. She said that the application had to be in by June 29th and that due to the late notice given by HUD of the deadline, R. Augenstern of STERB had speeded up the A-95 review. Van Cort has drafted a letter to HUD from the Mayor complaining about the short notice and said other communities have had the same problem. Stein asked if there is anything in this year's contingency that deals with the possibility of buying school [buildings and Williams said no but that this subject is being considered and discussed with developers. Conley said he would like to take a look at federally funded projects that will later entail long term City maintenance. He specified the swimming pool project and asked if it might be possible to have the school system operate the pool if the City built it with C.D. funds. MINUTES IURA/CDA May 21 , 1979 Page 2 - Schedule: Evans reminded IURA/CDA members of the upcoming public hearings: Tuesday, May 29, at 7:30 in the Cooperative Extension Building. (This is also a CAC meeting where the performance of both the Entitlement and Small Cities Program will be discussed) . The second public hearing is on Thursday, May 31 , at 7:d0 in Common Council Chambers co-hosted by Common Council and IURA/CDA, where Council will vote on the application. Conley mentioned that Council was upset about the special meeting but understood it could not be helped because of the late notice of the application deadline. Evans has sent Council members rough drafts of the 2nd year application for review before the meetings. III. Contracts - RPPW Retainer: Van Cort recommended that the IURA renew the contract with Raymond, Parish Pine and Weiner and stressed the help that Nat Parish had been during the IC drafting of the original application. Conley mentioned the help given with the UDAG application when Parish joined them at a meeting in New York City. Stein asked about the method of payment under this contract. Van Cort said the IURA/CDA would be billed for time and materials up to an upset and that Parish was in the process of sending a new fee schedule. He said that in any case the Mayor could not sign the contract without approval of the City Attorney. Jones asked what the upset on the contract had been. Van Cort said that last time it had been $5000. Jones asked if the money came from CD funds and Van Cort said yes, from Small Cities Adminsitration. Stein said it appeared that the contract specified higher charges than Van Cort claimed and Van Cort said he would check past bills. Stein stressed he did not think the charges were high for the services. Jones MOVED to renew the IURA/CDA contract with RPPW not to exceed $5000 and upon approval of the City Attorney. Stein SECONDED and MOTION PASSED unanimously. /' • MINUTES 4 ` IURA/CDA May 21 , 1979 Page 3 - 1st Baptish Church Williams introduced a memo from Jon Meigs in which he states that al- though the status of litigation between the ACLU and HUD (regarding separation between Church and State) remains the same, he requests that IURA/CDA sign a contract with the 1st Baptish Church in preparation of settlement of the case. He has written HUD asking that the 1st Baptist Church and the A.M.E. Zion Church be recognized as historic landmarks rather than religious buildings. Conley suggested the contract be signed as the IURA/CDA has already agreed to do the work. Stein asked if there was a contingency clause whereby the City would not be responsible for the money if the case was settled against the churches. Williams said this can be included in the contract. Van Cort suggested a clause saying that the contract does not go into effect until the legal questions regarding it are resolved to allow the City to use CD funds for restoration of Church property. Stein MOVED to approve the resolution with the above contingency clause, Jones SECONDED and the MOTION was unanimously PASSED. IV. Neighborhood Technicians Williams introduced a resolution that the IURA/CDA authorize the Mayor to sign a contract with INHS to operate the Neighborhood Technicai- Assistance program. Pearce said that since the public hearings a year ago, the INHS has rea- lized that it is more desirable to run the program from their headquarters on Green Street and stressed the importance of working closely with neigh- borhood residents. Conley agreed that he thought this would be a good alternative. Pearce said he prefers beginning with one long term (18 months) tech- nician and bring on another employee when necessary. The contract will use 5th year entitlement funds. Pearce is confident that the INHS Board of Directors will approve the proposal . Jones asked what happened to the re-definition of the job descriptions. • MINUTES IURA/CDA May 21 , 1979 Page 4 South said this was now delegated to Pearce but added that she feels that the project summary as presented today accurately represents the redefini- tion of the job description. Van Cort said HUD and the Urban Reinvestment Taskforce recommend the addition of Neighborhood Technicians to round out the INHS program. Stein MOVED to approve the contract. Jones SECONDED but asked what the mechanism was for post evaluation of the technic n's work. Pearce said that success will be measured in terms of growth and opera- tion of block and merchant associations. Jones asked if INHS could make a report in six months to the IURA/CDA. Pearce said that INHS already reports periodically to the IURA/CDA and that the addition of this program would not be a problem. Jones asked that a clause be included in the contract to include periodic reports. , A vote was taken and MOTION PASSED unanimously. V. Reprogramming and Revisions - Parallel Use: Williams discussed a letter to James Sweeney and the Appendix A to the application presenting the technical assistance project of the INHS. She said that the parallel use proposal ($30,000) had been re-programmed, $20,000 to Contingency, and $10,000 to the Citywide Materials Grant. The Land Bank part of the House Recylcling line has been dropped due to HUD criticism of inability to calculate low income benefit. She mentioned that she had tried to reprogram in areas that could later be reapplied to Parallel Use Projects. Jones asked when the money for parallel use would be available. Williams answered that after HUD approval of the 5th year application, the 10% contingency provision will be in effect and the IURA/CDA can reprogram locally. (The 10% contingency is $20,000) . The remaining $10,000 could be available through reproamming which would take about 50 days. Stein asked if the resolution to reprogram has to go before the CAC or Common Council . Williams said no because it is not a new activity. MINUTES IURA/CDA May 21 , 1979 Page 5 Conley suggested that as part of the resolution that CAC and Common Council be informed of the reprogramming and revisions at their next meeting and that an explanation for the changes be included. Jones MOVED to pass the resolution with the above provision, Stein SECONDED and MOTION PASSED unanimously. • - Land Banking: Williams suggested returning the proceeds of the sale of 213 South Plain St. ($22,735) to the INHS Land-Banking Contract or INHS Rehab loans. Conley stated that the intention of this would be to use the money for House Recycling. Stein MOVED to vote on the principle of the motion with intention to invest the money to earn interest (savings account) and to keep it in housing rehab and resell under the loans line. The details of wording would be left with the staff. Jones SECONDED and MOTION PASSED. 4 VI. Reports - 312 Van Cort said that Thomas Hoard had reported about the progress of the 312 program to the Planning Department as required by his contract. Hoard said that Ron Osher and Sharon Brown had been busy setting up the 312 program but that additional funds are required for architectural and legal assistance. H e said that the City Attorney did not have the time to devote to the programs needs and that the appraisal fees have doubled since the program had initially been discussed. With regards to archi- tectural fees, Hoard said that some of the costs can be passed to the borrower but that in the case of low income persons, fees must be absorbed by the program. Conley asked if the program was financially secure for the moment. Hoard said that the lack of an attorney is holding up their program. Van Cort recommended that Hoard be authorized to make claims on the funds. Stein preferred making a nominal decision at present to get the program started. He asked where the money would be coming from. Williams said it would come from Small Cities Administration funds. Conley asked how much money would be needed immediately. ti C MINUTES IURA/CDA May 21 , 1979 Page 6 Van Cort suggested an initial $2000 to cover an attorney's contract. Stein MOVED to allocate $2000 immediately for an initial retainer fee. A proposed budget for additional funds will be brought before the IURA/CDA at the next meeting. The meeting adjourned at 5:30 and the IURA/CDA went into Executive Session. 4[ MEMORANDUM TO: IURA/CDA FROM: Jon Meig SUBJECT: CD Histo c Preservation Grants Update DATE: May 21 , 1979 Two of our projects - St. James and 1st Baptist -. have been held up by HUD because they involve questions around the constitutional separations between church and state. The ACLU has challenged HUD on some midwestern city's CD project, and HUD Washington's lawyers are preparing an opinion which may satisfy the ACLU, but the whole question may have to be resolved by the Supreme Court before such projects can proceed. I have no indication when the solicitor's opinion can be expected, though I have explained the problem and its urgency to a number of people in the preservation hierarchy in hopes that they might be able to exert a little friendly persuasion on their HUD colleagues, Both churches are aware of the problem, and on Buffalo's suggestion are providing me with letters expressing the urgency of their need, which I will forward in further support of a request for timely action by HUD. . Pf • o+ � v'v£/ . v1rrir.�cru� t"' •e�' Lam` si CITY OF IiI- r CA • 108 EAST GREEN STREET ITHACA, NEW YORK 1'lCE0 TELEPHONE: 272-1713 • CITY PLANNING & DEVELOPMENT BOARD - CODE 607 May 14, 1979 James Sweeney . - . Deputy Regional Adm. HUD Buffalo Area Office Suite 800, Statler Bldg. Buffalo, New York 14202 ATTENTION: Anna Walker Dear Mr. Sweeney, In response to our conversation, enclosed are the parts of the 5th year - application that we discussed requiring changes: INHS Services and Neighborhood Technical Assistance. The information included on the Project Sheet for neighborhood technicians has been retyped as an attachment. In addition, we took full credit for low income benefit for INNS services. After considering the nature of your problem with the Land Bank and Parallel use proposal , we have decided that our only alternative is to reprogram Parallel uses and drop the Land Bank part of the House Recycling . line. We therefore proposed to reprogram parallel use .($30,000) to: - Contingency ($20,000) • Citywide Materials Grant ($10,000) We have had several agencies express interest in "parallel use" in the Central School (target area school on Buffalo and Albany Streets) : • They are INHS and Infant Care and Resource Center, and a Senior Citizens Center. On the other hand, we can't guarantee at this time that they will be the ones that actually qualify for the grants. We still believe the "parallel use proposals" as outlined in the application is a useful and valuable tool in preserving neighborhoods. • lc ) • James Sweeney May 14, 1979 page two Since the Citywide Materials Grant program is presently under review and has been discussed at public hearings during the 4th application process, we will send you the reprogramming after the Ithaca Urban Renewal meeting on Monday, May 21 , 1979. If you have any questions about any of the above, please contact us. Sincerely, Rosalind Williams City Planner • • • RW:ndc Encl. -*T- } • 1 OMB Approval No.29-R0218 • APPLY, a. NUMBER 3, STATE a. 110M9ER FE t%I:RAl. ASSISTANCE 2. APPUCA- " A CANTS VON 1.,•TY►l CANT'S PP.EAPPLICATI 74 APPU• a. DATE IDENTI• b. DATE Year'.ronth day A t J .}'•or "Sub d{rp ACllhp t-I APPLICATION CATION 19/y fLF FIER ASSIGNED 19 tA/a.l , n NOTIFICATION OF INTENT (Opt.) J:ro.. • Ilrbo) I REPORT OF FEDERAL ACTION Bank t LEGAL APPLICANT/RECIPIENT 5. FEDERAL EMPLOYER IDENTIFICATION NO. •• ApDtuetrl pi.," • City of Ithaca - I. Oqaels.I;..nUnit : City of Ithaca Urban Renewal Agency 6, (� ' e. Strout/P.0. pan : 108 E. Green Street PRO- a. NUMBER GRAM •b.TITLE d • • "`' Ithaca cauat7 : Tompkins (Front IL State : New York g•ZIP rod.: 14850 . Federal • b. `enta`I r".. (Nam Rosalind Williams (607-272-1713) ' Catalog) 1 7. TITLI AND DESCRIPTION OF APPLICANTS PROJECT 8. TYPE OF APPLICANT/RECIPIENT E City 'It Ithaca 5th yr• entitlement grant program -eta:• R-Commar:it,-A..iaw*PM including citywide housing rehabilitation, public B-Intetalat. )-ndaerEd_cs:ionallns:l:utien 9 Yw g asp'J i K Dino"(SE rtly): E facil it.ies rehabilitation, homeownership subsidy, `hay hand i( ,lpped accessabi l i ty educational program and 05 i1 p istrict survey of needs , code enforcement and payment of Dn rlct Enter appropriate letter non--federal share for an industrial park. 9. TYPE OF ASSISTANCE A-Basic Grant D-Insurance B-S,uppl•mantal Grant (-Other Ewte?omen.- r Giwn print.lett.rlaJ 1 IA 1 10. AREA 1)1 PROJECT IMPACT (Mims of cilia,counting. 11. ESTIMATED NUM- 12. TYPE OF APPLICATION I. City o f Ithaca Slats,.at..) DER OFF PE SONS A-Ne.r C-Resimlcn E-Au[mentatioe B-Renewal D-Continuatica F-'T 28,000 Eater appropriate letter lye t 13. )•thIIOSED FUNDING 14. CONGRESSIONAL DISTRICTS OF: '15. TYPE OF CHANGE (For Etc or tt.) 4.•--��Dollars. a. FEDER41 1244,860 .00 a. APPLICANT 27 b. PROJECT 27 8-IDe�:rsase Dollars f-0tber (SpseifY)t C-Inneasa ion b. APPLICANT .00 -0 Detreas.D D ration . c. STATE DD lei PROJE T START 17. PROJECT E-Cnncallation DATE afar montA day DURATION Enter ePDre• R. LOCAL CO 19 /9 6 1 1 2 le,ntA. print.letter(e) �� ,.•OTHER .60 18. ESTIMATED DATE TO 3 !• month day 19. EXISTING FEDERAL IDENTIFICATION NUMBER • CE SUCluITTED TO L. TOTAL / .OD l FEDERAL AGENCY - 19 79 �`` -q 3600105 t 20. FEDts:AtAGENCY TO RECEIVE REQUEST (tiams,City.State.ZIP codr) Dept 01 �IDUS'ifI � 21. REMARKS ADDED 1 Urban Development, Buffalo Area Office, Buffalo, N.Y. 14202 ❑ Yes ❑ he 22- a. To the best of my knowledge and Dslief, b. If r.guirad by OIAd Grater l.-95 this a;D!iat.on was submitt.d. pursuant to in- No re- Rr.pone. • data In this praap:6ca!icn/applioation a,. e:rudrons tbarain, tat appropriate dearinghouies and all responses at. atta:hed: span.. ntiodsed - THE true and correct, the dowmeat has been APPLICANT dal, a athor;met b, It. gas.r°ine bad„ a< Southern Tier East Regional ❑ ❑ CERTIFIES the applicant and the apchant "'II eonF!t (1) ❑ ❑ THAT. With the attached assumes* If tb. assist- ance c,Plannina Dev. Board, Binghamton b 'ppr°`` (3)N.Y.S. Clearinghouse, Albany ❑ 0 23. a. TYPED NAME AND TITLE pH:MAT:PRE---' nom- / �,/J C. DATE SIGNED CERTIFYt\.:: / �,!(`/--- L (/j/i•- /ear wrath toy • REPRE• Edward J. Conley �`r 1979 5 14 SENTATI'.t' ( triaymr 1p'1 (, .• c 24.AGLI. NAME G 2TION 5. APPLICA• Year snewtJa day RECEIVED 19 26 OR:.ANI;ATIONAL UNIT 27. ADMINISTRATIVE OFFICE • 20. FEDERAL APPLICATION tS LDENTIFrCATION 29 ADOR&Ng 30. FEDERAL GRANT • IDENTIFICATION 31. ACTT,? TAKEN 32 FUNDING Tsar month day 33. Tear. >tsostJ. day gSTARTING ❑ a. AA AC:t D a. FEDERAL S .00 33. ACTION DATE P. 19 DATE 19 Ft ❑ b. RLJt:11.D b. APPLICANT 1 .00 35. CONTACT FOR ADDITIONAL INFORMA. 35. Year month. day TION (Nam. and te.e.Hone number) ENDING ❑ e. ET:c%I D FOR c. STATE .00 DATE 19 A1:A.•u(M 4. LOCAL .00 37. REMARKS ADDED f 6 ❑4. 011:44111 e. OTHER .00 tt ❑ e. •"0:,.:%AM71 F. TOTAL 1 S .00 ❑ Yes nne 3.11. a. In take( above act..n, any comm.nts rec.rred tram clearinghouses seem con- b. FEDERAL AGENCY A-9S OFFICIAL FEDERAL ♦; *Meted. II werg mponss is tea until prov.sr.na et Part 1.005 C■rcuiar A-95, (Nam•bad telepAona wo.) •t NCY It has been at a Nisei scads. A-9S AZI is Y 424-101 STANDARD FORM 424 PAGE 1 (10-75) Ytsatrsled by GSA.Federal Monaasesent Circular 74-7 It Form Approved ' OMB No.63-81619 US.DEPARTMENT OF HOUSING AND URBAN VELOPMENT I. NAME OF APPLICANT ANNUAL COMMUNITY DEVELOPMENT PRO G�A!!A �tk i-VAI _� — _ _ 2. APPLICATION/ZG fAf. UMBER PROJECT SUMMARY • - $ ,I , 3. PERIOD OF APPLICABILITY �__ 4. 0 ORIGINAL teach year) -- __ FROM TO 0 REVISION,DATED - June I , 1979 May 31 , 1980 ro AMENDMENT,DATED y 14, 1979 S. NAME OF PROJECT 6.PROJECT NUMBER I 7.ENVIRONMENTAL REVIEW STATUS ------ _Citywide Materials Grant Pro II 502 • • . 1 - 8. ENTITY WITH RESPONSIBILITY FOR CARRYING OUT THE PROJECT COnOii 9. TELEPHONE NUMBER Ithaca Npighborthood Housing Services (INHS)Opport. 1277-4500(INHS)/ 273-881 (EOC) 10. OESCRIPTION OF PROJECT Corp. (EOC) The Citywide Materials Grant Program will make grants to low income homeowner and renters up to $1 ,000 to be used for material and speciality labor (plumbe s, . electricians) in conjunction with two free labor programs that already operat in the City. These two programs are CHORES a Community Service Administratio (CSA) program under the Economic Opportunity Corp. of Tompkins County and a CETA crew operated by Ithaca Neighborhood Housing Services. They will screen applicants to meet their respective low income requirements (INHS- 125% of poverty and CHORES - 200% of poverty) . The average grants are expected to be '. around $300. The work Check if continued on additional page(s)and attach. tja 11C1,CENSUS TeACT(S1/ENUMERATION DISTRICTS) Cltr lit :2. ANTICIPATED ACCOMPLISHMENTS The grants are intended to meet the needs of property owners and renters in the City who do not have the financial capacity to make any monthly payments ' • . on a rehabilitation loan. Approximately 72 households could be served under .'2 F this program. . P - 0 Check if continued on additional pages)and attach. • 13. COBG COMPONENT ACTIVITIES PROGRAM YEAR FUND;lin thousands of Si (List component activities using names of activities shown CDBG OTHER in Parr A. COST SUMMARY, Form HUD-7067.1 LOW/MOD OTHER BENEFIT. BENEFIT AMOUNT SOURCE la) le) Id f (dl (a) 12 c. Rehab. of Private Properti -§ 32.5 $ 524.0 EOC (CSA) 25.5 INHS (CETA) I_ •14. Totals 1 532.5 $ 49.5 s 1-. :----- -_f :,_ . ; 15. Total Costs To Be Paid With Community Development Block Grant Funds(Sum of Columns b and c) $ 32•5 Replaces Form HUD-7015.1,which is Obsolete Page of pages Hu0.7066(6.781 • • • ATTACHMENT A. • • 10. Description of Project • - (continued) would be code abating and prevent dangers to health and safety. The program will begin January 1979 with funds from the 4th year entitlement grant. • • • • • • • • • • Form Approved OMB No.63-R1619 U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 1, i..N6ME.OF APPLICANT I 1 T HACA ANNUAL COMMUNITY DEVELOPMENT PROGRAM 2. APPLICATION/GRANT NUMBER PROJECT SUMMARY _ B-79-HN-36-0105 • 3. PERIOD OF APPLICABILITY 4. yC3 ORIGINAL(each year) FROM TO p '�rC.y9, REVISION,DATED May 1 4, 1979 June 1 , 1979 May 31 , 1980 Apt AMENDMENT.DATED Feb. 1979 5. NAME OF PROJECT 6.PROJECT NUMBER 7.ENVIRONMENTAL REVIEW STATUS INHS Administration 511 Fx¢mp t 8. ENTITY WITH RESPONSIBILITY FOR CARRYING OUT THE PROJECT 9. TELEPHONE NUMBER. Ithaca Neighborhood Housing Services, Inc (TNRS) 607- 277-45.00 10. DESCRIPTION OF PROJECT Administration of the INHS high risk loan fund and other rehabilitation services in connection with the overall housing rehabilitation program. • 0 Check if continued on additional pages)and attach. • 11. CENSUS TRACTS)/ENUMERATION DISTRICTS) EDs 37-40 and 44-46 • 2. ANTICIPATED ACCOMPLISHMENTS • 100 families will be assisted through house inspections, home repair } �� counseling, loan application assistance, specification writing and financial counseling. 0 Check if continued on additional pages)and attach. 13. COBG COMPONENT ACTIVITIES PROGRAM YEAR FUND. (in mousandsofSi (List component activities using names of activities shown CO 8G OTHER in Part A. COST SUMMARY, FonnHUO.7067.1 Low/MOD OTHER BENEFIT • BENEFIT AMOUNT SOURCE (a) (b) (c) (d) (el Rehab and Preservation Activities $ 30 S $ 22 Local Banks, ( Industries, Foundations It 14. Totals I s 30 Is S -22 _ ✓ 15. Total Costs To Be Paid With Community Development Block Grant Funds(Sum of Columns b and c) S Replaces Form HUD•7015.1,which is Obsolete Page of pages HUO-7066(6.78) • Form Approve APProveglik ! • OMB Nn,63.f. 1 U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY DEVELOPMENT AND HOUSING PLAN SUMMARY i , THREE YEAR PROJECT.SUMMARY I. NAME OF APPLICANT 3. PERIOD OF APPLICABILITY 4. { City of Ithaca C.] Or+ylnal(Every three years. 4 1979 1 2. APPLICATION/GRANT NUMBER , , From. June 1 , 1979 To: May 31 , 1980 Ix?� I;"�"'°"•dated May B-79-HN-36-0105 GAR Amendment.dated—Ma_y-1-4, 1979 Li 5. PROJECT SUMMARY S U TIMING AND ESTIMATED FUNDING On MOUSJnds of SI T E p U PROGRAM BENEFIT OF ESTIMATED CDBG FUNDS A E W N YEAR I YEAR II YEAR III ESTI• (IMPORTANT: See instructions before PROJECT T R / I r MATED completing this section.) NUMBER E E M L OTHER LOW/MOO OTHER LOW/MOD OTHER OTHER G N O I LOW/MOO Y C o G, i BENEFIT BENEFIT BENEFIT BENEFIT BENEFIT BENEFIT FUNDS t E .� II r (a) (b) Cc) Idl (el CO WI (hl III ((C (k) I11 Iml Citywide Materials Grant Program 502 11 x 32.5 49.5 i. Citywide Crew Leader 503 11 x 13.0 Elderly Mini-Repair Program 504 6 x 18.0 4.1 Homeownership Assistance 507 12 x . 20.0 Citywide House Recycling 509 11 ,12 x 60.0 Code Enforcement 510 10 x 6.0 6.0 INHS Administration 511 12 x 30.0 • Code Enforcement - Junk Removal 512 12 x 5.0 -- i 1 Strand Theater 514 12 0 0 I • t I I- . 4. 6. SUBTOTALS $ 184.5k 6.0 $ s s S s:••. • l: 7. TOTAL COSTS TO BE PAID WITH COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS $190.5 • li 8. ESTIMATED EXPENDITURES BENEFITTING LOW•AND MODERATE•INCOME PERSONS(Sum of Columns q,1,and kJ s184.5 9. LINE P AS A PERCENT OF LINE 7 • 96.8 X ■ THREE EAR PROJECT SUMMARY Page of rata. NUO.705518.78) • Because we are a hold harmless applicant whose entitlement will end in Federal Fiscal Year 1980 we I do not have to submit this form. However, since you have no other reference of objectives to r program activities we are submitting the forms to provide this particular bit of information. . r i • _ 5th year amendment , Form Approved OM9 No.53-R1619 U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 1. NAME OF APPLICANT ANNUAL COMMUNITY DEVELOPMENT PROGRAM • City of Ithaca 2. APPLICATION/GRANT NUMBER COST SUMMARY B-79-HIV-36-0105 3. PERIOD OF APPLICABILITY FROM TO - 4. 0 ORIGINAL leach year, " y�1� REVISION.DATED May 11`/'fiq r, 1979 June 1 , 1979 May 31 , 1980 y(AMENDMENT.DATEOMAy_l4> 1979 PART A. SUMMARY OF PROGRAM ACTIVITY AMOUNT FOR HUD Line (Important: See instructions before classifying costs.) USE ONLY . 1 Acquisition of Real Property S S 2 Disposition 3 Public Facilities and Improvements • a Senior Centers b Parks,Playgrounds and Other Recreational Facilities c Centers for the Handicapped • • d Neighborhood Facilities e Solid Waste Disposal Facilities f Fire Protection Facilities and Equipment _ g Parking Facilities h Public Utilities,Other Than Water and Sewer Facilities Street Improvements Water and Sewer Facilities k Foundations and Platforms for Air Rights Sites Pedestrian Malls and Walkways m Flood and Drainage Facilities n Specially Authorized Public Facilities and Improvements(List) (1i S .. • (21 13) 4 Clearance Activities 5 Public Services 6 Interim Assistance 7 Completion of Previously Approved Urban Renewal Projects Replaces Form HUO•7015.5,which is Obsolete Page 1 of pages HUD-7067 t6-781 • i . ' .r - FOR HUO I AMOUNT USE ONLY 8 Relocation Payments and Assistance $ $ 9 Payments for Loss of Rental Income 1 iJ Removal of Architectural Barriers ' - I11 Specially Authorized Assistance to Privately Owned Utilities . 12 Rehabilitation and Preservation Activities a Rehabilitation of Public Residential Structures • i b Public Housing Modernization , II I I 1 13000) 4. c Rehabilitation�04r(v� ;Q00 09 (60,000) 511 (30,000) 153,500 T , d Code Enforcement 510 (12,000) 512 (5,000) 17,000 .; e Historic Preservation AJ 13 Specially Authorized Economic Development Activities a Acquisition for Economic Development .i b Public Facilities and Improvements for Economic Development c Commercial and Industrial Facilities A i 14 Special Activities By Local Development Corporations, Etc.(List) 20,000 a 507 (20,000) ji Homeownership Assistance $ 20,000 '1 b 1 71 c A • 1 15 SUBTOTAL . 190,500 1 16 Planning and Urban Environmental Design(See Part B of this form.). il 1 a Development of a Comprehensive Community Development PIan508 (7,000) 7,000 b Development of a Policy-Planning-Management Capacity a c Specially Authorized Comprehensive Planning Activities 17 General Administration(From Part C,Line 6) 506 20,0 513 ( 5,000) 25,000 18 Contingencies and/or Local Option Activities(Not to exceed 10%of amount shown in 227560 Part 0,Line 1) 19 I TOTAL PROGRAM COSTS(Sum of Lines 15 through 18) . s244,860 s Pagc 2 of pages HUO-7067 16-781 PART B. DESCRIPTION OF PLANNING AND URBAN ENVIRONMENTAL DESIGN COSTS. • • • • • • [] Cherk if continued on additional pac(s)and attach. PART C.GENERAL ADMINISTRATION COSTS FOR HUD Lino (See instructions for descriptions of administration activities before AMOUNT USE ONLY classifying costs below.) 1 General Management,Oversight and Coordination 506 20,000}513 ,000} s 25,000 S 2 Indirect Costs(Allowable if charged pursuant to a cost allocation plan) • 3 Citizen Participation 4 Environmental Studies Necessary to Comply With Environmental Regulations 5 Other (List) a I 5 b c d eI • 6 Total General Administration Costs (Sum of Lines 1 through 51 s25,000 $ • Page 3 of pages HUD-7067(8.78) • .- . , r _ _.__._..�..._ _— .. . ._- It . . . Line PART D. BLOCK GRANT RESOURCES FOR PROGRAM COSTS AMOUNT FOR HUD USE ONLY —' 1 Entitlement Amount $ 138,000 s • 2 Less: Repayment of Urban Renewal(NDP Loans (Attach Schedule)\$ 3 Grant Withheld for Repayment of HUD-Guaranteed Loan S - - • . 4 Grant Amount For Program Activities(Line 1 minus sum of Lines 2 and 3) $ 138,000 $ 5 Program Income • S S 6. Surplus From Urban RenewalMDP Settlement $ 106,860 $ 7 Loan Proceeds S S . 4 . 8 Reprogrammed Unobligated Funds From Prior Program Year(Attach Schedule) $ $ 9 TOTAL BLOCK GRANT RESOURCES FOR PROGRAM COSTS $ 244,860 $ (Sum of Lines 4 thru 8) iLine PART E. SUMMARY OF PROGRAM BENEFIT AMOUNT FOR HUD . 1 - USE ONLY i 1 Costs Subject to Program Benefit Rules $ $ 190.5 1 2 Expenditures Principally Benefitting Low-and Moderate-Income Persons $ $ 184.5 3 Line 2 as a Percent of Line 1 96.8 x A 4 Other Expenditures $ $ 6.0 5 Lii : ATTACHMENT B. • 506 Neighborhood Technical Assistant (S) $20,000 (General Management, Oversight and Coordination) • Two technical Assistants to work with the West State Street business community and northside/southside residents to establish block associations and neighborhood organizations which represent residents concerns (especially on the Northside) and the merchants concerns on West State Street. Cost based on prevailing wages for beginning planners. • Establish 8-10 block associations including one on West State Street to work toward neighborhood revitalization. • • • 4$3 I • CITY ®r ITi'HACA • 109 EAST GREEN STREET ITHACA, NEW YORK 1 es c.50 TELEPHONE: 272-1713 CITY PLANNING & DEVELOPMENT BOARD CODE 607 May 14, 1979 • • - James Sweeney Deputy Regional Adm. HUD Buffalo Area Office Suite 800, Statler Bldg. • Buffalo, New York 14202 ATTENTION: Anna Walker • Dear Mr. Sweeney, 4 In response to our conversation, enclosed are the parts of the 5th year application that we discussed requiring changes: INHS'Services and Neighborhood Technical Assistance. The information included on the Project Sheet for neighborhood technicians has been retyped as an attachment. In addition, we took full credit for low income benefit for INNS services. After considering the nature of your problem with the Land Bank and Parallel use proposal , we have decided that our only alternative is to reprogram Parallel uses and drop the Land Bank part of the House Recycling line. We therefore proposed to reprogram parallel use ($30,000) to: Contingency ($20,000) • • Citywide Materials Grant ($10,000) We have had several agencies express interest in "parallel use" in the Central School (target area school on Buffalo and Albany Streets) . They are INNS and Infant Care and Resource Center, and a Senior Citizens Center. On the other hand, we can't guarantee at this time that they will be the ones that actually qualify for the grants. We still believe the "parallel use proposals" as outlined in the application is a useful and valuable tool in preserving neighborhoods. • 4 ' James Sweeney 14, 1979 • page two • Since the City;: Materials Grant program is presently under review and has been discussed at public hearings during the 4th application process, we will send you the reprogramming after the Ithaca Urban Renewal meeting on Monday, May 21 , 1979. If you have any questions about any of the above, please contact us. Sincerely, Rosalind Williams City Planner t) - • RW:ndc Encl . OMD Approval No.29-R0218' •• w' Z APPU• a. NUstEER 3. STATE a. NUMBER FE %f:RAL ASSISTANCE ANTS APPLICA- TION 1. FY11.' f-7 PREAPPL)CATIC APPLI- b. DATE IDENTi• b. DATE Tear'mowtA day ACIItItI I] APPLICATION CATION 19/9 r '"�tJa Iit FIER ASSIGNED 19 (Marl..,. i 1 NOTIFICATION OF INTENT (Opt) 1,,...,y+ur. •°i) t 3 REPORT OF FEDERAL ACTION )rah . 4. LEGAL n1••LICANT/RECIPIEt:T 5. FEDERAL EMPLOYER rD5NTIFICATION NO. a• APPlicanl ham. . City of Ithaca - b. Orranle.,i.n Unit : City of Ithaca Urban Renewal Agency . I Imo ' e: Stroet/P.O. pot : 108 E. Green Street PRO- a. NUMBER GRAM b. TITLE. 4. Ciq : Ithaca a. County : Tompkins (From f. Vita : New York t-2IP Cad.: 14850 . Federal I. C.nta:t newer (Nasae - Catalog) rele1%.... No):_g Rosand Williams (607-272-1713) _ ri:.:.. a 7. TITLE Arit DESCRIPTION OF APPLICANTS PROJECT 8. TYPE OF APPLICANT/RECIPIENT E City ill Ithaca 5th yr. entitlement grant program A-Slane H-Gnmmunit,•A.,ioe Agent, 8 Interstala 1-Haher Ed.cntional lao:t:ution including citywide housing rehabilitation, public cta'ui /-Indian P. facilities rehabilitation, homeownership subsidy, ;"h handicapped accessability educational program and F-s;hr°'Dir - r���1� survt��' of needs , code enforcement and payment of Drstnct Eater appropriate Letter i non ft�Eieral share for an industrial parka 9. TYPE OF ASSISTANCE A.-Basic Grant D-lnsuranca • 8 Supplomanta) Grant E-0Der Eater appro- GLon priau kiter(a1 r IA 30. AREA OF PROJECT IMPACT (Name of cilia,counties. 11. • ESTIMATED NUM- 12. TYPE OF APPLICATION C i t l-.f Ithaca Stataa.stow) BENEFITING PERSONS A-New C-Rerislrn E-Antmotatiaa y B--Renege( 0-Continuation Enter appropriate letter _ : 111 13. f_r:.IIOSEO FUNDING 14. CONGRESSIONAL DISTRICTS OF: 115. TYPE OF CHANGE (For Jig or Sae) a. MERA • :244,860 .00 a. APPLICANT 27 b. PROJECT 27 8.-Decrease Dollars F Othor (Specify): ' b. APPLICANT .00 • 0-Decrease Duration a_ STATE .00 16. PROJECT START 17. PROJECT E-Cancotlation t. LOCAL _ DATE ar rnontls Jay DURATION Enter appro. = .00 19 9 6 1 12 Month, L_L)_1 ...OTHER •00I 18. ESTIMATED DADTTOTO 3)Jyi month day 19. EXISTING FEDERAL IDENTIFICATION NUMBER -1. TOTAL 3 ,00 I FEDERAL AGENCY b 19 79 ��yI oQ N 36 0106 20. FE-D• EDE 1i AL AGENCY TO RECEIVE REQUEST (tiem..City,State.ZIP code) Dept O F1OUS'I YI 21. REMARKS ADDED Urban Development, Buffalo Area Office, Buffalo, N.Y. 14202 fl Yea p i:o - p 22. a. To the but of wry Snow:eda. and belief, t. It rar;uirod by 01.15 Cireu!ar A-95 this *pollution was submitted. pursuant to in. No re- Re.pone. data In this prsapplication/appiiation are strudrons therein, to eppropnats clearinghouses and all responses are attached: sponge attached THE Irv. end correct, the document has been t APPLICANT duy authorized by the gorsraina body M. Southern Tier East Regional ❑ ❑ THAT e.ES the applicant th att and the ranee If will comply (,Planning Dev. Board, Binghamton ❑ ❑ with the attached aswranesa If the assist- '"a t""`°i° (3)N.Yr<S. Clearinghouse, Albany ❑ ❑ 23. a. TYPED iMIE AND TITLE b. ICNAT)IRE /J.. c. DATE SIGNED CERTIFYI\. ���0(/ `/' �I�-a------... Year month day i 1 REPRE• Edward J. Conley - C. 3979 5 14 SENTATIVt I Mayor ?-1/e(. , V. 24. AGEPs:Y NAM 25. APPLICA- Year -oath day IKON RECEIVED 19 26. ORGANI;.ATIONAL UNIT 27. ADMINISTRATIVE OFFICE • 20. FEDERAL APPLICATION ' g • IDENTIFICATION 29.ADORt\S 30. FEDERAL GRANT IDENTIFICATION• 31. ACTION\ TAKEN 32. FUNDING year month day 34. Tear.month day • STARTING a. An TAN D a. FEDERAL I S .DO 33. ACTION DATE i r 19 DATE 19 O b. R 't;TED p. APPLICANT DO 35. CONTACT FOR ADDITIONAL INFORMA- 35. Year month day 0 TION (Nam. and to:eyione number) ENDING a. DATE R^:cAtB FOR e. STATE 00 ENDING 19 rear .at(M d. LOCAL 1 .00 37. REMARKS ADDED g 0 d g DEftcD a. OTHER .00 w ❑a. lvt:>.?ctvrl( f. TOT/1 i 5 .00 0 Yes ON* I. 3t. a. In t.4ne stove sct.im. any comments r.ca,d from daarinthovsa ware con- b. FEDERAL AGENCY A-95 OFFICIAL FEDERAL a;' eid.r.d. II.lw•r respuns.is due under prow:wane of Pert I,OMB Grcutar A.-95, (Nnaae and telephone era) CNCY h boa bean er u N¢g needs 1 A-9S A�.;.•V IL , M I '24-101 STANDARD FCR 424 PAGE 1 (10-75) Prsscrsb.d by LISA.Fawn:Manage.+ent Cirta it 74-11 1 Form Approved . US-.DEPARTMENT OF HOUSING A• . RBAN DEVELOPMENT 1. NAME OF APPLICANT OMB No.63-R1619 • ANNUAL COMMUNITY OEVELOPMEN ' =OGRAM Ci tv of I-tha-La - . __ - 2. APPLICATION/GRAN UMBER PROJECT SUMMARY R_7Q_N.,M-_w fl w 2ti_ l05 • 3. PERIOD OF APPLICABILITY 4. ❑ ORIGINAL(each year/ FROM TO ❑ REVISION.DATED June 1 , 1979 May 31 , 1980 rz AMENDMENT.DATED.i y l4, 19/9 5. NAME OF PROJECT 6.PROJECT NUMBER ENVIRONMENTAL REVIEW STATUS Citywide Materials Grant Program I 502 .17. Under Review 8. ENTITY WITH RESPONSIBILITY FOR CARRYING OUT THE PROJECT Economitg. TELEPHONE NUM3 R -Ttbara Neighborhood Housing Services (INHS)OQoort./+1277-4500(INHS)/ 273-881 : (EOC) 10. OESCRIPTION OF PROJECT . Corp. (EOC) The Citywide Materials Grant Program will make grants to low income homeowner and renters up to $1 ,000 to be used for material and speciality labor (plumbe s, electricians) in conjunction with two free labor programs that already operat: in the City. These two programs are CHORES a Community Service Administratio (CSA) program under the Economic Opportunity Corp. .of Tompkins County and a CETA crew operated by Ithaca Neighborhood Housing Services. They will screen applicants to meet their respective low income requirements (INHS- 125% of poverty and CHORES - 200% of poverty) . The average grants are expected to be • • around $300. The work Check,f continued on add'rional paeg'sJ and attach. vit 1111 tNSU TRACTS)/ENUMERATION OISTRICTtS) ir 12. ANTICIPATED ACCOMPLISHMENTS -The grants are intended to meet the needs of property -owners and renters in the City who do not have the financial capacity to make any monthly payments on a rehabilitation loan. Approximately 72 households could be served under `z . this program. ❑ Check if continued on additional page(sl and attach. . 13. CDBG COMPONENT ACTIVITIES PROGRAM YEAR FUNDS lin thousands of$1 (List component activities using names of activities shown CDBG OTHER in Part A. COST SUMMARY, FOrmHUD-7067/ LOw/MoD • OTHER BENEFIT . BENEFIT AMOUNT SOURCE (al (bl rcJ l (di (el 12 c. Rehab. of Private Properti § 32.5 s 224.0 EOC (CSA) . • 25.5 INNS (CETA) •14. Totals 1 532.5 S 49.5 S I'• _• --- . .:, '_ : . -. 15. Total Costs To Be Paid With Community Development Block Grant Funds(Sum of Columns b and c) 5 32.5 .•Replaces Form HUU-7015.1,which is Obsolete Page of pages HUD-7066(6.7B) ATTACHMENT A. 10. Description of Project • (continued) would be code abating and prevent dangers to health and safety. The program will begin January 1979 with funds from the 4th year entitlement grant. • • • • i • • • Form Approved • • OMB No.63-R1619 U.S.IL DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT i. Nirr°OFPPITHACA • ANNUAL COMMUNITY DEVELOPMENT PROGRAM T 2. APPLICATION/GRANT NUMBER • PROJECT SUMMARY B-79-HN-36-0105 • 3. PERIOD OF APPLICABILITY a. y��y� ORIGINAL(each year/ FROM TO 'fV_yY, REVISION,DATED Ma,y 14, 1979 dune 1 s 1979 May 31 , 1980 >a AMENDMENT,DATED Feb. 1979 5. NAME OF PROJECT 6.PROJECT NUMBER 7.ENVIRONMENTAL REVIEW STATUS LAOS Adminis.tra.tion 511 Fxcmpt 8. ENTITY WITH RESPONSIBILITY FOR CARRYING OUT THE PROJECT 9. TELEPHONE NUMBER. Ithac.a Ne-ghborhnnd Housing SPrvirPs, Tor- (ThIHc) 607- 277-4500 10. DESCRIPTION OF PROJECT Administration of the INHS high risk loan fund and other rehabilitation services in connection with the overall housing rehabilitation program. • • 0 Check if continued on additional pages)and attach. 11. CENSUS TRACT(S)/ENUMERATION DISTRICT(S) EDs 37-40 and 44-46 C 12. ANTICIPATED ACCOMPLISHMENTS • • 100 families will be assisted through house inspections, home repair counseling, loan application assistance, specification writing and financial counseling. 0 Check if continued on additional pages)and attach. 13. COBG COMPONENT ACTIVITIES PROGRAM YEAR FUND.;(in thousands of Si (List component activities using names of activities shown CMG OTHER in Part A, COST SUMMARY, FormHUO-7067.1 LOW/MOD OTHER BENEFIT • BENEFIT AMOUNT SOURCE (a) (b) (c) (di (a1 Rehab and Preservation Activities s 30 $ $ 22 Local Banks, Industries, Foundations • 14. Totals I S 30 I S $ '22 _ • 15. Total Costs To Be Paid With Community Development Block Grant Funds(Sum of Columns b and c) S Replaces Form Hu0.7015.1,which is Obsolete Page of pages HUD-7066(6.78) ire........ _... • t Fenn Approved OMB No.63-R1619• US.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 1. NAME OF APPLICANT ANNUAL COMMUNITY DEVELOPMENT PROGRAM City of Ithaca • 2. APPLICATICN/GRANT NUMBER • PROJECT SUMMARY B-79-Hid-36-0105 3. PERIOD OF APPLICABILITY •. 0 ORIGINAL leash year) FROM TO REVISION.DATED r�-� June 1 , 1979 May 31 , 1980 AMENDMENT.OATEO�y 1 4, �94.9 5. NAME OF PROJECT 6.PROJECT NUMBER 7.ENVIRONMENTAL REVIEW STATUS Citywide House Recycling • 509 Under Review 8. ENTITY WITH RESPONSIBILITY FOR CARRYING OUT THE PROJECT 9. TELEPHONE NUMBER Dept. of Planning and Development & INHS 272-1713 ext. 222 10. DESCRIPTION OF PROJECT House Recycling Program would be similar to the Small Cities House Recycling Program that will operate in the CD Target area: The Intent is to provide low income and minority persons opportunities to reside in areas of the City with less concentration of low and moderate income households. Recycling will improve housing that is blighting areas that are otherwise in . good condition. Eight houses will be recycled. 0 Check if continued on additional page(s)and attach. 11. CENSUS TRACTIS)/ENUMERATION OISTRICT(S) 12. ANTICIPATED ACCOMPLISHMENTS ' Recycle 8 houses to low income homebuyers. • • 0 Check if continued on additional page(s)and attach. 13. CDBG COMPONENT ACTIVITIES PROGRAM YEAR FUND.;lin thousands of S) (List component activities using names of activities shown COBG OTHER in Pan A, COST SUMMARY, Fonn HUD-7067.1 LOW/MOD OTHER BENEFIT BENEFIT AMOUNT SOURCE (a) (b) (e) ld) (e) Rehab of Private Properties S 60.0 $ S • • 14. Totals $ 60.0 $ IS �. :,f• r • 15. Total Costs To Be Paid With Community Development Block Grant Funds(Sum of Columns band c1 S 60.0 Replaces Form HUO.7015.1.which is Obsolete Page of pages HUD4066 16.78) • 5th year amendment • Form Approved OM9 No..S3.R 1619 U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 1. NAME OF APPLICANT ANNUAL COMMUNITY DEVELOPMENT PROGRAM • City of Ithaca 2. APPLICATION/GRANT NUMBER COST SUMMARY B-79-HIV-36-0105 3. PERIOD OF APPLICABILITY 4. O� ORIGINAL (each year) FROM ro &Y` REVISION,DATED May 14, 1979 June 1 , 1979 May 31 , 1980 (XX AMENDMENT.DATED 14. • PART A. SUMMARY OF PROGRAM ACTIVITY FOR HUD Line (Important: See instructions before classifying costs.) AMOUNT USE ONLY 1 Acquisition of Real Property S S • • 2 Disposition 3 ( Public Facilities and Improvements • a • Senior Centers • b Parks,Playgrounds and Other Recreational Facilities c Centers for the Handicapped • d Neighborhood Facilities e Solid Waste Disposal Facilities f Fire Protection Facilities and Equipment - g Parking Facilities •-s r-- h Public Utilities,Other Than Water and Sewer Facilities Street Improvements Water and Sewer Facilities k Foundations and Platforms for Air Rights Sites Pedestrian Malls and Walkways m Flood and Drainage Facilities n Specially Authorized Public Facilities and Improvements(List) (1) S • .. i • (2) (3) • 4 Clearance Activities 5 Public Services 6 Interim Assistance 7 Completion of Previously Approved Urban Renewal Projects Repiaces Form HUO.7015.5,which is Obsolete Page 1 of pages HUO-7067 te•751 • . .. i . . . , • FOR HUO AMOUNT USE ONLY r _ .a.4 8 Relocation Payments and Assistance $ $ 9 Payments for Loss of Rental Income 1J Removal of Architectural Barriers • - i 11 Specially Authorized Assistance to Privately Owned Utilities . 1 12 Rehabilitation and Preservation Activities a Rehabilitation of Public Residential Structures 1 b Public Housing Modernization A 502 (32,5UU) 503 .(T3000) —' - 1 • e Rehabilitation 0P4r�b �1 ,P0r eo r ie • s509 (60000) 511 (30,000) 153,500 i d Code Enforcement 510 (12,000) 512 (5,000) 17,000 S - ti a e Historic Preservation 4 13 Specially Authorized Economic Development Activities ' 1 - r .t a Acquisition for Economic Development b Public Facilities and Improvements for Economic Development ICc Commercial and Industrial Facilities 1 S f 14 Special Activities By Local Development Corporations,Etc.(List/ 20,000 j 507 (20,000) ' t; a Homeownership Assistance $ 20,000 ! b .1 1 c S d i • 15 SUBTOTAL 190,500 i f 16 Planning and Urban Environmental Design(See Part B of this form.) F a Development of a Comprehensive Community Development PIan508 (7,000) 7,000 b Development of a Policy-Planning-Management Capacity 1 c Specially Authorized Comprehensive Planning Activities 17 General Administration(From Part C.Line 61 506 j2 : g0) 25,000 1 18 Contingencies and/or Local Option Activities(Not w exceed 10%of amount shown in 22,30--- Part D,Line 11 19 1 TOTAL PROGRAM COSTS(Sum of Lines 15 through 131 • s244,860 $ Page 2 of pages HUD-7067(6.781 • • PART 6. DESCRIPTION OF PLANNING AND URBAN ENVIRONMENTAL DESIGN COSTS • • • O Cheek if continued on additional nace(s)and attach. PART C.GENERAL ADMINISTRATION COSTS Line (See instructions for descriptions of administration activities before AMOUNT FOR HUO USE ONLY classifying costs below.) 1 1 General Management,Oversight and Coordination 506(20,000)513(5,00U) �' e s 25,000 $ 2 Indirect Costs(Allowable if charged pursuant to a cost allocation plan) 3 Citizen Participation • 4 Environmental Studies Necessary to Comply With Environmental Regulations 5 Other (List) • a + b c d e • 6 ' Total General Administration Costs (Sum of Lines f through 5) s25,000 $ Page 3 of pages HUD-7067 46-78) • • Line PART D. BLOCK GRANT RESOURCES FOR PROGRAM COSTS AMOUNT FOR HUD 1 USE ONLY —. f1 Entitlement Amount $ 138,000 S" i r I 2 Less: Repayment of Urban Renewal)NDP Loans (Attach Schedule) $ 3 Grant Withheld for Repayment • payment of HUD-Guaranteed Loan" $ ' 4 Grant Amount For Program Activities(Line 1 minus sum of Lines 2 and 3) $ 138,000 $ 5 Program Income S S . 6. Surplus From Urban Renewal/NDP Settlement $ 106,860 $ 7 Loan Proceeds $ $ I8 Reprogrammed Unobligated Funds From Prior Program Year(Attach Schedule) S S 9 L TOTAL BLOCK GRANT RESOURCES FOR PROGRAM COSTS 244 860 $ (Sum of Lines 4 thru 8) Is s i . • Line PART E. SUMMARY OF PROGRAM BENEFIT AMOUNT FOR HUD USE ONLY 1 Costs Subject to Program Benefit Rules $ $ 190.5 ~ 2 Expenditures Principally 8enefitting Low-and Moderate-Income Persons $ $ 184.5 1 3 Line 2 as a Percent of Line 1 % 96.8 % 1 . c 4 Other Expenditures 3 $ $ 6.0 4 5 Li. ;4 as a Percent of Line 1 % 3.2 ".6 • • Page 4 of pages HUO•7067 t6.781 • ATTACHMENT B. 506 Neighborhood Technical Assistant (S) $20,000 (General Management, Oversight and Coordination) Two technical Assistants to work with the West State Street business community and northside/southside residents to establish block associations and neighborhood organizations which represent residents concerns (especially on the Northside) and the merchants concerns on West State Street. Cost based on prevailing wages for beginning planners. • Establish 8-10 block associations including one on West State Street - to work toward neighborhood revitalization. APPENDIX A lc SCOPE OF SERVICES I. PROJECT NARRATIVE: Ithaca Neighborhood Housing Services, Inc. will provide technical as- sistance to residents in the Northside and Southside neighborhoods. The assistance includes: assisting residents in developing block strategies for neighborhood revitalization; increasing citizen input into the com- munity development process; developing linkages with public and private agencies; and increasing merchant input in the revitalization of West State Street. • Door-to-door contact with residents will lead to block meetings. The creation of a block-by-block revitalization strategy will be the initial focal point for such gatherings. Building on the relationship developed at such meetings , attempts will be made to form civic associations to deal with the full range of Community Development concerns. Door-to-door contact will be made with merchants in an effort to form a merchant's association to represent the West State Street commercial in- terests and to insure their input into and participation in the revitali- zation process. In order to insure that the interests of the residential and commercial groups in the Northside/Southside neighborhood are articulated, and to encourage communication between the residents and commercial groups, the project will work towards developing an overall Northside/Southside Neigh- borhood Organization. This neighborhood organization will be a coalition of the various residential civic associations and the merchants association. II. BUDGET The budget for this project is $25,000. RESOLUTION Resolve, that the 5th year application be amended to reprogram 505 Parallel Use ($30,000) to: 5th year Contingency $20,000 502 Citywide Direct Grant $10,000 Further be it resolved, that Land Banking be dropped as a program element from the 5th year House Recycling/Land Banking line 509. 41: //al / c.� CeLdeXeil- CONTRACT FOR PERSONAL SERVICES C By and Between THE ITHACA URBAN RENEWAL AGENCY and RAYMOND, PARISH, PINE & WEINER, INC. PART I - AGREEMENT VJ THIS AGREEMENT entered into as of this 2/ day of V� , 1977 , by and between the ITHACA URBAN RENEWAL AGENCY, hereinafter referred to as the "IURA" and RAYMOND, PARISH, PINE & WEINER, INC. , a Delaware Corpora- tion registered in the State of New York with offices in the Town of Greenburgh, New York, and other locations and hereinafter referred to as the "Consultant." WITNESSETH THAT: WHEREAS, the City of Ithaca is receiving funds from the U.S. Cepartment of Housing and Urban Development for the under- taking of a Community Development Program under the Housing and Community Development Act of 1974; and WHEREAS, the IURA has been designated to administer the said programs; and WHEREAS, the IURA desires to engage the Consultant to render certain technical assistance in connection with the Community Development Program; NOW, THEREFORE, the parties hereto do mutually agree as follows : 1. Employment of Consultant The IURA hereby engages the Consultant and the Consultant hereby agrees to perform the professional services hereinafter set forth. • a 2. Area Covered The Consultant shall perform certain services authorized by the IURA under this Contract, in relation to the Com- munity Development Program, and other programs related thereto, all within the legal boundaries of the City of Ithaca, New York. 3. Scope of Services The Consultant shall perform all the services under this Contract in a satisfactory and prompt manner, as determined by the LURA in accordance with the applicable requirements of the Housing and Community Development Act of 1974, HUD Regulations on Community Development Grants , and other relevant local, state and federal laws . Such services shall include, but are not necessarily limited to, the following: (a) Assistance and advice on the assemblage of basic community development and housing data including the review of existing reports and studies . This shall include maps identifying population to be served, low income households , elderly and minority persons, demography and related data. (b) Assistance and advice on the identification of community IL development needs , developing a comprehensive strategy for meeting the needs and establishing short-term and long-term community development goals and objectives. This shall include evaluations and analyses of the applicability of new legislation, including the Hous- ing and Community Development Act of 1977 for meeting Ithaca community development needs. (c) Assistance and advice in the preparation of Community Development Applications, Plans and the local Housing Assistance Plans, and any other data for funding of community development related programs, including the identification and location of community development activities and developing estimated costs for same. (d) Assistance and advice in the preparation of necessary data to support said applications, including assistance in providing answers to any comments or questions of any federal, state or other governmental review agency. 2 (e) Preparation of required environmental assessment reports for community development activities, except that the preparation of an Environmental Impact Statement, if required, shall not be deemed to be a part of this Scope of Services. (f) Assistance and advice in carrying out the planning and implementation of community development and housing assistance plan activities to the extent that such assistance may be needed to supplement work of the IURA staff and other consultant engaged by the IURA or the City of Ithaca. 4. Data and Assistance to be Provided by the City of Ithaca It is understood that the IURA shall be responsible for providing any necessary data or assuring that data is pro- vided by the IURA or other City of Ithaca entities with respect to existing conditions , records , base maps, maps of program areas and any other necessary data which may be available in files or records of the IURA or said other entities . 5. Time and Method of Performance (a) The services of the Consultant are to commence upon the execution of this Contract. The Contract shall be in force for a period of one (1) year. Services shall be performed only at the specific request of the Director of Planning and Development or his designate. (b) The IURA shall be responsible for arranging for any desired coordination or consultation meetings, pre- sentation meetings , press conferences, etc. All in- quiries by communications media or the public shall be responded to by the IURA, except that the Consultant shall at the specific request of the IURA be available for providing any necessary information should any such responses be required. (c) The IURA representative for purposes of administering, coordinating and supervising the work of the Consultant under this Contract shall be the Director of Planning and Development or a representative designated by him. The IURA may at any time inform the Consultant as to any change in designation of its representative. 3 .�._._,._. 6. Compensation and Method of Payment The IURA shall pay the Consultant an amount not to exceed Five Thousand Dollars ($5,000) for the full time that this contract is in force. All work is to be paid for on a per diem basis in accordance with the fee schedule, Exhibit A, attached hereto and made a part hereof. Payments shall be made upon receipt by the IURA of a requi- sition for payment and voucher from the Consultant specifying the time worked and specifying that he has performed the authorized work as requested by the IURA and that he is entitled to receive the amount requisitioned under the terms of the contract. The IURA, prior to making payment, shall determine that the fees claimed are in accordance with the fee schedule established in this contract. It is expressly understood and agreed that in no event shall the total compensation and reimbursement, if any, to be paid hereunder exceed the sum of Five Thousand Dollars ($5,000) as previously set forth. It is also expressly understood that the IURA is under no obligation to expend this entire sum unless the costs incurred by the Consultant for services expressly requested by the IURA aggregate to such amount. 7. Terms and Conditions IL This agreement is subject to and incorporates the applicable provisions attached hereto as Part II - Terms and Conditions (6-77) . 8. Other Provisions None. 9. Certifications Not applicable. IN WITNESS WHEREOF, the IURA and the Consultant have executed this Agreement as of the date first above written. ATTEST: ITHACA URBAN RENEWAL AGENCY ,44( by IE. ar• J. Con es', - irman ATTEST: RAYMOND , PARISH, PINE & WEINER, INC. affeby j �V CONTRACT FOR PROFESSIONAL SERVICES (6-77) COMMUNITY DEVELOPMENT PROGjlAM Part Il— Terms and Conditions • 1. Labor Standards. The Consultant understands that this Contract is financed in - whole or part with Federal funds and hence is subject to any applicable labor standards promulgated by the United States Department of Labor and other Federal offices. 2. Lower Income Group Employment Opportunity Requirements.The work to be performed under this contract is subject to the requirements of section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u.Section 3 requires that to the greatest extent feasible opportunities for training and employment be given lower income residents of the project area and contracts for work in connection with the project be awarded to business concerns which are located in, or owned in substantial part by persons residing in the area of the project. The parties to this Contract will comply with the provisions of said section 3 and the regulations issued pursuant thereto by the Secretary of Housing and Urban Development set forth in 24 CFR 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this Contract. The parties to this Contract certify and agree that they are under no contractual or other disability which would prevent them from complying with these requirements. The Consultant will send to each labor organization or representative of workers with which it has a collective bargaining agreement or other contract or understanding,if any, a notice advising the said labor organization,or workers' representative of its commitments under this section 3 clause and shall post copies of notice in conspicuous ' places available to employees and applicants for employment or training. The Consultant will include this section 3 clause in every subcontract for work in connection with the project and will, at the direction of the applicant for or recipient of Federal financial assistance, take appropriate action pursuant to the subcontract upon a finding that the subcontractor is in violation of regulations issued by the Secretary of Housing and Urban Development, 24 CFR 135.The Consultant will not subcontract with any subcontractor where it has notice or knowledge that the latter has been found in violation of regulations under 24 CFR 135 and will not let any subcontract unless the subcontractor has first provided him with a preliminary statement of ability to comply with the requirements of these regulations. Compliance with the provisions of section 3, the regulations set forth in 24 CFR 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this Contract, is a condition of the Federal financial assistance provided to the project, binding upon the Consultant, its successors, and assigns to those sanctions specified by the grant or loan agreement or contract through which Federal assistance is provided,and to such sanctions as are specified by 24 CFR 135. 3. Equal Opportunity Requirements. During the performance of this Contract,the Consultant agrees as follows: a. The Consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation: and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause. lb .. 2 b. The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive ir consideration for employment without regard to race, color, religion, sex, or national origin. c. The Consultant will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided by the Department's contracting officer,advising the labor union or workers' representative of the Consultant's commitments under section 202 of Executive ' Order 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. • d. The Consultant will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules,regulations,and relevant orders of the Secretary of Labor. e. The Consultant will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,and will permit access to his books,records,and accounts by the Department and the Secretary of Labor for purposes of investigation to . ascertain compliance with such rules,regulations,and orders. f. In the event of the Consultant's noncompliance with the nondiscrimination clauses of this Contract or with any of such rules, regulations, or orders, this Contract may be canceled, terminated or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965,and such other sanctions • may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule,regulation, or order of the Secretary of Labor, or as otherwise provided by law. g. The Consultant will include the provisions of paragraphs (a) through (g) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of .September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Consultant will take such action with respect to any subcontract or purchase order as the Department may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the Department, the Consultant may request the United States to enter into such litigation to protect the interests of the United States. 4. Environmental Requirements. a. The Consultant hereby agrees and stipulates as required by 40 CFR 15 that any facility to be utilized by it or any subcontractor in the performance of the scope of services herein is not on the United States Environmental Protection Agency's List of Violating Facilities as of the date of this contract or thereafter. . b. The Consultant further agrees that it will obtain similar stipulations satisfactory to the Municipality from any subcontractors it engages. c. The Consultant agrees to comply with all the requirements of section 114 of the Clean Air Act (42 U.S.C. 1857) and section 308 of the Water Pollution Control Act (33 U.S.C. 1251)and all regulations and other requirements issued pursuant thereto. d. The Consultant agrees and stipulates that this Contract is conditioned upon the Consultant's promptly notifying the Municipality of any communication it receives indicating that a facility to be utilized for this Contract is being considered for placement on the Environmental Protection Agency's List of Violating Facilities. c. The Consultant agrees that it will include or cause to be included in all non exempt subcontracts (as provided by 40 CFR 15) the criteria and requirements of a. through d. of this paragraph on Environmental Requirements;and the Consultant further agrees that it will take such action as the Municipality may direct as a means of enforcing such provisions. . 3 f. The Municipality and the Consultant understand that subcontracts not exceeding ONE HUNDRED TIIOUSAND DOLLARS (SI00,000) are exempt from these environmental regulations (40 CFR 15)but in any event the Consultant is.responsible for •complying with all environmental regulations relevant to this Contract. g. In no event shall any amount of the payment provided under this Contract be used with respect to a facility which has given rise to a conviction under section 113(c)(1) of the Clean Air Act or section 309(c)of the Federal Water Pollution Control Act. 5. Interest of Members, Officers, or Employees of Municipality,Members of Local Governing Body,or Other Public Officials.The Consultant agrees that no officer,member or employee of the Municipality and no members of its governing body and no other public official of the governing body of the locality or localities in which the project is situated or being carried out who exercises any functions or responsibilities in the review or approval in the undertaking or carrying out of this contract shall participate in any decision relating to this contract which affects his personal interest or the interest of any corporation, partnership or association in which it is, directly or indirectly,interested or have any personal or pecuniary interest, direct or indirect, in this Contract or the proceeds thereof. 6. Interest of Certain Federal Officials.No members of or delegates to the Congress of the United States and no Resident Commissioner shall be admitted to any share or part of this Contract or to any benefit arising from it. 7. Prohibition Against Payments of Bonus or Commission.The payments provided under this Contract shall not be used in the payment of any bonus or commission for the purpose of obtaining HUD approval of the application for such assistance, or HUD approval of applications for additional assistance,or any other approval or concurrence of - HUD required under this Contract, Title I of the Housing and Community Development Act of 1974 or HUD regulations with respect thereto;provided,however,that reasonable fees or bonafide technical,consultant,managerial or other such services,other than actual solicitation,are not hereby prohibited if otherwise eligible as program costs. 8. Disbursement of Materials. No information or material gathered under this Contract shall be made available to any individual or organization without the prior approval of the Municipality. 9. Examination of Records. The Municipality, the Comptroller General of the United States,the Federal or State agency providing the funds under which this Contract is funded and any of their duly authorized representatives shall have access to any and all books, documents, papers, and records of the Consultant which in their discretion are directly pertinent to this Contract for the purpose of auditing,examining,excerpting and transcribing same. 10. Assignability. The Consultant shall not assign any interest in this Contract,and shall not transfer any interest in the same (whether by assignment or novation)without the prior written approval of the Municipality: Provided,however,that claims for money due or to become due the Consultant from the Municipality under this Contract may be assigned to a bank, trust company, or other financial institution, or to a Trustee in Bankruptcy, without such approval. Notice of any such assignment or transfer shall be furnished promptly to the Municipality, provided, however, that a merger of the Consultant with another firm or corporation or an acquisition of the Consultant by another corporation or firm shall not be construed as affecting the contractual relationship between the Consultant and the Municipality. 11. Insurance. The Consultant shall provide Workman's Compensation Insurance for its own personnel in accordance with statutory requirements. 12. Changes. The Municipality may, from time to time, request changes in the Scope of Services of the Consultant to be performed hereunder.Such changes,including any increase or decrease in the amount of the Consultant's compensation, which are mutually agreed upon by and between the Municipality and the Consultant, shall be incorporated in written amendments to this Contract. r • • 4 13. Termination Provisions. a. Termination For Cause: If, for any reason, the Consultant fails to fulfill in a timely and proper manner its obligations undcr this Contract, or if thc Consultant violates any of thc conditions, covenants, agreements or stipulations of this Contract,the Municipality shall,thereupon have thc right to terminate this Contract by giving written notice to the Consultant of such termination and • specifying the effective date thcrcof,at least twcnty days before such date.In that event, all or any part of finished or unfinished materials prepared by thc Consultant shall become the property of the Municipality and the Consultant shall be entitled to just and equitable compensation for said materials. b. Termination For The Convenience of The Municipality: The Municipality may terminate this Contract at its convenience at any time by giving written notice to the Consultant of such termination and specifying the effective date thereof at least twenty days before the effective date of such termination. In that event, all finished or . unfinished materials prepared under this Contract shall become the property of the Municipality. In the event of termination for the convenience of the Municipality, the Consultant shall be paid an amount which bears the same ratio to the total amount . provided for in this Contract as thc services actually performed bear to the total services envisioned by this Contract less payments already made: Provided, however, that if less . than 60%of the services covered by this Contract have been performed upon the effective - date of such termination, the Consultant shall be reimbursed (in addition to the above payment) for that portion of the actual out of pocket expenses (not otherwise reimbursed under this Contract) incurred by the Consultant during the contract period which are directly.attributable to the uncompleted portion of the services covered by this ' Contract. If this Contract is terminated due to the fault of the Consultant,subparagraph a. of this agreement shall apply. The above provisions of this section shall not be applicable in the case of a contract which provides for per diem compensation in which event termination of the Contract shall require the Municipality to only compensate the Consultant for per diem fees due for work undertaken prior to the time of receipt by the _ Consultant of a notice of termination. • • • • RAYMOND, l'AIt1SIIrPINE & WEINER, INC. TRANSPORTATION PLANNING GROUP . . . . DEVELOPMENT ECONOMICS GROUP • FEE SCHEDULE -- PER DIEM SERVICES -- MARCH, 1977 Our fee to clients is the total of the items 1, II and III. 1. TECHNICAL SALARY CHARGES Personnel(a) Hourly Salary to be Billed))) President, Executive Vice President, Senior Vice Presidents, Director Transportation Planning Group . .$23.00 Vice Presidents, Director Development Economics Group 19 50 Associate Vice Presidents 15.50 Senior Associates,Senior Transportation Engineers 14 00 Senior Planners,Senior Economists, Designers, Environmental Planners 11 00 Planners,Economists,Transportation Engineers 9.00 Associate Planners, Research Analysts,Junior Engineers 7 00 Junior Planners 4.50 Graphics Specialists,Chief Draftsman .- 9 00 Draftsmen 6 00 Junior Draftsmen and Planning Aides 3.50 (a) Where specialists are used who do not fit into specific category, nearest appropriate category will be utilized. (b) Time required for field visit travel will be charged to a maximum of 1V hours in each direction. : 3 II. -GENERAL OVERHEAD CHARGES . • This charge is 160% of total.Wary costs incurred as per I above. (This covers our general office overhead costs for-items such as typing and-clerical-costs, project-telephone calls, travel,postage, incidental reproduction, rent, insurance, utilities, employee fringe benefits and a 10%allowance for profit.) III. OTHER COSTS (a) Major out-of-pocket costs such as models, printing of large quantity of reports, multi-colored printing, and outside consultants shall be billed at cost plus 5%, except if billed directly to client, in which case it shall be at cost. No such costs shall be incurred without the prior approval of the client. (The 5% fcc is to cover our financing,bookkeeping and administrative costs for these items.) (b) For any necessary trip, the portion of air travel costs exceeding $60 shall be charged.Costs shall be computed at tourist or air-coach rates from the nearest applicable office of the firm. H RESOLUTION The IURA/CDA approves the Contract with Robert S. Leathers, subject to the approval of Martin A. Shapiro, City Attorney, to design, prepare specifications and supervise construction of Wood Street and Conway Parks improvements. It is specified that work on Conway Park will not proceed further than the preliminary design without further approval of the Agency. May 9, 1979 • IL IURA/CDA May 21 , 1979 RESOLUTION BE IT RESOLVED, that the IURA/CDA authorize the mayor to sign a contract with INNS to operate the Neighborhood Technical Assistance program, contingent upon the approval of the INHS Board of Directors and the City Attorney. • C. 71."1 2 /1 �� -� WHEREAS, the Small Cities program has been approved by HUD, i,nd WHEREAS, a budget of $20,000 each for the Wood Street and Conway Parks is included in the 1st year Small Cities and WHEREAS, improvement of these parks in the 1979 construction season is desired, and WHEREAS, the funds have to be spent in the fiscal year, THEREFORE, be it resolved that the IURA enter into a contract with Bob Leathers to design, prepare specifications, supervise the construction of Wood Street and Conway Parks. RESOLUTION AUTHORIZING ADOPTION OF THE OVERALL ECONOMIC DEVELOPMENT PROGRAM FOR THE CITY OF ITHACA, NEW YORK WHEREAS, the City of Ithaca, N. Y. has been notified by the Economic Development Administration that it is eligible to be designated as a Redevelop- ment Area; and, WHEREAS, submission and approval of an Overall Economic Development Program is a prerequisite to designation as a Redevelopment Area; and, WHEREAS, the Overall Economic Development Program Committee (OEDP Committee) has been appointed by the Mayor of the City of Ithaca, N.Y. and charged with the development and continuation of an action program for economic development in the City of Ithaca; and, WHEREAS, the OEDP Committee has discussed economic problems in the City of Ithaca and reviewed strategies for the solving of these problems, and incorporated this information in an Overall Economic Development Program for the City of Ithaca, N.Y., BE IT RESOLVED: Section 1: That the Overall Eeonomic Development Program for the City of Ithaca is hereby approved and adopted by the OEDP Committee as the initial Overall Economic Development Program for the City of Ithaca, N. Y. Section 2: That the OEDP Committee recommends that the Common Council of the City of Ithaca, N.Y. adopt the Overall Economic Development Program and submit it to the Economic Development Administration of the United States Department of Commerce. ADOPTED by the OEDP Committee at a meeting held on March 19, 1979. • • I IURA/CDA May 21 , 1979 RESOLUTION BE IT RESOLVED, that the IURA/CDA authorize the mayor to sign a contract with INNS to operate the Neighborhood Technical Assistance program, contingent upon the approval of the INNS Board of Directors and the City Attorney. • (! • • 21 Ja s RESOLUTION Resolve, that the 5th year application be amended to reprogram 505 Parallel Use ($30,000) to 5th year Contingency $20,000 502 Citywide Direct Grant $10,000 Further be it resolved, that Land Banking be dropped as a program element from the 5th year House Recycling/Land Banking line 509. C IURA/CDA May 21 , 1979 RESOLUTION BE IT RESOLVED, that the IURA/CDA authorize the mayor to sign • a contract with INHS to operate the Neighborhood Technical Assistance program, contingent upon the approval of the INHS Board of Directors and the City Attorney. IL e } APPENDIX A SCOPE OF SERVICES I. PROJECT NARRATTVE: Ithaca Neighborhood Housing Services will employ two organizers who will provide technical assistance to residents in the Northside and Southside neighborhoods. The assistance includes: assisting residents in developing block strategies for neighborhood revitalization; increasing citizen input into the community development process; developing linkages with public and private agencies; and increasing merchant input in the revitalization of West State Street. The organizers will make door-to-door contact with residents which will lead to block meetings. The creation of a block-by-block revitalization strategy will be the initial focal point for such gatherings. Building on the relationship developed at such meetings, the organizers will attempt to help residents form civic associations to deal with the full range of Community Development concerns. The organizers will work door-to-door with merchants in an effort to form a merchants association to represent the West State Street commercial interests and to insure their input into and participation in the revitalization process. In order to insure that the interests of the residential and commercial groups in the Northside/Southside neighborhood are articulated, and to encourage communication between the residents and commercial groups, the organizers will work towards developing an overall Northside/Southside Neighborhood Organization. This neighborhood organization will be a coalition of the various residential civic associations and the merchants association. TI. BUDGET The budget for this project is $25,000. SPECIAL MEETING IURA/CDA May 31, 1979 PRESENT: Mayor Edward J. Conley, IURA Chairman ' Anne Jones, IURA/CDA Stuart Stein, IURA/CDA Clarence Reed, IURA/CDA Rosalind Williams, CD Staff Amy South, CD Staff Thys Van Cort, Planning - Press • The meeting was called to order at 12:30 P.M. I. A Waiver was approved as due notification of the meeting had not been given. II. Approval of 2nd Year Application Williams introduced a revision of the second year Small cities application that would de-emphasize the pool for GIAC. Conley repeated his concerns about using federal money to fund a project that would require ongoing City maintenance. He again voiced his opinion that inquiries should be made into the feasibility of 'giving' the pool to either the School District or to the YMCA with the stipulation that it would be open to the public. - r Reed asked how much the Cass Park pool was being used. ' Conley said it was used to full capacity but that it had the disadvantage of being a seasonal and recreational pool . The new swimming pool , if devel- oped, would be covered, heated and multi purpose. He said that the City needs this kind of public pool but he estimated that the maintenance costs would run to $100,000 a year. Reed said that because of the City budget constraints, this would be impossible, Some of the costs would include energy, life guards, chemicals and insurance. Conley said that if the pool project is deleted, a whole new application must be made. He suggested putting it on hold until other organizations, including the School District and the YMCA had been approached. Jones said that Rochester had had the same kind of problems and suggested con- tacting them to see how they managed. Van Cort said that if the application is approved, the money designated for the Pool Will-have-to-be spent building it. : He said the pool must be deleted from the-" application{ and the tunds reprogrammed. Williams said she wants to stress the recreational aspects such as renovation and lighting, de-emphasizing the pool without dropping it from the application. Reed agreed saying he thought it best to remain flexible in case conditions changed. • IURA/CDA May 31 , 1979 Pap 2 , Williams proposed changing the project summary to read as 'additional renovations and sight improvements' . Reed MOVED to accept the proposal . Stein SECONDED. Jones asked if this would be the only change in the application and Williams said yes. A vote was taken and MOTION PASSED unanimously. III GIAC renovations Williams said that. Superintendent of Public Works Robert Dingman would like to begin working on GIAC as the season for exterior work has begun. Conley said that because of the reconsideration of the relocation of the Youth Bureau, and the present confusion of the School District reorganization, nothing has been concluded to date, He said that the IURA can take steps that the City cannot. Williams said she is trying to give Dingman a list of priorities that he can work with in a given :order with some agreement of the cost, Stein asked if Dingman was contracted by CD and asked if the work could be put out to bid to private contractors. Conley said Dingman has a level of expertise not easily matched. Stein suggested identifying the items of work to be done. Williams listed reorganization of office space, safety items such as fire escapes, energy saving devices such as skylights and handicapped access fa- cilities. She said that this leaves out preventive maintenance and exterior renovation. Stein said he thought safety and energy items should be handled first, leaving comfort items such as office renovation until last. Jones suggested that exterior work be done first because of the present con- struction season. Conley asked if there was enough money to begin safety and energy improvements. Williams said that if exterior work was considered low priority, there would be $15,000 available. The entire amount of $90,000 for this year would include the entire project. IURA/CDA May 31 , 1979 4[ : Page 3 Stein asked if the process required specific items to be accompanied with their cost estimates. Van Cort said no, that it was enough to give Dingman a list in priority order with a cost limit of $90,000. Stein questioned whether a private contractor would be cheaper. Van Cort said Dingman does the work of two private firms as he acts both as bidder and sometimes general contractor. Williams proposed that the IURA direct that the specifications be prepared for GIAC according to the following priorities: safety, energy, handicapped access, program, and preventive maintenance and that CD staff he directed to determine specific items that correspond to the priority list. Staff would also work with the BPW and the GIAC Board on implementation of the project. Stein MOVED to accept the proposal , Jones SECONDED and the MOTION PASSED unanimously. • The meeting adjourned at 1 :30 and the Agency went into Executive Session. IL We do waive the 48 hour notice of the May 31 , 1979 meeting of IURA/CDA called for 12:00 noon. • Signed, Mayor Edward J. Conley Chairman, IURA/CDA 0/4,7 Clarence Reed Cle-"NtoRa--64- Jim Dennis Gto� PKt4-4-1- Anne Jones 4.01a.. I . at142...0 Stuart Stein „Ae4rif , i s DATE: May 31 ' 1979 fi. ✓7J i Common Council RESOLUTION: SECOND YEAR SMALL CITIES APPLICATION WHEREAS, the City of Ithaca is committed to continuation of Rehabilitation Activities in the Northside/Southside target area, and WHEREAS, the City has successfully moved along in implementation of its 1st year Small Cities programs and projects, and WHEREAS, second year projects are a continuation for the most part of 1st year projects, and also a continuation of the overall target area strategy, NOW, THEREFORE, BE IT RESOLVED that Common Council approve the second year Small Cities Application and authorize the mayor to sign the application, • • IE May 31 , 1979 Pf C D PROGRAMS AND PROJECTS NORTHSIDE/SOUTHSIDE PROGRAMS 59.5% CITYWIDE PROGRAMS 5.9% NORTHSIDE/SOUTHSIDE PROJECTS 31.4% PROJECTS OUTSIDE C.D. TARGET AREA 3.0% 100 % May 1979 �9 4:` 59.5% NORTHSIDE/SOUTHSIDE PROGRAMS 1. INHS Rehabilitation Loans and Grants (101,201,301,402,5101) The high risk loan fund will grow to $700,000 after the 2nd year Small Cities funding. The fund is also being expanded through selling loans to the Neighborhood Housing Services of America, a second mortgage pool. 2. Neighborhood Improvements (105, 305, 311, 406, S106) The budget for Neighborhood Improvements has grown to over $600,000. Past efforts to develop a concept for neighborhood improvements have varied from spot neighborhood initiated projects, to murals, to prototype demonstration streets to a corridor that would provide handicapped access, lighting for safety as well as complementary improvements to housing rehabilitation efforts throughout the neighborhood. There have been several delays over the years due to lack of focus, small sums of monies and lately due to unfortunate false starts. In May, 1979 we hired a firm that we feel has the skills to take past and present concepts, working with the substantial funds we now have available to result in a comprehensive plan that will provide alternatives with cost estimates so that the community can determine its priorities. We have scheduled completion of the design phase by June 30 and Phase I construction to start by September 1, 1979. 3. INNS Administration Housing Services (108, 202, 302, 511, 5102) Funds used to support the administrative component necessary to provide high risk loans to low-income and unbankable people, also produces services that includes rehabilitation technical assistance, housing counseling, and financial counseling. The city contributes approximately one-half of the administrative costs for the basic program as well as additional programs: INNS crew, house recycling, etc. 4. Support Services for Housing Rehabilitation (206) This fund was used to provide a truck and tools for the CHORES Program. It is now in the possession of the INNS crew. NOUTHSIDE/SOUTHSIDE PROGRAMS PAGE 2 It was also used to pay for some of the expenses of the Southside Festival which promoted the neighborhood. Future use of this fund is undetermined. However, it could be used for other promotional activities from newsletters to buttons. Staff suggests that once the Neighborhood Technicians are hired these monies could be used for communications, brochures, etc. for specific neighborhood issues. 5. Code Envorcement/Junk Removal (306, 512) The junk removal fund for the Southside is being used. The funds for the Northside will come in June 1979. 6. 312 Loan Administration (403) A contract has been signed with the Building Department under Tom Hoard's direction to administer the 312 Program. Ron Oshier and Sharon Brown were hired as rehabilitation specialist and finance counselor, respectively. They both received training in this program at a workshop in Washington sponsored by NAHRO, They are presently designing the policies and procedures necessary to obtain loans of $27,000 or less per unit. They think that they can take their first loan applications by mid-summer. 7. Land Banking (405) Land banking was originally invisioned as a multi purpose fund that would allow for acquisition, demolition, rehabilitation and/or resale of delinquent properties to be used for mini parks as well as recycle houses. INNS has used the fund initially to recycle a house (216 S. Plain Street) . Because this type of activity is greatly needed to eliminate delinquent houses that discourage private investments nearby, additional funds (see House Recycling) were requested in the Small Cities application. Land bank can still be used for a range of purposes if needed. 8, Economic Development Study (4111 A market study of West State Street will be initiated in the Fall of 1979 after merchants on West State Street are organized, This study should evaluate the direction for future commercial growth. Designs and plans for the area will also be developed, • NORTHSIDE/SOUTHSIDE PROGRAMS PAGE 3 9. Mini Repair Program (504, S103) The mini repair program is ready to begin. INHS and the Tompkins County Office for the Aging are coordinating the program. Howard Ingram, the former INHS crew leader will be the elderly Repair Program Carpenter. This program is also available to the handicapped and low income female heads of households. 10. Neighborhood. Technical Assistance (506) There have always been a number of problems in the neighborhood that have never received the attention of the entire neighborhood even though they effect individuals and groups in real ways. INHS has identified an area of concern -displacement- that need not remain a threat if the neighborhood could be organized to deal with the potential problem on an aggressive and positive level. There are other concerns that residents have identified but have not had the time to address. The Neighborhood Technical Assistance Program will eventually hire two persons to be constructively creative in organizing the community around program potentials, West State Street revitalization, and community issues. 11. Code Enforcement (510) Funds to pay for a housing inspector for the C. D. neighborhood. This person has been contributed in the past by the city. 12. Home Recycling (S105) The House Recycling Program has been developed by INHS as a solution to derelict houses(see Land Banking) . Operating expenses come from a grant from the NYS Neighborhood Preservation Companies Program. At least three houses have been purchased to date and more are being planned. The fund should enable INHS to recycle at least ten (10) houses in the C. D, neighborhood. 13. Land Banking (307) This land bank line is distinct from land banking mentioned above because this fund was used by the City to rehabilitate 213 South Plain Street which was finally sold in March, 1979. The IURA recently turned over the proceeds from the sale of this house to INHS to rehab and sell more houses. IURA felt that the City did not have the machinery to effectively recycle houses. 5.9% CITYWIDE PROGRAMS 1. Citywide Emergency Grant (404, 502) 2. Citywide Housing (412) These two programs have been combined into the Citywide Direct Grant Program that provides grants to low income homeowners and renters. The grants will average in the $300.00 range. INNS and EOC are administering the program in the target area and citywide respectively. 3. Citywide Sidewalk Program (408) Program was established under the Citywide Housing Program. A contract for administering these funds has not been developed. 4. Citywide Crew Leader (503) • EOC requested funds to continue their CHORES crew leader after their present CSA funds are depleted. The crew will be used Citywide with the Citywide Direct Grant Program. 5. Parallel -Use This program was reprogrammed to contingency and Citywide direct grants when HUD Buffalo office insisted that they could not evaluate the programs benefit to low and moderate income or elimination of slums and blight, unless specific agencies and schools were determined. In light of the incentive nature of the parallel use program, which was established to encourage non-profit agencies to elect a school site over a residential one, we were unable to designate recipients of the grants at the time, although there have been interested groups and agencies. 6. Homeownership Assistance (507) The Homeownership Assistance Program is being developed. The intent is to provide a homeownership subsidy for low-income purchasers of recycled housing. The concept is borrowed from a new rural housing program which grants a subsidy to homeowners which reduces mortgage payments down to 25% of the families income. This program is a complement to house recycling which subsidizes the difference between actual costs and market price. Home ownership assistance would effectively subsidize the difference between market price and 25% of the families income. The subsidy would be returned upon resale, • CITYWIDE PROGRAMS PAGE 2 7. Handicapped Access (508) Beginning meetings with Easter Seals and the former PASDD Inc. to develop a contract. The survey has been completed and plan to publish the results by July, 1979. 8. Citywide House Recycling (509) The program will be similar to INHS's home recycling program except under this program houses will be chosen outside the INHS neighborhood, in areas where the house is strategic to the upgrading of a small neighborhood area, Once rehabilitated, homes would be sold to low- and moderate-income persons with assistance from the homeownership assistance program if necessary. The administrator of the program is unclear at this moment. We originally invisioned the City's rehab. specialist (312 Program) would provide specifications and monitor work while INHS would actually purchase, market and sell the properties. That arrangement has not been totally agreed to. ' 9. Historic Survey 9.0,44 co -ei_ 't, -2, (413) The survey is 70% complete. All work will be finished by July 30, 1979. 10. Economic Development (106) The study analyzed the fiscal and economic potential and implications for C. D. activities, C • PROJECTS UNDERWAY 1. 303 Southside Center A list of improvements was developed by Southside Center Inc. and priced by Bob Boehlecke, the architect. The BPW and the Southside Inc. together worked out priority items to be addressed with the approximately $40,000 remaining in the Neighborhood Facilities budget. The exterior and interior doors have been repaired and the kitchen will soon be totally renewed. 2. S109 GIAC The GIAC Board requested that the City purchase the building. That request will be forwarded to C. C. Wednesday night. In the meantime, plans for renovating the building will proceed similar to the Southside approach, of course as approved by the School Board. 3. 413 and S110 Historic Preservation -. St. James AME Zion Church Funds for this project and 1st Baptist Church have been held up administratively by HUD pending the results of a legal opinion on the constitutionality of supporting church properties through C. D. grants (separation of church and state principle.) 107 Historic Preservation - 1st Baptist Church (See above) 5108 Conway Park This park and Wood Street Park Phase II will be designed and constructed this summer by Bob Leathers. The IURA requested that the design for Conway Park be approved by them before proceeding with implementation. 413 and 514.Historic Preservation r Strand Theater Funds were provided from the Historic Preservation line for restoration of the marquee on the Strand Theater. The work is almost completed. 5107 Wood Street Park II (See Conway Park) PROJECTS UNDERWAY PAGE 2 ir IL 416 Street Improvements II This line was added through an amendment a couple of months ago. Unfortunately the peripheral Streets project got underway before the change was approved or released. • • • • • • • • COMPLETED PROJECTS 106 Economic Development Study Clinton Hall Wanzer Block 102 Neighborhood Facilities Southside Center 203 Neighborhood Facilities GIAC 209 Park Facilities Wood Street Park I 205 Historic Preservation Boardman I 308 Historic Preservation Boardman II 312 Street Improvements Peripheral Streets Project I 414 Handicapped Access Family and Children Services 415 Fall Creek Study `. • I, W1-‘(1e)‘ fir° LEGAL NOTICE For Publication on Thursday, May 31 , 1979 Date Submitted: Tuesday, May 29, 1979 LEGAL NOTICE NOTICE OF FINDING OF NO SIGNIFICANT EFFECT ON THE ENVIRONMENT COMMUNITY DEVELOPMENT PROGRAM 1. The City of Ithaca proposes to continue its Community Development Block Grant under Provisions of Title 1 of the Housing and Community Develop- ment Act of 1974 with the 5th Year Entitlement Program. The Fifth Year Program will include E# new programs: • 1 Home ownership Assistance Program 2 Citywide Crew Leader - C.H.O.R.E.S. Program 3 Code Enforcement Program 4 Handicapped Accessibility Public Information Program 5 Neighborhood Technicians Program 2. A. Ithaca's 5th Year Entitlement Program includes a citywide crew leader, a staff person• related to the citywide materials grant program: The citywide crew leader is an Economic Opportunity Program staff person who will supervise and execute repair work on homes *of lower income persons within the City of Ithaca. B. The-Home Ownership Assistance Program will be used in con- junction with house recycling activities, making such houses available to lower income families. C. The Code Enforcement Program will support a code enforce- (I ment officer for the target area, particularly the north side area. • Legal NI tice May 29, 1979 Page 2. ) 2. D. The Handicapped Accessibility Public Information Program will result in the publication of an access guide to the City of Ithaca and a public information library and service regarding the handicapped. E. The Neighborhood Technicians Prot am will result in p dt� / affjDe t ooti t formation of block assotiationssto work toward neighborhood improvement. 3. Basic Facts and Rimasons for the Determination of No Significant Effects are: A. All repair work will take place on existing structures in long developed areas. It is not expected that repair work will require even temporary relocation of individuals and/or families. B. To observers, repair work will look like normal maintenance and upkeep. C. There will be little if any damage to flora or fauna, and. since the area is a built-up one, there are few native plants and • animals in the area. D. No disruption of public spaces is anticipated through these programs and any disruption in privately owned spaces will be minimal. E. Positive effects are likely to mitigate or reduce whatever negative effects which may occur. Safer and neater dwellings will increase liveability to low income residents of the City. An Environmental Review Record has been established for Community Development activities which may be examined and copied at the Office of City Planning and Development Board, 108 E. Green Street. Ithaca, New York, between 8:30 A.M. C and 4:30 P.M. , weekdays. Legal Notice May 29, 1979 Page 3. No further environmental review is proposed to be conducted. The City of Ithaca intends to request the U.S. Department of Housing and Urban Development to release funds for the other activities listed above. Comments on the environmental review should be submitted in writing to the City of Ithaca, 108 E. Green Street, Ithaca, Hew York, 14850, Attn.: Community Development and received no later than June 16,1979, in order to be fully considered. • CITY OF ITHACA • 103 E. Green Street Ithaca, New York 14850 • Edward J. Conley, Mayor • - KE:jv • 5-29-79 bcc: c, s, w • • PLANNING DEPT. r 1010 ,d2.1a- Afi CITY OF ITHACA 108 EAST GREEN STREET ITHACA, NEW YORK 14850 OFFICE OF TELEPHONE: 272-17i3 MAYOR CODE 607 MEMO TO: Common Council Members IURA Members • Planning Board Members FROM: Mayor Edward J. Conley DATE: May 22 , 1979 G�� SUBJECT: Council Meetings • • This memo is written to try to clear up any confusion which may exist regarding meetings scheduled for the week of May 28th. Due to scheduling conflicts , holidays ,, and other commitments , it has , unfortunately been extremely difficult to schedule the meetings necessary to cover the variety of topics which are coming up in the near future. As a result, it has become necessary to schedule an informal meeting of the Common Council, the IURA, and the Planning Board on May 30th, in addition to a previously scheduled, formal public hearing and Council meeting on May 31st. , Thursday. The Thursday meeting is a requirement of the Community Development regulations as established by the U.S. Department of Housing and Urban Development, and is a necessary part of submitting the application for the second year of the 3 Year Small Cities Program. Our notification by HUD of the schedule for applying for the 2nd Year was extremely late, so that we have had virtually no flexibility in scheduling the required hearings. The Wednesday meeting, which is on the Ithaca Center Site, was called so that Council, IURA, and Planning- and Development Board would have the opportunity to meet with a developer whose interest in picking up the Ithaca Center project at the point where O'Brien, Taube, Gardner and Abbott left it in February of this year. It is our impressing that these developers have the experience, the leasing contact, and the financing necessary to make the project go, and I would like to have the opportunity to interview them with the appropriate City agencies . It is ,ay intention, after meeting with the developer, to discuss with Council the alternatives which face the City in this very important project. As the members of the Planning and Development Committee know, we have had a very difficult time in scheduling their meeting, and after much deliberation, finally did arrive at Wednesday, May 30th, as the date for the regular Planning and Development Committee meeting. Unfortunate ly, that was THE day which seemed to me to be most convenient for all involved regarding the Ithaca Center meeting, so for that reason I +, took the liberty of scheduling the Ithaca Center meeting on the night which had previously been scheduled as the Planning and Development Committee meeting. When Alderman Dennis returns to Ithaca I will ask him to reschedule the Planning and Development Committee meeting. I urge those of you who can make the meeting on the Ithaca Center (May 30th, 7: 30 P.M. , Common Council Chambers) to come. I look forward to working on this extremely important project with you. • UPS t+c. 63-P.152t U.S. DEPAF,TMENT OF HOUSING AND UR'tAN DEVELOPMENT Y �, COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM • GRANTEE PERFORMANCE REPORT 1. GRANTEE NAME AND ADDRESS 2. DATE OF PERIOD COVERED City of Ithaca BY REPORT 108 E. Green Street January 1979 Ithaca, New York 14850 FROM: • TO: May 1979 3. THE GRANTEE CERTIFIES THAT: (a) To the best of its knowledge and belief the data in this report was true and correct as of the date in Item 2. (b) The records mentioned in 24 CFR Port 570.907 ore being maintained and will be mode available upon request. (c) Federal assistance mode available under the CDBG Program is not being utilized to reduce substantially the omount of local Financial Support for community development activities below the level of such support prior to the start of the CDBG Program Year. i TYPED NAMEAND TITLE OFAUTHORIZEDREPRESENTATIVE SIGNATURE TELEPHONE NO. (Incle:dr Area Code) .07-272-1713 EDWARD J. CONLEY, MAYOR. DATE: MAY 1979 HUD—tA71 ( —75) • rJ _ OMlt flrer524 U.S.DEPARTMENT Or HOUSING AND URBAN DEVELOPMENT I-B POPULATION BENEFITTING FROM ACTIVITIES UNDER�'' AY OR COMPLETED — SERVICES OR ASSISTANCE GRANTEE NAME j DATE PERSON WHO CAN BEST ANSWER QUESTIONS ABOUT HUD GRANT PS THIS FORM IDENTIFICATION NO, City of Ithaca May 31 , 1979 Amy South ! B78-DN-36-0138 POPULATION BENEFITTING MINORTIY POPULATION BENEFITTING 1 OF TOTAL (2b) AC- TIVITY I SPANISH- AMERICAN ID BLACK ORIENTAL I ALL OTHER TYPE TOTAL Y. MALE % % LOWER AMERICAN INDIAN NUM• FEMALE INCOME , DER MALE FEMALE MALE FEMALE MALE FEMALE MALE { FEMALE MALE FEMALE (1) (2a) (2b) (2c) (2d) (2e) (3a) (3b) (3c) (3d) (3c) (3f) (3g) ' Ohl (31) I (31) S102 B 5,530 46.5 53.5 49 7.8 9.1 S103 C * S104 C * i *See Progress on Planned ned Ac:l i vi ti cs Narrative { ° i I { - I I j I I { 1 L1 , _... ?<„u 1 cf 1 papers ND-4070 (i-J6■ OMn 63R 172R U.S. DEPARTMENT OF HOUSiNG AND URBAN DEVELOPMENT • 1 I-A HOUSEHOLDS BENEFITTING FROM ACTIVITIES UNDERWAY OR COMPLETED—PHYSICAL AND CAPITAL IMPROVEMENTS GRANTEE NAME DATE PERSON WHO CAN BEST ANSWER QUESTIONS ABOUT HUD GRANT IDENTIFICATION CITY OF ITHACA MAY 31 , 1979 THIS FORM AM SOUTH NUMBER B78_O:y_36.0138 PROJECT/1 HOUSEHOLDS BENEFITTING MINORITY HOUSEHOLDS ACTIVITY BENEFITTING_%OF TOTAL 2b ID DESCRIPTION TOTAL (2b) NUMDER TYPE TOTAL INCOME _ SOURCE OR SCALE BLACK AMERICAN 'INDIIANSN ORIENTAL OTHER (1) (2a) (2b) (2c) (2d) (3a) (3b) (3c) (3d) (ir) S105 C see Progress on Pknned Activities Narrative (p.2) • { S109 GIAC • a. Architects analysis of building improvements costs and priorities has been completed. b. Urban Parks Recovery monies originally anticipated to match Small Cities funds for GIAC improvements are not available to cities under 40,000 population to our dismay. c. N. A. d. N. A. e. N. A. 5110 St. James AME Zion Church a. Contract has been signed for exterior restoration b. Funds have been held up by lawsuit concerning separation of church and state. c. N. A. d. N. A. e. N. A. • -3- • • . S105 Home Recycling Program . A a. Contract was signed with INHS to operate this program. Three (3) houses have been bought and are now being rehabilitated. b. N. A. c. N.Y.S. Neighborhood Preservation Companies. d. N. A. e. N. A. S106 Neighborhood Improvements a. The consultant to provide the overall design and specifications for the neighborhood improvements has been hired and is presently des-hi-l- ing improvements . Phase I of construction to start September 1 , 1979. b. N. A. c. N. A. d. N. A.. e. N. A. S107 Wood Street Park • a. Contract has been signed with Robert S. Leathers & Associates to do the final design and construction of the improvements. Construct- ion will be July-September 1979. b. N. A. c. N. A. d. N. A. e. N. A. S108 Conway Park a. Contract has been signed with Robert S. Leathers & Associates to do • the designs and construction of the improvements. Construction will be July-September 1979 b. N. A. c. N. A. d. N. A. r) e. N. A. -2- • • • • SUMMARY OF SMALL CITIES PROGRAMS - 1979 PROGRESS ON PLANNED ACTIVITIES - Narrative Summary S101 Loans/Grants a. Operating Steps Taken - Funds have been released for this project. A contract with INHS was signed. Loans/grants will be disbursed on a continuing basis. b. N. A. c. Neighborhood Housing Services of America • d. N. A. e. N. A. S102 INHS Services a. The funds have been expended to provide rehabilitation, financial and counseling services to assist in housing rehabilitation activities in the Small Cities target area. b. N. A. c. Local Banks, N.Y.S. Preservation Companies, CETA, Local Industry. • d. N. A. e. N. A. S103 Elderly Mini-Repair Program a. A contract was signed with INHS to operate this program. Staff has been -hired and the program is providing assistance to residents. b. N. A. c. In kind services from the Tompkins County Office for the Aging. d. N. A. e. N. A. S104 312 Technical Assistance a. Contract was signed. All program staff has been hired, trained and are now developing program policies and procedures. b. N. A. c. Office space, heat and lights contributed by the City. d. N. A. • 1 e. N. A. i -1- • • • } . ,""' OMR 1t 3OI324 . • U.5. OCPA TwNT OF: HOUSING AND URBAN DEVELOPMENT • I. PROGRESS ON PLANNED ACTIVITIES - SMALL CITIES PROGRAM GRANT[[ NAME DATE 1 PSRSON WHO CAN BEST ANSWER QUESTIONS ABOUT rORM THUD GRANT IDE.NTIr'ICATION NO City of Ithaca , New York !May 1979 Amy South B78-DN-36-0138 I AMOUNT CURRENT ESTIMATED RELATED 011LIOAT[O EXPENDED NO. I - DESCRIPTION - YEAR CENSUS TRACT ORIGIN CO M- flVOG[7 CUB REN7 BEGUN PL[TION ESTIMATED CURRENT I CURRENT ! DATE LINE ITEM COST I 1..ir[ or Lira or PROGRAM PROGRAM PROGRAM PROGRAM YEAR YEAR (1) I (2) (31 • (4) (51 (6) (71 (8) (9) (10) (1/) (12) S101 Low cost rehabilitation Loans Grants 1st* ? I 2j A ongoing 12C j300,000 200,000 200,000 0 0 1 31 S10 INNS Rehabilitation Services 1st* 0 21 A ongoing 12C 150,000 50,000 50,000 50,000 50,000 1 31 • (45,000) • 5101 Elderly Mini Repair Program ' 1st 0 2I A ;ongoing 12C 50,000 16 ,000 16,000 0 I. 0 1 01 3; (12,300) S104 312 Technical Assistance 1st* ! 1 2 A ongoing 12C, 8 90,000 30,000 30,000 11 ,800 11 ,800 • j3 � I S10q Home Recycling Program 1st* i I 2 A ongoing 12C 100,000 1100,000 100,000 165,000 65,000 1 I 3 (30,000) 510o Neighborhood Improvements • 1st* I � 2! A 12/ 81 3i 500,000 29,000 29,000 0 0 31 5107 Wood Street Park .- 1st* f I 3j A 11/79 3b 20,000 20,000 20,000 0 0 S10 Conway Park 1st i2! A 11/79 3b 20,000 20,000 20,000 0 0 5109 GIAC 1st* 12i A 12/80 3b 175,000 90,000 90,000 0 0 Slid . James A.,9.E. Zion Church 1st* 3i A ** 12e 30,000 30,000 30,000 0 0 (30,000) I R I I i * See 4th y.!ar Performance Report (Jan, , 1979) ( 1 f I for past h,(rformance under C,D.B.G. Entitlement Funding. ' i 1 ** Continnt upon settlement of church/state lawsuit. � � i i f _.�_____ ____ , ..... i I _1 eOMB 1;7RIe7i U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT I-C RELOCATION FUNDED UNDER CDBG C,TE: COMPLETE A SEPARATE FORM FOR EACH ACTIVITY LISTED ON FORM HUD-4070 WHICH GENERATED A RELOCATION WORKLOAD. 6RANTEa NAME DATE ACTIVITY NUMBER PERSON WHO CAN BEST ANSWER QUESTIONS ABOUT THIS FORM HUD GRANT IDENTIFICATION NUMBER CITY OF ITHACA MAY 31 , 197. ALL AMY SOUTH B78-DN-36-0138 RELOCATION, BY HEAD OF HOUSEHOLD • TOTAL MINORITY WORKLOAD WORKLOAD - ITEM DESCRIPTION BLACK SPANISH•AMERICAN AMERICAN INDIAN ORIENTAL ALL OTHER MALE FEMALE MALE FEMALE MALE FEMALE MALE FEMALE MALE FEMALE MALI FEMALE • foal (1 b) f1a1 , (2b) (2c) (2d) rte) (2!) 1141 ON 1 f1+1 fell TOTAL RELOCATION WORKLOAD N A. N• A• . PLACED IN TEMPORARY t HOUSING J .. O. ON-SITE , • b. OFF-SITE . • BALANCE IN WORKLOAD • • REMOVED FROM WORKLOAD • WH[REABOUTS UNKNOWN PERMANENTLY RELOCATED, BY CENSUS TRACT • • ' a. • • b. . • C ' d. - I e. II _ _ _ - - \ ` ` \ \ � \ ` \ � . \ \ ` ` ` \ ` ` \ ` ` ` ` ` ` ` ` ` ` ` \ \ ' Tr ' � .� ■ ^�' DESCRIPTION AND/OR SOURCE OF DATA FOR PART I I.A Households Benefiting from Activities Underway or Completed - Physical and Capital Improvements Sources Used: N.A. f . I.B Population Benefiting from Activities Underway or Completed - Services or Assistance Sources Used: 1st Count Census of Population Percent male and female - 1970 Census of Population and Housing I.0 Relocation Funded under CDBG No relocation to date. • Form Appro..d OMB Ne. 63-R1524 II. Recipient Assessment 24 CFR 570. 906 (b) (2) Statutory National Objectives The following constitute the general objectives established by Congress for the national program of Community Development Block Grants. It is not anticipated that any one community's CD program, in any one year, will deal with each objective. (The local program, of course, remains subject to the assurance, required by law, concerning giving maximum feasible priority to activities which will benefit low- or moderate-income families or aid in the prevention of elimination of slums or blight) . For each of the following general objectives, check the appropriate box to indicate whether the current program year's activities do or do not contribute to that objective. Briefly explain, on a separate sheet of paper, all affirmative responses, in- dicating how the current program year' s activities have contributed to each objective. CD Program Does Does Not Contribute Contribute (1) Elimination of shuns . and IL blight and prevention of blighting influences. yes (2) Elimination of conditions detrimental to health, safety, and public welfare through code enforcement, demolition, interim rehabilitation assistance, and related activities. yes (3) Conservation and expansion of the nation's housing stock yes (4) Expansion and improvement of the quality and quality { of community services yes (5) More rational utilization of land and other natural resources and better arrangement of needed activity centers yep HUD-4080(1-76) 2 Does Does Not Contribute Contribute it (6) Reduction of the isolation of income groups within communities and promotion of an increase in the diversity and vitality of neighborhoods. yes (7) Restoration and preservation of properties of special value for historic, architectural, or esthetic reasons. yes II. Short-Term Objectives Using a separate sheet of paper, list all short-term objectives which are being addressed by this year's CD program. (Use the numbers from the previous Community Development Plan Summary: C-1, C-2, etc.) . Briefly explain how the current program year' s activities have contributed to each objective. For each objective list the numbers of the activities listed on the Progress on Planned Activities (HUD-4070) that contribute to that objective. • MUD-4080(1-76) IL II RECIPIENT ASSESSMENT AP IL I. Local Facilitation of National Objectives (1) & (2) The variety of programs available for housing rehabi- litation promote the enforcement of housing codes by eliminating code violations and/or safety conditions which presently exist. Demolition, or acquisition and rehabilitation of vacant properties will contribute to eliminating blight. (S101 , S102, S103, S104, S105) . (3) Rehabilitation programs can serve and improve the existing housing stock. (5101 , S102, S103, S105) . (4) Renovation of GIAC will improve the quality of community services and expand them by providing accessibility for the handi- capped. (5) The continued conservation of the Target neighborhood reinforces past investments. The neighborhood improvements will provide access for the handicapped to many of the major activity centers in the neighborhood. Park improvements will allow more utilization of the neighborhood parks. (6) Development and expansion of the physical amenities in the target neighborhood through park improvements and neighborhood improvements will help to attract and maintain income groups that may otherwise be attracted to the suburbs. (7) Restoration of St. James A.M.E. Zion Church will contribute to the preservation of historic properties in Ithaca. • II . LOCAL OBJECTIVES Short-Term Small Cities Activity Objectives # from HUD 4070 Comments Recreation C-2 S107, S108, S109 The Park Improvements in two neighborhood parks and the renovation of a neighborhood facility will improve both indoor and outdoor recreation. Historic Preservation C-3 S110 Grant for restoration of St. James A.M.E. Zion Church, a historic pro- 'r perty. Housing C-5 S101 , S102, S103, A comprehensive program S104, S105 including loans and grants for housing rehabilitation and demolition or rehabili. tation of blighting struct. ures in the community, is designed to attack the major physical problems of residential decline. Neighborhood Improvements Services C-6 S106 A comprehensive program including street trees, cup cuts, sidewalks, street furniture and landscaping is designed to support housing rehabilitation and neighborhood conservation. U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT / ill—A HOUSING ASSISTANCE PROVIDED GRANTEE NAME - DATE PERSON WHO CAN BEST ANSWER HUD GRANT ID NO. QUESTIONS ABOUT THIS FORM CITY OF ITHACA MAY 1979 KATHE EVANS B78-DN-36-0138 TOTAL ELDERLY OR HANDICAPPED (I.2 Persons) TYPES AND SOURCES OF ASSISTANCE OCCUPIED COM- OCCU- CTTE MI- HANDI- GOAL MITTED PIED GOAL MITTED TOTAL NORITY CAPPED (1 a) (lb) (le) (2a) (2b) (2c) (2d) (2e1 A. NEW RENTAL UNITS: 1. Section 8—HUD 2 State Agency-Total (Sum of lines a & b) a. Section 8 _ b. Other 3. Other Assisted New Rental Housing (Identify) Total b. 4. Total: (Sum of lines 1,2, & 3) B. REHABILITATION OF RENTAL UNITS: 1. Section 8—HUD 2. State Agency-Total (Sum of lines a & b) a. Section 8 4 b. Other 3. Other Assisted Rehabilitation of Rental Housing - (Identify) Total a. . b. 4. Total (Sum of lines 1. 2, & 3) PLEASE SEE r-- _ GRANTEE PERFORMANCE C. EXISTING RENTAL UNITS: REPORT, JANUARY 1979 TABLE 111-A, HOUSING ASSISTANCE _1. Section 8—HUD - PROVIDED. 2. State Agency-Total (Sum of lines a & b) _ -- a. Section 8 _ _ b. Other _ 3. Other Assisted Existing Rental Housing (Identify) Total . a- b. 4. Total (Sum of lines 1, 2, & 3) D. REHABILITATION ASSISTANCE TO HOME- OWNERS OR PROSPECTIVE HOMEOWNERS 1. CD Block Grants 2. Section 235 13 . Other Rehabilitation Assistance to Owners r (Identia Total a. b. 4. Total (Sum of lines 1, 2, & 3) 1NEW CONSTRUCTION ASSISTANCE TO HOME- OWNERS OR PROSPECTIVE HOMEOWNERS: 1. Section 235 2. Other (Identify) Total a. - IL 3. Total (Sl.m of lines 1 + 2) ALL HOUSING ASSISTANCE (Sum of linen As, B4, C4, D4, and£3) P•p• 1 o1 2 - HUD-4076 (1-78) US. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT III—A HOUSING ASSISTANCE PROVIDED GRANTEE NAME DATE PERSON WHO CAN BEST ANSWER MUD GRANT ID NO. QUESTIONS ABOUT THIS FORM CITY OF ITHACA MAY 1979 KATHE EVANS 878-DN-36-0138 FAMILY LARGE FAMILY (4 or less persons) IS or more persons) TYPES AND SOURCES OF ASSISTANCE CO M- OCCUPIED COM- OCCUPIED GOAL MITT ED TOTAL MI- FEMALE GOAL.MITMITT"! TOTAL!MINORITYfFEA NORITY R 2 HEADED (3a) (3b) (3c) (3d) (3e) (4a) (4b) (4c) (4dj r(4e; A. NEW RENTAL UNITS: 1. Section 8—BUD 2. State Agency-Total (Sum of lines a & b) a. Section 8 b. Other • • 3. Other Assisted New Rental Housing (Identify) Total a. b. 4. Total (Sum of lines 1, 2, and 3) B. REHABILITATION OF RENTAL UNITS: 1. Section 8—HUD 2. State Agency-Total (Sum of lines a & b) I ' a. Section 8 b. Other 3. Other Assisted Rehabilitation of Rental Housing (Identify) Total a. b. 4. Total(Sum of lines 1, 2, & 3) C. EXISTING RENTAL UNITS: PLEASE SEE GRANTEE PERFORMANCE 1. Section 8—HUD REPORT, JANUARY 1979 j 2. State Agency-Total (Sum of lines a & b) TABLE 111-A, HOUSING ASSISTANCE a. Section 8 PROVIDED. b. Other 3. Other Assisted Existing Rental Housing — (Identify) Total a. b. 4. Total (Sum of lines 1, 2, & 3) D. REHABILITATION ASSISTANCE TO HOME- OWNERS OR PROSPECTIVE HOMEOWNERS: 1. CD Block Grants t 2. Section 235 • 3. Other Rehabilitation Assistance to Owners (Identify) Total a. b. 4. Total (Sum of lines 1, 2, & 3) E. NEW CONSTRUCTION ASSISTANCE TO HOMEOWN- ERS OR PROSPECTIVE HOMEOWNERS: I. Section 235 2. Other (Identify) Total a. b. 3. Total (Sum of lines I +2) • ALL HOUSING ASSISTANCE: (Sum of lines Al, 84. C4. D4, and E3) P.p. 2 of 2. HUD-4076 (1: 4 . OMw 11311J921 HUD ORANT IDENTIFICATION NO. U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT B78-DN-36-0138 III-B LOCATION OF UNITS WITH FINANCIAL COMMITMENT (Attach Map) +MSA CODE NUMBER OF UNITS CENSUS TRACT TOTAL NEW REHABILITATION EXISTING (a) ' (d� l�l • PLEASE SEE GRANTEE PERFORMANCE REPORT, JANUARY 1979 TABLE 111-A, HOUSING ASSISTANCE PROVIDED. • • Fora App.oJed OMB No. 63•R15?4 V-B. Fair Housing (24 CFR 570.900(c)(2)) 1 . By executing the Certificate of Assurance for Title VIII of the Civil Rights Act of 1968, the recipient has agreed to administer its programs relating to housing and urban development in a man- ner to affirmatively further fair housing. (Activities under this category need not be limited to those funded under CD Block Grants. ) Listed below are areas of particular concern in which specific actions can be taken to provide for greater housing opportunities throughout the locality for minorities and women. For the areas of concern listed below: a. Check those in which studies or actions have been undertaken during the program year. • b. On a separate sheet of paper, summarize the specific study • or activity and briefly describe the results and recommenda- tions of the study or the effects of the action. As an example, a locality might examine the pattern of multi-family zoning to determine its effect on minorities. The recipient would check "zoning", and note on the separate sheet that a study was undertaken to determine the effects of current multi-family zoning on minorities. The results of the study could be summarized , for example, "the pattern of zoning tends to further the concentration of minorities in the locality because the bulk of the multi- family zoning is in, or adjacent to, minority communities, rather than located throughout the locality." If the study recommends actions, such as dispersing multi-family housing, these recommenda- tions must be summarized. Zoning Building Codes Housing Codes Land Use Planning, Policy and Implementation Development Program Planning, Policy (including Site Selection Policies), and Implementation Public Facilities Housing Other (Specify ) 2. Complete Form V-C , "Action to Prevent Discrimination in the Sale, Rental and Financing of Housing , " (HUD-4072 ) . * MUD.AD6?(1.76) *SEE GRANTEE PERFORMANCE REPORT (Jan. 1979) - Appendix A. j #041 . Form Approved OMB No. 63.81524 U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT V—C ACTION TO PREVENT DISCRIMINATION IN THE SALE, RENTAL, AND FINANCING OF HOUSING GRANTEE NAME DATE PERSON WHO CAN BEST ANSWER QUESTIONS ABOUT THIS FORM CITY OF ITHACA MAY 1979 AMY SOUTH CODE NUMBER OF SPECIFIC ACTIONS TO PREVENT STAFF PERSON REPONSIBLE DOLLAR VALUE DISCRIMINATION UNDERTAKEN DURING PROGRAM YEAR AND/OR CONTRACTOR OF STAFF TIME AND/OR CONTRACT ACCOMPLISHMENTS (1) (2) (3) (4) PLEASE SEE GRANTEE PERFORMANCE REPORT, JANUARY 1979. • PAGE OF PAGES HUD.4072 (9.761 Form Approved • 0M© No.63.R1524 NAME OF CITY U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ITHACA, N. Y. V—E TITLE I ASSISTED ,PRIME CONTRACTS OVER S10,000 _DATE May 1979 JANUARY, 1979--MAY, 1979 AGENCY OR UNIT OF GOVERNMENT r q y (Specify period covered) Ithaca Urban Qenewal Agency/ ►�1� 1PuR cDevelop- PEPSON WHO CAN BEST ANSWER QUESTIONS ABOUT THIS FORM HUD GRANT IDENTIFICATION NUMBER AMY SOUTH B78-DN-36-0138 W SPECIFY TYPE OF WORK > SPECIFY DOLLAR VALUE OF CONTRACT IN 1J) (J) NA IJ) UNDER THE APPROPRIATE a W DATE APPROPRIATE COLUMN ELIGIBLE COLUMN . 7 NAME OF CONTRACTOR OF AWARD SECTION 3 COMPETITIVE MINORITY FEMALE on Z Z OVER 510,000 5100,000 BUSINESS CONTRACTOR CONTRACTOR CONSTRUC. SUP. SER. U UNDER$100,000 OR MORE YES NO TION PLIES VICES (1) ' (2) (3) (4a) (4b) . . (5) (6a) (6b) (7) (8) (9a) (96) (9e) TOTAL DOLLAR VALUE-- construction contracts $22,690 0 0 0 • TOTAL NUMBER--construction . contracts (TOTAL NUMBER CONTRACTORS) ' 1(1) 0(0) 0(0) 0(0) ,_____ TOTAL DOLLAR VALUE-- contracts for supplies ' 0 0 0 0 , i TOTAL NUMBER--contracts for supplies (TOTAL NUMBER CONTRACTORS) 0(0) 0(0) • 0(0) 0(0) TOTAL DOLLAR VALUE contracts for services $58,000* $708,900* $600,000 0 0 A TOTAL NUMBER--contracts for services (TOTAL NUMBER 2(2) 2(2) 0(0) 0(0) CONTRACTORS) CUMULATIVE TOTALS $ 80,690 $ 708 900 ' 1 " 0 1 1 8 1 N N N * HUD-407319.75) These totals represent three-year contracts based on the three-Year Small Cities Plan. f z (Sam NAp.p63 v-Rdd 324 NAME OF CITY U.S.DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CITY OF ITHACA • V-F TITLE I ASSISTED SUB-CONTRACTS OVER $10,000 DATE MAY 31 , 1979 AGENCY OR UNIT OP GOVERNMENT COMMUNITY DEVELOP- , JAN.1979 - MAY 1979 , ' A URBAN RENEWAL AGENCY '�l NT AGENCY • (Specify period covered) ABOUT SON WHO S FORM BEST ANSWER QUESTIONS _ AMY SOUTH NAME OF CONTRACTOR DATE OF AWARD HUG GRANT IDENTIFICATION NUMBER _ B78–DN-36-0133 a L/ I- / SPECIFY TYPE OF WORK DOLLAR ' 0 'v I `�I UNDER THE APPROPRIATE • APPROPRIATE COLUMN O W DATE ELIGIBLE COLUMN I W 2 NAME OF SUB-CONTRACTOR OF SECTION 3 MINORITY FEMALE , z z AWARD OVER 310,000 $100,000 BUSINESS CONTRACTOR CONTRACTOR CONSTRUC- SUP- SER- U UNDER$100,000 OR MORE TION PLIES VICES (I) I — (2) (3) (4a) (4b) (S) (6) (7) (8a) - (8b) (8c) N. A. • • I i 11-+• I • - • r CUMULATIVE TOTALS $ $ 1 0 1 0 b E PACE OF PAGES ,, OMt! NO. e3R•1e24 �j R NAME or ORANT[[ DATE !ON WHO CAN AMY SOUTH C1U6lTIONf ABOUT THItr FORM NUbi, �tN JD6NV13� '` MAY 31 , 1979 tjj 11 U U O • CITY OF ITHACA (IURA/Cs. EMPLOYEES. i i V-0 Recipient Employment • Total Non•Mlnority Black Spanish-American American Indian I Oriental All Other Minoritir rTitle I Recipient deportment',•gentles,and units of Fluvial* "^�'e I government. M le Fem•t• Male F.• el* Male Female IA Female Mole F•mel• I mail / ' A. All Employees as of 1—79 t MEM Srorl o Ro ►om imonth/year) 1 Z pt 1 pt 1. Under $7,500 F 2. 57,500 • 59,999 1 f t-1 p s 1 pt • "� +3- S10,000 •S 1 2,499 1 ME ________ - , ' 4. Over • S15,000 .�.��� • e r ' s- E•. Cwtr 415.000 - - - II B. Total Number Hired - Start of Program to Date - 2 ft 1 1 ft 1 of Report 1 2 pt 2 pt 0 1. Under$7,500 • 2 $7,500 $9,999 1 ft 1 pi 1 pt T 1 3. S10,000• S12,499 1 _ 4. S12,500 • S15 000 1 ft 1 pi 1 ft 1 p I 5. Over S15,000 _ NM-_ C. Total Number Fired or Resigned(Designate whether 0 fired or resigned)Start of Pro rem to One of Report 0 0 0 0 III I a 1 g 0 MI 1. Under$7,500 2. $7,5_00•S9,999 3. S10,000•S12.499 � 4. 512,500•S15,00000 5. Over S15,000 -- - lin — -- 0. Total Number Promoted' (by new salary) O.__ 0 0 0 0 0 Start of Program to Oats of Report 1. Under S7,500 2. $7,500•S9.999 _ 3. S10.000•512„499 4. S12.500•5 15,000 ' 5. Over S15,000 .11 E Total Number Section 3 Residents Employed- 0 1 pt 0 1 pt 0 0 • NNE Start of Program to Oate of Report(/ks not include employees listed under"F Training/Yogrem:) 1. Under$7,500 2. 57,500.59.999 1 �t 1 �t . _3. !t0.000.517.499 _ ! =� 4, 512,500.515,000 ,.____.,.... II �Ir I 5. Over S15,000 — F. Tntat Number Enienng into Training Programs - I Sr•rt of Program to Oct.of Report/Note those 1 1 1 0 0 i. who are tccifwl.j�_corctedtratdutW • 4. Under 57.500 _i I �.�•∎ N .-�. mow► 1' 2. $7,500_59.999... -'"_"'.'..'_i. - ,. lr-----y .3. $10.000• S 17 499 .... ._..__......— _ - 1 ��..�...-......- .. .. _. 4. S 1 2.500•S15.000 — OMs ► n. •35.1524 • • NAM[ O► GRANTEE - DATE -SON WHO CAN BEST ANSWER QUESTIONS ABOUT THIS FORM HU• •NT 10 NO. CITY OF ITHh, ACA NEIGH :HOOD HOUSING SERVICES, INC.) MAY 1979 AMY SOUTH B-,8-DN-36-0138 , . , V-O Recipient Employment ITitle I Recipient departments,agencies,and units of Total Non•Minority Black Spanish•American American Indian Oriental All Other Minori I government. Mph Fem.!. Male Ferrate Male Female I Male Female Male Female Male Female Male Filo lie 1 11 bi (24/ (241 lief (JJiJ ® (i r) 1341 (lei (ID -/3l1 /3111-, 04 i91 A. All Employees es of 1/79 . (Start of Program) (month/year) 7 3 5 1 2 2 ' 1. Under $7,500 1 2. $3.500 ••$9,099 3 1 2 1 1 . a. s t o;000-s 12 499 __1 1 1 1 1 I 4. S12,500 • S15,000 2 L. 5. Over 515,000 1 1 B. Tonal Number Hired - Start of Program to Date , 0 0 0 1 of Report I. Undo.,57,500 - 7. i 1,500••is,999 • 3. S10,000• S12,499 n l 4. S12,500• S15,000 l 5. Over S15.000 _ - t l - C. Total Number Fired or Resigned(Designate whether fired or resigned)Start of Program to Date of Report 0 0 0 0 0 0 } I. Under$7,500 2. $7,500•S9,999 - r, r 3. S 00,000•S12,499 4. 512,500•S15,000 5 Over$15,000 • - - -_ i. a-- v_ -D. Total Number Promoted• (hy new salary) S1rrt of Program to Date of Report 1 0 1 0 0 0 • 1. Under$7,500 2. 57,500•S9,999 1 1 j 3. S10,000•S12,499 , ' 4. S12,500•S15,000 5. Over S 15,000 E. Total Number Section 3 Residents Employed- Start of Program to Date of Report(()o not Include 3 1 • 1 0 2 1 • employers listed under"b"; Training Programs) C , 1. Under$7,500 1 1 2. $7,500.$9,999 2 1 1 + ■____- 3. $1 0,_000•S12,499 1 1 4. $12,500•S15,000 • _ S • 5. Over$1 5,000 ' ' 1 ._ - ,F. Total Number Enlersnp-into Training-Programs- , Start of Program to Date of Report(Note those 2 2 1 1 1 1 ,_ who are SCUion_i CurercdlgsidUllsl- - - 1. Under S7,500 1 1 - , 2. S7,500_S9,999 2 1 1 1 1 3. S10,000•$17,499 _..__ . ..- _ S SPECIAL MEETING COMMON COUNCIL/IURA May 31 , 1979 MINUTES 7:30 P.M. Common Council Chambers • • PRESENT: Elva Holman, CC Mayor Conley, IURA Chairman Richard Boronkay, CC Richard Daley, City Controller Kathe Evans,, CD Staff Roz Williams , CD Staff Ray Bordoni , CC, • Donald Slattery, CC Ethel Nichols, CC John Gutenberger, CC Rudolph Saccuccir CC Robert Boothroyd, CC Nancy Meyer, CC JMme Dennis , CC Joseph Rundle, City Clerk Art Pearce, INHS Press Mayor Conley called the meeting to order at 7;45 P.M, with the Pledge of Allegiance to the flag, Conley explained that the hearings were scheduled back to back because of the late notice by HUD of the Small Cities application, The application must be in Bingamton on June 1 , 1979 for A-95 review. Conley asked Council if they would entertain a motion to open the Puclic . Hearing. Dennis so MOVED, Boronkay SECONDED and MOTION PASSED. George Wands spoke on behalf of the Strand Theater. He said that the Strand was probably one of the most important things happening in downtown Ithaca. Wands said he had come from Buffalo, N.Y. where he had taken over an entire block that was in a derelict section of upper Main Street and turned that block around into an officially designated theater district by the City of Buffalo, the University n Buffalo and the State of New York.. Wands said that his salary was funded '. ' art by the New York State Council on the Arts and that this Council and tr. =overnor are very interested in opening the Ithaca area at the grass roc level (non-academic) as a center for the performing arts. Wands proposed the creation of 3 full tie positions at the Strand Theater, and a brick and mortar grant to replace the essential plumbing and bathroom fixtures throughout the entire theater. One request is for $31 ,139 and the other is for $26,500, He said that he would be available at the theater to answc • any questions, Monday through Friday from 8 to 6 and during performances. a MINUTES COMMON COUNCIL/IURA May 31 , 1979 Page 2 Wands added that he had spoken before Council and the CAC in November, 1978, to ask for money from CD funds to give disadvantaged people in Ithaca, free tickets to the Strand Theater. That proposal was denied because of CD guidelines. Subsequently, the Strand gave free tickets to events sponsored by the Strand. He said that documentation of this is available. Meyers asked CD staff and Wands for more information on how people found out about the possibility of asking for CD funds. Wands said that meetings were advertised in the paper and that by virtue of these advertisements, he had attended a Planning and Development meeting the night before. That meeting was not a public hearing so he had returned to tonight's special meeting. Meyer said that she particularly questions what the CD staff interest is in this project . She said thatmoney was going to the same recreational areas that had already received money. Williams said that activities outside the target area are funded by the 5th year entitlement and that the Strand is listed as an activity under this grant. She explained that the 2nd year Small Cities application was compe- ting with other cities and that it had to be put into the target area and show benefits to low and moderate income persons. Williams said that the Strand is applying for an Appalachian Regional Commission grant of $400,000 and that CD has agreed to act as the basic administrative agency for the theater, Previous CD funding for the Strand have involved the theater marquee and the building facade, Jim Dennis suggested forwarding the proposal by resolutfion to the CAC where they can be studied in relation to the overall picture. Conley said that he had spoken with Wands earlier and asked if the present program could be changed or Jf there was a possiblity of adding the Strand proposal into next year's Small Cities Application if appropriate. Meyers said she is concerned about the people in the target area. She said that four theaters downtown have been lost to date and she noted that cultural activities go out of the target area's reach. Dennis MOVED to refer the Strand proposal to CAC and the IURA. Bordoni SECONDED. Saccucci asked if the income from the sale of tickets had increased in order for the Strand to become self supporting, Wands said that the Strand's priority was to restore the theater to a full proscenium theater with full stage rigging so that a facility of this kind will be available for various indiginous groups. Among these, Wands mentioned The Ithaca Opera, the Ithaca Ballet, the Ithaca Players , the Cayuga Chamber Orchestra, and Cornell and Ithaca College, No such facility exists at present ' MINUTES COMMON COUNCIL/IURA May 31 , 1979 IL Page 3 in this community and he said that the Strand is the last legitimate house left with the kind of architecture that one needs in a theatrical setting to put on a fully mounted production. Wands added that the theater must be programmed so that it reaches the broad cross cultural peoples of the com- munity. He said that citizen's projects at the grass roots level ultimately improve the quality of life, provide a home for supporting groups and also increase the economic tax base of the communities they;serve. He noted that this has already been demonstrated in Buffalo, Spkane, Denver and Hartford. Conley said that if the theater gets the grants they need to bring the building back to full restoration, they would then be able to maintain their operation from their proceeds. He pointed out that they will need help for some time until this situation is established. Wands added that full restoration makes the building more rentable. A vote was taken and MOTION,.PASSED to accept the resolution that the Strand proposal be referred to CAC, Art Pearce, Director of INHS and a member of the Community Advisory Committee, voiced his support of the 2nd year Small Cities application. He said that this application included the ongoing funding of the new Mini-Repair Program that provides basic repairs to elderly or disabled homeowners. He said that the program has been very successful and that he would be returning in July to make a full mid year report to Common Council . Copies of the INHS Mini- Repair brochure were passed out to Council members. Saccucci asked if the application, once passed, would apply to all neighborhoods and Conley answered no, that most of the programs are in the target area. After asking if there was anyone else who wanted to address Common Council on the Small Cities application, Conley entertained a motion to close public hearing. Gutenberger so MOVED, Boothroyd SECONDED and MOTION PASSED. Dennis MOVED to approve the 2nd year Small Cities application and to author- ize the Mayor to sign the application, Nichols SECONDED. Conley mentioned that the application was the highest rated of the non-metro- politan applications and received a higher rating than any metropolitan area. He said that it reflects the high quality of work done by Rosalind Williams and the Community Development Staff, Williams explained that the original application was submitted in May of 1978 and that it outlined the full program. This program includes housing reha- bilitation through various programs such as the INHS high risk loan program, the 312 program, the Mini-Repair program, and the house recycling program. The Neighborhood Facilities financing program included renovations to GIAC r. • MINUTES COMMON COUNCIL/TURA 4 May 31 , .1979:. . .. . .., t. Page 4 for interior work and for exterior recreational improvements. Other improve- ments include the renovation of two area parks (Conway and Wood Street Parks). Williams added that a large sum of money was available for neighborhood im- provements to complement the housing improvements, Another major program is the West State Street program which will begin with this 2nd year application, She said that each year Ithaca applies for different amounts of money or for different programs under the ap- proved and funded 3 year plan. The 2nd year funds will be for rehabilitation loans and grants, INHS rehabilitation services including administration costs, the elderly Mini Repair program, the 312 technical assistance program, and Southside and Northside neighborhood improvements. The West State Street revitalization program will get $50,000 this year • in order to begin. Salaries for organizers that will work with West State Street merchants will come from the Entitlement funds, She added that the Small Cities Grant provided the funding that made it possible for the INHS process to move into the Northside area. Slattery asked where the play structures slated to be constructed in Conway Park will be built. He noted that the available space is used for older children's activities such as baseball and basketball and questioned the feasibility of interaction between the two age groups. • Conley said this was also a concern of the Ithaca IURA and said that meetings with neighborhood people were being set up to discuss other possibilities. He said that there is a need to accomodate both groups. Slattery said he was concerned about overdevelopment of the park to a point where it becomes useless. Boothroyd said he thought it was better to have activity structures to accomodate both groups. Conley agreed but said the space available in Conway Park was very limited. Slattery suggested using the nearby housing projects to build the play- structures. Conley said that CD was committed to looking into this possibility. Boronkay asked if the proposed GIAC pool assumed staffing of the facility once it was built. Conley mentioned that this was a concern of his and that he had dealt with it an a noon meeting with the IURA where a resolution had been passed to study that situation. He said he did not like the idea of using federal funds to build something that would require long term city maintenance and • . MINUTES COMMON COUNCIL/IURA May 31 , 1979 Pa'e 5 added that he and the IURA were looking into the possiblity of giving the pool to a group to operate and maintain the facility with the sti- pulation that it be opened to the public. Groups such as the YMCA and the School District were mentioned as possibilities. He said that in the meantime the proposal was being left in the application pending more information into these options. Boronkay asked if operational expenditures like staffing could be taken out of the funds and Williams said no. Holman asked if home recycling was an attempt to meet the concernts that some Southside residents had expressed about derelict properties. Williams said that in the home recycling description, derelict properties were listed as being abandoned, or as properties that have been on the market for a long time and constitute a blight in the neighborhood. She said that $100,000 is allocated to this program, Slatterly asked if the funds for Wood Street Park can be used to take care of the drainage probelm in the Wood Street Park, Williams said funds were going to be used for landscaping and drainage in the immediate park area but not the area where Softball is played. Holman asked for an explanation of the $12,500 listed for citizen participa- tion under administration. Williams said it was not a program but that it covered part of the admin- istration costs of the Small Cities program such as public hearing notices, legal ads, environmental assessments and notices and release of funds noti- ces. She said that the total admin costs came to $65,000 but that HUD required that this figure be broken down by administration components. Holman asked if that included staff time and Williams said that it did. Conley asked that all in favor of the resolution to approve the 2nd year Small Cities application say aye and MOTION PASSED unanimously, Williams said that they had just received a contract for funds of 5th year entitlement. She said that during the process of HUD's review, they required that categories of funding be changed. She said that as HUD could not evaluate the low income value of the parallel use program, they had suggested placing $20,000 in contingency and $10,000 into the citywide direct grant program which is the highest priority program that was funded in the 5th year. The other change was the landbanking fund which was dropped because of HUD's objection that no guarantee could be made that the land they bought would 4 be used for sites to provide low income housing. • • MINUTES COMMON COUNCIL/IURA May 31 , 1979 Page 6 Dennis said the Common Coucil appreciates the work and time takne by Rosa- lind Williams and Kathe Evans to devleop and put together this and other applications. Holman added that she specifically appreciated the detailed balance sheet of Community Development expenditures prepared by CD Staff. This concluded the IURA/CDA portion of the meeting. Common Council conti- nued with its regular order of business and the IURA/CDA adjourned.