Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
IC Eastman and Landon Quad Renovations PB Packet 4.15.25
DEPARTMENT OF PLANNING 215 N. Tioga St 14850 607.273.1747 www.town.ithaca.ny.us TO: Planning Board Members FROM: Nicholas Quilty-Koval, Planner DATE: April 8, 2025 RE: Ithaca College Eastman and Landon Residence Hall Renovations – Preliminary and Final Site Plan Approval, Special Permit Enclosed please find materials for the proposed Ithaca College Eastman and Landon Residence Hall Renovations, located at 953 Danby Road in a Medium Density Residential Zone. This project involves renovations of the existing dormitory buildings including color changes, recoating existing building materials, repair and replacement to existing architectural building features, the addition of a new concrete slab on grade at the entry for an existing mechanical room at Landon Hall, modifications to the grade at an entryway for Eastman Hall, and other building modifications. In addition to the modifications noted above, the project includes the repair of an existing concrete retaining wall and replacement of a guardrail, replacement of an existing walkway at the north entryway of Eastman Hall, and proposed slab on grade at the north entryway of Landon Hall. This project requires preliminary and final site plan review because the proposed alterations include the modification of institutional buildings for which not previous site plans exist as noted in Town of Ithaca Code §270-184(C). The project is anticipated to be classified as a Type II Action under State Environmental Quality Review Act 6 NYCRR 617.5 (c)(1) and 617.5(c)(10). Attached is the draft Special Permit resolution for Planning Board consideration. Please do not hesitate to contact me via email at nqultykoval@townithacany.gov or by phone at 607- 273-1747 extension 127 if you have any questions prior to the meeting. Cc: Steve Dayton, Ithaca College Ernie McClatchie, Ithaca College Vincent Nicotra, QPK Design March 3,2025 Town of Ithaca Ithaca,New York 14850 Re:Planning Board Site Plan Review Submission Development Review Application:DEV-25-5 Project:Ithaca College-953 Danby Road Quads Eastman and Landon Residence Hall Renovations Project Description: Renovation of an existing 3 story pitched metal roof residence hall on Ithaca College’s campus. Scope includes: Exterior: .New colors for exterior surfaces undergoing repair,recoating or replacement as indicated. .New colors for exterior window and storefront replacement,concrete precast columns,metal roof panels,roof overhang metal soffits and metal wall panels. U Replacement of all operable and fixed exterior windows and entrance storefront. .Resetting of ground floor blue stone window sills and installing new joint sealant. .Coating existing standing seam metal roofs with a performance coating to extend their useful life. .Coating of existing metal wall panels to extend their useful life. .Repair and recoating of existing precast concrete column spalling and misc.concrete spalling. .Repair of existing concrete retaining wall and stairs lead to a subgrade mechanical roof.Replacement of the guardrail (Eastman only). .Replacement of entrance walk to provide an accessible entry (Eastman only). .Addition of a new concrete slab on grade on the exterior of the existing ground floor mechanical room entrance door.(Landon only). .Addition of ventilation and insulation in attic areas of existing roofs and accessible areas of center vaulted roofs.Replacement of overhang soffits with new metal soffits. .Replacement of existing gas fired boilers with energy efficient units. Interior: B Alteration of existing first floor community bathrooms into single use bathrooms with two ADA accessible single use bathrooms on first floor. .Providing hi-low accessible drinking fountains on the first floor.Providing one refrigerated bottle fillers station per floor on other than first floors. .Conversion of two existing sleeping rooms into an accessible lounge. •Providing automatic door openers for accessibility into laundry and kitchen areas where not currently provided. •Overall refresh of interior finishes,including selective painting,carpet,and flooring replacement. Selective e\fresh of ground,second and third floor bathroom materials and fixtures. •Replacement of lighting fixtures with LED light fixtures for energy efficiency and reduced maintenance. Submitted by,QPI DESIGN Architecture Engineering Site &Planning Vincent Nicotra,R.A. ARCHITECTURE ENGINEERING SITE-i-PLANNING 450 SOUTH SALINA ST P0 BOX 29 I SYRACUSE NY 13201-0029 I T:315.472.7806 I F:315.472.7800 I WWW.QPKDESIGN.COM Pg. 1 PROPOSED RESOLUTION: Preliminary & Final Site Plan Approval, Special Permit Ithaca College Eastman and Landon Hall Renovations 953 Danby Road Tax Parcel No. 41.-1-30.2 Town of Ithaca Planning Board April 15, 2025 WHEREAS: 1. This action is a consideration of Preliminary & Final Site Plan Approval and Special Permit for the proposed Ithaca College Eastman and Landon Hall Renovations, located at 953 Danby Road, in a Medium Density Residential Zone. The project involves renovations of the existing dormitory buildings including color changes, recoating existing building materials, repair and replacement to existing architectural building features, the addition of a new concrete slab on grade at the entry for an existing mechanical room at Landon Hall, modifications to the grade at an entryway for Eastman Hall, and other building modifications. Steve Dayton, Owner/Applicant; Vincent Nicotra, Agent, 2. In accordance with 6 NYCRR §617.5 (c)(1), State Environmental Quality Review, “maintenance or repair involving no substantial changes in an existing structure or facility;” is a Type II Action and not subject to further environmental review, and 3. The Planning Board, at a public hearing held on April 15, 2025, has reviewed and accepted as adequate a narrative and a set of drawings entitled “Ithaca College Quads – Landon and Eastman Hall Renovation,” including Sheets A-005, A-201E, A-201L, A-900, prepared by QPK Design, dated February 26, 2025, and other application materials, and NOW THEREFORE BE IT RESOLVED: 1. That the Planning Board hereby finds that the Special Permit standards of Article XXIV Section 270-200, Subsections A – H, of the Town of Ithaca Code, have been met, specifically that: A. The project will be suitable for the property on which it is proposed, considering the property’s size, location, and physical site characteristics. • The project is located on the Ithaca College Campus property and maintains the existing building footprint and physical site characteristics. B. The proposed structure design and site layout are compatible with the surrounding area. • The proposed exterior modifications to existing buildings with updated architectural materials match the college design aesthetic. C. Operations in connection with the proposed use do not create any more noise, fumes, vibration, illumination, or other potential nuisances than the operation of any permitted use in the particular zone. Pg. 2 • The proposed project will produce temporary noise, vibration, and other nuisances associated with removing and replacing architectural features, painting, resurfacing an asphalt walkway, and installing a concrete pad. Such nuisances will cease upon completion of the project. D. Community infrastructure and services, such as police, fire and other protective services, roadways, schools, and water and sewer facilities are currently, or will be, of adequate capacity to accommodate the proposed use. • The project does not include modifications to existing community infrastructure and services are of adequate capacity to accommodate the proposed use. E. The proposed use, structure design, and site layout comply with all the provisions of the Town Code and with the Town of Ithaca Comprehensive Plan. F. The site layout, with proposed vehicular, bicycle and pedestrian access, traffic circulation, and parking and loading facilities, is sufficient for the proposed use and is safely designed for emergency vehicles. • The project includes the installation of a new concrete pad for the entry of the mechanical room at Landon Hall and modifications to the slope of the asphalt entryway located at Eastman Hall. These modifications include improvements to accessibility and pedestrian access. This project does not include modifications to accessways for emergency vehicles. G. The project includes sufficient landscaping and/or other forms of buffering to protect surrounding land uses. Existing vegetation is preserved to the extent possible. • The project does not include the removal of existing vegetation and is centrally located on the Ithaca College campus away from surrounding land uses. H. To the extent deemed relevant by the reviewing Board, the proposed use or structure complies with all the criteria applicable to site plan review set forth in this chapter, AND BE IT FURTHER RESOLVED: 1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary and Final Site Plan Approval, as shown on the Preliminary & Final Site Plan Checklists, having determined from the materials presented that such waiver will result in a significant alteration of neither the purpose of site plan control nor the policies enunciated or implied by the Town Board; and 2. That the Town of Ithaca Planning Board hereby grants Preliminary & Final Site Plan Approval for the proposed Ithaca College Eastman and Landon Hall Renovations, as described in the materials listed in Whereas #3 above. COMMISSIONER Katherine Borgella DEPUTY COMMISSIONER M. Megan McDonald 121 E. Court St, Ithaca, N.Y. 14850 | Phone: (607) 274-5560 | tompkinscountyny.gov/planning Creating and implementing plans that position Tompkins County communities to thrive. April 4, 2025 Nick Quilty-Koval, Planner Town of Ithaca 215 North Tioga St. Ithaca, NY 14850 Re: Review Pursuant to §239 -l, -m and -n of New York State General Municipal Law Proposed Action: Special Use Permit and Site Plan for proposed Ithaca College Eastman and Landon Quad Renovations located at 953 Danby Road, Tax Parcel #41.-1-30.2, Ithaca College, Owner; Vincent Nicotra, Applicant. Dear Mr. Quilty-Koval: This letter acknowledges your referral of the proposed action identified above for review by the Tompkins County Department of Planning and Sustainability pursuant to §239 -l, -m and -n of the New York State General Municipal Law. We have determined the proposed action will have no significant county-wide or inter-community impact. We look forward to receiving notification on the final action taken by your municipality within 30 days of decision, as required by State law. Sincerely, Katherine Borgella, AICP Commissioner of Planning and Sustainability 450 SOUTH SALINA ST PO BOX 29 | SYRACUSE NY 13201-0029 | T: 315.472.7806 | F: 315.472.7800 | WWW.QPKDESIGN.COM February 4, 2025 Town of Ithaca Code Enforcement and Zoning 215 N. Tioga Street Ithaca, NY 14850 Attn: Mr. Marty Mosley Director for Code Enforcement and Zoning Re: Ithaca College – Quads Residence Hall Renovations Window Replacement and Roof insulation QPK no. 2224145.00 Dear Marty, I am following up on our discussion regarding the need for Ithaca College to comply with the 2020 Energy Conservation Construction Code of NYS (ECCC) for window replacements and for adding insulation to existing roofs in the Quad Residence Halls proposed renovations. To briefly recap, Ithaca College is planning to submit a permit for the renovation of Eastman and Landon, two of the ten Quad Residence Halls planned for construction to occur this summer. Their goal is to renovate all ten as budgets allow in following years. The overall renovation goals are to: 1) Increase accessibility to students and staff by providing accessible and non-accessible all gender (Single use) bathrooms on the first floors, along with improving accessibility to common areas on the first floors and adding new accessible lounge spaces on the first floors. 2) Increase thermal comfort by replacing exterior windows, adding to existing roof insulation, and replacing existing gas fired boilers with more efficient gas fired equipment. 3) Reducing energy usage with item 2) improvements, along with replacing existing lighting fixtures with LED lighting. The work area for reconfiguration of bathrooms and other minor areas, will not exceed 50% of the floor areas of these three story buildings. As discussed, this will not require compliance with the Town of Ithaca Energy Code Supplement or requirements of a Level 3 alteration under the Existing Building Code of New York State. Particular to our discussion was the financial burden placed on Ithaca College if compliance with the Residential provisions of the ECCC due to the higher cost products that would meet the code requirement for window energy performance and also that compliance for roof insulation was also not feasible where space limitations of the existing roof construction limit insulation installation. You agreed initially that compliance with the residential provisions was a requirement. I am confirming that based on your follow up discussions with the Energy Code Compliance Director of NYS, under the EB301.3 exception of the Existing Building Code (excerpted below) you have the authority to allow window replacements if they are better performing than those required by the building in existence at the time the buildings were built as opposed to meeting the residential (or commercial code). The Quads were built circa 1962. We understand that the Town of Ithaca’s code in existence in 1960 did not have an energy Ithaca College – Quads Residence Hall Renovations Window Replacement and Roof insulation February 4, 2025 Page 3 ARCHITECTURE | ENGINEERING | INTERIOR DESIGN | SITE + PLANNING compliance requirement, therefore modern replacement windows will easily outperform the originals in all categories. EB301.3 Alteration, addition or change of occupancy. The alteration, addition or change of occupancy of all existing buildings shall comply with one of the methods listed in Section EB301.3.1, EB301.3.2 or EB301.3.3 as selected by the applicant. Sections EB301.3.1 through EB301.3.3 shall not be applied in combination with each other. Exception: Subject to the approval of the building official, alterations complying with the laws in existence at the time the building or the affected portion of the building was built shall be considered in compliance with the provisions of this code. Please confirm that you will approve the use of windows that perform better than those installed in the original buildings. Ithaca College needs to order windows in the following week in order to meet the construction schedule and needs to commit a substantial amount of money that cannot be recouped. I have attached a preliminary shop drawing of the windows that includes a specification of the windows proposed for order. Additionally, we would like approval to install additional roof insulation to augment what is already in place as a substantial improvement over the original building insulation. Other than insulating the attics and roof areas, the existing standing seam metal roof is remaining as is, and thus no exposure of roof cavities was planned that would require compliance with the energy code. Please cc: Steve Dayton and Ernie McClatchie with your response if possible. I have copied them on the email correspondence that this communication is attached to. Both Ithaca College and I appreciated your significant assistance when I initially contacted you in pursuit of a satisfactory solution to this issue. We also thank you in advance for expediting a response to our request. Please contact me with any questions or if further information is required. Sincerely, QPK DESIGN Architecture Engineering Site & Planning Vincent Nicotra, R.A. Partner Attachments: - Ithaca College Quads Res Hall Aluminum Window Preliminary Shop Drawings and Specs cc: E. McClatchie, IC; S. Dayton, IC S. Murphy, MCE COLLEGE CIRCLE APARTMENTS PROJECT NORTH P R O J E C T N O R T H IT H A C A C O L L E G E Q U A D S - L A N D O N A N D E A S T M A N R E N O V A T I O N 20 1 F A C I L I T I E S B L V D , 95 3 D A N B Y R O A D IT H A C A , N E W Y O R K 1 4 8 5 0 ; T O M P K I N S C O U N T Y IT H A C A C O L L E G E Q U A D S - L A N D O N A N D E A S T M A N R E N O V A T I O N 20 1 F A C I L I T I E S B L V D , 95 3 D A N B Y R O A D IT H A C A , N E W Y O R K 1 4 8 5 0 ; T O M P K I N S C O U N T Y ARCHITECTURAL AND STRUCTURAL: QPK DESIGN ARCHITECTS/ENGINEERS 450 SOUTH SALINA ST SYRACUSE, NEW YORK 13201 315-472-7806 MEP: MURPHY ENGINEERING 5532 BURDOCK STREET MORAVIA, NEW YORK 13118 315-730-4185 LOCATION MAP IMAGE FOR ILLUSTRATIVE PURPOSES ONLY IC QUAD RESIDENCE HALL RENO - EASTMAN & LANDON QPK JOB NO: 224145 FEBRUARY 26, 2025 PLANNING SUBMISSION CAMPUS MAP IMAGE FOR ILLUSTRATIVE PURPOSES ONLY DRAWING LIST - PLANNING GENERAL -- COVER SHEET - PLANNING ARCHITECTURAL INFORMATION A-005 ARCHITECTURAL SITE PLAN ARCHITECTURAL A-201E EXTERIOR ELEVATIONS AND BUILDING SECTIONS - EASTMAN A-201L EXTERIOR ELEVATIONS AND BUILDING SECTIONS - LANDON A-900 EXTERIOR RENDERING SWITCHGEAR SWITCHBOARD TEL. MAIN VAULT XFMR XFMR XFMR PROJECT NORTH EASTMAN LANDON PROPOSED CONCRETE SLAB ON GRADE. REWORK OF ASPHALT WALKWAY. 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E A B C D E IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUMENT IN ANY WAY. IF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX THEIR SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION S H E E T T I T L E D A T E P R O J E C T N U M NOT FOR CONSTRUCTIONR E V I S I O N S P R O J E C T S T A T U S 450 SOUTH SALINA STREET SUITE 500 PO BOX 29 SYRACUSE, NY 13201-0029 ARCHITECTURAL SITE PLAN A-005 02/26/25 224145 ITHACA COLLEGE ITHACA COLLEGE QUADS - LANDON AND EASTMAN RENOVATION 201 FACILITIES BLVD, 953 DANBY ROAD ITHACA, NEW YORK 14850; TOMPKINS COUNTY PLANNING SUBMISSION SCALE: A3 CAMPUS MAP 1"=160'-0" 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" AE BE CE DE EE FE 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " +/ - 3 5 ' - 1 0 3 / 4 " 316 328322 322 306 206222228222216 116 132 126B 132 106 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" AE BE CE DE EE FE E2E6 E7E7 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " +/ - 3 0 ' - 1 0 " E8 334 331 231231A 200 130130A100 230 G26 G15 G17 E17 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" AEBECEDEEEFE E1 E1 E1E1 E2E6 E7E7 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " E17 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" 1E2E3E4E5E6E7E8E9E10E11E12E13E14E E1 E1 E1 E1 E1 E1 E1E1E1E1E1E1 E2 E2 E2 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3E3E3E3 E6 E6 E6 E7E7E7E7 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " E1E1 E9E9E9E9E9E9E9E9E9E9E9E9E9 E11 E12 E16 E17 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" 1E 2E 3E 4E 5E 6E 7E 8E 9E 10E 11E 12E 13E 14E E1 E1 E1 E1 E1 E1 E1E1E1E1E1E1E1E1 E2 E2 E2 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3E3E3E3 E6 E6 E6 E7E7E7E7 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " +/ - 3 5 ' - 1 0 3 / 4 " E9E9E9E9E9E9E9E9E9E9 SF1 E13 E14 E15 E17 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" TO RAFTERS @ INFILL 29'-7" AE BE CE DE EE FE E1 E1 E1E1 E2E6 E7E7 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " +/ - 3 5 ' - 1 0 3 / 4 " 1. PROVIDE SECURITY SCREENS AT ALL OPERABLE WINDOWS WITHIN 8'-0" OF GRADE, REFER TO SPECIFICATION FOR BASIS OF DESIGN PRODUCT. 2. REMOVE AND REPAIR/REPLACE BLUESTONE SILLS AT STONE WATERTABLE LOCATIONS BASED ON OWNER EVALUATION OF RESPECTIVE BLUESTONE SILLS CONDITIONS. 3. CLEAN AND PREPARE CONCRETE SURFACES PRIOR TO APPLICATION OF CTG-905. GENERAL NOTES -ELEVATIONS EXTERIOR MATERIAL LEGEND 601 (WDW) -FRAMING FINISH AS SPECIFIED, UNLESS NOTED OTHERWISE. 602 (SOFF)-VENTED SOFFIT PRODUCT: PETERSON PAC-CLAD FLUSH/ REVEAL SOFFIT, FLUSH SOLID & NARROW VENT (6% NFA PER SQFT) 12" WIDTHS, COLOR: TBD. 907 (PNT)-EXTERIOR PAINT, SHERWIN WILLIAMS, COLOR: SW7044 AMAZING GRAY. (EXTERIOR METAL PANELS UNLESS NOTED OTHERWISE) 905 (CTG)-EXTERIOR CONCRETE COATING, SIKA THOROLASTIC 750, COLOR TO MATCH SHERWIN WILLIAMS, COLOR: SW7075 WEB GRAY. PREPARE EXISTING CONCRETE SURFACE AS DIRECTED BY PRODUCT MANUFACTURER REQUIREMENTS. APPLY COATING AS DIRECTED BY PRODUCT MANUFACTURER REQUIREMENTS TO A DRY FILM THICKNESS OF 16 MILS. (PRECAST CONCRETE COLUMNS AND LINTELS UNLESS NOTED OTHERWISE) 906 (CTG)-ROOF COATING, COLOR TO MATCH BENJAMIN MOORE, COLOR: HC-155 NEWBURYPORT BLUE. (STANDING SEAM METAL ROOF PANELS AND METAL SEAM COVERS) 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E A B C D E IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUMENT IN ANY WAY. IF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX THEIR SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION S H E E T T I T L E D A T E P R O J E C T N U M NOT FOR CONSTRUCTIONR E V I S I O N S P R O J E C T S T A T U S 450 SOUTH SALINA STREET SUITE 500 PO BOX 29 SYRACUSE, NY 13201-0029 EXTERIOR ELEVATIONS AND BUILDING SECTIONS - EASTMAN A-201E 02/26/25 224145 ITHACA COLLEGE ITHACA COLLEGE QUADS - LANDON AND EASTMAN RENOVATION 201 FACILITIES BLVD, 953 DANBY ROAD ITHACA, NEW YORK 14850; TOMPKINS COUNTY PLANNING SUBMISSION SCALE: 1/8" = 1'-0"C5 BLDG SECT - DORM WING - EASTMAN SCALE: 1/8" = 1'-0"A5 BLDG SECT - COMMON SPACES - EASTMAN SCALE: 1/8" = 1'-0"A3 BLDG ELEVATION - EAST - EASTMAN SCALE: 1/8" = 1'-0"D1 BLDG ELEVATION - NORTH - EASTMAN SCALE: 1/8" = 1'-0"C1 BLDG ELEVATION - SOUTH - EASTMAN SCALE: 1/8" = 1'-0"A1 BLDG ELEVATION - WEST - EASTMAN KEYED NOTES-ELEV NUMBER COMMENT E1 SELECTIVELY PATCH AND REPAIR EXTERIOR CONCRETE COLUMNS. PROVIDE FULL COATING OF CTG-905. E2 APPLY METAL ROOF COATING CTG-906 TO FULL EXTENT OF EXISTING METAL ROOFS. E3 PAINT ALL EXTERIOR METAL PANELS PNT-907. E6 PROVIDE REPLACEMENT STAINLESS STEEL SCREENS AT FULL LENGTH OF RIDGE VENTS. E7 REPAIR OR REPLACE STANDING SEAM METAL ROOF FASCIA CLOSURES. FINISH TO MATCH ADJACENT ROOF TREATMENT. E8 PAINT METAL RAILING; PNT-907. E9 REINSTALL BLUE STONE SILLS. RESEAT IN MORTAR AND PROVIDE SEALANT AT HORIZONTAL JOINTS. SEALANT COLOR TO MATCH BLUE STONE SILLS. E11 PROVIDE CUSTOM FLASHING BOOT AT BOILER FLUE PENETRATIONS THROUGH ROOF. BOOT SHALL BE COMPATIBLE WITH EXISTING ROOF PITCH, NEW FLUE DIAMETER, AND EXISTING PENETRATION DIAMETER. PATCH ROOF PENETRATION WITH FRAMING, SHEATHING, AND WATERPROOFING TO MATCH EXISTING ROOF ASSEMBLY. E12 PROVIDE LOUVER INFILL, COMPATIBLE WITH WINDOW FRAME, TO VENT LAUNDRY ROOM. E13 REINSTALL SALVAGED KNOX BOX AT SAME LOCATION. E14 REINSTALL BUILDING SIGNAGE AT SAME LOCATION. E15 EXTERIOR LIGHT FIXTURE, REFER TO ELEC DWGS FOR MORE INFORMATION. E16 PROVIDE 1" INSULATED METAL PANEL INFILL, WITH WINDOW FRAME, TO SUPPORT KITCHEN EXHAUST VENT. E17 HEAT PUMP UNIT; REFER TO MECH DWGS. 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" ALBLEL TO RAFTERS 34'-6 5/8" FL DL CL TO RAFTERS @ INFILL 29'-7" E1E1 E1 E1 E2E6 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" TO RAFTERS 34'-6 5/8" 1L2L3L4L5L6L7L8L9L10L11L12L13L14L TO RAFTERS @ INFILL 29'-7" E1 E1 E1 E1 E1 E1 E1E1E1E1E1E1E1E1 E2 E2 E2 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3E3E3 E6 E6 E6 E9 E9 E9 E9 E9 E9 E9 E9 E9 E9 E11 E12 E16 E17 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" TO RAFTERS 34'-6 5/8" 1L 2L 3L 4L 5L 6L 7L 8L 9L 10L 11L 12L 13L 14L TO RAFTERS @ INFILL 29'-7" E1 E1 E1 E1 E1 E1 E1E1E1E1E1E1E1E1 E2 E2 E2 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 E3E3E3E3 E6 E6 E6 E9E9E9E9E9E9E9E9E9E9 E10 E10 E10 E10 SF1 E13 E14 E15 E17 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " +/ - 3 5 ' - 1 0 3 / 4 " 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" AL BL EL TO RAFTERS 34'-6 5/8" FLDLCL TO RAFTERS @ INFILL 29'-7" E1 E1 E1 E1 E2E6 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " +/ - 3 5 ' - 1 0 3 / 4 " 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" AL BL EL TO RAFTERS 34'-6 5/8" FLDLCL TO RAFTERS @ INFILL 29'-7" E2E6 229 153 G26 G17 130A 231A 231 130 G13 230 334 331 7' - 4 3 / 8 " 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " +/ - 3 0 ' - 1 0 " +/ - 3 5 ' - 1 0 3 / 4 " 1ST FLOOR 0" 2ND FLOOR 8'-11" TO MASONRY BEAM 25'-2 3/8" 3RD FLOOR 17'-10" GROUND FLOOR -8'-11" AL BL EL TO RAFTERS 34'-6 5/8" FLDLCL TO RAFTERS @ INFILL 29'-7" 316 216 116 0016 G24 126B 228 328 306 206 102B G19 322 222 132 G12 132 222 322 8' - 1 1 " 8' - 1 1 " 8' - 1 1 " 7' - 4 3 / 8 " +/ - 3 5 ' - 1 0 3 / 4 " 1. PROVIDE SECURITY SCREENS AT ALL OPERABLE WINDOWS WITHIN 8'-0" OF GRADE, REFER TO SPECIFICATION FOR BASIS OF DESIGN PRODUCT. 2. REMOVE AND REPAIR/REPLACE BLUESTONE SILLS AT STONE WATERTABLE LOCATIONS BASED ON OWNER EVALUATION OF RESPECTIVE BLUESTONE SILLS CONDITIONS. 3. CLEAN AND PREPARE CONCRETE SURFACES PRIOR TO APPLICATION OF CTG-905. GENERAL NOTES -ELEVATIONS EXTERIOR MATERIAL LEGEND 601 (WDW) -FRAMING FINISH AS SPECIFIED, UNLESS NOTED OTHERWISE. 602 (SOFF)-VENTED SOFFIT PRODUCT: PETERSON PAC-CLAD FLUSH/ REVEAL SOFFIT, FLUSH SOLID & NARROW VENT (6% NFA PER SQFT) 12" WIDTHS, COLOR: TBD. 907 (PNT)-EXTERIOR PAINT, SHERWIN WILLIAMS, COLOR: SW7044 AMAZING GRAY. (EXTERIOR METAL PANELS UNLESS NOTED OTHERWISE) 905 (CTG)-EXTERIOR CONCRETE COATING, SIKA THOROLASTIC 750, COLOR TO MATCH SHERWIN WILLIAMS, COLOR: SW7075 WEB GRAY. PREPARE EXISTING CONCRETE SURFACE AS DIRECTED BY PRODUCT MANUFACTURER REQUIREMENTS. APPLY COATING AS DIRECTED BY PRODUCT MANUFACTURER REQUIREMENTS TO A DRY FILM THICKNESS OF 16 MILS. (PRECAST CONCRETE COLUMNS AND LINTELS UNLESS NOTED OTHERWISE) 906 (CTG)-ROOF COATING, COLOR TO MATCH BENJAMIN MOORE, COLOR: HC-155 NEWBURYPORT BLUE. (STANDING SEAM METAL ROOF PANELS AND METAL SEAM COVERS) 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E A B C D E IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUMENT IN ANY WAY. IF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX THEIR SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION S H E E T T I T L E D A T E P R O J E C T N U M NOT FOR CONSTRUCTIONR E V I S I O N S P R O J E C T S T A T U S 450 SOUTH SALINA STREET SUITE 500 PO BOX 29 SYRACUSE, NY 13201-0029 EXTERIOR ELEVATIONS AND BUILDING SECTIONS - LANDON A-201L 02/26/25 224145 ITHACA COLLEGE ITHACA COLLEGE QUADS - LANDON AND EASTMAN RENOVATION 201 FACILITIES BLVD, 953 DANBY ROAD ITHACA, NEW YORK 14850; TOMPKINS COUNTY PLANNING SUBMISSION SCALE: 1/8" = 1'-0"A3 BLDG ELEVATION - EAST - LANDON SCALE: 1/8" = 1'-0"C1 BLDG ELEVATION - NORTH - LANDON SCALE: 1/8" = 1'-0"D1 BLDG ELEVATION - SOUTH - LANDON SCALE: 1/8" = 1'-0"A1 BLDG ELEVATION - WEST - LANDON SCALE: 1/8" = 1'-0"A5 BLDG SECT - COMMON SPACES - LANDON SCALE: 1/8" = 1'-0"C5 BLDG SECT - DORM WING - LANDON KEYED NOTES-ELEV NUMBER COMMENT E1 SELECTIVELY PATCH AND REPAIR EXTERIOR CONCRETE COLUMNS. PROVIDE FULL COATING OF CTG-905. E2 APPLY METAL ROOF COATING CTG-906 TO FULL EXTENT OF EXISTING METAL ROOFS. E3 PAINT ALL EXTERIOR METAL PANELS PNT-907. E6 PROVIDE REPLACEMENT STAINLESS STEEL SCREENS AT FULL LENGTH OF RIDGE VENTS. E9 REINSTALL BLUE STONE SILLS. RESEAT IN MORTAR AND PROVIDE SEALANT AT HORIZONTAL JOINTS. SEALANT COLOR TO MATCH BLUE STONE SILLS. E10 REPAIR CONCRETE AREAWAY WALLS AT BELOW GRADE WINDOWS. E11 PROVIDE CUSTOM FLASHING BOOT AT BOILER FLUE PENETRATIONS THROUGH ROOF. BOOT SHALL BE COMPATIBLE WITH EXISTING ROOF PITCH, NEW FLUE DIAMETER, AND EXISTING PENETRATION DIAMETER. PATCH ROOF PENETRATION WITH FRAMING, SHEATHING, AND WATERPROOFING TO MATCH EXISTING ROOF ASSEMBLY. E12 PROVIDE LOUVER INFILL, COMPATIBLE WITH WINDOW FRAME, TO VENT LAUNDRY ROOM. E13 REINSTALL SALVAGED KNOX BOX AT SAME LOCATION. E14 REINSTALL BUILDING SIGNAGE AT SAME LOCATION. E15 EXTERIOR LIGHT FIXTURE, REFER TO ELEC DWGS FOR MORE INFORMATION. E16 PROVIDE 1" INSULATED METAL PANEL INFILL, WITH WINDOW FRAME, TO SUPPORT KITCHEN EXHAUST VENT. E17 HEAT PUMP UNIT; REFER TO MECH DWGS. 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E A B C D E IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUMENT IN ANY WAY. IF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX THEIR SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION S H E E T T I T L E D A T E P R O J E C T N U M NOT FOR CONSTRUCTIONR E V I S I O N S P R O J E C T S T A T U S 450 SOUTH SALINA STREET SUITE 500 PO BOX 29 SYRACUSE, NY 13201-0029 EXTERIOR RENDERING A-900 02/26/25 224145 ITHACA COLLEGE ITHACA COLLEGE QUADS - LANDON AND EASTMAN RENOVATION 201 FACILITIES BLVD, 953 DANBY ROAD ITHACA, NEW YORK 14850; TOMPKINS COUNTY PLANNING SUBMISSION SCALE: NO SCALE C2 EXISTING EXTERIOR PHOTOGRAPH - TYPICAL LOWER QUAD SCALE: NO SCALE A2 PROPOSED EXTERIOR RENDERING - TYPICAL LOWER QUAD Project Catalog #Type Prepared by Notes Date PS51580223EN page 1 March 23, 2023 Quick Facts •• Selectable configurations available •• Lumen packages range from 2,100-10,200 lumens •• Replaces 155W-375W HID equivalent •• Efficacies up to 130 lumens per watt •• Energy and maintenance savings up to 89% •• Heat and impact resistant borosilicate glass lens Interactive Menu • Ordering Information page 2 • Product Specifications page 2 • Energy and Performance Data page 3 Dimensional Details 6.613 167.97 8.010 203.44 4.757 120.84 NOTES:FINAL ASSEMBLY MUST BE CLEAN AND FREE OF HANDLING MARKS SUCH AS 1.FINGERPRINTS, GREASE / OILS, AND SCRATCHES.FIXTURE COLOR: BLACK2.COOPER LIGHTING SOLUTIONS PACKAGING SHALL BE CARDBOARD UNIT CARTON. 3.GRAPHICS FILES AND PACKAGING DIMENSIONS PER SEPARATE COOPER LIGHTING SOLUTIONS DOCUMENTS.INSTRUCTION SHEET FILE TO BE PROVIDED BY COOPER LIGHTING SOLUTIONS AND 4.INCLUDED IN THE PACKAGING.DESIGN CONTROL BY JIANGSU DALITE ELECTRICAL TECHNOLOGY CO., LTD. REFER 5.TO DALITE DOCUMENTS FOR SPECIFIC DESIGN DETAILS.MOUNTING PLATE INCLUDED WITH LUMINAIRE.6. REVISIONS REV.DESCRIPTION DATE CHANGE_NUMBER BY APPROVED 1 INITIAL RELEASE 10/3/2022 ECN ECN DALITE CATALOG INFORMATION COOPER LIGHTING SOLUTIONS CATALOG INFORMATION COOPER LIGHTING SOLUTIONS MATERIAL NUMBER COOPER LIGHTING SOLUTIONS UNIT CARTON UPC COOPER LIGHTING SOLUTIONS I2of5 COOPER LIGHTING SOLUTIONS CASE CARTON UPC INPUT VOLTAGE WATTAGE SELECTABLE SELECTABLE LED CCT LED CRI CONTROLS FIXTURE IP RATING FIXTURE OPERATING AMBIENT TEMP RANGE POWDER COLOR COAT CERTIFICATIONS WARRANTY LBDL-1030A-30W-H-CCTS-FAO-PC-IDA-BRZ ASWPLED1S 13612590 080083265169 10080083265166 080083265176 120V-347V 30W, 24W, 20W, 15W 3000K, 4000K, 5000K 70 BUTTON PC IP65 -40°C - +40°C BRONZE UL, ROHS, DLC 5.1 PREMIUM 5 YEAR D C B A B C D 12345678 8 7 6 5 4 3 2 1 E F E F ATHIRD ANGLE PROJECTION MATERIAL: METRIC (mm) ENGLISH (IN).X.XX.XXX X..X.XX DIMENSIONS ARE IN INCHESDIMENSIONS IN [ ] ARE IN mm ELECTRONIC CAD DRAWING. DO NOT REVISE MANUALLY. TITLE: SIZE:DWG NO:REV: SHEETVOL:WT:SCALE:SURFACE AREA:DO NOT SCALE DRAWING FINISH: APPR: CHKD: DRWN: DATEAPPROVALS .040.020.010 10.50.25 x.x x.x DENOTES CRITICALDIMENSIONS ANDGAUGE CHECK POINTS DENOTES FIRST PIECE INSPECTION ONLYFPC PRODUCT MUST CONFORM TO ROHSCOOPER LIGHTING SOLUTIONS - CONFIDENTIAL AND PROPRIETARYNOTICE TO PERSONS RECEIVING THIS DOCUMENT AND/OR TECHNICAL INFORMATIONTHIS DOCUMENT, INCLUDING THE DRAWING AND INFORMATION CONTAINED THEREON, IS CONFIDENTIAL AND IS THE EXCLUSIVE PROPERTY OF COOPER LIGHTING SOLUTIONS, AND IS MERELY ON LOAN AND SUBJECT TO RECALL BY COOPER LIGHTING SOLUTIONS AT ANY TIME. BY TAKING POSSESSION OF THIS DOCUMENT, THE RECIPIENT ACKNOWLEDGES AND AGREES THAT THIS DOCUMENT CANNOT BE USED IN ANY MANNER ADVERSE TO THE INTERESTS OF COOPER LIGHTING SOLUTIONS, AND THAT NO PORTION OF THIS DOCUMENT MAY BE COPIED OR OTHERWISE REPRODUCED WITHOUT THE PRIOR WRITTEN CONSENT OF COOPER LIGHTING SOLUTIONS. IN THE CASE OF CONFLICTING CONTRACTUAL PROVISIONS, THIS NOTICE SHALL GOVERN THE STATUS OF THIS DOCUMENT.MATERIAL MASTER ASWPLED1S C CLP0012740 - 1.280 LB 1 E. NACE E. NACE E. NACE 10/3/2022 10/3/2022 10/3/2022 CL P 0 0 1 2 7 4 0 L MOD:670245746 10/3/2022 DIMENSIONS THAT AFFECT SAFE HANDLING OR OPERATIONS TOLERANCE GENERAL 882.854 IN2 35.437 IN3 1 OF ANGLES ALL 1.0 00 Co o p e r L i g h t i n g S o l u t i o n s T e m p l a t e R e v - IP LEVEL: DENOTES FIRST PIECE AND IN-PROCESS INSPECTION 6.613 167.97 8.010 203.44 4.757 120.84 NOTES:FINAL ASSEMBLY MUST BE CLEAN AND FREE OF HANDLING MARKS SUCH AS 1.FINGERPRINTS, GREASE / OILS, AND SCRATCHES.FIXTURE COLOR: BLACK2.COOPER LIGHTING SOLUTIONS PACKAGING SHALL BE CARDBOARD UNIT CARTON. 3.GRAPHICS FILES AND PACKAGING DIMENSIONS PER SEPARATE COOPER LIGHTING SOLUTIONS DOCUMENTS.INSTRUCTION SHEET FILE TO BE PROVIDED BY COOPER LIGHTING SOLUTIONS AND 4.INCLUDED IN THE PACKAGING.DESIGN CONTROL BY JIANGSU DALITE ELECTRICAL TECHNOLOGY CO., LTD. REFER 5.TO DALITE DOCUMENTS FOR SPECIFIC DESIGN DETAILS.MOUNTING PLATE INCLUDED WITH LUMINAIRE.6. REVISIONS REV.DESCRIPTION DATE CHANGE_NUMBER BY APPROVED 1 INITIAL RELEASE 10/3/2022 ECN ECN DALITE CATALOG INFORMATION COOPER LIGHTING SOLUTIONS CATALOG INFORMATION COOPER LIGHTING SOLUTIONS MATERIAL NUMBER COOPER LIGHTING SOLUTIONS UNIT CARTON UPC COOPER LIGHTING SOLUTIONS I2of5 COOPER LIGHTING SOLUTIONS CASE CARTON UPC INPUT VOLTAGE WATTAGE SELECTABLE SELECTABLE LED CCT LED CRI CONTROLS FIXTURE IP RATING FIXTURE OPERATING AMBIENT TEMP RANGE POWDER COLOR COAT CERTIFICATIONS WARRANTY LBDL-1030A-30W-H-CCTS-FAO-PC-IDA-BRZ ASWPLED1S 13612590 080083265169 10080083265166 080083265176 120V-347V 30W, 24W, 20W, 15W 3000K, 4000K, 5000K 70 BUTTON PC IP65 -40°C - +40°C BRONZE UL, ROHS, DLC 5.1 PREMIUM 5 YEAR D C B A B C D 12345678 8 7 6 5 4 3 2 1 E F E F ATHIRD ANGLE PROJECTION MATERIAL: METRIC (mm) ENGLISH (IN).X.XX.XXX X..X.XX DIMENSIONS ARE IN INCHESDIMENSIONS IN [ ] ARE IN mm ELECTRONIC CAD DRAWING. DO NOT REVISE MANUALLY. TITLE: SIZE:DWG NO:REV: SHEETVOL:WT:SCALE:SURFACE AREA:DO NOT SCALE DRAWING FINISH: APPR: CHKD: DRWN: DATEAPPROVALS .040.020.010 10.50.25 x.x x.x DENOTES CRITICALDIMENSIONS ANDGAUGE CHECK POINTS DENOTES FIRST PIECE INSPECTION ONLYFPC PRODUCT MUST CONFORM TO ROHSCOOPER LIGHTING SOLUTIONS - CONFIDENTIAL AND PROPRIETARYNOTICE TO PERSONS RECEIVING THIS DOCUMENT AND/OR TECHNICAL INFORMATIONTHIS DOCUMENT, INCLUDING THE DRAWING AND INFORMATION CONTAINED THEREON, IS CONFIDENTIAL AND IS THE EXCLUSIVE PROPERTY OF COOPER LIGHTING SOLUTIONS, AND IS MERELY ON LOAN AND SUBJECT TO RECALL BY COOPER LIGHTING SOLUTIONS AT ANY TIME. BY TAKING POSSESSION OF THIS DOCUMENT, THE RECIPIENT ACKNOWLEDGES AND AGREES THAT THIS DOCUMENT CANNOT BE USED IN ANY MANNER ADVERSE TO THE INTERESTS OF COOPER LIGHTING SOLUTIONS, AND THAT NO PORTION OF THIS DOCUMENT MAY BE COPIED OR OTHERWISE REPRODUCED WITHOUT THE PRIOR WRITTEN CONSENT OF COOPER LIGHTING SOLUTIONS. IN THE CASE OF CONFLICTING CONTRACTUAL PROVISIONS, THIS NOTICE SHALL GOVERN THE STATUS OF THIS DOCUMENT.MATERIAL MASTER ASWPLED1S C CLP0012740 - 1.280 LB 1 E. NACE E. NACE E. NACE 10/3/2022 10/3/2022 10/3/2022 CL P 0 0 1 2 7 4 0 L MOD:670245746 10/3/2022 DIMENSIONS THAT AFFECT SAFE HANDLING OR OPERATIONS TOLERANCE GENERAL 882.854 IN2 35.437 IN3 1 OF ANGLES ALL 1.0 00 Co o p e r L i g h t i n g S o l u t i o n s T e m p l a t e R e v - IP LEVEL: DENOTES FIRST PIECE AND IN-PROCESS INSPECTION Wall Mount Luminaire Lumark AP ASWP Adjustable Slim Wall Pack Series Product Features CLASS A CAN ICES-005 Product Certifications ASWP Adjustable Slim Wall Pack SeriesLumark AP PS51580223EN page 2 March 23, 2023 Product Specifications Construction • Die-cast aluminum housing with hinged, removable die-cast aluminum door • Three 1/2” threaded conduit entry points • Removable mounting plate for easy installation • Cast-in angle indicators Optics • Impact and heat resistant borosilicate refractive glass lens Electrical • -40°C minimum operating temperature • 40°C maximum operating temperature • >.9 power factor • <20% total harmonic distortion • Class 2 driver incorporates internal fusing designed to withstand 3kV surge • 0-10V dimming driver standard Controls • Selectable configurations supply internal toggle switches to adjust luminaire CCT and lumens. Selectable luminaires will ship default at 4000K CCT and maximum lumen output. Selectable configurations also provide an integrated button- type photocontrol for dusk-to-dawn operation. The photocontrol is also field-adjustable via toggle switches to either enable, disable, or modify the settings. The photocontrol ships default enabled. Typical Applications • Outdoor • Parking Lots • Walkways • Building Areas Finish • Bronze Shipping Data • Unit Carton: • ASWPLED1S: 4.4 lbs. • ASWPLED2S: 9.1 lbs. • Master Carton: • ASWPLED1S: 19.7 lbs. Qty 4 • ASWPLED2S: 20.2 lbs. Qty 2 Model Number 1 Lumens / Wattage Color Temperature Voltage Controls ASWPLED1S=Small LED Wall Pack Selectable Lumens: 2,000-4,000 / 15-20-24-30W Selectable CCT: 3000,4000,5000K / 70CRI 120-347V, 50/60Hz Selectable Dusk-to-Dawn via Button-type photocontrol ASWPLED2S=Medium LED Wall Pack Selectable Lumens: 5,000-10,000 / 40-50-60-75W Selectable CCT: 3000,4000,5000K / 70CRI 120-347V, 50/60Hz Selectable Dusk-to-Dawn via Button-type photocontrol NOTES: 1. DesignLights Consortium® Qualified. Refer to www.designlights.org Qualified Products List under Family Models for details. Ordering Information Cooper Lighting Solutions 1121 Highway 74 South Peachtree City, GA 30269 P: 770-486-4800 www.cooperlighting.com © 2022 Cooper Lighting Solutions All Rights Reserved. Specifications and dimensions subject to change without notice. Lumark AP PS51580223EN page 3 March 23, 2023 ASWP Adjustable Slim Wall Pack Series Power and Lumens (ASWPLED1S Selectable) Light Engine Set to 15W Set to 20W Set to 24W Set to 30W Switch setting 3-ON 2-ON 1-ON 1,2,3-OFF Power (Watts)15 19.6 23.1 30.4 Input Current @ 120V (A)0.13 0.16 0.19 0.25 Input Current @ 277V (A)0.05 0.07 0.08 0.11 Input Current @ 347V (A)0.04 0.06 0.07 0.09 Performance 3000K Lumens 2.083 2,569 2,964 3,733 Lumens per Watt 138.9 131 128.3 12 2.8 4000K Lumens 2,223 2,742 3,163 3,984 Lumens per Watt 148.2 139.8 136.9 131.1 5000K Lumens 2,154 2,657 3,065 3,860 Lumens per Watt 143.6 135.4 132.6 127 Power and Lumens (ASWPLED2S Selectable) Light Engine Set to 40W Set to 50W Set to 60W Set to 75W Switch setting 3-ON 2-ON 1-ON 1,2,3-OFF Power (Watts)38.8 50.2 60.4 74.4 Input Current @ 120V (A)0.32 0.42 0.50 0.62 Input Current @ 277V (A)0.14 0.18 0.22 0.27 Input Current @ 347V (A)0.16 0.21 0.25 0.31 Performance 3000K Lumens 5,492 6,916 8,086 9,575 Lumens per Watt 141.5 137.7 133.9 128.7 4000K Lumens 5,861 7,381 8,630 10,219 Lumens per Watt 151 146.9 142.9 137.3 5000K Lumens 5,679 7,151 8,361 9,900 Lumens per Watt 146.3 142.4 138.5 133.1 Lumen Maintenance Configuration Ambient Temperature TM-21 Lumen Maintenance (50,000 hrs) Reported L70 (hrs) Up to 30W 40°C 87.30%>72,000 Up to 75W 40°C 86.90%>72,000 CCT Multipliers CCT Multipliers 3000K 1.0000 4000K 1.0672 5000K 1.0340 Energy and Performance Data View WP IES files