Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MWII PB packet 1-21-25
TOWN OF ITHACA NEW YORK DEPARTMENT OF PLANNING 215 N.Tioga St 14850 607.273.1747 www.town.ithaca.ny.us TO: Planning Board Members FROM: Christine Balestra, Senior Planner DATE: January 14, 2025 RE: Cornell University Maplewood Phase II Project —Consideration of Preliminary Site Plan Approval and Special Permit Enclosed please find materials associated with the consideration of Preliminary Site Plan approval and Special Permit for the Maplewood Phase II Project on Maple Avenue, located between the Maplewood Graduate Student Apartment complex and the East Lawn Cemetery. The project, which requires a rezoning from Multiple Residence and High-Density Residential Zones to a Planned Development Zone (PDZ), involves consolidating four parcels and constructing six(6) five-story apartment buildings, containing 615 units/800 beds in studio, one bedroom, and two-bedroom unit configurations. The project will also include integrated amenity/service spaces, parking areas, trails and pedestrian facilities, open spaces, stormwater facilities, and other site improvements. The purpose of the January 21, 2025, meeting is for the Planning Board to consider granting Preliminary Site Plan approval and Special Permit for the project. The attachments include a narrative and drawings to assist the board with the specific site plan elements of the project.The board also reviewed these materials at their December 17, 2024, meeting, at which the Planning Board held a public hearing related to the proposed rezoning for the project, issued a negative determination of environmental significance, and provided a recommendation to the Town Board regarding the Planned Development Zone (PDZ) language for the project. The Town Board will review the PDZ and the Planning Board's recommendation at their study session on January 27, 2025. Among the attachments is a revised memo from the Town Engineering Department and a draft resolution for the board to consider. Please feel free to contact me if you have questions regarding this proposal by phone at (607) 273-1721, extension 121, or by email at cbalestra@townithacany.gov. Cc: Michele Palmer,Senior Associate,Whitham Planning&Design,PLLC Leslie Schill,University Planner&Director of Campus Planning,Cornell University Jeremy Thomas,Senior Director of Real Estate,Cornell University Scott Whitham, Principal,Whitham Planning&Design,PLLC 1 TOWN OF ITHACA „ n NEW YORK DEPARTMENT OF ENGINEERING Stormwater,Sanitary Sewer, Potable Water, Roads, Parks,and Trails 114 Seven Mile Drive, Ithaca, N.Y. 14850 ENGINEERING@TOWN ITHACANY.GOV PHONE: 607.273.1656 FAX: 607.272.6076 www.townithacany.gov DATE: nainai�n�� 01/02/2025 TO: Michele Palmer, P.L.A., WPDLA, PLLC CC: David Herrick, P.E, T.G. Miller PC Owen Barden, P.E, T.G. Miller PC FROM: David O'Shea, P.E. Director of Engineering Emily Rodgers, Civil Engineer Joe Slater, Director of Public Works/Highway Superintendent RE: Maplewood Phase II m oo�rr cnh 111 fnr 9epter her 47 2024 \Ale nffe.r}h 8fGl l9wi Rg nnmm�s, rrrcc c�crr cFrc c�-�-rz --rPc-crrcrcrr rnTvwrrr�ucrrtrrr We have reviewed the Storm Water Pollution Prevention Plan Volume I and Volume 11, dated August 16th, 2024 revised November 15, 2024 and the civil plan set titled "Cornell — Maplewood Phase 2", dated November 15, 2024 associated with the project referenced above. We have also received correspondence from T.G. Miller in response to the 09/09/2024 comments. We off the following comments: General plan and niVil cof ni irronfly dG nnf Road Right of Way (ROW) Prior to Issuance of a Highway Right of Way Work Permit: 1. Any utilities that will be buried within the ROW will require review and approval. Acknowledged by Applicant 2. Please provide additional details and grades for all proposed sidewalks and/or trails within the ROW showing their compliance with ADA requirements. Acknowledged by Applicant. Please revise the detail to incorporate the following: • Joints between sidewalks, curb ramps, turning spaces and roadways shall be flush and free from abrupt vertical changes greater than a ,/n 4 • A maximum cross slope for all accessible sidewalks to be 1 .5%. • Please review and revise the details to include the required clear space and turning space. • Please provide the proposed truncated domes that will be installed in the asphalt walkway for review. 3. All proposed sidewalks/trails within the ROW must meet the recommended AASHTO buffer to travel lane. Acknowledged by Applicant. 2' separation from the back of curb to sidewalk is the minimum buffer. 4. Please provide additional details showing that improvements to the midblock crosswalk will be in conformance with the Manual of Uniform Traffic Control Devices (MUTCD), the NY MUTCD Supplement, and Federal Highway Administration recommendations. Provide stopping sight distance diagrams showing compliance. RRFBs are preference over a raised crosswalk. The crosswalk shall also be illuminated. Acknowledged by Applicant 5. Numerous curb cuts are proposed for this project. Please provide stopping sight distance diagrams with proposed site improvements and landscaping shown. Dlo;;co once iro +rein fraffin is analyzed at all 19-GA-tit 1n0 as fho onfrannoc Will nnf be ene way d6IFiRg Provided traffic report analyzed site exit drives. Sight distances appear to be sufficient. Please provide the requested diagrams overlaid on the landscape plan. Numerous improvements are proposed adjacent to the exits. The sight lines must be maintained. 6. Temporary fencing cannot be installed within the ROW. Terminate temporary fencing at the ROW boundary. At exit and entrance gates, sufficient distance from the edge of travel lane needs to be provided for a vehicle to exit the roadway perpendicular to the gate. Acknowledged by Applicant 7. The plans indicate that numerous roadways signs are to be removed and reinstalled. These signs need to be reviewed to determine if temporary signs need to be installed during construction. ArknowlPdopd by Applicant. 8. A permanent signage plan for proposed signs within the ROW with details will need to be provided during permitting for review and approval. Acknowledged by Applicant 9. Please provide a work zone traffic control plan and with sign locations in the plan set. Acknowledged by Applicant 10. the TeyVp of Ithaca thrnilghnilt the lift-9 of the PFGjeGt Roadway Use AgF8Gmenf vv-n--vrTcr-r��ca, cn-ivac��vcr�cn-��rr�vrcn-��rvrcc�� �.,crrrcr-rc may be required—based—A.A the estimate A Koaaway use Agreement will Kee requirea TOr the project. i ne roan is also currently weight restricted. 11.Any additional bus stops should be constructed outside of the ROW or outside of the travel lane. Acknowledged by Applicant. They are coordinating with TCAT to finalize the location. 12.Correspondence between various people have proposed widening Maple Ave. at building A to meet fire apparatus requirements. If widened/realigned, the curb shall maintain a linear face. A detailed plan needs to be provided for review. The proposed transition appears to be sufficient. Please revise the following: • Update C102 to include this work. • Detail 2, C204 to indicate the asphalt thicknesses shown are minimal thicknesses. If the asphalt is thicker, the contractor shall match the adjacent thicknesses. Also identify the maximum lift per pavement type. • Detail 10, C204 shall apply to Maple Ave. The top thickness shall be 2" on the rebate within Maple Ave. A crack sealer shall be applied to the joint. The note referenced in the detail does not correspond to any of the project details. • Please provide a site plan indicating where each detail is to be applied. 13.Three parking spots for East Ithaca Recreation Way on Maple Avenue will be removed for the creation of a driveway. To compensate the community, it is recommended that the applicant install a small parking area on the north side of Maple Avenue adjacent to the trail entrance. Applicant has proposed to install 3 general parking spaces and 1 EV parking spaces within the site reserved for the public to access the Town trail. Signage associated with these spaces shall be approved by the Highway Superintendent and maintained by the developer. a Make .ter„d medel b.jnnfnrm�nno vVith TeyVp of IthaGa Street Light The applicant has identified they do not intend to dedicate the streetlights. The streetlights will be illuminating the public right of way, therefore they must be installed in accordance with the Town of Ithaca Street Light Policy. Please provide additional information showing the proposed lighting is in conformance with the policy. 15.Provide turning movements for the largest vehicle anticipated to service the site. The entrances and exits shall be large enough to accommodate these vehicles without the need for them to cross the road centerline. Such vehicles may be a bus or garbage truck. Sanitary Sewer 1 . The City of Ithaca has issued a Will Serve letter indicating there is sufficient capacity within the infrastructure they own and/or manage. '� The c�eweF maOR between the me'teF pot and ViRe 05 does not have SUffi + z�n�.rcavc�--rrrarrr�ccv�ccrr zrvc��ry r-rlw-v-c��rrrGenGapaG It has been determined there is sufficient capacity. Pet be i itiliZedo it she ild be rerneyed by the applicant Project will be utilizing this line. A wye connection will be required. Please provide a detail of this connection for review. 4. The water tank drain shall not be connected to the sanitary sewer. 5. The proposed modification to the existing Town of Ithaca sewer main at the Maplewood I and Maplewood II property line will require concept and location approval and dedication approval by the Town Board. This will need to be constructed and dedicated prior to issuance of a building permit. Additional information needs to be provided. Acknowledged by Applicant. 6. An in-depth review of the private system will not begin until plans and fee are submitted for external plumbing permit approval. Some general comments: a. Applicant will need to perform pressure testing of all mains, laterals, and manholes. This testing will need to be witnessed by the Town of Ithaca. b. The applicant will need to clarify where the cleanout associated with the building drain and building sewer is located. c. Changes of direction require the installation of cleanouts prior to the first change in direction. Acknowledged by Applicant. 7. The sanitary sewer manhole and drop detail are not in conformance with Town details. We will provide these for incorporation into the plans. Potable Water 1. The applicant is proposing to extend their water service from Maple Wood I into the project parcel. A note should be added to the consolidation survey stating: "A private potable water service is shared between parcels. The Tompkins County Whole Health and Town of Ithaca must be notified prior to any change in ownership between the parcels that results in a non-common owner." Acknowledged y�by}'Applican 2.-Please- a-te with+ the TewR of Ithaca ( ede Cnfnrnomont flepaFtmont and ca--vvcr��rn vrccnTCTrQc�urcm crn--crrTcr Rnitnn Dnint nn rJesign insPentinn and Permitting regiiireme snt f o Acknowledged by Applicant. Stormwater The materials were reviewed against the following for compliance: - New York State Stormwater Management Design Manual, 2015 (Design Manual) - New York State Standards and Specifications for Erosion and Sediment Control Manual, 2016 (ESC Manual). - SPDES General Permit for Stormwater Discharges from Construction Activity; GP-0-20-001 (General Permit) 1. Please update the SWPPP to include/clarify the following items: a. GGyRer�i-94ii NIUmber y i i are seeking GE)Verege under �cyilSfi�U. b. It appears that you are seeking to utilize "redevelopment" design criteria. Please outline which criteria you are utilizing per watershed. Applicants response needs to be incorporated into the SWPPP narrative. The response also needs to expand on RRv requirements in relation to redeveloped areas. c. I believe you may be claiming impervious surface as existing that was previously removed. Please update the SWPPP to indicate if so and to identify that the surface was not removed greater than 5 years ago. Please update the SWPPP narrative to clarify that all claimed impervious surfaces were onsite within the last 5 years and were verified with aerial imagery. FegaFdiRg the pi:epesed imnorVinUo oUrfaGG amr)i info Applicant has corrected the error.. 4 Cr1mo of Seil nn site .pro /� onilo RRv minima im rolvi air hni ild nnf be a. �r-t#��„-�r-t+�c�Tt��„�. ��et�e�s�,-,���� i ifili-7orJ in fhoco Inn;4.914 Applicant is no longer claiming minimum RRv due to site infiltration rates. 4 Please 6ipdate the parrative tables, te whir-h watershed the pr;;r_tOr_P.;; ;;re jR `^Satisfied. cnil ;;Ad �ccnni�f c;it n�mo h� �ii� rin nnth�tQy �n o/ram/n coil nrniin acrrr-arra--c�..rrcrcrcrc rrrn-a-rrr� ac-rry ov Satisfied. L . update Please ni ate the ronoiViRg water hedy to the Se th ERGI of Cayuga Lake. ake v Satisfied. 7. Please pFeyide infilfFati )R teStYY1g OR aGGeFdaRGG with nnonil�ID. Satisfied. 8. Please provide information on the proposed plantings for the bioretention filters. Acknowledged by Applicant. A future submission will contain the information. Q_ Please prevmde stage sterage data ORGIOGatiRg the PFetFGatM8QRt VG_lIImt_Q .;;Ad- tA_ta4 h�cin deli ime per hinrofonfinn filfor Satisfied. 1. Per the NYS Standards and Specifications for Erosion and Sediments Control, sediment traps shall not be located closer than 20' to a building. A sediment trap cannot be used beyond one construction season. Acknowledged by applicant. 1 hey will review and revise as necessary. Please include the following: • Modify the sequence to include stabilization immediately after excavation of the traps. • Embankments of sediment traps shall not exceed 5' in height. • Excavated portion of the sediment trap shall have a 1 :1 or flatter slopes. GGRyeyed as deSigRed Satisfied. Satisfied. 12 ExistiRg nenditiens wateFshed 4 appears te he missing from Vel II 6atisfied. 13.Please update the ESC plans to include the following notes: a. Contractor is responsible for adding ESC controls downslope from any disturbance that is not directed to a sediment basin. Satisfied b. All material laydown/storage areas shall be a stabilized surface. Satisfied 14.Please update the Vel. 1 RaFFative FegaFdOR@ foil sites. if the foil site is withiR aR IVIS the nnc�stappreve site A-Rd cigR nnte to C\A�P—. Please revise the narrative to reflect the recent information obtained from the DEC regarding fill sites. 15.Please review the Proposed Watersheds Map to ensure that all impervious surfaces are accounted for, and the plan is accurate. A conflict may be present in the Bike Shelter Building area. 16.Table 1 of the Narrative appears to be missing WS3. Please revise accordingly. 17.Please review the WQv calculations for WS1 & WS3. A Rv value less than 0.2 should not be utilized in the calculation. 18.Based on the calculations submitted, you are no longer seeking the RRv minimum criteria. Please revise the narrative and tables to reflect this. 19.BGIS a. Pg 8. of the narrative references spreadsheet calculations for the volume of the system. It appears this information is contained within the HydroCad not a spreadsheet. Please revise the statement or provide the spreadsheet. b. Please review all documents for consistency for the number of chambers for BGIS 1. The narrative lists 12, then states two rows of 4, and the HydroCad has 10. c. The pretreatment devices are installed inline. These devices must handle the peak flow during the 100-year storm. Please provide additional information and details showing you are in conformance with ADS TN-1-09 white paper. Please include this paper with the other information. d. Please move the Hydrodynamic Separator Unit section to the beginning of the narrative with the redevelopment section. Please provide documentation in the SWPPP documenting the practice is approved per 9.4.1 of the Design Manual. e. Revise the detail to depict the cover. A table for each practice within the detail may be helpful during construction to ensure that elements of the practices are installed at the correct elevations. BGIS 1 appears to have marginal separation to the observed groundwater level. f. The Hydrodynamic Separator Units need to be added to the maintenance section of the SWPPP narrative. 20.Please revise the BGDS narrative. Only WS1 is utilizing this system now. 21.The outlet structures are labeled as Diversion Structures on the HydroCad calculations. These should be revised to Outlet Structures to reflect their naming on the plan set. 22.Please provide updated plans with a complete Profile E. 23.Please provide information showing the isolator show fills prior to the other chambers. 24.Bioretention a. Please update the narrative to incorporate information on why the bio filters are oversized and able to be utilized for 100% RRv in C and D soils. b. Please provide forebay sizing calculations in conformance with the design manual (Area calculation). c. Please revise the forebay detail to be 6" in height from the top of the filter soil. d. The detail is missing the required mulch. e. A stone fill outlet protection detail is not provided. f. Add a note to the detail stating that underdrains, planting soil, and mulch cannot be installed until all contributing areas are stabilized. 25.Outlet Control Structure 3 is not detailed with a 4.5" x 6" orifice. This conflicts with the HydroCad. 26.Pg. 10 contains a typo. "...capacity for both BGIS." 27.Please update the plan set identify the need to provide the Town of Ithaca with an Asbuilt prior to NOT. Please identify what is required on the as-built. 28.Please revise the NOI to reflect revisions made to the SWPPP. OWHITHAM Greystar PLANNING DESIGN LANDSCAPE ARCHITECTURE,PLLC Maplewood Phase II January 7, 2025 CJ Randall Director of Planning The Town of Ithaca 215 North Tioga Street, Ithaca, NY 14850 Re: Maplewood Phase II — Preliminary Site Plan Review with Town of Ithaca Planning Board Dear CJ and all, On behalf of the project team, please find submission materials attached for the Maplewood Phase II proposed project. We introduced the project to the Planning Board at the July 2,2024, meeting. Review continued through the Negative SEQR determination on December 17, 2024. With this submission we request that the Town begin the review of project for Preliminary Site Plan approval at its January 21, 2025, Planning Board meeting. The project proposes a redevelopment of the former East Hill Apartments with new construction of apartment units for graduate and professional students at Cornell. This development will be an extension of the existing Maplewood Phase I site, and it is proposed that a new PDZ be created for Phase II to include the project area. Also at the December 17, the Planning Board made a recommendation to the Town Board,where the project will appear on January 27, for approval of the PDZ. Maplewood Phase II proposes approximately 800 new beds, spread among approximately 615 new units between six new residential buildings and a community center. The project team is composed of: • Greystar Development East, LLC—Sponsor/Developer • CBT—Architects • GTS Consulting —Traffic Engineers • T.G. Miler, P.C. —Project Civil Engineers • Whitham Planning & Design—Landscape Architects, Approvals& Project Coordinators This submission is intended to provide an update on the progress of design and planning for this project. The materials included in this submission are as follows: • Project Narrative • Site Plan • Photometric Plans and cut sheet • Architectural Drawings • Visual Assessment • Building Elevations • Grading & Drainage • Utilities • Landscape & Planting We look forward to our further conversation with the Planning Board and Town staff. Please let us know if there are any questions. Sincerely, aAzl� Michele A Palmer, RLA,ASLA, LEED GA Senior Associate Whitham Planning Design Landscape Architecture, PLLC Phone.607.272.1290 Email. admin(2m)hithamderign.com 404 North Cayuga Street,Ithaca NY 14850 1 r OWHITHAM Greystar PLANNING DESIGN LANDSCAPE ARCHITECTURE,PLLC Maplewood Phase 11 Project Narrative January 7, 2025 Town of Ithaca Review Update The project was introduced to the Planning Board at the July 2,2024, meeting. The project is a Type 1 Action, and a coordinated review was conducted. The SEQR Review concluded with a Negative determination on December 17, 2024. Concurrent with the SEAR review, the Town Planning Committee, Town Board, and Planning Board have reviewed the draft PDZ required to change the site's zoning to allow the project as proposed to be approved. Also on December 17, the Planning Board made a recommendation to the Town Board to approve the PDZ. With this submission we request that the Town begin the review of the project for Preliminary Site Plan approval at its January 21, 2025, Planning Board meeting. The project will also appear at the Town Board on January 27, for approval of the PDZ The following summarizes changes to the project since first presented to the Planning Board. Approach The project is a second phase of the existing Maplewood student housing community and is oriented toward Cornell graduate students, similar to the residents of the current community. Six five-story buildings are proposed that will house 615 units with 800 beds, primarily studios and one-bedroom apartments with a percentage of two-bedroom. 155 parking spaces are proposed. Greystar, the operator of Maplewood Phase I, is uniquely positioned to blend Maplewood Phase I and Maplewood Phase II to create a larger Maplewood neighborhood, a vibrant resident community of approximately 1,672+ primarily graduate students. The project redevelops a vacant site, within an existing neighborhood with high connectivity that includes bike paths, accommodations for personal and Bikeshare bikes, sidewalks, easy connections to TCAT bus routes, and Ithaca CarShare vehicles. With a lower parking ratio for personal vehicles per unit, constructing housing in this location, within proximity to campus, aids in reducing the number of personal vehicle trips for commuting to campus for graduate and professional students. Schedule Inclusive of the actions already accomplished in the municipal and environmental review, the following schedule summary is anticipated: • Complete Town of Ithaca Approvals early spring 2025 • Break ground late spring 2025 • 20-22 months construction period OWHITHAM Greystar PLANNING DESIGN LANDSCAPE ARCHITECTURE,PLLC Maplewood Phase 11 • Move in August 2027 Site Design Updates Landscape- The site design has incorporated small alignment adjustments as required by the progress of architectural footprint changes and site grading requirements. The overall concept has been maintained. The landscape consists of lawns and open meadows with tree planting, detailed shrub plantings adjacent to buildings, and street tree plantings where possible, not obstructing fire access. Plantings are predominantly native or native adapted with a biodiverse range of species. A draft technical planting plan is included in the submission package. An active recreation location plan was added identifying activity zones. Several parking spaces were removed to accommodate the fire access lane described below. The total number of proposed parking spaces on the site has been reduced from 161 to 155. Public, Accessible, EV Charging, and Car Share parking spaces were not impacted. Fire Department and Emergency Vehicle Access—Ongoing conversations have been held with IFD Chief Covert and Code Enforcement Director of Code Enforcement&Zoning Marty Moseley. It was determined that a fire apparatus access lane is required to be provided between buildings C and F and between buildings D and E to comply with the remoteness requirements of the NYS Fire Code. a.D106.3 Remoteness. Where two fire apparatus access roads are required they shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the property or area to be served, measured in a straight line between accesses. This lane has been added to the plans and will be used for fire vehicle access only and controlled with collapsible bollards. Lighting— Site lighting has been revised to utilize similar luminaires to those installed at Maplewood I but with better photometric properties. The Levanto pole top luminaires will be painted black and 16' tall located adjacent to parking areas and 12' tall along pedestrian walkways. The Clio Bollards will also be located in pedestrian areas. The luminaires are Dark Sky compliant. A photometric plan and lighting cut sheets are included in the submission package. OWHITHAM Greystar PLANNING DESIGN LANDSCAPE ARCHITECTURE,PLLC Maplewood Phase II ig - �itga _, I `FIF' ��s� 5rct#�rrrryrii 1 N^ . �s 4 Levanto Luminaire Example Image a Clio Bollard Example Image OWHITHAM Greystar PLANNING DESIGN LANDSCAPE ARCHITECTURE,PLCC Maplewood Phase II Architectural Updates The Residential Building Material Palette:The materiality of Level 1 changed from natural stone to fiber cement due to cost escalation. Layout Changes: Building A was mirrored and rotated. The main entrance from Maple Ave shifted west(closer to Phase 1) to provide an accessible entry from the main Maple Avenue walk/trail without modifications to existing roadway grades. Building A was adjusted. We heard concerns about the height and massing of Building A as related to the Phase 1 adjacent building. The updated massing provides a better transition between the Phase 1 and Phase 2 buildings by recessing the northwest corner mass and stepping it away from Maple Ave. Use of glass:The amount of glass at the residential building's main entrances and study lounge curtainwall was adjusted to reduce the total amount of glass and create a better relationship with the vertical cement siding expression. The glass in these locations only will be bird safe. Color Palette:The building paint colors were refined. A wood-tone color palette will provide more variety and identity for the six residential buildings. Physical models with actual paint colors were provided to better illustrate the palette. Conclusion The Maplewood Phase 11 project will bring much-needed graduate student housing to a neighborhood targeted by the Town of Ithaca for more dense development. The Greystar team is committed to continuing to provide high-quality, affordable, and sustainable housing to the Cornell and Ithaca communities and looks forward to the continued review with the Town of Ithaca. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG1 CYCLone Levanto CLE174A Approval - Specification Project: -- Order: Qty: Luminaire:F7 Type: Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a tight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplight.The combination of two distribution types(backward optics)is also available in the same optical module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-407(40°C)to 1137 (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV/5kA or 20kV/10kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring I Hardware:Type TEWT 14-7 AWG,12"(30.5cm)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ft Weight:32.8 Ibs 114.9 kg hftp:JJwww.cvclonelighbnq.com/assets/Legal/Cyclone-Sales-TermsCondifions-en.oddf Stamp/Approval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(OC)Canada MY 1 W9 www.cyclonelightinti.com Rev.2024/06 Phone:1-866436-5500-infoAgWonelighting.cwm ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG1 CYCLone Levanto CLE17T4A Approval - Specification Project: Order: J Qty: Luminaire:L Type: Ordering Code CLE17T4A-FGC-T4-P10-30K-MVOLT-SURGE-DIM-BK•TX!16FT POLE ModelDistribution Performance package CLE17T4AF., Flat Glass ear T1 Type 1 P10 (29001m) 30K 3000K MVOLT 120-277VAC 10KV 10kV/5kA FGF Flat Glass Frosted T1A Type1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV710kA TtAHS Type IAwithHS NIL No Lens T2 Typ e2 P30 (54001m) 120 P40 (66001m) 208 T2H5 Type 2 with HS T211111 Type2M P50 (75001m) 240 T211111S Type 2M With HS P60 (101001m) 277 T3 Type P70 (131001m) 347 T3HS Type 3 with HS p80 (148001m) 480 T31111 Type 3M T3MHS Type 3MwithHS T4 Type 4 UHS Type 4 with HS T5 Type 5 TCW Crosswalk Backward optic Reducer Photocell Dimming Color Texture Pre-finish BK Black RAL9005 TX Textured — Fits 0 4"(10cm)X 3"(7.5cm) PT Photocell W17-PIN DIM 0-10 volts wire for DG Dark green RAL6012 bm bmoolnMG Marine grade long tenon receptacle(ANSI C136.41) external controls MA Marine blue RAL5013 pre-finish R28 Reducer 0 4'(1 Ocm)0 pX Shorting CAP W17-PIN PND506 Program 50%for SI Metallic silver RAL9006(smooth only) to 2 7/8"(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3"(7.5cm)long tenon PTL Long life photocell W/7-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours(11 PM to 5AM) GM Moss green RAL6005 to 3'(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3"(7.5cm)long tenon 10%increment step- WH White RAL9003 dimming switch BKH' Black Holophane BZH* Dark bronze Holophane GNH* Green Holophane GHH* Graphite Holophane GRH* Gray Holophane SLH* Silver Holophane WHH* White Holophane 'Holophane colors are only mailable in Smooth(S&q finish. 'Backward optic: The Orion light engine features 180'c tentable optics that can be customized as needed.This makes it a Note:Actual performance may differ as a result of end-user environment and application.All values are design or typical simple matter to combine two distribution types in a single light engine,simultaneously fighting a road and values,measured under laborahory conddbns at 254C.Specifications shdhect to change without notice.Please consult a bike path a sidewalk,for instance.Contact factory for more irdomation. ourweh site for up4odam product information and IES files. 18.5- r 'sT � I r EPA:0.67 tit' Weig32.8 Is Stamp/Approval: Name: Page 2 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.cyclonelightin_q.com Rev.2024/06 Phone:l-866-436-5500-info a c rdonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG2 CYCLone Levanto CLE17T4A Approval - Specification Project: Order: Qty: I Luminaire:F Type: Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a fight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. (42 cm)___J Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to _ illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplight.The combination of two distribution types(backward optics)is also available in the same optical module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40°F(AO*C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV/5kA or 20kV/10kA bipolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring I Hardware:Type TEWT 14-7 AWG,12"(30.5cm)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at EPA:0.67 It' Weight:32.8 Ibs!14.9 kg htta:l/www.cyclonelighfing.com/assets/Legal/Cyclone-Sales-TermsConditons-en.A Stamp/Approval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1W9 www.gycloneliohtino.com Rev.2024/06 Phone:1-866A36-5500-info@cyclonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG2 cyclone Levanto CLE17T4A Approval — Specification Project: Order: Qty: Luminaire:C Type: Ordering Code CLE17T4A-FGC-T4HS-P10-30K-MVOLT-SURGE-DIM-BK-TX!16FT POLE Modelpackage CCT Volts Surge protector CLE17r4AF., FI.R.I.-Clear T1 Type 1 P10 29001m 30K 30DOK MVOLT 120-277VAC 10KV 10kV15kA FGF Flat Glass Frosted T1A Type to P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV110kA NL No Lens T1AHS Type 1Awith HS P30 (54001m) 120 T2 Type 2 T2HS Type 2 with HS P40 (66001m) 208 T21111 Type 2M P50 (75001m) 240 T2MHS Type 2M with HIS P60 (101001m) 277 T3 Type 3 P70 (131001m) 347 T31HIS Type 3 with HS p80 (148001m) 480 T3M Type3M T31YIHS Type 3M with HIS T4 Type 4 UHS Type 4 with HIS 13 type TCW Crosswalk BackwardoPhc ColorReducer Photocell Dimming - BK Black RAL9005 TX Textured - Fits 0 4'(1 Ocm)X 3"(7.5cm) PT Photocell W/7-PIN DIM 0-10 volts wire far DG Dark green RAL6012 moo MG Marine grade long tenon receptacle(ANSI C136.41) external controls MA Marine blue RAL5013 pre-finish R28 Reducer 0 4-(10cm)0 pX Shorting CAP Wf7-PIN PND506 Program 50%for SI Metallic silver RAL9006(smooth only) to 2 718'(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3'(7.5cm)long tenon PTL Long life photocell W17-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours It PM to 5AM) GM Moss green RAL6005 to 3'(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3"(7.5cm)long tenon 10%increment step- WH White RAL9003 dimming switch BKH' Black Holophane BZH- Dark bronze Holophane GNH' Green Holophane GHH- Graphite Holophane GRH- Gray Holophane SLH' Silver Holophane WHH' White Holophane Holophane wbrs ere only available in Smooth(Shq finish. •Backwardoptic: The Orion light engine features 1806ventable optics that can be wslomized as needed.This makes ita Note:Actual performance my differ as a result of end-user environment and application.All values are design or typical ample meter to wrrbine two distribution types in a single light engine,simullareously lighting a road and values,measured under laboratory conditions at 254C.Specifications subject to charge without notice.Please wnwit a bike palh or sidewalk,for instance.Contact factory for more information. our web site for up-tociale product information and IES files. (42.)� i EPA:0.67 ft- Weight:32.8 Ibs 114.9 kg tam Approval: LD Page 2 of 2 Name: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1 W9 www.cvclonelighting.com Rev.2024/06 Phone:1-866436-5500-info6cycloneliahting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG3 CYCLone Levanto CLE17T4A Approval - Specification Project: J Order: Qty: Luminaire:F Type: Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a tight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. r (42 crn)___J Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1.70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplight The combination of two distribution types(backward optics)is also available in the same optical a module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 900/.Operating temperature is-40°F(-40°C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV/5kA or 20kV/10kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring/Hardware:Type TEWf 14-7 AWG,12"(30.5crn)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,8117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ft2 Weight:32.8 Ibs/14.9 kg http:l/www.cyclonelighfing.comlassetslLggal/Cyclone-Sales-TermsCondifions-en.pddf Stamp/Approval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.cucloneliahtina.com Rev.2024/06 Phone:1-866-436-5500-infoCa cydonelighting.com 0 2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG3 CYCLone Levanto CLE174A Approval — Specification Project: Order: Qty: Luminaire:F Type: Ordering Code CLE17T4A-FGC-T5-P10-30K-MVOLT-SURGE-DIM-BK-TX 116FT POLE Modelpackage CCT Volts Surge protectot CLEITT4A ass Clear Tt Type 1 P10 (29001m) 30K 3000K MVOLT 120-277VAC 10KV 10kV15kA FGF Flat Glass Frosted T1A Type1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV1lOkA NIL No Lens T1AHS Type lAvAthHS P30 (54001m) 120 T2 Type 2 P40 (66001m) 208 T2HS Type 2 with HS T211 Type 2M P50 (75001m) 240 T21dHS Type 2M vAth HS P60 (101001m) 277 T3 Type P70 (131001m) 347 T3HS Type 3 with HIS P80 (148001m) 480 T31111 Type 3M T3MHS Type 3M with HS T4 Type 4 T4HS Type 4 with HS T5 Type 5 rosswa Backward optic Reducer - BK BlackRAL9005 TX Textured - Fits 0 4'(10cm)X 3"(7.5cm) PT Photocell W/7-PIN DIM 0-10 vol wire for DIG Dark green RAL6012 moo MG Marine grade long tenon receptacle(ANSI C136.41) external controls MA Marine blue RAL5013 pre-finish R29 Reducer 0 4"(10cm)0 pX Shorting CAP W17-PIN PND506 Program 50%for 81 Metallic silver RAL9006(smooth only) to 2 718"(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3"(7.5cm)long tenon PTL Long life photocell W/7-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours(11PM to 5AM) GM Moss green RAL6005 to 3"(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3'(7.5cm)long tenon 10%increment step- WH WhiteRAL9003 dimming switch BKH* Black Holophane BZH* Dark bronze Holophane GNH* Green Holophane GHH* Graphite Holophane GRH* Gray Holophane SLH' Silver Holophane WHH* White Holophane •Holophane colors are any evadable In smooth(sM)firdsh. •Backward optic: The Orion light engine features 180'onerdable optics that can be customized as needed.This makes it a Note:Actual pedormame my differ as a mull of end-user environment and application.All values are design or typical simple matter to combine two distribution types in a single tight engine,simultaneously lighting a road and values,measured under laboratory conditions at 25'C.Specifications subject to charge without notice.Please consult a bike path or sidewalk,for instance.Contact faclory for rtare infannabon. our web site for up-to-date product information and IES files. 1es �.s m'))" EPA:0.67 W Weight:32.8 Ibs 114.9 kg ---:] Stamp/Approval: Name: Page 2 of 2 Name: Date: Date. Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.cyclonelighting.com Rev.2024/06 Phone:1.866-436-5500-infoAcyclonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG4 CYCLone Levanto CLE17T4A Approval - Specification Project: - T J Order: Qty: Luminaire:E Type: Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a tight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(1Ocm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. (42 cm) Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplight.The combination of two distribution types(backward optics)is also available in the same optical 2 module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(1370 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40°F(-40°C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV15kA or 20kW10kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring/Hardware:Type TEWT 14-7 AWG,12"(30.5cm)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ft2 Weight:32.8 Ibs!14.9 kg htto:llwww.gyclonelighting.comiassets/Legal/Cyclone-Sales-TermsCondifions-en.nddf Stamp/Approval: [Date: ame: Page 1 of 2 Name: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada SY 1W9 www.gyclonelighting.com Rev.2024/06 Phone:1-866-436-5500-info(a gyclonelighfing.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG4 cycLone Levanto CLE17T4A Approval — Specification Project: Order: Qty: Luminaire: Type: Ordering Code CLE17T4A-FGC-T2-P10.30K-MVOLT-SURGE-DIM-BK-TX 112FT POLE Model Lens Distribution Performance package CCT volts Surge protector CLE17T4A713=17 ass ear T1 Type P10 29001m 30K 3000K li 120-277VAC 10KV 10kV/5kA FGF Flat Glass Frosted T1A Type 1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV110kA NIL No Lens T1AH5 T e 1Awith HIS P30 (54001m) 120 7 2 Type 2Umb ypevn p40 (66001m) 208 T2M Type 2M P50 (75001m) 240 T2MHS Type 2Mwith HS P60 (101001m) 277 T3 Type P70 (131001m) 347 T3HS Type 3 with HIS P90 (148001m) 480 T3M Type 3M T3MHS Type 3M with HIS T4 Type 4 T4HS Type 4 with HIS T5 Type 5 TCW Crosswalk •Backward OW Reducer Photocell Dimming Color Texture Pre-finish BK Black RAL9005 TX Textured — Fits 0 4"(10cm)X 3'(7.5cm) PT Photocell W77-PIN D -10 volts wire for DG Dark green RAL6012 moo MG Marine grade long tenon receptacle(ANSI C136.41) external MA Marine blue RAL5013 pre-finish R28 Reducer 0 4'(10cm)0 pX shorting CAP W/7-PIN PND506 Program 50%for S1 Metallic silver RAL9006(smooth only) to 2 718'(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3'(7.5cm)long tenon PTL Long life photocell W/7-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours(11 PM to 5AM) GM Moss green RAL6005 to 3'(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3"(7.5cm)long tenon 10%increment step- WH While RAL9003 dimming switch BKH• Black Holophane BZH• Dark bronze Holophane GNH' Green Holophane GHH' Graphite Holophane GRH' Gray Holophane SLH' Silver Holophane WHH' White Holophane Holophane colors are only availe6le in Smooth(Shq finish. 'Backward optic: The Orion light engine features 18W orientable optics that can be customized as needed This makes it a Note:Actual performance may differ as a result of end-user environment and application.All values are design or typical simple matter to combine two distnbulion types in a single light engine,simultaneously lighting a road and values,measured under laboratory conditions at 25'C.Specification subject to change umlaut notice.Please consult a bike path or sidewalk,for instance.Contact rectory for more inlonnation. our web site for up-to-date product information and IES files. 16.5• �a2anj� it V4a IV EPA:0.67 ft` Weight:32.81bs 114.9 kg StamplApproval: Name: Page 2 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.gyclonelicihting.com Rev.2024/06 Phone:1-866-436-5500-info aOcvdoneliohting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG5 cycLone Levanto CLE17T4A Approval - Specification Project: — i Order: Qty: Luminaire: Type: Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a fight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. r (42 cm) Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplight.The combination of two distribution types(backward optics)is also available in the same optical module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts. 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40°F(-40°C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV15kA or 20kV/10kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring/Hardware:Type TEWf 14-7AWG,12"(30.5cm)minimum exceeding Iuminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ft2 Weight:32.8 Ibs/14.9 kg htto:I/www.cyclonelighting.com/assets/Legal/Cyclone-Sales-TermsConditions-en.pdf Stamp/Approval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.cyclonelighting.com Rev.2024/06 Phone:1-866A36-5500-info cycionelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG5 cyclone Levanto CLE174A Approval — Specification Project: I Order:C QtY• _ _-_� Luminaire: Type: Ordering Code CLE17T4A-FGC-T2HS-P10.30K-MVOLT-SURGE-DIM-BK-TX!12FT POLE Model Lens Distribution Perf. package 7a ass ear T1 Type 1 P10 29001m) 30K 3000K MVOLT 120-277VAC 10KV 10kV15kA FGF Flat Glass Frosted T1A Type 1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV110kA NIL No Lens T1AHS Type 1Awith HS P30 (54001m) 120 T2 Type 2 T2HS Type 2 with HS P40 (66001m) 208 ype P50 (75001m) 240 T2MHS 1'Irl IType 2M with HS P60 (101001m) 277 T3 Type 3 P70 (131001m) 347 T3HS Type 3 with HS P80 (148001m) 480 T3M Type 3M T3MHS Type 3M with HS T4 Type 4 UHS Type 4 with HIS T5 Type 5 TCW Crosswalk 'Backward opts Reducer • • DimmingColor Texture Pre-finish — — — BK Black RAL9005 TX Textured — Fills 0 4"(1 Ocm)X 3-(7.5cm) PT Photocell W17-PIN DIM -10 vo wire or DG Dark green RAL6012 moo MG Marine grade long tenon receptacle(ANSI C736.41) external controls MA Marine blue RAL5013 pre-finish R28 Reducer 0 4"(10cm)0 px Shorting CAP W17-PIN PND506 Program 50%for SI Metallic silver RAL9006(smooth only) to 2 718"(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3"(7.5cm)long tenon pTL Long life photocell W/7-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours(11 PM to 5AM) GM Moss green RAL6005 to 3'(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3"(7.5cm)long tenon 10%increment step- WH White RAL9003 dimming switch BKH' Black Holophane BZH• Dark bronze Holophane GNH• Green Holophane GHH' Graphite Holophane GRH' Gray Holophane SLH' Silver Holophane WHH' White Holophane 'Holophane colors are only available in Smooth ISM)finish. 'Backward optic: The Orion light engine features 1B8'onentable optics that can be cuslomized as needed.This makes it a Note:Actual performance may Ceeras a result of eM-user environment and application.All values are design or typical simple matter to combine two distribution types in a single light engine,simultaneously lighting a road and values,measured under laboratory conditions at 25'C.Specifications subject to change without notice.Please consult a bike path or sidewalk,for instance.Contact lactory for more information. our web site for up-to-date product information and IES files. 18S' IF r (a2 an� s t'A� EPA:0.67 ft Weight:32.8 Ibs 114.9 kg Stamp/Approval: Name: Page 2 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada AY 1 W9 www.pyclonelighting.com Rev.2024/06 Phone:1-866-436-5500-info@cycloneliohtina.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG6 cyclone Levanto CLE174A Approval — Specification Project: Order: Qty: Luminaire: Type: Base module:CastA356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a tight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically 16.5" assembled to the top of the ring. (42 cm)� Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% r uplight.The combination of two distribution types(backward optics)is also available in the same optical W module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40"F(-40°C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kVl5kA or 20kV110kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.412002 C. Wiring 1 Hardware:Type TEWT 14-7 AWG,12"(30.5cm)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ft2 Weight:32.8 Ibs!14.9 kg htto:/hvww.cyclonelighfing.com/assets/Legal/Cycone-Sales-TermsCondibons-en.idf StamplApproval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1W9 www.gclonelightinci.com Rev.2024/06 Phone:1-866-436-5500-info(acyconelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG6 cycLone Levanto CLE17T4A Approval — Specification Project: � Order: Qty: Luminaires�—-- Type: Ordering Code CLE17T4A-FGC-T5-P10.30K-MVOLT-SURGE-DIM-BK-TX 112FT POLE Model Lens Distribution Performance package CCT Volts Surge protectol CLE17T4AME, 1-lat Glass Cipar T1 Type 1 P10 (29001m) 30K 3000K MVOLT 120-277VAG 1OKV 10kV/5kA FGF Flat Glass Frosted T1A Type 1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV/10kA NIL No Lens T1AHS Type 1Awith HS P30 (54001m) 120 T2 Type 2 T2HS Type 2 with HS P40 (66001m) 208 T2M Type2M P50 (75001m) 240 T2MHS Type 2M with HS P60 (101001m) 277 T3 Type 3 P70 (131001m) 347 T3HS Type 3 with HS P80 (148001m) 480 T3M Type 3M T3MHS Type 3M with HS T4 Type 4 T4HS Type 4 wi01 HS T5 Type 5 Row rosswa rd0* Reducer . . — — — BK Black RAL9005 TX Textured — Fits 0 4"(1 Ocm)X 3"(7.5cm) PT Photocell W/7-PIN DIM 0-10 volts vme for DG Dark green"LOU 12 moo MG Marine grade long tenon receptacle(ANSI C136.41) a temal controls MA Marine blue RAL5013 pre-finish R28 Reducer 0 4"(10cm)0 pX Shorting CAP W!7-PIN PND506 Program 50%for SI Metallic silver RAL9006(smooth only) to 2 7/8"(7cm)0 receptacle(ANSI C136,41) 6 hours(gPM to 5AM) BZ Dark bronze RAL8019 x 3"(7.5cm)long tenon PTL Long life photocell W,7-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours(11PM to 5AM) GM Moss green RAL6005 to 3"(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3'(7.5cm)long tenon 10%increment step- WH WhiteRAL9003 dimming switch BKH' Black Holophane BZH' Dark bronze Holophane GNH' Green Holophane GHH' Graphite Holophane GRH' Gray Holophane SLH' Silver Holophane WHH' White Holophane •Holophane colors are only available in Smooth(SM)finish. 'Backward optic: The Orion light engine features 160'wentable optics that can be customized as needed.This makes it a Note:Actual performance may differ as a result of end-user environment and application.Al values are design or typical simple matter to combine two distrmubw types in a single light engine,simultaneously lighting a mad and values,measured under laboratory conditions at 25'C.Specifications subject to change without notice.Please consult a bike path or sidewalk,for instance.Contact factory for more information. our web site for up-to-date product infotmaticn and IES files. Is. �62 mr� s� EPA:0.67 ft- Weight:32.81bs/14.9 kg StamplApproval: Name: Page 2 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1W9 www.cycloneliahting.com Rev.2024/06 Phone:1-866-436-5500-infoA yc clonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG7 CYCLone Levanto CLE17T4A Approval — Specification Project: Order: Qty: Luminaire: Type:F Base module:Cast A356 round aluminum shape.Complete with removable door module,equipped with a tool-free opening system,that provides a tight compression when closed.This allows access to the block connector and driver module.The pole-top fitter is self-leveling and retained using set screws.Fits on a 4"(10cm)outside diameter x 3"(7cm)long tenon. Frame module:Four(4)cast aluminum A356 arms are welded to the base module.A cast aluminum ring is welded to the upper end of the arms to support the optical module. Roof module:The roof module is capped with a A356 cast aluminum decorative dome and is mechanically �` 16.5' assembled to the top of the ring. r_(`42 cm�) Optical module:The molded A384.0-F aluminum heat sink is designed to minimize the temperature of the LEDs,increasing their longevity and efficiency.The high efficiency Orion LED optical engine is mechanically assembled on the heat sink.The optical lenses are cured directly on the LED board and offer an IP66 ingress protection rating.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70). The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.Produce 0% uplighL The combination of two distribution types(backward optics)is also available in the same optical module.Tempered clear(FCG)or frosted(FGF)flat glass lenses are attached to a cast aluminum frame. With the No Lens(NL)option,a white decorative acrylic protection plate is mechanically assembled under the optical module.The available light distribution types are T1,T1A,T1AHS,T2,T2HS,T2M,T2MHS,T3,T3HS, T3M,T3MHS,T4,T4HS,T5.The crosswalk optic(TCW)for pedestrian crossing is also available. Driver module:Class 1(P70 and P80)or Class 2(P10 to P60).Primary tension is of 120 to 480VAC Volts, 50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40°F(-40°C)to 113°F (45°C).The regulator offers an output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV/5kA or 20kV110kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Wiring/Hardware:Type TEWT 14-7 AWG,12"(30.5cm)minimum exceeding luminaire.All electrical connections between the modules are provided with quick-disconnect connectors for easy maintenance.All outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.A durable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,B117.D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: EPA:0.67 ftz Weight:32.8 Ibs!14.9 kg http:/Iwww.cycloneliQhbng.comlassets/Legal/Cvdone-Sales-TermsCanditions-en.pdf StamplApproval: Name: Page 1 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada AY 1 W9 www.gyclonelighting.com Rev.2024/06 Phone:1-866436-5500-info@5ydonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG7 CYCLone Levanto CLE17T4A Approval — Specification Project: Order:' —� Qty: L Luminaire:7 Type: Ordering Code CLE17T4A-FGC-T4-P10-30K-MVOLT-SURGE-DIM-BK-TX 112FT POLE packageModel Lens Distribution Performance CLE17T4AME; Rai wass CleaD T1 Type', L P10 (29001m) 30K 3000K MVOLT 120-277VAG 10KV 10kV15kA FGF Flat Glass Frosted T1A Type 1A P20 (42001m) 40K 4000K HVOLT 347-480VAC 20KV 20kV110kA NIL No Lens T1AHS Type 1Awith HS P30 (54001m) 120 i'.T2 Type 2 T2H3 Type 2 with HIS (66001m) 208 T2M Type 2M P50 (75001m) 240 T2MHS Type 2Mwith HIS P60 (101001m) 277 T3 Type 3 P70 (131001m) 347 T3HS Type 3 with HIS P80 (148001m) 480 T3M Type 3M T3MHS TvDe3MwithHS T4 Type4 T4HS Type 4 with HIS T5 Type 5 TCW Crosswalk •Backward opts ColorReducer Photocell Dimming — BK Black RAL9005 TX Textured — F8s 0 4"(1 Ocm)X 3"(7.5cm) PT Photocell Wf7-PIN DIM 0-10 volts wire for DG Dark green RAL6012 mooth MG Marine grade long tenon receptacle(ANSI C136.41) external controls MA Marine blue RAL5013 pre-finish R28 Reducer 0 4"It0cm)0 PX Shorting CAP Wf7-PIN PND506 Program 50%for SI Metallic silver RAL9006(smooth only) to 2 7/8'(7cm)0 receptacle(ANSI C136,41) 6 hours(9PM to 5AM) BZ Dark bronze RAL8019 x 3"(7.5cm)long tenon PTL Long life photocell Wfl-PIN PND508 Program 50%for BG Burgundy RAL3005 R30 Reducer 0 4"(10cm)0 receptacle(ANSI C136.41) 8 hours It PM to 5AM) GM Moss green RAL6005 to 3"(7.5cm)0 PTDR 7-PIN receptacle(ANSI C136.41) SD Field adjustable PG Pale grey RAL7040 3'(7.5cm)long tenon 10%increment step- WH White RAL9003 dimming switch BKH' Black Holophane BZH' Dark bronze Holophane GNH' Green Holophane GHH' Graphite Holophane GRH' Gray Holophane SLH' Silver Holophane WHH' White Holophane •Holophane colors ere only available in Smooth ISM)finish. 'Backward optic: The Orion Ight engine features 18o'odentable optics that can be ouslomvad as needed.This makes its rote:Actual performance may differ as a result of end user environment and application.An values are design or typical simple matter to combine two distribution typesin a single light engine,simultaneously lighting a road and values,measured under laboratory conditions at 25'C.Specifications subject to change v ithoul notice,Plum consult a bike path or sidewalk,for instance.Contact factory for more information. our web site for up4odale product information and IES files. 16.5• r 02.)--I 3 EPA:0.67 ft- Weight:32.8 Ibs/14.9 kg Stamp/Approval: Name: Page 2 of 2 Name: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1W9 www.cyclonelighting.com Rev.2024/06 Phone:1-866-436-5500-inf gyclonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG8 cycLo17e CBM1701C Clio Bollard Approval — Specification Project: L _ Order:0 Qty: F Luminaire: Type: a 3i4 Head:Two castA356 aluminum arms are mechanically secured to a molded ring designed to support the optical module.The head module is closed by a mechanically secured castA356 round aluminum hood. Base:Tube 5"(13cm)0,made of 6061-T6 aluminum alloy.The head module is mechanically secured with 3 anti-vandal type Allen screws.The assembly is mechanically fastened to the anchor plate with 4 anti-vandal type Allen screws. Bolt circle:Recommended installation at 3112"(9cm)0.Available from 31/4"to 31/2"(8cm to 9cm)0. Anchor bolts:Supplied by Cyclone:3/8"(1cm)0 x 12"(30.5cm)(9.3),4 galvanized anchor bolts,8 nuts and 8 washers for levelling. Optical module:The molded A356 aluminum heat sink is designed to minimize the temperature of the LEDs, increasing their longevity and efficiency.The high efficiency Copernic LED optical engine is mechanically assembled on the heat sink.The lifetime of the LEDs is 100,000 hours.It is based on the LM-80 test and extrapolated with TM-21.This data is calculated when 50%of the LEDs produce 70%of their initial luminous flux(1-70).The minimum color rendering index(CRI)is 70.The optical lenses are made of acrylic and designed to illuminate only where needed while achieving excellent uniformity with maximum spacing.The optical lenses are cured directly on the LED board.A tempered Frosted flat glass lense(FGF)flat is attached to a cast aluminum frame.The light distribution types available are T3 and T5 t1 Driver:Class 2(P10 to P40).Primary tension is of 120 to 480VAC Volts,50/60Hz,THD max 20%with a high-power factor of 90%.Operating temperature is-40°F(-40°C)to 1137(45°C).The regulator offers an Anchor Plate output of 0-10 Volts and is ROHS compliant.Assembled with pull-out connectors.Complete with 10kV/5kA 180° or 20 kVl10kA tripolar surge protection for live-MALT,live-neutral and neutral-MALT lines according to IEEE/ANSI C62.41 2002 C. Zzo°@ so° o° Wiring I Hardware:Type TEWT 14-7 AWG,12u(30.5cm)minimum exceeding Iuminaire.All electrical eon coda connections between the modules are provided with quick-disconnect connectors for easy maintenance.All 3 112'(9cm) outside accessible hardware is made of 304 stainless steel. Color:All Cyclone colors are available in textured(TX)or smooth(SM)finish.Adurable polyester powder coating is applied and meets the AAMA 2604 requirements(5 years exposure to all weather conditions). The finish meets the ASTM G7,6117,D1654 and D2247 requirements relative to salt spray and humidity resistance.Cyclone recommends a textured finish for this product. Warranty:5-year limited warranty.Complete warranty terms located at: http�IM,ww.cyclonelighbng.comlassets/Lftg al/Qydone-Sales-TermsCondidons-en.pddf Stamp/Approval: FDa e: Page 1 of 2 Name: Date: Cyclone Lighting: 2175 Des Enfreprises Blvd,Terrebonne(QC)Canada MY 1 W9 www.cyclonelighting.com Rev.2024/01 Phone:1-866436-5500-info a c clonelighting.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Sladen Feinstein Integrated Lighting Inc. CORNELL MAPLEWOOD PHASE 2 Fixture Type:XG8 CYCLone CBM1701 C Clio Bollard Approval - Specification Project: Order: Qty: J Luminaire:L Type: Ordering Code F CBM1701C-FGF-T3-P20-30K-MVOLT-SURGE-BK-TX Model Lens Distribution Performance package CCT Volts Surge protector CBM1701C Cliobollar fGF FIatGlassFrostad] RIO I 30 MVOLT 120-277VAC 10KV 1OkV15kA T5 Type 5 P20 16001m 40K 4000K HVOLT 347-480VAC 20KV 20kVl10kA P30 (19001m) 120 P40 (22001m) 208 240 277 347 480 Photocell Dimming Duplex black TX Textured — PC Button type SD Field adjustable GFIC1 Duplex receptacle,ground fault current DG Dark green RAL6012 SM Smooth MG Marine grade photocell 10%increment Interrupter,125 VAC(15A),complete with a MA Marine blue RAL5013 pre-finish step-dimming lockable'in-use'weather proofcover SI Metallic silver RAL9006(Smooth only) switch GFIC2 Duplex receptacle,ground fault current BZ Dark bronze RAL8019 Interrupter,125 VAC(20A),complete with a BG Burgundy RAL3005 lockable'in-use°weather proof cover GM Moss green RAL6005 PG Pale grey RAL7040 WH White RAL9003 BKH' Black Holophane BZH' Dark bronze Holophane GNH' Green Holophane GHH• Graphite Holophane GRH' Gray Holophane SLH' Silver Holophane WHH• White Holophane 'Hobplwne cdas ere aNy aveiWble N Smcolh(SM)fiNsh. Note:Actual performance may dffer as a result of end-user environment and application.All values are design or typical values,measured under laboratory conditions at 25 T.Specifications subject to change without notice.Please consult our web site for up-lo-date product information and IES files. e>/e- IS s- nacm) CBM1701C-Clio rN1 mlApproval: Name: Page 2 ofme: Date: Date: Cyclone Lighting: 2175 Des Entreprises Blvd,Terrebonne(QC)Canada J6Y 1 W9 www.cyclonelightina,com Rev.2024/01 Phone:1-866436-5500-infwagycloneligh6ng.com ©2024 Acuity Brands Lighting,Inc.All Rights Reserved. Chris Balestra From: Chris Balestra <CBa lest ra @town ithaca ny.gov> Sent: Friday, January 10, 2025 2:15 PM To: Chris Balestra Subject: Maplewood II - City Water Tank Meeting From: Matthew Sledjeski <MSledieski@citvofithaca.org> Sent:Thursday, September 12, 2024 2:21 PM To:Jacob von Mechow <vonmechow@whithamdesign.com>; dah@tgmillerpc.com; David Oshea <DOshea@townithacanv.gov>; gelormini@cbtarchitects.com; Huanran Li <li@whithamdesign.com>; Mary Martin <martin@whithamdesign.com>; obb@tgmillerpc.com; Michele Palmer<palmer@whithamdesign.com>; weinberg@cbtarchitects.com Subject: RE: Maplewood II - City Water Tank Meeting will PM .. Jacob, I reviewed our discussions and the proposed drawings with the Assistant Superintendent of Water&Sewer and there are some additional comments. • Project must plan for a track of at least 15'width all the way around tank to accommodate lifts, scaffolding, etc. • City crew will move the hydrant as needed and bill the project • Request 20'wide access gate to accommodate construction equipment, crane, etc. • 8'fence line pinch point at north end of tank is unacceptable. Must maintain distance from tank to fence of at least 15' • Ensure that any new trees do not exceed the height of tank at maturity • Gravity tank drainage solution from tank to Maplewood storm system requested • Should the project decide to paint the tank, preparation and paint specifications will be provided by the City under separate cover. City must inspect and approve paint project. For reference, the bids for exterior blast & recoat in 2010 ranged from$120,000-200,000. • All site modification costs not limited to,fencing, relocation of storage shed, relocation of hydrant, painting tank, etc. shall be borne by project • City property line to remain as shown. Easements can be provided to project for desired encroachment • Tank draining would be a routine procedure that could be scheduled in advance. Please let me know if you have any further questions. Matt Sledjeski Environmental Engineer City of Ithaca DPW Water&Sewer Division 510 First St Ithaca, NY 14850 0: 607-272-1717 x 4332 M: 607-252-0247 --- Note new# 1 Department of COMMISSIONER Planning Katherine Borgella DEPUTY COMMISSIONER *` *} Sustainability M. Megan McDonald 121 E. Court St, Ithaca, N.Y. 14850 1 Phone: (607)274-5560 tompkinscountyny.gov/planning January 10, 2025 Christine Balestra, Senior Planner Town of Ithaca 215 North Tioga St. Ithaca,NY 14850 Re: Review Pursuant to §239-1,-m and -n of New York State General Municipal Law Proposed Action: Special Use Permit and Preliminary Site Plan for proposed Maplewood Phase II located on Maple Avenue, Town of Ithaca, Tax Parcel#s 63.-2-5, 63.-2-6, 63.-2-7.1, and 63.-2-7.3, Cornell University, Owner and Applicant. Dear Ms.Balestra: This letter acknowledges your referral of the proposed action identified above for review by the Tompkins County Department of Planning and Sustainability pursuant to §239 -1, -m and-n of the New York State General Municipal Law. We have determined the proposed action will have no significant county-wide or inter-community impact. We look forward to receiving notification on the final action taken by your municipality within 30 days of decision, as required by State law. Sincerely, 4�Z_ 4A�t, Katherine Borgella, AICP Commissioner of Planning and Sustainability Creating and implementing plans that position Tompkins County communities to thrive. \ \) } 04 22 - \/ §2:lk �) ( §/ /) \ §) u 0.1 ol 1. | . ( ! > > , _ , [ : _ § } _ _ [ ! : \ ! }\, ! : \ _ \ 4 ; ) ) ( ) ( { . m _ ) \ [ \ : \ \ \ ! ( _ ! § \ _ { § -z. E ! ) ( ) ! ) [ ; § }§ 4§ § ! ) ) ) ) ) \ ) § ( ) ( ) ) \ \ ( \ ( j \ \ \ \ ( \ ( ( ioz_ : , , z ! = l , : : , ) > _ j ! \ ( \ \ o § - 0 ® \ | x 0■ . � � 0 «, « > ( ! } / < ) > § - / ( } ( ) ) / � ( [Im \ \1. () � ) ( ( : - - { / j : \ � , : , . / \ _ : \ , \ , _ _ : / . . } \ \ \ } / \ (\ § ( [ _ - \ ; ; §! ( [ { ()( ) z- z` ) }[ § § ( - ; ) (\ / -- - - ! \ \ \ \ ( - ` - } j§» (� - :\ \\ Iz op \ ( [ ( \(} () - - _ _ \ ( _ _ [ !� ]\: _ : : zo - _ _ _ ) - _ _ _ §! ;`/ ' - � j\� \ \ \\ �`� \\ \\ \ \\ \\ \ \ \\ \)\( - - ) \\ \\\ [!\ §{ §{ {\ - \ )) \j § \\�\ \\}��\ \ - ( \ \])z \((;\( \\ §) /( / - 2 \)(`,;!!!;: ; \t<; ( \{�!!! _;: } )( - LL, §� - \\ \ \\\\§ §,_:!__: , )},/(z ° -- \_ !_ ;i !` , � :;:::,:_!§. ( - w!: !§ - \:§ o :;:=�:` :§ , ) §>(;d \ - _ - \ L_; _. - ;:, >,o. « ;._,!!:!!;� ! - _&:!>! : _ _ - ; ■°! :! >!_ - L� - z =:!!!::l;:! ! !:§§;! ( mr ((� \/[(i )/ >§ o§! ;� _ :_- §}!;;§[ � !§z!§, :;; § § 4\!!:� : W ! ;z� -!� !§; `, «§> `� )/ §!( ! !I;!) ■ ;:4�,1,;,=, !, _ - m .! ( (!!|!; :;_ mr, „ !! - ;,§:E>z !` _ : o ! :!- - =- i, \(:\)z, ki \!!;( :� }\\[ (� z ! :§(}\( (°( \}((}, S )( a(� i�\j\/\\)(\(\ ))(!!!; o �[:Z:!!r:„ !§))\ ;! [ q § [(;(1( )(-l;:o== z !! z=: ;: :, ;__ ):;:/\( zl:,l;,=l;;! _:: \\(§)! ) ` !§}!r:l;,r,;: �!: !§!;\;il;).°! §:l � ,::!!;:#;,=,t:iK[ ( : _ ! z, :1,;.:: � ;} �:. __ _ - - L- IiN if K 1 � � ���y �/�4}tip � ®.► � �• �1�� \ \) } 04 22 - \/ §2:lk �) ( ,1 /) \ §) u 0.1 } , , , , , , , / „ ( ( \ ` - \ \ \ ( - } § om § § \ § \ \ : !:!:! \ mo ! z z - » / - >©� / Z< 10, � «: e � /\ : ,_ ,. , :§« \� /; \ : a! _ « > I < x: a, = Z. = = 2 �} S \S\\\\\\\\� \\ Im / \ ` 2 � \ , § § 2 . f - : \ ?^ » r \ > m . \ ® \« . . � . :. . IN, ^ . ® _ �x I�YII In■ >tiyl i IjSni■��5■'nRin� IS _i��J�rnla ��nrnll�l•RJI!�J��1"x'"'!1l��C�III �I r -- dlilT 5■JII RJIIj5J11�fej1115111J111■JllrjilllRJlll511i■J�� TW J•I •44!! -�- �§���iJ i■I■'"'S'4 VIIRjpI■JnPF 'll■Jnr■In�'il►I II■Jli1J� � I�����® .. a. pIIRJII ■Illi•illllow,lliijll ■ani•illRjll ■III■iIlR iii-k:"�l�l�ll M4W�AMARi JIIF■Iii�IIRJ 5V1i�1 a ®las5liyil�4 sii4nl�l5m• ���'� nm 51jr il5n� l it 5n!■iil!■Jnr :.5i� �,�� 'illl5m■- 'm■rr ,F ,a FAI 5... 11�11151 I'-�,�.'l■Jnrjpii5ln Jliv!�jIII?JIII■JII� III' Ilia$' llr r' ON' IAII■JIIR @ illi■Jllf�'Si?Jlli■Ji�l i'S11511 ,• IIII I. e ;..: IG it I■!a�' t YIr151111� -4 MMl Vn 11Jn�ll. IY��I�Ir - rJlni•ir• i6 ° aIn i IR, i Spl� I■Jllrwri ro 'O'_ a. "JII -I■ VII15111 a'l Y `� ■ �lI•SI'' � � •��n - JIIRi,¢Ia Ilr■Iwi IA 1 2> r.I I JII riiiiw!�'� � � ♦in., ill■Jn9rir �� I■iii nlr - �14 is il' lllMr I�n�J y � iur■riis I�n� R ���li �!n5liir���!s 31�� � � yl: i II Ii�•.. ®Jiltjrl II IIII � iJ j�Jll,�f�'rj•IY'�j@Ii�Jlltjr ♦ IIRn �� 7�j" IIII t IISiI ' IIRj � �II;I;A�� ��a�IR VilRjll 'il115111 Fe � ,�AI 1W.JIIrjriri5111ii - _ iJ�I�5ii:gil 115" 41Rjlli 'raJllrjiiri511i=�° /� IMMUNE, �nc . II��1! - JII.-rjii IRJIII■Jlitjii I;yg�II 5n- Se1 1 ... ` I • �M1 i��� '�Ilin■J- 1 ': -� m■! i mii'li.■i.JRJI llSlIr'Ii-jm5Jl'■°151i•-rijii4o''ij■1=11l li■iJ1 1I 5SI'■YJI lll5iNrj 1]4ii ii Ii\i 1 4 •fasta<°. "\n5iii■iil nRJiii■iii n5ni�ri �,.. 1 RinlynE! Rinlynrnr a �. n5iii■r n5iiirjj: n an ��EII,�v. Ijjl l■JII I■I � 4 -.° ':='RI'gri1916 nllil ._.n I`i■1 G11l15111riIIlfJII�J 1=!11M11 ' 37Fr� 'i9�6 r ='- ---- °�'y -- ea ..,:. l II!• ® °l■Jnr■ IiiyJii ! dr �. 2'°^aa 5il l•IIIRJIII■JII■::�Illr�p�••: .7 - �,.' •_ .. III J>Vi Io-.^.!i111�11� i 111 iilfjll I■11 I I� ®.m,, .I �lnir5anr a ri I■Jn4'iii5minn( ding!■JllrjiyiRJlll■ini5.. rilili5i' Sl'll5onr�in� �, '"Ill■JIIF IJllfpr_Ijii� `\. IC7,11 rJlliitallEjj� � ®�f rnnp,,l �P51i lPsli!■ 91 oa • 4 ■Jllf� :115111511:ra:■J�II�I •I iir�ji p. ♦ III\ 1� '■fd'S'IM1 `a• 1 'aiy �iiyilun5mr� llnisir:, ♦ n5m J M. ur■rol as • ■'n4ri .MnR,1A .a � ��� Jlltjrj Ilr■I 115111 115111 llSB� _� 11151111■ ■ �rIIRjIA■.._.:e. nrgi¢■irl -n5m� u "5mm�1 l5 nlrn _ EIR - ��,6� ` ■'ll5nl■rililmy ayllSli.Jli■Ilr■iiA�Jl511 `Cc !IIH \ �nIlla■nlrnpilll� IInYIIRJII�J15 rR,r Y11151I F• ni�JlSm -n~111.I FAH II¢i IIII�¢I�■RlII.Illla mi. 551!lrIIR, '1�ip® iY5114r�i'pRJll�j n Sul. 'Sm■Jl�iii5il'■inna °' ■ln 4 •■'nRiiii■� 'n51i1■r Ri ♦ l� il�g5mi■ 15nnlllr■!nr �dM�yrSm7 '10! I k 9j. to l `II I! 'iJlltjrl I nn r■J IIR�Ii■JllE, <,� 1 Y i,•. h151n �Jnl 1151n 115 : n I:�lII•RJII�Jil�i._ MIlRjlli■JIIF.Rll ♦ i - - II i II it i 5m ..51 ® : ' t�'' 'lk`'f�� , ��� ■IIII. ■In °Ini"�■In lnlll c..- ® - (i�yi!� � � ■ lllrjrin5jliyr.• '`'�lI�56i■IIII�i�l��,5-11151jj�i��115RIli�jjj`I�IIILG:■11'.. •IIMn�115111�ii F a 1■JIIfjlir Fili ;lijn`i1n511r '■Jllrjiln5111 'iJll�rill■� N alfJni '®JI I�. i,. -- >..� _��i14�n.:.:�, ,, •Isnl■ �n!iiii■ 11 'gill.�I RiPllax>. 0 0 F c� �� P OJ N C N U � v oin co�ry o " rc� Ud o� V O�n'm°u.o \ r s � 4 • I 0 J �z 1 \\� \\\\ O ... ... IIIMFW ■1'— II 0 MlP� 4j�:::=::: J!l�jji ■1 : r ,moo mil_■■rI 'on_ _ ■_■■, III ass I 40 MEN 'Ain No IMME r i1 ■■■ rl■_ No 0 ON :: ., .. ._.■■_■ ! �11 ! on °i -■ :SI dl ■= No r •■:�:j;®...JII' No No ME _.. ..r .. ._. !1� . :!E_ !=r �JlNo l 510 j®Jjj00 No No ■rjj IlRjll ■No 9 ._■■■Ijl�i� Elmo :: 11�► NONE !!lrJlll—°:: ■l!■jllj::=�:� .ors ■■ ■■■ ■■■_■■■ E� MEN 0 �jl■ �111� 11■ ..■ Slllj •Jllrjjllso lj IN j r_ ,..._..1■JII ._..._.■!■J!F ■ .._..1■J. ■.. j�- �!■iii�jii..■!!jj■iii�jl °` !!lS !! 1_■_..._ .. ..._... ■Li_■■■ �. ._... i■■o_Eo ._..._.. ._■oE_Ea .. !!j■�i;r �iii—l—�'j�=..!S!!j■�ii—l—�'jF■:a�i !■�ii—l—�'jF■::: �.. I OEM ME ll!' .. ��11■rjjj:=:jlJjjj■ ..■I . ..lJllj■ ... ..■ . osaE .JII■ .. _...Jllrjjj .. T■ ._. JIM.. mom ..• ■.._. ._...ri!!jj■lni� I1EMEMEM 1j :: _■■■_■ III ■■_■■■_■ ■■_■ ■ if 1 ■11 ■■ ■ ill „` .\_i!■�! .,._�!=�!!�JIQ�ji�='ii-11j■JII■ Simi _ :. _ ems !! MINE_■ _ !1� ■■■ ■■■ „ ���p ■_■■ ■■!�!! ..1■Jilrjj ■v^e■ ..I�J11 'j - �c.aEMEM !!._..1■J11r■iii=:::_ �.._- EWA �EEEJI��r ...MEN .. Illrjllj■ M IlnJllj� i�l!■ .1 ■ Illj�j ■::�111�. a=911�: ■ry_■_ __■_ �_■_■EMI _■__n ■ MEN MOOMM NMI E■ __■__■ _:�■■r __■__■ m_■■. .■_..._.11111 ■■- JIII r.■_..._.IISIII ■■— • •�=■moos ae...■::�ee ■ea ■Ln � a A..a �_ee ■1:::�, 0 0 F c� m o Oo J N C N U ' N v >mGP v oin _ co�ry 4¢ C N rc� Ua o¢ V om�.o r� 9.> W 41 1 T� i i i 0 O F c� m O OJ N C N U N v » Q GP 4Q C N a c7w a c' oL po O-C f I I _..._..._........... ,. .. r Lim IIII II II II 1 i i 1 � i i i 1 i i i � III i II - i o II i i II III o� II 1 I - i i i i i r � f ..........:� rI 'f ✓.yam'. .'�-. a, ..,, :':':':':':':':':':':':':':':':':':' 0 O F c� m o OJ N C N U o GP � v oin co�ry 4¢ C co a c7w po O C)L �w .e•'3�n o� V o`er m$o �GiGGGG GGGGGiGiGiGiGiGGiGiGG /�V O 1 �11911�1G1 om 0 0 •; . o — o 00 z o Q O r ' c • I + + 11 g '< • + + z • � O • O O ' + + + + + oc o • o �,tl • o • III. ^� • mom 4 i!l�jjj■Jllrjjili JiiirSi� jMoms .. as _. ... Boom _.■am „ Ilj■ iii �Ilj►��iij =� , _:.. �—�•j::=!!! —•::_ ?I_:!!■ill 11■JIIh■_IIIJIj �IIIJII ...__ _:::_.rl1 no ... .. MEN .ii ■Y__jIN !!J 'gon_ o■_. moo■_No MEN■ .. ... Illj�jll� �1EMME 1 ■Ia■ _■■■_■■■ \■■ \.n._.. j._■■■_, \■■ 'iii. _\.::_.11■iii=�:. ..mom 00 so No !■iii� ii �5111j■� i!!�!!■111■jjjj! \■a._■■■ ■_�■■ o._n. VI._o tee. _oo ■Y■__■, ■ n®o■JII oY —:::_..!��. , �; ���!■:.._III■...�jll�Iljj•:: je:. 1 YY■ ;;JII•■_ ..._.,.� \Y.._: =..!JII �l1 "w: 1 111 Y■■mook . Jll lNellj;j'J _■ll�n V y` ,•s:rnlllME ajam .o_.o.►I11 �Illmon �j■jji�°::.:.. �jilljj�! .�:::. : j 1®�jlji�._..._.► BEEN mom mmom .. :■Iljmom*jllh ■.�1■..111111100 IlljrjBEE111J Aljj—::• ® - :I:j�j11j Jllj�11:1111 am _ \_■■1J1 =:::_■\ .■..rill :::_■■■■■■ ■ ■•:_:::_.. ■YI JII• ..... .JII -: ..._Y■.J j ...=;;;BEEMOM om !■111� —:::=:!!■111j®j■,_..._.11■Illj�j.. ::MEMO 0 _:00allSlljj�j^—:::EN .J0 0BONN .., ,...JI0 ME Y■ JII•rjjl'—•::= moJjllli� \a:::_.11 ::ME .._..._.11 �lljpJlf= �. 6 !■ jj�j =jj, Jii mI =..Y 1lM .a... \.. _..._..1■ ._..._.. ._.■■. o lj .■■■ .J •_.■. ..■_■■■ ..Y_• ■■Y ;::_ 11 6 :_:::l,,:1■nl—•::=:::_.IIJ11''" Mjjj■Illi iii ®am�l�` �!!!■ii!vj ::!■11!■!!i■� _: ijjj�:::=:: ■■ Y■■1% ��� :■_■.. iii■iii=:::_ �I■ii!_..■m .Y .1111jll �rll ...■Ir ._..,..■1lllrJll._ :a:_..1:■!1 1_■.1■all !OMBEEN ll jj'��! _!■ ■■_■■■_1 ■■_■MIMME ■■_■ ■■r j.j::� r■j ...� .ilk �•—:::=:!!■116 —:::=:.■■11 �. :._Ill�j : -._IIIJIIj■JIIsR 4JIIj■JIII�".r �iio� ►_. o■_o■ 1■0_-000 0■ y ''j._..._.■ ijs11._■■■1111 _■■■Ijj� _..■I Y■■__ _■__■_ _■ r e: ! JII 10111•—•� - IIF 11 IE- mommim PINme..._..!Jllj■ ■■_ 00 00 ■■ or ::�: ■■■= :_o■ 1 ■■■=:::_o■ 11_■0 111 ■■r �■ 111 0_■0► ..Y_.11■jlllj■.._.... �Y_..Y_..■Ijp _::._..■Illj jll :._IlIJII■®:::=::._Ills t ••:_:- ,.1 p••:=:::_..1■JII ICI Jjl: •NONE..1■J--101 ii JI :. ..: Illi --0. ,!11rJ111- —•■■®--- MEN` ����� ---.0 MOM, iii ■■r " 1 MEMOI ■� �Ilj■ .. ■ OM MEMO! 1 .:..�....� '■.. J' �:,■_■..Jllrjp.J..._..._...___ SDI i:o_ r o■_o ■_o■__ ■ruo_ N Cn:�•■:o�•:owl. rar•_._ _■_■Y■ _■__■r.._ rMEN;jj ■■■ lu�l�r _::■®Ijjj�j!! :::■_:jj IIW:RM •:0—`yi 11 ..■■_:� \�.. 1.._... �..._t ..._..._ .. _....�� 1 -- .YI__■Jllrjjl._.■._..1■JII •---- __ ,.ems..:�..._..1� 0 0 F c� m O Oo J N C N U ' N v >NGP v oin co�ry 4¢ C N rc� Ua o¢ V om�.o of N z N N I I I i t I i l i l l l I i l i l i l i l i l i l 8 E a m '�$ x rn E - m' E E 3 w m O OR 3 d a a ¢ a 3 w a a a < < < m w w > w � w aw rc w U a a / N z U a a N r tl 3 $ m 3 g z cg w i o E N =w P G $ { N E o n c a o v U _ _ 2 m a a a a a a a a O O x chi N N p N �wI 0 0 Z. ")z O ow OCD W� 00 � �o N z sZ — O z>-FM o R U V �>r U rpa 1 N G> 0 0 C) > LLLUO O z ZZ <g W U) a O (n-i L fn Q Zwuj O c LU z 0 aW J[p a A�@ A�@ F- gw a co QbA F- z0 gca a i <1 � , C C,Z O ow OCD 00 �o N z �z O zoo U V �>r U 2 F- N o 0 C) WZ° O N ZZ z �0W Cn a OLU U)-iFM L fn Q Zw� cLU zo aw- a C0 o At o N N N �e M 0 0 ,. +o +o +o +o ✓.� +o +o o + 1 +c H ``� V r zo + d m o z O a aa w �J m M +o +o 70 0 0 0 z _0 Oo z J � w z a G� � � � _ � V) 00 � z 'to of � " ^ U) a� w w o of i r � N > QO a , � JN z z � ~ N Z oLU nU) Q � cn w , Q� (D Cl) Q L J zwQ3 Wo 0 wm � wo � � u U Cl) aU) E- z _o cq N / J O� N ,,f 70 0 0 0 z _0 Oo z J � w z a G� � � � _ � V) 00 � z 'to of � " ^ U) a� w w o of i r � N > QO a , � JN z z � ~ N Z oLU nU) Q � cn w , Q� (D Cl) Q L J zwQ3 Wo 0 wm � wo � (� M a U) E; ;o_ U_ ry m L U) 2 W LLI U W Of W Z z W C� W �_ W Q FZ CDC \ LLJ w 0Z � w N I \Q N0NN z Y � I J � m � NOIIVA&3S80 Sd0 d3d P��F HIYON 3n yi °01� 1 1 N Cd 4-j v� Ln o o � U 4-1 0 o / w NOIIVA&3S80 Sd0 d3d HIYON 3n yi Cd 4-1 v� N U4-1U �' O 4 O O /' NOIIVA&3S80 Sd0 d3d P��F HidON 3nal � / I Cd 4-j U � � O NOIIVA&3S80 Sd0 d3d HidON 3nal N 4-1 N O 7� O 4-1 O �� G . . NOIIVA&3S80 Sd0 d3d P�o� HidON 3nal O � � N O 4-J N � � 4-j O O � U � e NOIIVA&3S80 Sd0 d3d HIYON 3n yi l I 1 1 O � � N O ,4-J N � � 4-j O O NOIIVA&3S80 Sd0 d3d P�o� HIYON 3n yi � � I � � I D5N / `� 1 PROPOSED RESOLUTION: Preliminary Site Plan Approval & Special Permit Maplewood Phase II Project Maple Avenue, Town of Ithaca Tax Parcel No.’s 63.-2-5, 63.-2-6, 63.-2-7.1, and 63.-2-7.3 Town of Ithaca Planning Board January 21, 2025 WHEREAS: 1. This is consideration of Preliminary Site Plan Approval and Special Permit for the Maplewood Phase II Project on Maple Avenue, located between the Maplewood Graduate Student Apartment complex and the East Lawn Cemetery. The project, which requires a rezoning from Multiple Residence and High-Density Residential Zones to a Planned Development Zone (PDZ), involves consolidating four parcels and constructing six (6) five- story apartment buildings, containing 615 units/800 beds in studio, one bedroom, and two- bedroom unit configurations. The project will also include integrated amenity/service spaces, parking areas, trails and pedestrian facilities, open spaces, stormwater facilities, and other site improvements. Cornell University, Owner/Applicant; Michele Palmer, Whitham Planning, Design, Landscape Architecture, PLLC, Agent, 2. The proposed project, which requires Site Plan approval and Special Permit by the Town of Ithaca Planning Board and a rezoning to a Planned Development Zone (PDZ) by the Town of Ithaca Town Board, is a Type I action pursuant to the State Environmental Quality Review Act, 6 NYCRR Parts 617.4 (b)(3) and (b)(5)(iii), respectively, as well as Town of Ithaca Environmental Quality Review Code section 148-5B(2) as the project as proposed involves a zoning change and the construction of 250 or more residential units (30 or more per Town Code) that will be connected to existing community or public water and sewage systems, 3. The Planning Board, at its meeting on August 6, 2024, proposed to establish itself as Lead Agency to coordinate the environmental review of the project, and on August 7, 2024, notified potential Involved and Interested agencies of its intent to serve as Lead Agency, 4. The Planning Board, at its meeting on September 17, 2024, established itself as Lead Agency to coordinate the environmental review of the project, after having received no objections from other involved agencies, 5. The Planning Board, at a public hearing held on December 17, 2024, made a recommendation to the Town Board per Town Code 270-181 on a proposed revised draft Planned Development Zone rezoning document, labeled “for 12-17-24 PB meeting,” 6. The Planning Board, at their meeting on December 17, 2024, issued a negative determination of environmental significance for the project, after reviewing application materials, studies, and a narrative plan set dated 07-19-2024, titled “Maplewood Phase II Preliminary Site Plan Submission,” submitted by Whitham Planning Design Landscape Architecture, PLLC; supplemental materials and drawings dated 08-26-2024, submitted by Whitham Planning Design Landscape Architecture, PLLC; revised materials and drawings, dated 11-15-24, submitted by Whitham Planning Design Landscape Architecture, PLLC; 2 additional materials and drawings, dated 12-9-24, submitted by Whitham Planning Design Landscape Architecture, PLLC; a completed Full Environmental Assessment Form (FEAF) Part 1, prepared by the applicant; and a completed FEAF Parts 2 and 3 prepared by Town Planning staff, 7. At a Public Hearing held on January 21, 2025, the Planning Board has reviewed, and accepted as adequate additional project information, including a revised narrative with lighting cut sheets, dated January 7, 2025, drawings titled “Cornell- Maplewood Phase II,” including sheets L-001, L-002, L100-L108, AL100.S, and AL900.S, prepared by Whitham Planning Design Landscape Architecture, PLLC, dated 12/20/24; previously reviewed drawings received as stated above, including: Sheets A101-A103, A230, and A231, prepared by cbt, dated 10/25/2024; and Sheets C101-C110, Sheets C201-205, and Sheets C301-305, prepared by T.G. Miller, P.C., dated 11/15/2024; Construction Management Plan Sheets CMP 1-9 prepared by Greystar, dated July 18, 2024; and other application materials, and 8. Project plans, and related information, were duly delivered to the Tompkins County Planning and Sustainability Department per New York State General Municipal Law §§239- l et seq., and such Department responded in a January 10, 2025, letter from Katherine Borgella, Tompkins County Commissioner of Planning, pursuant to §§239-l, -m, and -n of the New York State General Municipal Law, determining that the proposed action will have no significant county-wide or inter-community impact; NOW, THEREFORE BE IT RESOLVED: 1. That the Planning Board hereby finds that the Special Permit standards of Article XXIV Section 270-200, Subsections A – H, of the Town of Ithaca Code, have been met, specifically that: A. The project will be suitable for the property on which it is proposed, considering the property’s size, location, and physical site characteristics. The properties are the former sites of an apartment complex and two residences that were demolished in 2020. A small portion of the project will be constructed over existing Cornell agricultural fields. The properties sizes, proximity to other developments, transportation and employment networks, and physical site characteristics can easily accommodate the proposed development and associated amenities. B. The proposed structure design and site layout are compatible with the surrounding area. The structure designs are modern and will be located among other modern structures along Maple Avenue. The project is located adjacent to Maplewood Phase I, developed in the same manner and with the same demographic in mind. The structures and site layout are compatible with the surrounding area. C. Operations in connection with the proposed use do not create any more noise, fumes, vibration, illumination, or other potential nuisances than the operation of any permitted use in the zone. The proposed project will produce temporary noise, vibration, and other nuisances associated with construction. Such nuisances will cease upon completion of the project. Proposed illumination will comply with the Town Outdoor Lighting Law (Town Code, Chapter 173), the Town Complete Streets Policy, and the Town Streetlight Policy. 3 D. Community infrastructure and services, such as police, fire and other protective services, roadways, schools, and water and sewer facilities are currently, or will be, of adequate capacity to accommodate the proposed use. E. The proposed use, structure design, and site layout will comply with all the provisions of the Town Code and with the Town of Ithaca Comprehensive Plan. F. The site layout, with proposed vehicular, bicycle and pedestrian access, traffic circulation, and parking and loading facilities, is sufficient for the proposed use and is safely designed for emergency vehicles. The site layout contains elements that are specifically designed with safety in mind and to accommodate multiple modes of transportation, including emergency vehicles. G. The project includes sufficient landscaping and/or other forms of buffering to protect surrounding land uses. Existing vegetation is preserved to the extent possible. The project will be constructed over an existing disturbed site and includes a robust and sufficient landscaping plan surrounding the buildings and site. H. To the extent deemed relevant by the Planning Board, the proposed use or structure complies with all the criteria applicable to site plan review set forth in Chapter 270, Zoning. 2. That the Town of Ithaca Planning Board hereby grants Preliminary Site Plan Approval for the proposed Maplewood Phase II Project, as described in the materials listed in Whereas #5 and #6 above, subject to the following conditions, to be met: Before final site plan approval: a. Submission of documentation and proof from the Town of Ithaca Director of Code Enforcement that the proposed fire flow calculations and emergency access issues have been satisfied, b. Submission for, and approval of, all items listed under the “Stormwater” section in the Town of Ithaca Engineering Memorandum prepared by David O’Shea, Director of Engineering, dated 01/02/2025, c. Approval by the Town Board of the concept and location of any proposed dedicated utilities (sanitary sewer), and trail/pedestrian facilities (including pedestrian-actuated Rectangular Rapid Flashing Beacon (RRFB)), d. Coordination with all utilities (NYSEG, Verizon, etc.) to assure that there are no concerns associated with the project’s connection to the electrical grid, with the burying of utility lines, or other concerns, e. Submission of proof by the City of Ithaca that the project has satisfied the comments regarding impacts the city-owned water tank property listed in the email from Matt Sledjeski, City of Ithaca Environmental Engineer, dated September 12, 2024, f. Submission of letters of commitment from Ithaca Bikeshare, Ithaca Carshare, and Tompkins Consolidated Area Transit, Inc. (TCAT), 4 g. Submission of documentation showing location(s) of off-site contractor parking, and location of temporary trail public parking. Before issuance of a building permit: h. Submission of evidence of approval from the NYS Office of Parks, Recreation, and Historic Preservation for the additional mitigation fencing proposed to protect the Mitchell Family Cemetery from the Maplewood Phase II development, i. Submission, review, execution, and filing of an Operation, Maintenance and Reporting agreement for the proposed stormwater management facilities, with the Town of Ithaca, specifying the ownership and maintenance responsibilities for the stormwater system, including: (i) Submission of an access easement, or other mechanism, to assure Town of Ithaca access to the stormwater facilities, (ii) Review and approval of the access easement and the Operation, Maintenance, and Reporting Agreement by the Attorney for the Town and the Town Engineer, and (iii) Town Board authorization to allow the Town Supervisor to sign any necessary easements and the Stormwater Operation, Maintenance, and Reporting Agreement associated with the project, j. Submission of a revised property survey that contains the following language: “A private potable water service is shared between parcels. The Tompkins County Whole Health and Town of Ithaca must be notified prior to any change in ownership between the parcels that results in a non-common owner,” k. Consolidation of Tax Parcel No.’s 63.-2-5, 63.-2-6, 63.-2-7.1, and 63.-2-7.3, and submission to the Planning Department of a copy of the completed Tompkins County Consolidation Request Form, l. Submission for, and approval of, a Highway Work Permit for review and approval by the Town of Ithaca Highway Superintendent, along with all items listed under the “Road Right of Way (ROW)” section in the Town of Ithaca Engineering Memorandum that was prepared by David O’Shea, Director of Engineering, dated 01/02/2025, m. Submission of a Roadway Use Agreement for review and issuance by the Town of Ithaca Highway Superintendent, and approval by the Town of Ithaca Town Board, n. Acceptance by the Town Board, and completion and dedication to the Town, of any sewer infrastructure, Before issuance of any Certificate of Occupancy: o. Construction of the multi-use trail, p. Installation, completion, and inspection by the Town of Ithaca Highway Superintendent for any proposed pedestrian facilities, safety devices, or lighting fixtures within the Maple Avenue Highway Right Of Way (ROW), q. Final acceptance and dedication to the Town of any pedestrian facilities or lighting fixtures proposed for dedication within the Highway ROW, 5 r. Installation of the bike storage building, s. Submission of any required executed easement, licenses, or other legal agreements involving Town or City property, for review and approval by the Attorney for the Town, including but not limited to an access and use agreement of the three public parking spaces listed in “w” below, for the benefit of the public, Before issuance of a final Certificate of Occupancy for the last constructed multi-unit residential building: t. Submission of the NYS DEC SPDES Notice of Termination to the Town of Ithaca Engineering Department, u. Satisfaction of the terms of the Road Use Agreement issued by the Town of Ithaca Highway Superintendent, and v. Completion of the Materials & Amenities Plan and Planting Plan to the satisfaction of the Director of Planning. General Conditions of Approval: w. The three parking spaces and one electric vehicle charging space indicated on the approved plan sets shall remain open to the public and maintained in acceptable conditions. Signage shall be approved by the Town of Ithaca Highway Superintendent and shall be installed and maintained, x. Noise producing construction activities will be limited to the hours between 7:00 A.M. and 9:00 P.M. unless authorized by the Town Board in accordance with Town Code Chapter 184, and y. Any changes to the approved site plans must be submitted to Planning staff for review and may require Planning Board approval in accordance with Town Code 270-191.