New York State Unified Solar Permit
Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric
Requirements for Application Submittal – Part A
For use in all New York State counties with the exception of Nassau County and Suffolk County.
The expedited solar permitting process uses a unified permit across
participating municipalities in New York State.
A combined building and electrical permit for a grid‐tied solar electric
system will be issued pending proper completion of forms, submission
of approved plans and approval by municipality. All applicants must submit:
1. Unified Solar Permit for Small-Scale
Solar Electric Systems Eligibility Checklist – PART B
2. set of plans that include:
• Site Plan showing location of major components of solar system and other
equipment on roof or legal accessory structure. This plan should represent
relative location of components at site, including, but not limited to, location
of array, existing electrical service location, utility meter, inverter location,
system orientation and tilt angle. This plan should show access and
pathways that are compliant with New York State Fire Code, if applicable.
• One‐Line or 3‐Line Electrical Diagram as required by:
• Specification Sheets for all manufactured components. If these sheets
are available electronically, a web address will be accepted in place of an
attachment, at the discretion of the municipality.
• All diagrams and plans must be prepared by a PE or RA as required by New York State law and include the following:
(a) Project address, section, block and lot number of the property; (b) Owner’s name, address and phone number;
(c) Name, address and phone number of the person preparing the plans; and (d) System capacity in kW‐DC.
3. Unified Solar Permit for Small-Scale Solar Electric Systems Application – PART C
4. Permit Fee Amount
Permit Review and Inspection Timeline
Permit determinations will be issued within 14 calendar days upon receipt of complete and accurate applications. The
municipality will provide feedback within 7 calendar days of receiving incomplete or inaccurate applications. If an inspection
is required, a single inspection should be sufficient and will be provided within 7 calendar days of inspection request.
The NY-Sun Initiative, a dynamic public-private partnership, will drive growth of the solar industry and make solar technology more affordable for all New Yorkers.
Visit ny-sun.ny.gov for more information on the NY-Sun initiative.
ny-sun.ny.gov
for Energy
Eligibility Checklist – Part B
To determine if you are eligible for the expedited permitting process, answer the questions below.
Yes No 1. Solar installation has a rated capacity of 12 kW or less.
Yes No 2. Solar installation is not subject to review by an Architectural or Historical Review Board.
Yes No 3. Solar installation does not need a zoning variance or special use permit/conditional use permit.
Yes No 4. Solar installation is to be mounted on a permitted roof structure of a building, or on a legal accessory
structure. If on a legal accessory structure, a diagram showing existing electrical connection to
structure is attached.
Yes No 5. Solar installation is compliant with all applicable electrical and building codes.
Yes No 6. Solar installation is compliant with New York State Fire Code.
Yes No 7. The Solar Installation Contractor complies with all licensing and other requirements of the jurisdiction
and the State.
Yes No 8. The proposed equipment is permitted by code and equipment meets all relevant certification standards.
Yes No 9. The solar electric system and all components will be installed per the manufacturer’s specifications.
Yes No 10. The project will comply with adopted National Electrical Code® requirements.
Yes No 11. The roof has no more than a single layer of roof covering (in addition to the solar equipment).
Yes No 12. The system is to be mounted parallel to the roof surface, or tilted with no more than
an 18 inch gap between the module frame and the roof surface.
Yes No 13. The system will have a distributed weight of less than 5 pounds per square foot and
less than 45 pounds per attachment point to roof.
If you answered “No” to any of Questions 1‐10, you are not eligible to participate in the expedited permitting process and
must go through the standard permitting process dictated by the municipality. If you answered “No” to any of Questions
11‐13, in order to use this form, in addition to other New York State PE or RA requirements, you must provide a letter
from a Professional Engineer or Registered Architect certifying that the existing structure can support the additional
weight and wind loads of the solar electric system. If you answered “Yes” to all of the above questions, please sign
below to affirm that all answers are correct, and you have met all the conditions and requirements to participate in this
expedited process.
Property Owner’s Signature Date
Solar Installation Contractor Signature Date
The NY-Sun Initiative, a dynamic public-private partnership, will drive growth of the solar industry and make solar technology more affordable for all New Yorkers.
Visit ny-sun.ny.gov for more information on the NY-Sun initiative.
for Energy
ny-sun.ny.gov
taller Business Name
Application – Part C
1. Property Owner:
Property Owner’s Name Phone Email
Property Address
Section Block Lot Number
2. Existing Use:
Single Family 2‐4 Family Commercial Other
3. Provide the total system capacity rating (sum of all panels)
Solar Electric System: kW‐DC
4. Solar Installation Contractor and Electrician:
Ins
Installer Business Address
Installer Contact Name Installer Phone Number
Installer License Number(s) Installer Email
Electrician Business Name Electrician License Number
5. What is the existing roofing material?
6. Provide method and type of weatherproofing for roof penetrations (i.e., flashing, caulk).
7. Is the mounting structure an engineered product designed to mount solar electric modules? Yes No
If no, provide details of structural attachment in a letter certified by a design professional.
continued >
The NY-Sun Initiative, a dynamic public-private partnership, will drive growth of the solar industry and make solar technology more affordable for all New Yorkers.
Visit ny-sun.ny.gov for more information on the NY-Sun initiative.
ny-sun.ny.gov
Application – Part C (continued)
for Energy
GEN-NYSUN-uspi-form-1-v3 10/14
8. For manufactured mounting systems, provide the following information about the mounting system:
a. Mounting System Manufacturer
b. Product Name and Model Number
c. Total Weight of Solar Electric Modules and Rails _lbs.
d. Total Number of Attachment Points
e. Weight per Attachment Point (c ÷ d) lbs.
f. Maximum Spacing Between Attachment Points on a Rail inches
(see product manual for maximum spacing allowed based on maximum design wind speed)
g. Total Surface Area of Solar Electric Modules (square feet) ft2
h. Distributed Weight of Solar Electric Module on Roof (c ÷ g) lbs./ft2
9. Indicate quantity, brand, make and model of the:
Inverter(s):
____________ ________________________ ______________________________________________
Quantity Make Model
Modules:
____________ ________________________ ______________________________________________
Quantity Make Model
Please sign below to affirm that all answers are correct and that you have met all the conditions and requirements
to participate in this expedited process.
Property Owner’s Signature Date
Solar Installation Contractor Signature Date
The NY-Sun Initiative, a dynamic public-private partnership, will drive growth of the solar industry and make solar technology more affordable for all New Yorkers.
Visit ny-sun.ny.gov for more information on the NY-Sun initiative.