Loading...
HomeMy WebLinkAboutagenda Board of Trustees August 9, 2010.doc.pdfREPORT OF PUBLIC WORKS July 17, 2006 TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: June 2006 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We had a crew painting, crosswalks, stop lines and arrows around the Village. The road sweeping company was here and finished sweeping the roads. We did a lot of ditching on Winthrop Drive and we have a lot more to do. A crew has bee cutting brush around signs and for clearance on the roads. b. Storm Water System: We repaired two catch basins on the corner of Berkshire and Cayuga Heights Road. We continue to clean catch basins.. c. Water System: The Parkway sewer line project has been put on hold for now. d. Sewer System: We are going to flush several sewer lines this month where there is trouble spots in the lines. e. Solid Waste: The brush is still very heavy and takes 6 men two or three days to pick it up. f. Equipment: DPW Fuel Consumption for the month: Gas = $2.72 Diesel = $409.70 g. Buildings and Grounds: No report h. Personnel: Dave Lanning is still our on Workers Comp. I will be retiring on August 30th.. i. Safety: No Report.