Loading...
HomeMy WebLinkAbout1996-05-02 - PB VeR JOINT MEETING TOWN OF ULYSSES AND VILLAGE OF TRUMANSBURG PLANNING BOARD Village Hall Meeting Room Trumansburg, New York 14886 May 2 , 1996 Present : Daniel H. Smith Town of Ulysses Planning Board Gregg Hoffmire Town Of Ulysses Planning Board Phil Colvin Chairman Building Committee of American Legion David Tyler Town of Ulysses Planning Board Rob Brown Village Planning Board Andrew Scott Village Planning Board Paul O'Dell Village Planning Board Rob Philfol Village Planning Board The meeting came to order at 7 : 10 pm The joint meeting was called for convenience to respond timely to a Town of Covert request for comment . It was stated that Property owner Robert Weatherby is not present. The board members have been informally looking at the sketches, short form environmental assessment form, survey, and discussing the issues of water coming from the village system. The question was asked will a 6 inch line need to be put in ? Yes . A septic system will need to be approved and installed also . It was stated that this meeting was requested by the Town of Covert so that if the Boards have any information to pass on to them they may do so . It was asked if a contract with Mr. Weatherby exists? Mr. Colvin replied. Yes there is, and it will be accepted contingent upon water service availability, and the town of Covert allowing them to build the facility. It was then asked when the title will be taken ? Mr. Colvin answered upon approval of the plan. It was then asked when the Legion will be prepared to begin after approval and what their time schedule is for building . Mr. Colvin indicated that they are planning to begin immediately and be under construction possibly by next fall. \)\75 It was then discussed that the access driveway should be on Townline Rd. between the corner on 96 and the Dr. office. It was stated that 3 ,5 acres would easily support a building of the magnitude that is being suggested and that it is in good proximity to the town. Mr. Colvin stated that Mr. Weatherby has contacted both of the adjacent property owners the Dr. office and the Baptist church. Parking will be adjacent to the Dr. office and the hours that the Legion will be used will not conflict with that of the adjacent owners Dr, office and Baptist church It was asked what will be happening with the 8" drainage line shown on the map, the response was that it will be moved because the ground is somewhat wet and fill will be required . It was noted that the building would create a buffer between the Baptist Church and the Dr. office as well as being the good use of an odd shaped lot . It was determined that there was no intention of a entrance on Rte. 96 and they will have access to the 50 foot right of way. The Boards strongly recommend that the Town of Covert proceed with all diligent effort the only condition being that the access driveway as shown on the map be on Townline Rd. not on Rte . 96 , and this unanimous Resolution should be duly communicated to The Town of Covert . The hearing was concluded at 7 : 25 7 : 30 Mr. Weatherby has arrived late to add more on the sewer septic issue . A neighboring parcel to the church is having trouble with their septic and is interested in hooking into the village system. There is a possibility of the Legion joining with some other neighbors to extend the existing line from Bradley St . Respectfully submitted; Julie Kraus