Loading...
HomeMy WebLinkAbout2021-03-03 Moratorium of Installations of Solar Facilities - Proposed Local LawTown of CortlandviIle Proposed Local Law for 2021 Moratorium of Installations of Solar Facilities WHEREAS, the Town Board of the Town of Cortlandville is committed to the encouragement of alternative sources of renewable energy; and WHEREAS, there has been a significant increase of interest by residents, landowners and others in developing Solar Facilities/Farms and similar installations in the Town; and WHEREAS, Part II of the General Legislation of the Town of Cortlandville Code, Part 2, Article 1, Chapter 178 contain several adopted regulations and zoning measures which address solar installations; and WHEREAS, it is in the best interest of the residents of the Town to adopt modifications to the existing regulations and zoning measures to address the location and technical issues related to Solar Facilities/Farms; and BE IT ENACTED by the Town Board of the Town of Cortlandville as follows: There is hereby established a moratorium on the review and approval of any and all applications for the installation of Solar Facilities in the Town of Cortlandville. This moratorium shall apply to any and all Solar Facility/Farm projects which have not yet been issued a building permit by the Town of Cortlandville. A list of all of the Solar Facilities projects in the Town of Cortlandville is attached. ii. This moratorium shall expire on midnight of the date certain which is six (6) months after this Local Law shall become effective or unless the Town Board of the Town of Cortlandville adopts a resolution either extending it or ending it. iii. This Local Law shall become effective when filed with the Secretary of State as required by law. SUMMARY OF SOLAR FARM PROJECTS ACRES PROJECT NAME TOTAL SOLAR PRIME FARMLAND SOLAR ARRAY ONLY SITE PROJECT IN SITE 1. ROUTE 13 SOLAR 71.20 16.25 8.48 40.80 21IME HOLLOW SOLAR 108.60 15.77 10.59 80.35 3.CORTLAND VIRGIL ROAD 136.05 12.25 8.92 13.18 4.MCLEAN SOLAR 2 46.40 9.20 7.19 25.81 5.EAST RIVER ROAD SOLAR 86.51 10.02 7.22 1.10 6.MCLEAN SOLAR 1 B 83.61 12.00 9.26 62.11 7.DG NEW YORK EAST RVER RD 129.70 31.27 24.96 21.52 B.DG NEW YORK RILEY RD LEFT 163.80 36.60 25.97 12.95 9.SOURCE RENEWABLES LOCUST 38.50 24.00 15.24 7.58 10.SSC CORTLANDVILLE II 113.30 37.50 2920 44,84 11.SSC CORTLANDVILLE III 75 A 26.7 A 21.10 A 32.40 A 12.TOWER ROAD SOLAR PROJECT 18.52 13.83 10.26 0 13.RILEY ROAD SOLAR RIGHT 52.00 36.00 32.20 13.44 14.3877 CARR HILL ROAD SOLAR A,B 48 30 19 PRIME FARMLAND IN SOLAR PROJECT 9.83 11.61 0 8.40 0 8.05 4.28 0.39 5.75 9.09 10.67 A 0 8.97 COMMENTS STATUS 95.00-06-04.01 105.00-04-2.12 105.00-04-12.000 95.15-01-2.12 77.00-11-08.000 95.00-01-33.100 87.00-03-02.110 87.00-01-08.100 76.20-01-08.000 86.00-02-01.100 106.00-06-05.200 87.00-03-08.112 87.00-01-34.111 STATUS CODE A= COMPLETE B=IN CONSTRUCTION C= WITH PLANNING BOARD D= DENIED E= SKETCH PLAN REVIEW F = WITHDRAWN REVISION A 2-19-21 ADDED ITEM 14 AND UPDATED ITEM 11 SHEET LAYOUT BY PREPARED BY ERIC LOPEZ B 2-27-21 UPDATED ITEM 6 AS WITHDRAWN AND DETAILS FOR ITEM 14 NICK RENZI CORTLAND PLANNING DEPARTMENT C E