HomeMy WebLinkAbout6.24.2013 MinutesMeeting #42 Planning Board June 24, 2013
F:\PLANNING BOARD\2013\June 2013\06.24.2013 Minutes.doc
Village of Cayuga Heights Planning Board
Meeting #42
Monday, June 24, 2013
Marcham Hall – 7:00pm
Minutes
Present: Planning Board Members Acting Chair F. Cowett, S. Cunningham, H. Richardson,
Alternate D. Hay
Deputy Clerk A. Podufalski and Code Enforcement Officer B. Cross
Item 1 – Meeting called to order
Acting Chair F. Cowett opened the meeting at 7:05 pm.
Acting Chair F. Cowett appointed Alternate D. Hay as a voting member.
Item 2- May 20, 2013 Minutes
Motion: D. Hay
Second: S. Cunningham
RESOLUTION No. 104
APPROVING MINUTES OF MAY 20, 2013
RESOLVE, that the written, reviewed and revised minutes of the May 20, 2013 meeting are hereby
approved.
Aye votes – Acting Chair F. Cowett, S. Cunningham, H. Richardson, Alternate D. Hay
Opposed- None
Item 3- Public Comment
• No members of the public wished to comment.
Item 4- Kendal Expansion Presentation
• Code Enforcement Officer B. Cross gave an overview of the history of Kendal at Ithaca and
the original Planned Unit Development (PUD) from 1993.
• Code Enforcement Officer B. Cross has received an application from Kendal for an
expansion project. The current proposal is likely within the parameters of the original PUD
which allowed up to 250 dwelling units and 12.9% maximum lot coverage.
• The following individuals, who are part of the Kendal expansion design team, were present
to make the presentation and answer questions for the Board:
1. Kim Michaels- Landscape Architect, Trowbridge & Wolf
2. Dan Governanti- Executive Director, Kendal at Ithaca
3. David Herrick- Engineer, T.G Miller
4. Larry Hoffman- Architect, Chiang O’Brian
Meeting #42 Planning Board June 24, 2013
F:\PLANNING BOARD\2013\June 2013\06.24.2013 Minutes.doc
• Kim Michaels stated that the design team has just finished schematic design and is entering
the design development phase; an expansion to 236 dwelling units is planned.
• The design team intends to provide a technical package to the Board by mid- August to
allow for at least a 30 day review including floor plans, elevations, site layout plan, site
grading plan, site planting plan, details, and draft SWPPP, along with a narrative explain the
proposal and plans
• The design team hopes the Board will declare itself the lead agency for SEQR review at the
September Planning Board meeting and schedule a public hearing for the October Planning
Board meeting.
• The design team also hopes that final site plan approval can be given by the Planning Board
at the October Planning Board meeting.
• Ground-breaking for the project is anticipated to take place in one year’s time.
Item 5-New Business
• Code Enforcement Officer B. Cross informed the Board of items for the July agenda.
1. Westview property site plan review
2. Minor subdivision at 110 Triphammer
• D. Hay and F. Cowett took photos and conducted a walking survey along Cayuga Heights
Rd north of Hanshaw Rd to assess the feasibility of extending a sidewalk on Cayuga Heights
Rd.
Item 6- Adjourn
Acting Chair F. Cowett adjourned the meeting at 8:35 pm.