Loading...
HomeMy WebLinkAbout2018-04-05 Addendum No. 1 - Alternate Sheets_Signed_NO-CERT_FlatC-102.1ALTERNATE SITELAYOUT ANDDIMENSION PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDFIELD LAYOUT NOTES:KEY MAP:C-101C-102.1C-104.1C-103.1C-106C-105 FIELD 2C-103.1ALTERNATE SITELAYOUT ANDDIMENSION PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDFIELD LAYOUT NOTES:KEY MAP:C-101C-102.1C-104.1C-103.1C-106C-105 FIELD 1C-104.1ALTERNATE SITELAYOUT ANDDIMENSION PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDFIELD LAYOUT NOTES:KEY MAP:C-101C-102.1C-104.1C-103.1C-106C-105 LEGENDFIELD GRADING NOTES:KEY MAP:C-202.1ALTERNATE SITEGRADING PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-201C-202.1C-204.1C-203.1C-206C-205 FIELD 2LEGENDFIELD GRADING NOTES:KEY MAP:C-203.1ALTERNATE SITEGRADING PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-201C-202.1C-204.1C-203.1C-206C-205 FIELD 1LEGENDFIELD GRADING NOTES:KEY MAP:C-204.1ALTERNATE SITEGRADING PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-201.1C-202C-204.1C-203.1C-206C-205 FIELD 2LEGENDSITE DRAINAGE NOTES:KEY MAP:C-223.1ALTERNATE SITEDRAINAGE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-221C-222C-224.1C-223.1C-226.1C-225.1 FIELD 1LEGENDSITE DRAINAGE NOTES:KEY MAP:C-224.1ALTERNATE SITEDRAINAGE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-221C-222C-224.1C-223.1C-226.1C-225.1 LEGEND SITE DRAINAGE NOTES: KEY MAP: C-225.1 ALTERNATE SITE DRAINAGE PLAN WM TM XX Drawing Copyright © 2018 Designed By:Checked By: Drawing No.: Issue Date: Designed By:Drawn By: Project No:Scale: No.By DateSubmittal / Revision 31591 App'd. 03/22/2018 www.chacompanies.com 300 South State Street - Suite 600 315.471.3920 Syracuse, NY 13202 TOWN OF CORTLANDVILLE GUTCHESS LUMBER SPORTS COMPLEX TOWN OF CORTLANDVILLE RAYMOND G. THORPE MUNICIPAL BUILDING 3577 TERRACE ROAD, CORTLAND, NY 13045 Dig Safely. New York 1-800-962-7962 IT'S THE LAW CALL BEFORE YOU DIG C-221C-222 C-224.1 C-223.1 C-226.1 C-225.1 LEGENDSITE DRAINAGE NOTES:KEY MAP:C-226.1ALTERNATE SITEDRAINAGE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-221C-222C-224.1C-223.1C-226.1C-225.1 FIELD 2LEGENDFIELD DRAINAGE NOTES:KEY MAP:C-231.1ALTERNATE SPORTSFIELD DRAINAGEPLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-232.1C-231.1NOTUSEDNOTUSEDNOTUSEDNOTUSED FIELD 1LEGENDFIELD DRAINAGE NOTES:KEY MAP:C-232.1ALTERNATE SPORTSFIELD DRAINAGEPLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-232.1C-231.1NOTUSEDNOTUSEDNOTUSEDNOTUSED FIELD 2FIELD 1PHASE 112.13 ACRESPHASE 22.32 ACRESC-250.1ALTERNATEEROSION &SEDIMENTCONTROL PHASINGPLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGKEY MAP:1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAININGTHE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEENSEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURECOMPLETE COVERAGE OF EXPOSED AREAS.2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BECOMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES.3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWINGINSPECTIONS:A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FORSTORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BEINSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTSENTERING THE DRAINAGE SYSTEM.B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURESIDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPERPOSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS.SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OFTHE PRACTICE.C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTEDTO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE INPREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERINGRECEIVING WATERS.D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXITTHE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENTTRACKING.4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEENESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION.INSPECTION PROCEDURES & MAINTENANCE:FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC,CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLEPHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH.PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITSGROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATEMULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS.PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERECONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITHPERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLEORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BECONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINETEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENTCLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH,NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOILAPPLICATION AND GRADING.THE PERMANENT SEED MIX SHALL BE AS FOLLOWS:SPECIESRATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.)KENTUCKY BLUEGRASS1152.6PERENNIAL RYE350.8FINE FESCUE250.6PERMANENT EROSION CONTROL MEASURES NOTESGENERAL NOTES:·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECTUNDISTURBED AREAS FROM SEDIMENT TRANSPORT.·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURINGUTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED ANDSTABILIZED IMMEDIATELY AFTER BACKFILL OPERATION.·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROMSEDIMENT TRANSPORT.·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALLOCCUR AS NECESSARY.·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS ANDBIORETENTION AREAS.SEQUENCE:PHASE 1:1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULARTRAFFIC TO THIS ENTRANCE ONLY.2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES.3.PROTECT EXISTING DRAINAGE FACILITIES.4.ROUGH GRADE SITE PER DESIGN.5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOILAND/OR TEMPORARY STAGED PILE OR FILL.6.CONSTRUCT ACCESS ROAD7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM.8.INSTALL INLET PROTECTION AND CHECK DAMS.9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVERIMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION.10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPINGPHASE 2:11.REPEAT STEPS 1-5 ABOVE.12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION.13.CONSTRUCT PLAYGROUND.14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPING.15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED,REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREASCREATED BY THEIR REMOVAL.CONSTRUCTION SEQUENCE:ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTIONMEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, ANDTO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN ASSPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES)GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES(GP-0-15-002).EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TOBEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTIONTO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARESTABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14CALENDAR DAYS.EROSION & SEDIMENT CONTROL SPECIFICATIONC-251C-252.1C-254.1C-253.1C-256.1C-255.1 KEY MAP:1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAININGTHE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEENSEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURECOMPLETE COVERAGE OF EXPOSED AREAS.2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BECOMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES.3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWINGINSPECTIONS:A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FORSTORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BEINSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTSENTERING THE DRAINAGE SYSTEM.B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURESIDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPERPOSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS.SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OFTHE PRACTICE.C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTEDTO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE INPREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERINGRECEIVING WATERS.D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXITTHE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENTTRACKING.4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEENESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION.INSPECTION PROCEDURES & MAINTENANCE:FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC,CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLEPHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH.PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITSGROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATEMULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS.PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERECONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITHPERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLEORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BECONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINETEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENTCLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH,NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOILAPPLICATION AND GRADING.THE PERMANENT SEED MIX SHALL BE AS FOLLOWS:SPECIESRATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.)KENTUCKY BLUEGRASS1152.6PERENNIAL RYE350.8FINE FESCUE250.6PERMANENT EROSION CONTROL MEASURES NOTESGENERAL NOTES:·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECTUNDISTURBED AREAS FROM SEDIMENT TRANSPORT.·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURINGUTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED ANDSTABILIZED IMMEDIATELY AFTER BACKFILL OPERATION.·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROMSEDIMENT TRANSPORT.·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALLOCCUR AS NECESSARY.·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS ANDBIORETENTION AREAS.SEQUENCE:PHASE 1:1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULARTRAFFIC TO THIS ENTRANCE ONLY.2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES.3.PROTECT EXISTING DRAINAGE FACILITIES.4.ROUGH GRADE SITE PER DESIGN.5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOILAND/OR TEMPORARY STAGED PILE OR FILL.6.CONSTRUCT ACCESS ROAD7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM.8.INSTALL INLET PROTECTION AND CHECK DAMS.9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVERIMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION.10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPINGPHASE 2:11.REPEAT STEPS 1-5 ABOVE.12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION.13.CONSTRUCT PLAYGROUND.14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPING.15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED,REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREASCREATED BY THEIR REMOVAL.CONSTRUCTION SEQUENCE:ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTIONMEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, ANDTO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN ASSPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES)GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES(GP-0-15-002).EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TOBEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTIONTO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARESTABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14CALENDAR DAYS.EROSION & SEDIMENT CONTROL SPECIFICATIONC-252.1ALTERNATEEROSION ANDSEDIMENTCONTROL PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDC-251C-252.1C-254.1C-253.1C-256.1C-255.1 FIELD 2KEY MAP:1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAININGTHE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEENSEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURECOMPLETE COVERAGE OF EXPOSED AREAS.2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BECOMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES.3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWINGINSPECTIONS:A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FORSTORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BEINSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTSENTERING THE DRAINAGE SYSTEM.B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURESIDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPERPOSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS.SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OFTHE PRACTICE.C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTEDTO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE INPREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERINGRECEIVING WATERS.D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXITTHE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENTTRACKING.4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEENESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION.INSPECTION PROCEDURES & MAINTENANCE:FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC,CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLEPHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH.PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITSGROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATEMULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS.PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERECONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITHPERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLEORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BECONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINETEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENTCLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH,NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOILAPPLICATION AND GRADING.THE PERMANENT SEED MIX SHALL BE AS FOLLOWS:SPECIESRATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.)KENTUCKY BLUEGRASS1152.6PERENNIAL RYE350.8FINE FESCUE250.6PERMANENT EROSION CONTROL MEASURES NOTESGENERAL NOTES:·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECTUNDISTURBED AREAS FROM SEDIMENT TRANSPORT.·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURINGUTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED ANDSTABILIZED IMMEDIATELY AFTER BACKFILL OPERATION.·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROMSEDIMENT TRANSPORT.·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALLOCCUR AS NECESSARY.·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS ANDBIORETENTION AREAS.SEQUENCE:PHASE 1:1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULARTRAFFIC TO THIS ENTRANCE ONLY.2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES.3.PROTECT EXISTING DRAINAGE FACILITIES.4.ROUGH GRADE SITE PER DESIGN.5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOILAND/OR TEMPORARY STAGED PILE OR FILL.6.CONSTRUCT ACCESS ROAD7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM.8.INSTALL INLET PROTECTION AND CHECK DAMS.9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVERIMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION.10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPINGPHASE 2:11.REPEAT STEPS 1-5 ABOVE.12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION.13.CONSTRUCT PLAYGROUND.14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPING.15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED,REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREASCREATED BY THEIR REMOVAL.CONSTRUCTION SEQUENCE:ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTIONMEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, ANDTO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN ASSPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES)GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES(GP-0-15-002).EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TOBEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTIONTO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARESTABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14CALENDAR DAYS.EROSION & SEDIMENT CONTROL SPECIFICATIONC-253.1ALTERNATEEROSION ANDSEDIMENTCONTROL PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDC-251C-252.1C-254.1C-253.1C-256.1C-255.1 FIELD 1KEY MAP:1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAININGTHE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEENSEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURECOMPLETE COVERAGE OF EXPOSED AREAS.2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BECOMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES.3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWINGINSPECTIONS:A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FORSTORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BEINSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTSENTERING THE DRAINAGE SYSTEM.B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURESIDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPERPOSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS.SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OFTHE PRACTICE.C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTEDTO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE INPREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERINGRECEIVING WATERS.D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXITTHE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENTTRACKING.4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEENESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION.INSPECTION PROCEDURES & MAINTENANCE:FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC,CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLEPHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH.PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITSGROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATEMULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS.PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERECONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITHPERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLEORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BECONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINETEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENTCLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH,NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOILAPPLICATION AND GRADING.THE PERMANENT SEED MIX SHALL BE AS FOLLOWS:SPECIESRATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.)KENTUCKY BLUEGRASS1152.6PERENNIAL RYE350.8FINE FESCUE250.6PERMANENT EROSION CONTROL MEASURES NOTESGENERAL NOTES:·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECTUNDISTURBED AREAS FROM SEDIMENT TRANSPORT.·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURINGUTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED ANDSTABILIZED IMMEDIATELY AFTER BACKFILL OPERATION.·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROMSEDIMENT TRANSPORT.·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALLOCCUR AS NECESSARY.·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS ANDBIORETENTION AREAS.SEQUENCE:PHASE 1:1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULARTRAFFIC TO THIS ENTRANCE ONLY.2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES.3.PROTECT EXISTING DRAINAGE FACILITIES.4.ROUGH GRADE SITE PER DESIGN.5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOILAND/OR TEMPORARY STAGED PILE OR FILL.6.CONSTRUCT ACCESS ROAD7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM.8.INSTALL INLET PROTECTION AND CHECK DAMS.9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVERIMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION.10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPINGPHASE 2:11.REPEAT STEPS 1-5 ABOVE.12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION.13.CONSTRUCT PLAYGROUND.14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPING.15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED,REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREASCREATED BY THEIR REMOVAL.CONSTRUCTION SEQUENCE:ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTIONMEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, ANDTO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN ASSPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES)GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES(GP-0-15-002).EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TOBEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTIONTO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARESTABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14CALENDAR DAYS.EROSION & SEDIMENT CONTROL SPECIFICATIONC-254.1ALTERNATEEROSION ANDSEDIMENTCONTROL PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDC-251C-252.1C-254.1C-253.1C-256.1C-255.1 KEY MAP: 1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING THE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEEN SEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURE COMPLETE COVERAGE OF EXPOSED AREAS. 2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BE COMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES. 3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWING INSPECTIONS: A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM. B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPER POSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS. SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OF THE PRACTICE. C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTED TO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERING RECEIVING WATERS. D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. 4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEEN ESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION. INSPECTION PROCEDURES & MAINTENANCE: FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC, CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLE PHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH. PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITS GROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATE MULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS. PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY. TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLE ORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BE CONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINE TEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENT CLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH, NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10 PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOIL APPLICATION AND GRADING. THE PERMANENT SEED MIX SHALL BE AS FOLLOWS: SPECIES RATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.) KENTUCKY BLUEGRASS 115 2.6 PERENNIAL RYE 35 0.8 FINE FESCUE 25 0.6 PERMANENT EROSION CONTROL MEASURES NOTES GENERAL NOTES: ·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECT UNDISTURBED AREAS FROM SEDIMENT TRANSPORT. ·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURING UTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED AND STABILIZED IMMEDIATELY AFTER BACKFILL OPERATION. ·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROM SEDIMENT TRANSPORT. ·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALL OCCUR AS NECESSARY. ·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS AND BIORETENTION AREAS. SEQUENCE: PHASE 1: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULAR TRAFFIC TO THIS ENTRANCE ONLY. 2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES. 3.PROTECT EXISTING DRAINAGE FACILITIES. 4.ROUGH GRADE SITE PER DESIGN. 5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOIL AND/OR TEMPORARY STAGED PILE OR FILL. 6.CONSTRUCT ACCESS ROAD 7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM. 8.INSTALL INLET PROTECTION AND CHECK DAMS. 9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVER IMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION. 10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH AND LANDSCAPING PHASE 2: 11.REPEAT STEPS 1-5 ABOVE. 12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION. 13.CONSTRUCT PLAYGROUND. 14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH AND LANDSCAPING. 15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED, REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREAS CREATED BY THEIR REMOVAL. CONSTRUCTION SEQUENCE: ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTION MEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, AND TO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN AS SPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES (GP-0-15-002). EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO BEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTION TO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARE STABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14 CALENDAR DAYS. EROSION & SEDIMENT CONTROL SPECIFICATION C-255.1 ALTERNATE EROSION AND SEDIMENT CONTROL PLAN WM TM XX Drawing Copyright © 2018 Designed By:Checked By: Drawing No.: Issue Date: Designed By:Drawn By: Project No:Scale: No.By DateSubmittal / Revision 31591 App'd. 03/22/2018 www.chacompanies.com 300 South State Street - Suite 600 315.471.3920 Syracuse, NY 13202 TOWN OF CORTLANDVILLE GUTCHESS LUMBER SPORTS COMPLEX TOWN OF CORTLANDVILLE RAYMOND G. THORPE MUNICIPAL BUILDING 3577 TERRACE ROAD, CORTLAND, NY 13045 Dig Safely. New York 1-800-962-7962 IT'S THE LAW CALL BEFORE YOU DIG LEGEND C-251C-252.1 C-254.1 C-253.1 C-256.1 C-255.1 KEY MAP:1.DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAININGTHE TEMPORARY EROSION CONTROL FACILITIES. ALSO, AREAS THAT HAVE BEENSEEDED SHALL BE INSPECTED REGULARLY AFTER SEED GERMINATION TO ENSURECOMPLETE COVERAGE OF EXPOSED AREAS.2.INSPECTIONS OF ALL DEVICES SHALL BE COMPLETED WEEKLY. REPAIRS SHOULD BECOMPLETED IMMEDIATELY UPON DISCOVERY OF DEFICIENCIES.3.THE OWNER WILL DESIGNATE A QUALIFIED PERSON(S) TO PERFORM THE FOLLOWINGINSPECTIONS:A.STABILIZATION MEASURES: DISTURBED AREAS AND AREAS USED FORSTORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION WILL BEINSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTSENTERING THE DRAINAGE SYSTEM.B.STRUCTURAL CONTROLS: ALL EROSION AND SEDIMENT CONTROL MEASURESIDENTIFIED IN THE PLAN SHALL BE INSPECTED REGULARLY FOR PROPERPOSITIONING, ANCHORING, AND EFFECTIVENESS IN TRAPPING SEDIMENTS.SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM OR UP-SLOPE SIDE OFTHE PRACTICE.C.DISCHARGE POINTS: DISCHARGE POINTS OR LOCATIONS WILL BE INSPECTEDTO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE INPREVENTING SIGNIFICANT AMOUNTS OF POLLUTANTS FROM ENTERINGRECEIVING WATERS.D.CONSTRUCTION ENTRANCE: LOCATIONS WHERE VEHICLES ENTER OR EXITTHE SITE WILL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENTTRACKING.4.ALL SEEDED AREAS SHALL BE PROTECTED UNTIL VEGETATION HAS BEENESTABLISHED. IMMEDIATELY RESEED AREAS WHICH DO NOT ESTABLISH VEGETATION.INSPECTION PROCEDURES & MAINTENANCE:FERTILIZER SHALL BE COMMERCIAL FERTILIZER (5-10-5) INORGANIC, OR ORGANIC,CONTAINING NOT LESS THAN FIVE (5) PERCENT NITROGEN, TEN (10) PERCENT AVAILABLEPHOSPHORIC ACID, AND FIVE (5) PERCENT WATER SOLUBLE POTASH.PROVIDE AND INSTALL A MULCH ADEQUATE TO PROTECT THE SEEDING DURING ITSGROWING PERIOD. REFER TO THE NYSSMDM TO DETERMINE THE APPROPRIATEMULCHING TECHNIQUES FOR THE PARTICULAR SITE CONDITIONS.PERMANENT STABILIZATION NOTES: DISTURBED PORTIONS OF THE SITE WHERECONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITHPERMANENT SEED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.TOPSOIL SHALL HAVE AT LEAST TWO (2) PERCENT BY WEIGHT OF FINE TEXTURED STABLEORGANIC MATERIAL, AND NO GREATER THAN SIX (6) PERCENT. MUCK SOIL SHALL NOT BECONSIDERED TOPSOIL. TOPSOIL SHALL NOT HAVE LESS THAN 20 PERCENT FINETEXTURES MATERIAL (PASSING THE No. 200 SIEVE) AND NOT MORE THAN 15 PERCENTCLAY. TOPSOIL SHALL BE FREE OF STONES OVER 1.5 INCHES IN DIAMETER, TRASH,NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10PERCENT GRAVEL BY VOLUME. REFER TO THE NYSSMDM FOR INFORMATION ON TOPSOILAPPLICATION AND GRADING.THE PERMANENT SEED MIX SHALL BE AS FOLLOWS:SPECIESRATE PER ACRE (LBS.) RATE PER 1,000 SQ.FT. (LBS.)KENTUCKY BLUEGRASS1152.6PERENNIAL RYE350.8FINE FESCUE250.6PERMANENT EROSION CONTROL MEASURES NOTESGENERAL NOTES:·ADDITIONAL MEASURES SHALL BE INSTALLED AS NECESSARY TO PROTECTUNDISTURBED AREAS FROM SEDIMENT TRANSPORT.·BACKFILL SHALL BE PLACED ON THE UPSTREAM SIDE OF ALL TRENCHES DURINGUTILITY CONSTRUCTION. TRENCHES SHALL BE BACKFILLED/COMPACTED ANDSTABILIZED IMMEDIATELY AFTER BACKFILL OPERATION.·PROTECT ALL EXISTING DRAINAGE FACILITIES SURROUNDING THE SITE FROMSEDIMENT TRANSPORT.·ADJACENT ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. ROAD SWEEPING SHALLOCCUR AS NECESSARY.·USE EXTREME CARE TO PREVENT SEDIMENT TRANSPORT TO DRYWELLS ANDBIORETENTION AREAS.SEQUENCE:PHASE 1:1.INSTALL STABILIZED CONSTRUCTION ENTRANCE AS SHOWN. LIMIT ALL VEHICULARTRAFFIC TO THIS ENTRANCE ONLY.2.INSTALL SILT FENCE AS NECESSARY AT TOES OF SLOPES.3.PROTECT EXISTING DRAINAGE FACILITIES.4.ROUGH GRADE SITE PER DESIGN.5.PROVIDE SILT FENCING AROUND PERIMETER OF STAGED/STOCKPILED TOP SOILAND/OR TEMPORARY STAGED PILE OR FILL.6.CONSTRUCT ACCESS ROAD7.CONSTRUCT SPORTS FIELDS, PERIMETER SWALES AND DRAINAGE SYSTEM.8.INSTALL INLET PROTECTION AND CHECK DAMS.9.ALL GRADED AREAS ARE TO BE SEEDED AND MULCHED FOR VEGETATIVE COVERIMMEDIATELY UPON COMPLETION OF EARTHWORK OPERATION.10.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPINGPHASE 2:11.REPEAT STEPS 1-5 ABOVE.12.INSTALL PARKING AREA, BIORETENTION AREAS, AND INLET PROTECTION.13.CONSTRUCT PLAYGROUND.14.COMPLETE FINAL GRADING AND INSTALL PERMANENT SEEDING, MULCH ANDLANDSCAPING.15.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND GROUND IS STABILIZED,REMOVE EROSION CONTROL MEASURES AND RESEED ANY DISTURBED AREASCREATED BY THEIR REMOVAL.CONSTRUCTION SEQUENCE:ONE WEEK PRIOR TO BEGINNING EARTHWORK OPERATIONS, A PRE-CONSTRUCTIONMEETING WILL BE HELD TO DISCUSS THE EROSION AND SEDIMENT CONTROL PLAN, ANDTO FINALIZE THE PAPER WORK FOR THE STORM WATER POLLUTION PREVENTION PLAN ASSPECIFIED IN THE STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES)GENERAL PERMIT FOR STORM WATER DISCHARGE FROM CONSTRUCTION ACTIVITIES(GP-0-15-002).EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TOBEGINNING ANY LAND DISTURBANCE ACTIVITIES. THE DEVICES PROVIDING PROTECTIONTO A GIVEN AREA SHALL NOT BE REMOVED UNTIL THE LANDS IN THAT AREA ARESTABILIZED. NO DISTURBED AREA SHALL REMAIN EXPOSED FOR MORE THAN 14CALENDAR DAYS.EROSION & SEDIMENT CONTROL SPECIFICATIONC-256.1ALTERNATEEROSION ANDSEDIMENTCONTROL PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDC-251C-252.1C-254.1C-253.1C-256.1C-255.1 FIELD 2FIELD 1BYRNE HOLLOW CROSSINGN . Y . S . R O U T E 1 3 & 2 8 1 (W ID TH WAR IES )SHEETSC302.1 / C352.1SHEETSC301.1 / C351SHEETSC303.1 / C353.1C-300.1ALTERNATEOVERALL SITEUTILITY PLANDBTDBTMDJDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302.1 /C352.1 C-301.1ALTERNATE WATERMAIN PLAN &PROFILE STA.A10+00 TO A17+00Drawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGDBTDBTMDJLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302.1 /C352.1 FIELD 1 Drawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-302.1ALTERNATE WATERMAIN PLAN &PROFILE STA.A17+00 TO A24+00DBTDBTMDJLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302.1 /C352.1 Drawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-303.1ALTERNATE WATERMAIN PLAN &PROFILE STA.A24+00 TO A30+50DBTDBTMDJLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302.1 /C352.1 Drawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-352.1ALTERNATESANITARY SEWERPLAN & PROFILE STA.B18+00 TO B25+00DBTDBTMDJLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302 .1/C352.1 Drawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-353.1ALTERNATESANITARY SEWERPLAN & PROFILE STA.B25+00 TO B31+20DBTDBTMDJLEGENDUTILITY NOTES:KEY MAP:C301.1 / C351C303.1 / C353.1C302 .1/C352.1 LEGENDLANDSCAPE NOTES:KEY MAP:PLANT KEY:C-502.1ALTERNATE SITELANDSCAPE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-501C-502.1C-504.1C-503.1C-506C-505 FIELD 2LEGENDLANDSCAPE NOTES:KEY MAP:PLANT KEY:C-503.1ALTERNATE SITELANDSCAPE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-501C-502.1C-504.1C-503.1C-506C-505 FIELD 1LEGENDLANDSCAPE NOTES:KEY MAP:PLANT KEY:C-504.1ALTERNATE SITELANDSCAPE PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-501C-502.1C-504.1C-503.1C-506C-505 FIELD 2LEGENDKEY MAP:IRRIGATION NOTES:C-551.1ALTERNATE SITEIRRIGATION PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-552.1C-551.1NOTUSEDNOTUSEDNOTUSEDNOTUSED FIELD 1LEGENDKEY MAP:IRRIGATION NOTES:C-552.1ALTERNATE SITEIRRIGATION PLANWMTMXXDrawing Copyright © 2018Designed By:Checked By:Drawing No.:Issue Date:Designed By:Drawn By:Project No:Scale:No.ByDateSubmittal / Revision31591App'd.03/22/2018www.chacompanies.com300 South State Street - Suite 600315.471.3920Syracuse, NY 13202TOWN OF CORTLANDVILLEGUTCHESS LUMBERSPORTS COMPLEXTOWN OFCORTLANDVILLERAYMOND G. THORPEMUNICIPAL BUILDING3577 TERRACE ROAD,CORTLAND, NY 13045Dig Safely.New York1-800-962-7962IT'S THE LAWCALL BEFORE YOU DIGC-552.1C-551.1NOTUSEDNOTUSEDNOTUSEDNOTUSED