Loading...
HomeMy WebLinkAboutI-09b Comprehensive Plan Comments - Nick Renzii-9 h COMMENTS ON THE DRAFT COMPREHENSIVE PLAN AS A MEMBER OF THE CORTLANDVILLE PLANNING BOARD GOING ON TWENTY-TWO YEARS AND AN ACTIVE PARTICIPANT IN THE 2002 LAND USE & AQUIFER PROTECTION PLAN MY COMMENTS HOPEFULLY ARE REFLECTIVE OF THOSE EXPERIENCES. IF MY COMMENTS ARE WORTHY OF INCORPORATION I WOULD LEAVE IT UP TO THE COMMITTEE AND CHA AS TO HOW AND WHERE TO INCORPORATE THEM. . 1. IT HAS BEEN EIGHTEEN YEARS SINCE THE ROUTE 281 CORRIDOR STUDY AND IT WOULD BE INTERESTING IF NOT IMPORTANT TO REFLECT ON WHAT HAS HAPPENED IN THE CORTLANDVILLE BUSINESS LANDSCAPE. TO THAT END A SUMMARY OF THE BUSINESSES THAT HAVE BEEN ADDED SUCH AS WAL-MART SUPERCENTER, LOWES, CORTLAND MEDICAL, PYROTEC ETC, THOSE THAT WE HAVE LOST SUCH AS MONARCH MACHINE TOOL, MARVIN WINDOWS, K -MART, STAPLES ETC SHOULD BE SUMMARIZED. IN ADDITION A SUMMARY WITH A UNIT OF MEASURE EITHER BY QUANTITY OR SQUARE FEET FOR BUSINESSES, SERVICES AND HOME BUILDING THAT HAVE BEEN ADDED IN THE FOLLOWING CATEGORIES WOULD HELP THE READER UNDERSTAND THE LEVEL AND DEPTH OF ACTIVITY IN CORTLANDVILLE OVER THE LAST EIGHTEEN YEARS: MANUFACTURING BUSINESSES MEDICAL SERVICES HOTELS RESTAURANTS DRUG STORES RETAIL STORES SOLAR FARMS STORAGE FACILITIES AUTO SALES AND REPAIR INDUSTRIAL PARKS RECREATION FACILITIES PERSONAL CARE FACILITIES CONVENIENCE STORES SINGE RESIDENCE HOMES LASTLY THE NUMBER OF UNITS AND SQUARE FOOTAGES CURRENTLY UNOCCUPIED AND AVAILABLE FOR BUSINESS DEVELOPMENT. 2. WITH THE INTENSE INTEREST IN PLACING SOLAR ARRAYS IN CORTLANDVILLE THERE SHOULD BE SPECIFICS RELATIVE TO THEIR PLACEMENT. WE CURRENTLY HAVE THIRTEEN SOLAR FARMS EITHER APPROVED AND IN CONSTRUCTION OR WORKING THEIR WAY THROUGH THE APPROVAL PROCESS. I REALIZE THAT A REVIEW OF THE EXISTING SOLAR LAW IS AN ACTION ITEM IN THE COMPREHENSIVE PLAN BUT EMPHASIS ON WHAT SHOULD BE PART OF THAT REVIEW WOULD BE HELPFUL. 3. THE SOLAR FARM ACTIVITY HAS BROUGHT ATTENTION TO PRIME FARM LAND AREAS, WITH THAT SAID THE PLAN SHOULD WORK THAT FEATURE INTO THE NARRATIVE. 4. THERE IS NO MENTION OF THE BUSINESS DISTRICT DESIGN SPECIFICATION, WHICH WAS ADOPTED AS A TOWN POLICY ON MAY 4, 2005. APPLICANTS AS APPROPRIATE ARE DIRECTED TO ENSURE THAT THIS POLICY IS REFLECTED IN THEIR DESIGNS WHEREVER POSSIBLE. A REVIEW OF THIS POLICY TO ENSURE THAT IT IS STILL CURRENT AND RELEVANT SHOULD BE PERFORMED. 5. ALL OF THE FIGURES THAT ARE INCLUDED AS 81/2 X,11 PAGES CAN REMAIN FOR CONTINUITY AND CONVENIENCE TO THE READER BUT THE FIGURES IN AS LARGER SIZE DRAWINGS SHOULD BE CONTAINED IN AN ACCESSORY FOLDER FOR THOSE REQUIRING MORE EASILY READ DETAILS. 6. CORTLANDVILLE HAS MANY SELLING POINTS ONE OF THE MOST IMPORTANT BEING THE ABUNDANCE OF CLEAN WATER. PALL TRINITY CONTINUES TO MAINTAIN ITS MANUFACTURING PRESENCE IN CORTLANDVILLE EVEN THOUGH IT WAS TAKEN OVER BY DANAHER CORPORATION DUE TO A LARGE EXTENT BY THE ABUNDANCE OF CLEAN WATER. MANUFACTURERS OF ELECTRONIC COMPONENTS SUCH A CHIPS SHOULD ALWAYS BE MADE AWARE OF THE ABUNDANCE OF OUR CLEAN WATER AND DEDICATED WORK FORCE. 7. SPECIFIC EXAMPLE OF BUSINESS DEVELOPMENT BEING CREATED IN HARMONY WITH ENVIRONMENTAL CONCERNS CAN USE AS AN EXAMPLE THE WAL-MART SUPER CENTER WHICH IS A 203,000 SQUARE FOOT BUILDING WITH 920 PARKING SPACES BUILT OVER THE AQUIFER RECHARGE AREA. WITH STATE OF THE ART IN GROUND FILTRATION SYSTEMS TREATING THE PARKING LOT RUNOFF. WATER SAMPLING USING MONITORING WELLS HAS SHOWN NO CONTAMINATION. 2 1 8. OVER THE YEARS THE IMPORTANCE OF STORMWATER MANAGEMENT SYSTEMS IN TERMS OF THEIR DESIGN AND MAINTENANCE HAS BEEN AN IMPORTANT PART OF THE PLANNING BOARD'S REVIEW TOGETHER WITH THE CORTLAND COUNTY SOIL AND WATER CONSERVATION DEPARTMENT. THERE HAS BEEN A STRONG EFFORT BETWEEN THE CORTLANDVILLE TOWN BOARD AND THE SOIL AND WATER DEPARTMENT TO ENSURE THAT STORM -WATER MANAGEMENT SYSTEMS THAT WERE APPROVED BY THE PLANNING BOARD WERE BEING PROPERLY MAINTAINED. TO THAT END ON SITE VISITS BY SOIL AND WATER PERSONNEL WERE MADE FOR A MAJORITY OF THE INSTALLATIONS. IT IS IMPORTANT THAT THESE INSPECTIONS AND FOLLOW-UP IF REPAIR IS REQUIRED BE CONTINUED. HIGH LIGHTING THIS ACTIVITY IN THE PLAN'S NARRATIVE WILL BE HELPFUL IN KEEPING. IT ALIVE. 9. AS APPROPRIATE CONNECT THE ACTIONS REQUIRED WITH THE DEPARTMENTS RESPONSIBLE FOR COMPLETING THE WORK. 10. IN THE SUMMARY OF PUBLIC COMMENTS REDACT MY NAME AND KATHY'S FROM ONE OF THE RESPONDENTS WHO WE OBVIOUSLY . DID NOT IMPRESS. 11. PROVIDE AN ALPHABETICAL DETAILED INDEX FOR EASY ACCESS TO SPECIFIC DETAILS WITHIN THE PLAN. 3 NICK RENZI JANUARY 13, 2021