HomeMy WebLinkAboutTB Minutes 2016-12-12Meeting of the Ithaca Town Board
Monday, December 12, 2016 at 5:30 p.m.
Agenda
1. Call to Order and Pledge of Allegiance
2. Report of Tompkins County Legislature and Ithaca Common Council
3. Village of Cayuga Heights Fire Department – Chief Tamborelle
4. Climate Smart Community – Nick Goldsmith
a. Consider appointing Town of Ithaca Sustainability Planner as the Town’s Climate Smart
Communities Coordinator
5. Discuss Finding statement – Maplewood
6. 5:30 p.m. Public hearing regarding a proposed local law to amend Zoning Chapters 270 &
271 of the Town of Ithaca Code to provide a Planned Development Zone for the Maplewood
Development between Maple Avenue and Mitchell Street
a. Town Board Discussion
7. Discuss and consider approval of an Out-of-District Water Use Agreement between the
Town of Ulysses and a resident for Ulysses Water District Number 3
8. Discuss and consider creating two Electrical Code Enforcement Officer positions
9. Discuss and consider the Trumansburg Road Pedestrian Study Grant and associated contracts
from NYS DOT
10. Discuss and consider a resolution for Support for continuing to work with Form Ithaca on the
Town Character Code and Regulating Plan for consideration of eventual adoption
11. Continue discussion on setting a public hearing regarding excluding Ithaca College from the
Town of Ithaca Fire Protection District
12. Consider Consent Agenda Items
a. Approval of Town Board Minutes
b. Town of Ithaca Abstract
c. Bolton Point Abstract
d. Ratify appointment of Maintenance Supervisor
e. Ratify appointment of Maintenance Worker
13. Report of Town Committees, Intermunicipal Organizations and Town Officials
14. Review of Correspondence
15. Consider Adjournment
TOWN OF ITHACA
AFFIDAVIT OF POSTING AND PUBLICATION
I, Paulette Terwilliger, being duly sworn, say that I am the Town Clerk of the Town of Ithaca, Tompkins
County, New York that the following notice has been duly posted on the sign board of the Town Clerk of
the Town of Ithaca and the notice has been duly published in the official newspaper, Ithaca Journal:
□ ADVERTISEMENT/NOTICE
□ NOTICE OE PUBLIC HEARINGS
□ NOTICE OF ESTOPPEL
□ NOTICE OF ADOPTION OF PUBLIC INTEREST
ORDER
Local Law to Provide a Planned Development Zone for
the Maplewood Development
Location of Sign Board Used for Posting:
Town Clerk's Office
215 North Tioga Street
Ithaca, NY 14850
Town website at www.town.ithaca.ny.us
Date of Posting: December 2, 2016
Paulette Terwilliger
Town Clerk
STATE OF NEW YORK)
COUNTY OF TOMPKINS) SS:
TOWN OF ITHACA)
SworpTp and subscribed before me this day of
A 3 Piu Aj>aJ , 2016.
Notmy Public
-0001732131-01
Town of IthacaPublic Hearing NoticeThe Ithaca Tovyn Board willhold a public hearingbeginning at 5:30meeting on December 12,2016 t6 hear public com
ment on the proposedLocai Law to Amendzoning Chapters 270 and271 of the Town of IthacaCode to Provide aDevelopment Zone for theMaplewood DevelopmentBetween Mapleand Mitchell Street at such?ime and place all personsinterested in the proposed
local law may be heard.Information on the above
can be found atwww.town.ithaca.ny.us or
by contacting the 1"°^"Clerk's office at 273-1721 towncierk@town.Ithaca.ny.us
Paulette Terwilliger
Town Cierk
I 1
Debra DeAugistina
Notary Public - State of New YofKNO.01DE6148035Qualified in Tompkins County . ^My Commission Expires June 19,20 _/„ o.
-y-
Town of Ithaca
Public Hearing Notice
The Ithaca Town Board will hold a public hearing beginning at 5:30 at their meeting on
December 12, 2016 to hear public comment on the proposed Local Law to Amend Zoning
Chapters 270 and 271 of the Town of Ithaca Code to Provide a Planned Development Zone for
the Maplewood Development Between Maple Avenue and Mitchell Street at such time and place
all persons interested in the proposed local law may be heard. Information on the above can be
found at www.town.ithaca.ny.us or by contacting the Town Clerk’s office at 273-1721
townclerk@town.ithaca.ny.us
Paulette Terwilliger
Town Clerk
TB 2016-12-12 pg. 1
Meeting of the Ithaca Town Board
Monday, December 12, 2016 at 5:30 p.m.
Minutes
Board Members Present: Bill Goodman, Supervisor; Rod Howe, Deputy Town Supervisor;
Pat Leary, Tee-Ann Hunter, Eric Levine, Rich DePaolo, and Pamela Bleiwas
Staff Present: Susan Ritter, Director of Planning, Bruce Bates, Director of Code Enforcement;
Mike Solvig, Director of Finance, Judy Drake, Director of Human Resources; Paulette
Terwilliger, Town Clerk; Jim Weber, Highway Superintendent and Susan Brock, Attorney for
the Town; Chris Balestra and Dan Tasman; Planners (Maplewood) and Nick Goldsmith,
Sustainability Planner (Report)
1. Call to Order and Pledge of Allegiance – Meeting was called to order at 5:30 p.m.
2. Report of Tompkins County Legislature and Ithaca Common Council – None
3. Persons to be Heard and Board Comments
Village of Cayuga Heights Fire Department – Chief Tamborelle – None
Ms. Hunter reported that the IO has been awarded the grant and will be outlining
the project for board approval and acceptance of the grant
4. Climate Smart Community – Nick Goldsmith (Attachment 1)
Mr. Goldsmith presented a progress report on what has happened over the year stating that he
was very proud of the grants that have been secured; $100K for Green Building Policy Project
and $50K for the Shared Sustainability Coordinator with the City.
The Green Building Policy Project is looking at the different standards for sustainability and
energy efficiency that we could use for new construction as well as different policy tools to
either mandate or incentivize energy standards. This will be an in depth study of both aspects of
the issue which will result in recommendations from the chosen consultant for what may work
for us. This is a joint project with the City of Ithaca involving a lot of public outreach so that the
recommendations are relevant to our area and population and will therefore have some traction in
moving forward to actual policies.
Mr. Goldsmith thanked the board again for their support of the Residential Energy Score Project
which is moving forward toward implementation. The committee is being formed and he is
looking for an organization to host the project to pass funds through and be the liaison between
the implementers, stakeholders and the project.
Mr. Goodman noted that the grant from the Park Foundation supports our Sustainability Planner
and the City has decided to keep their portion as a half-time position for 2017 and a grant will be
TB 2016-12-12 pg. 2
sought to finish out 2017 with the thought that in 2018 the City will make it a full time position.
This has budget implications for us and we need to start thinking about that.
Mr. Goodman explained that the resolution coming before the board is part of our ongoing
efforts to become a certified Climate Smart Community which helps in securing future grants. A
coordinator needs to be appointed and the obvious choice is our Sustainability Planner.
TB Resolution 2016 - 162: Appointing Town of Ithaca Sustainability Planner as Town’s
Climate Smart Communities Coordinator
Whereas, the Ithaca Town Board passed a resolution (No. 2009-086) to participate in the
New York State Department of Environmental Conservation’s “Climate Smart Communities”
Initiative on April 27, 2009; and
Whereas, the Town of Ithaca has a Sustainability Planner position to support all
sustainability efforts for the Town; and
Whereas, the Sustainability Planner is currently pursuing Climate Smart Communities
certification for the Town of Ithaca; and
Whereas, achieving Climate Smart Communities certification would help to make the
Town eligible for funding through the New York State Energy Research and Development
Authority’s (NYSERDA) Clean Energy Communities program, make other state funding
applications more attractive, and would provide good public relations opportunities for the
Town; and
Whereas, to become a Certified Climate Smart Community, one of the actions the Town
of Ithaca must take is to appoint a Climate Smart Communities Coordinator; and
Whereas, the Sustainability Planner’s duties include, among other things, many of the
items from the Climate Smart Communities Pledge, such as: promoting the reduction of
greenhouse gas emissions, encouraging the use of renewable energy sources, planning for
climate change, and educating the public; and
Whereas, the job duties of the Sustainability Planner align with the goals of the Climate
Smart Communities program, and would therefore remain the same, now, therefore, be it
Resolved, that the Sustainability Planner of the Town of Ithaca is hereby appointed as the
Town’s Climate Smart Communities Coordinator for the New York State Department of
Conservation’s Climate Smart Communities Initiative.
Moved: Bill Goodman Seconded: Rod Howe
Vote: Ayes- Goodman, Howe, DePaolo, Hunter, Leary and Bleiwas
Maplewood
TB 2016-12-12 pg. 3
Mr. Goodman gave an overview of the status of the project; the Planning Board is working on
their comments regarding the Findings Statement which will be followed by Preliminary Site
Plan approval. Cornell and EDR have a very short timeline because they want the buildings
inhabitable by July of 2018 for the Fall semester. The units have been offline since Spring
semester. They would like their demolition permits as soon as possible and given the schedule
of the Planning Board and this Board, the y are hoping the Planning Board will give Preliminary
Site Plan approval on December 20th and then they would get those demolition permits, but, they
need a Road Use Agreement with the Town to do that. Public Works and counsel are working
on that but there may need to be a special meeting to approve that given the holiday schedule
here at town hall. Mr. Goodman stated that he was looking at Wednesday, December 21 st for
that, before Personnel Committee, to discuss and approve the Agreement. In order to do that,
this Board needs to adopt the Finding Statement and we cannot do that tonight because the
Planning Board has not finished with theirs and this board should see that first. So, those two
items would be on the agenda for the special meeting. He added that the PDZ does not have to
be adopted before demolition permits, but does need to be before building permits. Mr.
Goodman thought the board would not be adopting the PDZ tonight, but he would hold the
public hearing for comments and if significant changes are needed, another public hearing can be
held. Mr. Goodman moved the public hearing up on the agenda.
5. 5:30 p.m. Public hearing regarding a proposed local law to amend Zoning Chapters 270
& 271 of the Town of Ithaca Code to provide a Planned Develop ment Zone for the
Maplewood Development between Maple Avenue and Mitchell Street
Mr. Goodman opened the public hearing at 5:50p.m. There was no one wishing to address the
board on this topic and the hearing was closed.
Board Comments – PDZ
Ms. Ritter noted that the board had a letter from the County on their desks outlining their
comments on the PDZ. The first comment regarding the façade’s transparency and the second
was their concern that the roof be ready for roof-top solar.
Ms. Ritter stated that she and Mr. Tasman have talked about the transparency issue and they are
not sure if the county really understood that the transparency is not for the entire wall of the
building, but rather a linear window transparency. She thought maybe the county thought it
would be the entire wall. There is a NYS Energy Code that controls the percentages of windows
and the developer has committed to meeting these energy requirements and that would fall under
Codes and therefore she does not recommend any change to the PDZ.
Mr. Goodman noted that the issue is mentioned on page 8 of the draft law and discussion
followed on the definition of “transparency” with Mr. Tasman explaining that Form Based Code
addresses this to prevent buildings from having very large blank walls or facades, including little
slit windows and giving a building a more “public face.”
Mr. DePaolo asked if Planning had talked to the County to see if they understand and Ms. Ritter
responded that she had not, having received the comments on Friday and then determined that
TB 2016-12-12 pg. 4
they are mostly concerned with meeting the Energy Code and whether there are too many
windows in the project which will increase energy use. Ms. Ritter felt the energy requirements
are met by their commitment to efficiency as well as NYS law enforced by Codes. There are
efficient systems that will handle more windows without increasing energy use and the 30% in
the draft PDZ is for Form Based Code aesthetics. Mr. Bates explained that the NYS Code has
mitigations for increased transparency such as type of glass, location, energy systems and more
so one could have a glass building if other mitigations were made and still meet the energy code.
There are other provisions that would then apply to cover a lot of windows. He added that the
30% coverage only applies to buildings other than the one- and two-family dwellings.
The board was comfortable with the explanation.
Ms. Ritter turned to the second comment regarding roof-top solar and stated that that was a big
conversation at the Planning Board and Ms. Balestra stated that the project has limited roof-top
space as well as orientation of the buildings hindering roof-top solar and one of the options
looked at and noted in the Findings Statement, is the option of reorienting the buildings to
maximize solar. Through the EIS process, it was discovered that the buildings are oriented in
many different ways, and in order to reorient them, it would completely change the site layout
and would not necessarily result in an energy savings and significantly increase the cost of
construction and negate any benefit of buying renewables. Cornell and EDR have committed to
getting 100% renewables for the project. They are using air source heat pumps that are electric
instead of the natural gas that is available on the site right now.
Mr. Goodman asked if Planning is comfortable with not making changes suggested by the
County and Ms. Ritter said she was, although she would like to know a little bit more and Mr.
DePaolo asked the developer representatives about the issue and they responded that they are
looking at the particulars, but can’t commit to saying they could or couldn’t do something and
Mr. Bates added that there are a lot of code distances involved and he didn’t think it could be
done. Mr. Goodman added that he believes the future is moving toward buying from solar farms
so he was not concerned with adding language to the PDZ and asked if other members had any
thoughts on the issue. No one did and the board considered the County’s comments addressed
and no changes made; super majority will be needed.
Mr. Goodman turned back to Ms. Ritter who stated that Mr. Tasman has had a chance to
compare the draft PDZ to the site plan submissions and we do have some additional comments,
mostly regarding the table on page 8 and the issue of “transparency.”.
Page 13 – Transparency – Definition needs to be tweaked slightly to “Transparency – building
wall length occupied by functioning doors and/or windows, 75% of which must be greater than
or equal to 4’ feet tall.” This allows for some flexibility for smaller windows where needed such
as bathrooms and closets. Ms. Brock added that the original submission was very institutional
and a lot of glass and as it went through the process and residents’ comments, it has evolved into
the current plan which is more residential looking and that is why it is specified in the PDZ
language where in others there may not be this type of detail. Board agreed to the change.
TB 2016-12-12 pg. 5
Page 8 Setback – The setback for the large building and the large apartment is supposed to be
zero to 10 foot primary frontage but there are certain places, such as where the road curves, that
the setback is quite a bit more. One way around this would be to change this to “average of zero
-20’ feet” for the corner and primary front. Mr. Bates asked how the average is computed and
would like how that is computed to be added to avoid any issues.
Page 8 – Setback – The Community Center location does not work with the setback requirement
and Staff suggests removing the requirement for this building by adding N/A for Not Applicable.
Some discussion followed and the Board agreed to change the setback to N/A.
Pg 8 – Setback – Townhomes; the overhang juts out in some areas and if you count the
overhang, which the town historically has, a change is needed there also. Board agreed.
Pg 8 – Height – Two of the apartment buildings have been built in a grade so the issue of stories
comes up because the requirement is 3-4 stories but some of these have a walkout basement
which could be interpreted as 5 stories. Ms. Ritter showed pictures of the buildings in question.
The suggestion is to state that requirement as “3-4 stories, not including walkout basement.” Mr.
Bates and Ms. Brock questioned whether this meets the definition of a “basement” in our Code.
Ms. Brock stated that “story” is not defined in the PDZ. Basement in the Code is “portion of the
building that is either partly or completely below grade and is not considered a story above
grade.” Ms. Brock thought the definition would need to be looked at and the language might be
changed in the PDZ to “story above grade” but that needs to be looked at with Mr. Bates. Some
discussion followed and Planning will work with Codes to work this out. Ms. Ritter added that
the basement level will not show from the street side and backs on to the cemetery when it does
happen and she didn’t think it was an issue.
Board comments
Mr. DePaolo asked about the nexus of the Board’s Finding Statement and the Planning Board’s
site plan review and the PDZ because there are instances in the Finding Statement where we are
wishing or hoping for an outcome and he wondered at what stage those could be stated as a
requirement in the PDZ. Mr. DePaolo gave the following examples: “as part of the site plan
review, the Planning Board should require…” “The Planning Board is expected to require….”
“No occupancy of the Maplewood development should be allowed until the new 600,000 gallon
tank is installed…” He stated that he is aware we have a Form Based Code and it is wide open
in many ways with parameters we are supposed to be operating in, but if we want these things to
happen, maybe they should be mandated and he asked if that was possible.
Ms. Ritter responded that she thought some things should not be in a PDZ; she thought the water
tank shouldn’t be in the PDZ because once it’s in it’s in. Ms. Brock responded that she wrestled
with this too and that is why the Town Board is not doing a Finding Statement until the Planning
Board does, but the thought was that we fully expect that the Planning Board will be requiring all
of these things and when this Board acts after that, that language will be changed to “has
required as a condition of site plan approval. These are the types of things that are typically dealt
with at site plan approval.
TB 2016-12-12 pg. 6
Mr. DePaolo agreed but asked if this is a SEQR Finding Statement and asked if the Board is
precluded from writing requirements into the law if for some reason the Planning Board does not
do what we wanted them to do. Ms. Brock responded that she was then trying to figure out if the
approval is conditioned on these things happening because the site is either rezoned or it is not.
It is rezoned once all of these conditions are met. Mr. DePaolo felt that the beauty of a PDZ is
that it gives us the opportunity to require things that we usually can’t in a straight rezoning and
he wanted to make sure the Board still had the authority to do that. Ms. Brock asked if the
Planning Board does require all of those things, would he still want the law to state them too and
Mr. DePaolo responded no, but he wanted to know what the options were. Ms. Brock responded
that if the Planning Board does not require elements the Board does, the PDZ law would or could
be changed to require them where wanted. Mr. DePaolo thanked her for the clarification.
Mr. Goodman noted that the Board did receive the minutes from the Planning Board to see what
their thoughts were on the PDZ. No other comments and Mr. Goodman will set another public
hearing when needed.
Finding Statement Discussion
Ms. Balestra explained that the Finding Statement summarizes all the information that has come
out through the Planning Board process and has elements of the Draft Environmental Impact
Statement, the Scoping Document and the Final Environmental Impact Statement and any
mitigations put forth for any of the impacts that were identified. She added that the Planning
Board’s Finding Statement has a lot more “wills” instead of “should” and she changed those for
the Town Board’s Finding Statement. Ms. Ritter added that the Planning Board, Planning staff
and Ms. Brock have looked at this, commented and made changes.
Questions from the Board
Ms. Hunter asked relative to the traffic, if she was reading it correctly that there will be
approximately 400 additional beds from the existing and of those 400 beds, that will generate an
increase of 78 cars entering and 68 exiting? Ms. Balestra responded yes, according to the traffic
study and Ms. Hunter asked what about the rest?
Ms. Balestra responded that those figures are for peak hours and many of the anticipated
residents will be students and not working the normal work hours. The traffic study did look at
the peak hours and some of the other timeframes for the expected population.
Ms. Hunter stated that this is for grad students and there may be families associated with those
students and she asked if those people were taken into consideration. Ms. Balestra responded
that it was her understanding that the traffic did take into account the demographic and that
demographic existed here before and still exists in other places so the times and patterns are
known for the grad student demographic. She felt confident that those concerns were taken into
account. Ms. Hunter thought it seemed optimistic and Ms. Ritter added that there is a bus stop
right there and it is walkable and parking on campus is very hard. The existing population uses
alternative transportation now.
TB 2016-12-12 pg. 7
Mr. Goodman stated that any questions that come up could be emailed to Ms. Balestra. He took
this time to thank all of the staff working on the Maplewood project noting that it is a huge
project and he appreciated all of the time and effort the staff has put in.
6. Discuss and consider approval of an Out-of-District Water Use Agreement between the
Town of Ulysses and a resident for Ulysses Water District Number 3
Mr. Goodman explained that this agreement has been approved by the Town of Ulysses and the
Bolton Point Commission. Ms. Brock had asked if there were enough protections from the
residents further selling water and maintaining proper backflow retention and Ms. Thomas from
Ulysses sent a copy of their water maintenance regulations which allows them to terminate
service if the users are doing anything unacceptable.
TB Resolution 2016 - 163: Approval of an Out-of-District Water User Agreement between
the Town of Ulysses and Timothy & Rebecca Cardina for Ulysses Water District Number 3
Whereas, the Town of Ithaca entered into a Water Service Agreement with the Town of
Ulysses on October 30, 2003 to supply water from the Southern Cayuga Lake Intermunicipal
Water Commission to the Ulysses Water District Number 3 (Water District) in the Jacksonville
area of Ulysses; and
Whereas, the Agreement states in Section 16(J): “Ulysses will not supply or resell any
water obtained from the Commission’s facilities to any third party municipality or other
customer (other than normal retail homeowners and business owners within the bounds of the
existing Ulysses Water District Number 3) unless Ithaca and the Commission approve that
supply and the terms of that supply in writing prior to the occurrence of any such re-supply or
sale.”; and
Whereas, Thomas and Rebecca Cardina have asked the Town of Ulysses to connect them
to the Water District (to which their property is adjacent) after their well ran dry in the summer
of 2016; and
Whereas, at its meeting on November 22, 2016, the Town Board of the Town of Ulysses
approved the Cardina connection to the Water District pursuant to the terms of the attached Out-
of-District Water User Agreement; and
Whereas, at its meeting on December 8, 2016, the Southern Cayuga Lake Intermunicipal
Water Commission approved the Cardina connection to the Water District pursuant to the terms
of the Out-of-District Water User Agreement; and now, therefore, be it
Resolved, that the Town Board of the Town of Ithaca hereby approves the Cardina
connection to the Water District pursuant to the terms of the Out-of-District Water User
Agreement.
Moved: Bill Goodman Seconded: Rich DePaolo
Vote: Ayes – Goodman, DePaolo, Hunter, Leary, Howe and Bleiwas
TB 2016-12-12 pg. 8
7. Discuss and consider creating two Electrical Code Enforcement Officer positions
Mr. Goodman stated that these were discussed at budget time and are in response to the
Maplewood project. The building permit fees will pay for most of one person and we are in
negotiations with Cornell to discuss support for the second person. This formally creates th e
positions so we can start advertising the positions.
TB Resolution 2016 – 164: Creation of two Electrical & Code Enforcement Officer
positions
Whereas, the Town of Ithaca established compliance under the New York State Civil
Service Agency to qualify employment positions in the Town of Ithaca in accordance with
Section 22 of Civil Service Laws, Rules and Regulations; and
Whereas, by regulation of Civil Service Law, the Town must create a position and
approve the job description before making an appointment; and
Whereas, during the 2017 Budget preparation the Town Personnel and Organization
Committee and Budget Committee recommended creating two additional Electrical & Code
Enforcement Officer positions as it was determined that the Maplewood Project would require
dedicated code enforcement due to the size and scope of the project; now, therefore, be it
Resolved, the Town Board of the Town of Ithaca does hereby establish the following
position(s) in accordance with the applicable New York State and Tompkins County Civil
Service rules:
(Two) – Electrical & Code Enforcement Officer, the competitive class pursuant to
Section 44 of the Civil Service Law:
Resolved, the Town Board does hereby approve the job description for the said position,
which is in Job Classification “E”; and further
Resolved, the Town Board approves commencing the recruitment process for these two
positions as they were fully funded in the 2017 budget.
Moved: Bill Goodman Seconded: Pamela Bleiwas
Vote: Ayes – Goodman, Bleiwas, DePaolo, Hunter, Leary and Howe
8. Added item Consider approval for town vehicle and associated budget amendment
Mr. Goodman noted this has been in the budget discussions and he pushed for a hybrid vehicle
through State Contract which came in slightly over our budgeted amount necessitating a budget
amendment.
TB Resolution 2016-165: Approval To Purchase Town Vehicle and Amend the 2016
General Part-Town Fund Budget
TB 2016-12-12 pg. 9
Whereas, the Code Enforcement and Zoning Department submitted a request in the 2016
Ithaca Town Budget to purchase a new model year 2016 vehicle at an estimated cost of
$28,000.00, and
Whereas, on October 19, 2015 the Town Board adopted the 2016 Ithaca Town Budget,
TB Resolution 2015-116, in which was appropriated $28,000 for the purchase of said vehicle in
the General Part-Town Fund, account B8020.270, and
Whereas, as there was no state contract or other available cooperative purchasing
agreement available for purchasing the recommended hybrid vehicle, the procurement process
for said vehicle was managed by the NYS Office of General Services - Procurement Services,
through the NYS Vehicle Marketplace Mini-Bid process (Mini-Bid No. 16110192), from which
was received one (1) responsive and responsible bid from Carbone Auto Group, bidding a 2017
Toyota Rav4 Hybrid XLE in the amount of $28,555.00 for the vehicle plus $50.00 for delivery,
and
Whereas, the Town Finance Officer recommends to this governing Board the approval of
an amendment to the 2016 Ithaca Town Budget, increasing appropriations to the General Part-
Town Fund, account B8020.270, in the amount of $605.00 to provide adequate funding for said
purchase, with such increase to be funded from the fund balance of the General Part-Town Fund;
now, therefore, be it
Resolved, that the Town Board approves the purchase of One (1) New 2017 Model
Toyota Rav4 Hybrid XLE for the total delivered amount of $28,605.00 from Carbone Auto
Group, 5194 Commercial Drive, Yorkville, New York 13495, and be it further
Resolved, that the Town Board approves, authorizes and directs the Town Finance
Officer to record the appropriate budgetary amendment in the amount of $605.00 to provide
adequate funding to meet this expense.
Moved: Bill Goodman Seconded: Rod Howe
Vote: Ayes – Goodman, Howe, Leary, Hunter, DePaolo and Bleiwas
9. Added item Authorization for Town Court escrow accounts
TB Resolution 2016-166: Authorization to Open New Escrow Account to Deposit
Unclaimed Exonerated Bail Transferred from Ithaca Town Court
Whereas, after several unsuccessful attempts to return exonerated bail money in
accordance with Office of Court Administration guidelines, the Ithaca Town Court is transferring
the unclaimed exonerated bail money to the Town of Ithaca, and
Whereas, the unclaimed exonerated bail money in the amount of $1,750.00 is the sum of
the unclaimed exonerated bail for the following cases:
TB 2016-12-12 pg. 10
1) $250.00 posted for defendant Jacob Allen (Docket #11065127), posted by Daniel
Allen, exonerated on 12/06/2016, and
2) $500.00 posted for defendant Patrick Chuderski (Docket #12015094), posted by
Patrick Chuderski, exonerated on 12/06/2016, and
3) $500.00 posted for defendant James Patana (Docket #05025011), posted by Davetta
Croak, exonerated on 12/06/2016, and
4) $500.00 posted for defendant Benjamin Williams (Docket #05055045), posted by
William Frisbie, Jr., exonerated on 12/06/2016, and
Whereas, in accordance with Office of Court Administration guidelines, any exonerated
bail remaining unclaimed six years after the date of exoneration becomes the property of the
Town of Ithaca. Now, therefore, be it
Resolved, that the Town Board of the Town of Ithaca authorizes the establishment of a
bank account for Unclaimed Exonerated Bail with Tompkins Trust Company, said account to be
accounted for within the Town’s Trust & Agency Fund, and be it further
Resolved, that any exonerated bail remaining unclaimed six years after the date of
exoneration becomes the property of the Town of Ithaca, to be transferred to the Town’s General
Fund.
Moved: Bill Goodman Seconded: Rod Howe
Vote: Ayes – Goodman, Howe, Hunter, Leary, DePaolo, and Bleiwas
10. Discuss and consider the Trumansburg Road Pedestrian Study Grant and associated
contracts from NYS DOT
Ms. Hunter stated that she was very in favor of this study and asked if a consultant has been
hired. Ms. Ritter responded that this is done through the state and if we are successful they will
have a list of consultants to choose from. Mr. DePaolo asked if the stake holders in the area have
been asked to help with the 20% the town is paying and Ms. Ritter responded that it would be
even better to ask them at the point where we are putting the sidewalks in. Mr. Goodman said he
could check in with the hospital and Cornell and any other major owners.
TB Resolution 2016 -167: Authorizing the Implementation and Funding in the First
Instance, 100% of the Federal-aid costs of a Transportation Federal-aid Project, and
Appropriating Funds therefore (Route 96/Trumansburg Road Pedestrian Corridor Study;
Preliminary Engineering / Design Study)
Whereas, a project for the Route 96/Trumansburg Road Pedestrian Corridor Study, P.I.N.
375621 (“the Project”) is eligible for funding under Title 23 U.S. Code, as amended, that calls
TB 2016-12-12 pg. 11
for the apportionment of the costs such program to be borne at the ratio of 80% Federal funds
and 20% non-Federal funds; and
Whereas, the Town of Ithaca desires to advance the Project by making a commitment of
100% of the non-Federal share of the costs of Preliminary Engineering / Design Study;
Now, therefore, the Ithaca Town Board, duly convened does hereby
Resolve, that the Ithaca Town Board hereby approves the above-referenced project; and it
is hereby further
Resolved, that the Ithaca Town Board hereby authorizes the Town of Ithaca to pay in the
first instance 100% of the Federal and non-Federal share of the cost of Preliminary Engineering /
Design Study work for the Project or portions thereof; and it is further
Resolved, that the sum of $105,000.00 is hereby appropriated from B8020.403 and made
available to cover the cost of participation in the above phase of the Project; and it is further
Resolved, that in the event the full Federal and non-Federal share costs of the project
exceed the amount appropriated above, the Town Board of the Town of Ithaca shall convene as
soon as possible to consider appropriating said excess amount immediately upon the notification
by the NYSDOT thereof, and it is further
Resolved, that the Supervisor of the Town Board of the Town of Ithaca be and is hereby
authorized to execute all necessary Agreements, certifications or reimbursements requests for
Federal aid on behalf of the Town of Ithaca with the New York State Department of
Transportation in connection with the advancement or approval of the Project and providing for
the administration of the Project and the municipality’s first instance funding of project costs and
permanent funding of the local share of Federal-aid and State-aid eligible Project costs and all
Project costs within appropriations therefore that are not so eligible, and it is further
Resolved, that a certified copy of this resolution be filed with the New York State
Commissioner of Transportation by attaching it to any necessary Agreement in connection with
the Project, and it is further
Resolved, this resolution shall take effect immediately.
Moved: Bill Goodman Seconded: Tee-Ann Hunter
Vote: Ayes – Goodman, Hunter, Howe, Leary, DePaolo and Bleiwas
11. Discuss and consider a resolution for Support for continuing to work with Form
Ithaca on the Town Character Code and Regulating Plan for consideration of
eventual
Ms. Ritter explained that this is for NYSERDA and releasing some funds.
TB 2016-12-12 pg. 12
TB Resolution 2016-168 : Support for continuing to work with Form Ithaca on the Town
Character Code and Regulating Plan for consideration of eventual adoption.
Whereas, former Town of Ithaca Supervisor Herb Engman and City of Ithaca Mayor
Svante Myrick co-signed a letter of support in August of 2013 on behalf of the Town and City
designating Better Cities & Towns of the Form Ithaca project team as the lead applicant for a
NYSERDA’s Cleaner Greener Communities grant to jointly update our zoning regulations, and
Whereas, the Town’s 2014 Comprehensive Plan expressly recommended “requiring a
form- or transect-based zoning code to guide the development (where appropriate) of new
neighborhoods and the redevelopment and retrofitting (where appropriate) of existing
neighborhoods”, and
Whereas, the Town’s commitment to utilizing form-based code is exemplified in the
proposed new Planned Development Zone for the Maplewood Redevelopment project which
utilizes a form-based code approach to guide and regulate the form and design of the
development, and
Whereas, the Form Ithaca project is led by the nonprofit Better Cities & Towns,
dedicated to promoting sustainable, walkable communities; architects and landscape architects
STREAM Collaborative; and urban planners Randall+West; and the team brought in leading
urban design, development, transportation, and form-based code consultants who offered their
valuable expertise to the Town, and
Whereas, the Form Ithaca project team has worked closely with Town staff and the
community in meetings with neighborhood groups, civic leaders, developers, State and County
agencies, and other stakeholders, completed four reports, and organized a four-day charrette for
the general community in June 2015, and a three-day charrette in January 2016 focused on the
Town’s Danby Road/King Road area, and these documents and the public process informed the
development of the draft town of Ithaca Character Code and Regulating Plan, and
Whereas, Form Ithaca and town planning staff continue to work together on refining the
draft Town of Ithaca Character Code to insure it aligns with the Comprehensive Plan
recommendations and zoning directives, and
Whereas, Town staff is generally supportive of the concepts proposed by the Form Ithaca
project team, recognizing the importance of maintaining a human scale along the street,
especially in transitional areas where commercial zones are located near residential districts, and
supporting development of underutilized land, particularly on South Hill, now, therefore, be it
Resolved, that Town Board supports continuing to work with Form Ithaca on the Town
Character Code and Regulating Plan for consideration of eventual adoption, while
acknowledging that final adoption will include further review and public hearings and
compliance with SEQR.
Moved: Bill Goodman Seconded: Rod Howe
TB 2016-12-12 pg. 13
Vote: Ayes – Goodman, Howe, Leary, Hunter, Bleiwas and DePaolo
12. Continue discussion on setting a public hearing regarding excluding Ithaca College
from the Town of Ithaca Fire Protection District
Mr. Goodman stated that he would like to move ahead with holding a public hearing and he
would like to have it at the February meeting as opposed to the organizational meeting in January
and Ms. Brock has information on the questions the board had at the last meeting.
Mr. Goodman moved to enter closed session to seek the advice of counsel at 7:07p.m.; seconded
by Ms. Leary, unanimous.
Motion made to reenter open session made by Mr. Goodman at 7:13 p.m.; seconded by Mr.
DePaolo, unanimous.
Mr. Goodman stated that he would like to propose that we move forward and bring a resolution
at the January meeting to set a public hearing for the February meeting. Board agreed
13. Consider Consent Agenda Items
TB Resolution 2016 - 169 : Adopt Consent Agenda
Resolved, that the Town Board of the Town of Ithaca hereby approves and/or adopts the
following Consent Agenda items:
a. Approval of Town Board Minutes
b. Town of Ithaca Abstract
c. Bolton Point Abstract
d. Ratify appointment of Maintenance Supervisor
e. Ratify appointment of Maintenance Worker
Moved: Rich DePaolo Seconded: Tee-Ann Hunter
Vote: Ayes – DePaolo, Hunter, Goodman, Leary, Howe and Bleiwas
TB Resolution 2016 - 169a: Approval of Minutes of the November 7, 2016
Whereas, the draft Minutes of the November 7, 2016 meeting of the Town Board have
been submitted for review and approval, now therefore be it
Resolved, that the Town Board hereby approves the submitted minutes as the final
minutes of the November 7, 2016 meeting of the Ithaca Town Board.
TB Resolution 2016 - 169b: Town of Ithaca Abstract
Whereas the following numbered vouchers have been presented to the Ithaca Town
Board for approval of payment; and
TB 2016-12-12 pg. 14
Whereas the said vouchers have been audited for payment by the said Town Board; now
therefore be it
Resolved that the governing Town Board hereby authorizes the payment of the said
vouchers in total for the amounts indicated.
VOUCHER NOS. 1558 - 1616
General Fund Townwide 44,750.75
General Fund Part-Town 644.90
Highway Fund Part-Town 13,117.57
Water Fund 561,707.58
Sewer Fund 48,908.64
Risk Retention Fund 89.00
Fire Protection Fund 510,000.00
TOTAL 1,179,218.44
TB Resolution 2016-169c: Bolton Point Abstract
Whereas, the following numbered vouchers for the Southern Cayuga Lake Intermunicipal
Water Commission have been presented to the governing Town Board for approval of payment;
and
Whereas, the said vouchers have been audited for payment by the said Town Board; now,
therefore, be it
Resolved, that the governing Town Board hereby authorizes the payment of the said
vouchers.
Voucher Numbers: 491-536
Check Numbers: 16845 - 16890
Capital Impr/Repl Project $134,808.23
Operating Fund $ 93,729.80
TOTAL $228,538.03
Less Prepaid $ 921.80
TOTAL $227,616.23
TB Resolution 2016 – 169d: Ratify Promotional Appointment of Maintenance Supervisor
Whereas, there is a vacancy in the full time position of Maintenance Supervisor in the
Public Works Department due to the creation of the position for 2017; and
Whereas, the Highway Superintendent has determined through interview and evaluation
that Joseph Hulbert, Maintenance Worker, possesses the necessary knowledge, skills and ability
to satisfactorily perform the duties of the Maintenance Supervisor; and
TB 2016-12-12 pg. 15
Whereas, the Highway Superintendent has promotionally appointed Joseph Hulbert to the
Maintenance Supervisor position, effective December 25, 2016; now, therefore, be it
Resolved, the Town Board of the Town of Ithaca does hereby ratify the Highway
Superintendent’s provisional non-competitive promotional appointment of Joseph Hulbert as a
full time Maintenance Supervisor for the Public Works Department, effective December 25,
2016; and be it further
Resolved, this is a 40 hours a week position, at the 2017 hourly wage of $28.66, which is
an estimated annual salary of $59,612.80, in Job Classification “V”, with full time benefits from
accounts A1620.100, A5132.100, A7110.100, F8340.100 and G8120.100; and be it further
Resolved, the appointee must successfully complete a mandatory eight (8) week
probationary period, as determined by the Highway Superintendent; and be it further
Resolved, the said appointment is a provisional non-competitive appointment pending the
results from the next promotional civil service exam for this position.
TB Resolution 2016 – 169e: Ratification of Highway Superintendent’s Appointment of
Maintenance Worker
Whereas, there is a vacancy in the full time position of Maintenance Worker for the
Public Works Department due to a promotion; and
Whereas, the Interview Committee interviewed three internal and three external
candidates from an open recruitment; and
Whereas, the Committee has determined that Patrick Barnes, Motor Equipment Operator,
possesses the necessary knowledge and skills to satisfactorily perform the duties of Maintenance
Worker; and
Whereas, Jim Weber, Highway Superintendent/Director of Public Works, appointed
Patrick Barnes as Maintenance Worker, effective December 25, 2016; now, therefore be it
Resolved, the Town Board of the Town of Ithaca does hereby ratify the appointment
made by the Highway Superintendent/Director of Public Works, of Patrick Barnes as
Maintenance Worker, effective December 25, 2016; and be it further
Resolved, this is a 40 hours a week position, at the hourly wage of $26.59, which is an
estimated annual salary of $55,307 from account numbers A1620.100, A5132.100, A7110.100,
F8340.100 and G8120.100, in Job Classification “IV”, with full time benefits; and be it further
Resolved, the said appointee must successfully complete a mandatory eight (8) week
probationary period, as determined by the Highway Superintendent/Director of Public Works.
TB 2016-12-12 pg. 16
14. Report of Town Committees, Intermunicipal Organizations and Town Officials
Mr. Goodman reported:
a. looking at committee assignments and if anyone wants any changes, they should let him
know, adding that he wasn’t looking at any big changes, and
b. South Hill Trail open forum was held with a lot of people there, especially adjoining land
owners. Some in favor, some not. Some owners are saying they believe they own the
property. This will be an ongoing topic, and
c. The historic house has been moved and he passed along pictures taken by Ms. Fogarty.
A neighbor was not happy with the process and Ms. Ritter took quite some time to
explain it to him, and
d. He would like to bring the INHS request for tax abatements on community land trust
properties to the board in January or February, and
e. The City has asked for $5k toward the Parks Study and he suggested that we contribute if
the consultants will also ask about our town parks and trail and their usage and give $3K.
Mr. DePaolo asked if we could see the draft survey prior to committing funds and Mr.
Goodman thought they would and with that condition, the board would consider the $3K
and
f. reviewed the special meeting and year end agendas
The Board discussed the recent Tompkins County Housing Summit and decided that a more in
depth discussion should happen at a study session.
Highlights – Ms. Bleiwas talked about the need to ensure there is public transportation available
which Ms. Leary echoed and added that we can’t wait for funds from other entities for public
transportation.
Ms. Leary also thought that the town needs to decide that housing is a priority. Thinking about
the town paying for some things to make development more affordable.
Mr. Howe thought the town is in an interesting position to solve some of these problems with the
nodes we have identified but added that there should be more integration between municipalities
around the housing issue(s).
Ms. Hunter agreed with everyone and stated that we seem to bear the responsibility for meeting
the middle income housing needs and we can do it well or very badly and we need to coordinate
regionally and look at requiring developers to include affordable housing for middle income.
We also need to understand how we are going to fund or attract funding for these housing needs
when construction costs are so high.
15. Review of Correspondence
Motion made by Mr. Goodman at 7:45 p.m. to enter executive session to discuss the employment
history of a particular person, seconded by Ms. Hunter, unanimous.
Motion made to reenter open session at 8:00 p.m., seconded by Mr. DePaolo, unanimous.
Motion made to adjourn by Ms. Bleiwas at 8:01 p.m., seconded by Ms. Hunter, unanimous.
Submittec
Paulette Terwilliger, Town Clerk
TB 2016-12-12 pg.17
Page 1 of 2
Town of Ithaca 2016 Sustainability Progress Report
Prepared by Nick Goldsmith, Sustainability Planner
December 7, 2016
Secured over $150,000 in grant funding
Awarded $103,940 by Partners for Places for the Green Building Policy project (see
below); half from national consortium of foundations, half from Park Foundation
Awarded $47,732 by Park Foundation for shared Sustainability Planner position
Administered two existing grants (NYSERDA and Park)
Kicked off Green Building Policy project
Will involve a comprehensive study of policy
tools that the Town & City of Ithaca can use to
incentivize or mandate green building standards
for new construction
Main deliverables include green building policy
study, development forecast, and outreach
Near end of consultant selection process
Completed Residential Energy Score Project
Led effort to create a voluntary
residential energy score program
for homes within the five
participating municipalities
Program document endorsed
and/or supported by all five municipalities
NYSERDA now considering regional pilot programs, thanks in part to our efforts
Program to be implemented as soon as funding allows; currently exploring options for
program host and funding
Launched Energize NY Financing program
Uses innovative Property Assessed Clean Energy (PACE) model
to offer long-term low-cost financing for energy efficiency and
renewable energy projects in commercially-owned buildings
Tompkins County and the City of Ithaca were the first two upstate
NY communities to offer this program
Page 2 of 2
Town of Ithaca 2016 Sustainability Progress Report (continued)
Continued publication of Ithaca Sustainability newsletter
Now over 575 subscribers
Also Facebook page (now nearly 475 likes)
Readers are not only locals, but also organizations at a regional and national level
Supported many local initiatives through participation in steering committees,
free meeting space, and promotion:
Tompkins County Energy Roadmap; Ithaca 2030 District; Community Choice
Aggregation working group (project of TCCOG); Sustainability Center; Electric Vehicle
Infrastructure Plan; Energy Smart Community; Community Energy Coordination; TCCPI
Developed and strengthened relationships with local, regional, and national
organizations
U.S. Department of Energy
Pacific Northwest National Laboratories
Urban Sustainability Directors Network
Northeast Energy Efficiency Partnerships
The Funders’ Network for Smart Growth and Livable Communities
Energize NY
NYSERDA
Various municipal sustainability departments
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
1
STATE ENVIRONMENTAL QUALITY REVIEW FINDINGS STATEMENT
Town of Ithaca Town Board
Maplewood Graduate and Professional Student Housing Redevelopment Project
___________________________________________________________________________________________________
Pursuant to Article 8 (State Environmental Quality Review Act – SEQR) of the Environmental
Conservation Law and 6 NYCRR Part 617, the Town of Ithaca Town Board, as an Involved Agency,
makes the following findings:
Name of Action: Maplewood Graduate and Professional Student Housing
Redevelopment Project.
Description of Action: The project involves demolishing the existing Maplewood Apartments
housing complex, located between Maple Avenue and Mitchell Street,
Town of Ithaca Tax Parcel No.’s 63.‐2‐1, 63.‐2‐2, 63.‐2‐3, 63.‐2‐10.2, and
63.‐2‐14, and redeveloping the +/‐ 17 acre site with 474 residential units
(studios and 1‐4 bedroom units) in a mix of townhomes, stacked flats,
and multi‐family apartment buildings. The project will also include
some small retail, new interior streets, parking areas, pedestrian
facilities, open spaces, storm water facilities, and a community center.
Agency Jurisdiction: Town of Ithaca Planning Board ‐ Lead Agency for the environmental
review. Town Planning Board actions include Site Plan Approval &
Special Permit. Town of Ithaca Town Board action includes enactment
of local law rezoning property from High Density Residential (HDR) to
Planned Development Zone (PDZ).
FEIS Accepted by Lead Agency: November 22, 2016
FEIS Filed: November 30, 2016
Findings Statement Adopted: xx, xx, 2016 (TBD)
I. INTRODUCTION
Compliance with State Environmental Quality Review (SEQR)
This document is a Findings Statement that pertains to the proposed Maplewood Graduate and
Professional Student Housing Redevelopment project. It is prepared pursuant to, and as required by,
6 NYCRR Part 617.11. The Town of Ithaca Planning Board is the Lead Agency and is responsible for
considering Site Plan Approval and Special Permit. The Town of Ithaca Town Board action includes
enactment of a local law rezoning property from High Density Residential (HDR) to Planned
Development Zone (PDZ). This Findings Statement is based upon the facts and conclusions in (1) the
Draft Environmental Impact Statement (DEIS) for the project, received on August 2, 2016, revised on
September 13, 2016 and accepted by the Town of Ithaca Planning Board on September 20, 2016, and
(2) the Final Environmental Impact Statement (FEIS), received on November 8, 2016, revised on
November 17, 2016 and November 22, 2016, and accepted by the Planning Board on November 22,
2016.
This Findings Statement demonstrates that the Town of Ithaca Town Board, as an Involved Agency,
has complied with all of the applicable procedural requirements of Part 617 in reviewing this matter,
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
2
and that the Town Board has given due consideration to the above‐referenced documents prepared
in conjunction with this action. Further, this Findings Statement contains the facts and conclusions in
the DEIS and FEIS relied upon by the Town of Ithaca Town Board to support future decisions related
to these documents.
Potential Environmental Impacts Leading to Preparation of an Environmental Impact Statement
Potential impacts were identified in the Final Scoping Document related to the proposed Maplewood
Graduate and Professional Student Housing Redevelopment project, which was accepted by the
Town of Ithaca Planning Board on July 19, 2016. The identified impacts include the following:
A. Land Use and Zoning: increased density, increased allowable building height, change in zoning
from High Density residential (HDR) to Planned Development Zone (PDZ) to allow increased
density, compatibility with surrounding land uses and with the Town of Ithaca Comprehensive
Plan.
B. Soils and Topography: construction on slopes greater than 15%, increase in impervious cover,
tree and vegetation removal, soil erosion and sedimentation control, excavation and removal of
materials (truck routing discussed in “Construction and Demolition Activities”), construction on
land with possible shallow depth to water table.
C. Water Resources: increased runoff and potential flooding, soil erosion and sedimentation control
(related to stormwater impacts), changes in drainage patterns, degradation of water quality from
urban pollutants.
D. Transportation and Circulation: increased traffic on existing street network, increased population
utilizing public transit, pedestrian and bicycle networks, increased number of parking spaces on
site, impacts to existing fire, ambulance and police access to the area.
E. Utilities: increased water service demands/usage where there is insufficient water service
capacity, increased sewer service demands/usage, increased demand/usage on telephone, cable
television, telecommunications and high‐speed internet accessibility, impact of light spillage onto
adjacent parcels.
F. Aesthetic Resources and Neighborhood Character: compatibility with and relationship to existing
development adjacent to and in the vicinity of the proposal (in terms of architectural style, scale,
density, building heights), visual impact of the proposed development on the surrounding
neighborhood and the community at large.
G. Community Services: greater demand on emergency services, solid waste management,
educational services, health care services, recreation facilities.
H. Greenhouse Gas (GHG) Emissions/Effect of Project on The Use and Conservation of Energy:
analysis of project GHG emissions as they relate to increased energy usage, energy efficiency in
buildings and in project design, energy conservation measures, use of renewable energy sources.
I. Construction and Demolition Activities: generation of noise, dust and vibration during
construction, impacts on neighborhood related to hours of construction and construction on
weekends, impacts related to contractor parking, construction traffic on existing street network
(truck routing plan).
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
3
II. ENVIRONMENTAL IMPACTS
A. Land Use and Zoning
Impacts and Proposed Mitigation
The Maplewood Graduate and Professional Student Housing Redevelopment project involves a
significant increase in density, from the 170 unit/372 bed development that exists on the site to a 474
unit/887 bed development that will exist after completion of the project. The existing one‐story
structures will be replaced with a mix of 4–story apartment buildings and 2½ to 3‐story townhomes
and stacked flats. There will be no change in the residential land use characteristic or the
graduate/professional‐student population demographic that will live in the Maplewood
development.
The Town of Ithaca Comprehensive Plan recommends focusing new residential development in areas
near major employment centers and the City of Ithaca boundary. The Maplewood project meets the
Plan’s recommendation, as it is located on an infill site within both the Town and City of Ithaca. The
project is also next to the Cornell University campus, about 1.2 miles east of downtown Ithaca, and
within a 10 to 20 minute walk of East Hill Plaza and the center of Ithaca’s Collegetown area.
The Comprehensive Plan also recommends denser, mixed‐use development in the Mitchell
Street/Maple Avenue/Pine Tree Road area, which includes the Maplewood site. The Plan has
designated the Maplewood project site as an area where traditional neighborhood development
(TND) would be appropriate. The project involves a change in the town’s zoning from the current
“High Density Residential” zoning designation to a “Planned Development Zone” (PDZ).
The PDZ language for Maplewood utilizes a form‐based code, TND zoning approach that includes
design standards for many elements of the development. The height and density of buildings within
the project will be mitigated through design that is sensitive to the surrounding area, particularly the
residential neighborhoods along Mitchell Street on the south side of the project and along the East
Hill Recreation Way on the west side of the project. Specific mitigations related to aesthetics and
building design are described below in Section F. Aesthetic Resources and Neighborhood Character.
Discussion and Findings
The Town Board finds that:
The form‐based zoning approach and PDZ language will provide clarity in guiding site planning for the
redevelopment and will minimize adverse environmental impacts to the maximum extent practicable.
B. Soils and Topography
Impacts and Proposed Mitigation
Construction of this project will take place in several phases over the course of 18 months. Phases 1‐
4 will include the demolition of the existing Maplewood structures, followed by site preparation,
which will include clearing vegetation, establishing access roadways and construction staging areas,
and installing temporary erosion control measures, foundation drains and permanent stormwater
basins. Temporary erosion control measures will include the placement of silt fence, curb inlet
protections, stabilized stone construction entrances, soil cover and temporary seeding, check dams,
and dust control measures. All details of the Erosion and Sediment Control Plan will be incorporated
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
4
into a Stormwater Pollution Prevention Plan (SWPPP) that meets the requirements of the NYS
Department of Environmental Conservation (NYSDEC), under the State Pollutant Discharge
Elimination System (SPDES) and the Town of Ithaca requirements for stormwater management. The
SWPPP will be reviewed and approved by the Town of Ithaca Public Works Department and the
NYSDEC as part of the site plan review process. Per NYSDEC requirements, development areas within
each of the phases will generally be delineated to limit disturbance to five acres at any given time.
The site largely consists of man‐made fill from previous development, along with a few areas with
steep slopes. There are also some areas where the depth to water table is shallow. As proposed, the
steepest portions of the property (slopes of 15% or more) will remain undisturbed. Soil stabilization
will be accomplished by using soil covers and temporary seeding, with mulching and/or hydro‐
seeding to be applied to areas with low slopes that have been stripped of natural vegetation, and rip‐
rapping, matting and/or sodding for permanent soil stabilization. The project also will include the
installation of foundation drains, which will mitigate impacts to areas with shallow depth to water
table.
The project will preserve some of the existing vegetation on the site, but there will be tree and
vegetation loss and an overall increase in impervious surface (approx. 1.3 acres). The project will
include significant re‐landscaping of the site, which will mitigate the impacts of vegetation loss as well
as provide screening between the development and the surrounding neighborhoods. The SWPPP for
the project will also include measures to mitigate the increase of impervious surface as a result of the
project (discussed in greater detail below, C. Water Resources).
Please see below Section I. Construction and Demolition Activities for findings related specifically to
construction and demolition activities, including excavation and removal of materials, construction
staging, contractor parking, impacts related to dust, noise and vibration during construction,
construction hours, etc.
Discussion and Findings
The Town Board finds that:
Although the project will disturb a significant portion of the existing site, the proposed plans appear
to be sensitive to the site and the surrounding area, and will involve the least amount of disturbance
that is necessary for the project. The proposed mitigations noted above will minimize adverse
environmental impacts to the maximum extent practicable, and are expected to be incorporated as
conditions of Planning Board site plan approval.
C. Water Resources
Impacts and Proposed Mitigation
The proposed development will result in an increase of 1.3 acres of impervious surface, increasing the
potential for flooding, erosion, and increased pollutant export if not mitigated. Changes to the
existing drainage patterns of the site will also occur as the land is re‐graded to construct buildings,
parking areas, and roads. In the absence of stormwater controls, both runoff volume and peak
discharge rate will increase as a result of the proposed project.
Water quality treatment for the project will be achieved through the construction of rain gardens, bio
retention filters, vegetated swales and other green infrastructure practices. Treatment will also
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
5
involve the incorporation of on‐site stormwater storage basins that will serve as sediment basins
during construction and as permanent stormwater facilities after construction. All erosion control
measures and post‐construction related permanent stormwater management practices will meet
NYSDEC design and implementation guidelines. As noted in the Soils and Topography section above,
all details of the Erosion and Sediment Control Plan will be incorporated into a Stormwater Pollution
Prevention Plan (SWPPP) that meets the requirements of the NYSDEC, under the State Pollutant
Discharge Elimination System (SPDES) and the Town of Ithaca requirements for stormwater
management. The SWPPP will be reviewed and approved by the Town of Ithaca Public Works
Department and the NYSDEC as part of the site plan review process.
The on‐site stormwater storage basins, combined with underground detention basins, will control
rates of runoff from the site during the 1, 2, 10, 25 and 100‐year design storms. Both the stormwater
practices and the stormwater infrastructure within the site will require ongoing maintenance to
ensure proper functioning and long‐term pollutant removal performance. A formal Operation,
Maintenance, and Reporting Agreement will be developed between the Applicant and the Town. The
Agreement will list the requirements for long‐term operational and maintenance responsibilities for
all applicable stormwater facilities related to the project. The Agreement will also give the Town the
ultimate authority, at the expense of the Applicant, to implement any action needed to maintain the
functions of the stormwater infrastructure in the event that the Applicant does not undertake such
actions themselves. The Operations, Maintenance, and Reporting Agreement will be a required
condition of the site plan approval.
Discussion and Findings
The Town Board finds that:
While the project will result in an increase in stormwater runoff and impacts to water quality, the EIS
has adequately addressed these impacts with proposals for implementing necessary mitigation
measures. The mitigation measures will be developed further in the required SWPPP and in the site
plan materials, and will need to be reviewed and approved by the Town of Ithaca Public Works
Department and the NYSDEC. The proposal calls for construction‐related erosion control measures,
which, if properly installed and maintained, should adequately control sediment laden runoff from
leaving the site. The proposed design and proper installation of permanent stormwater facilities that
address water quality and runoff impacts, along with continuous and long‐term maintenance of these
facilities, will minimize adverse environmental impacts related to water resources to the maximum
extent practicable.
D. Transportation and Circulation
Impacts and Proposed Mitigation
The traffic evaluation in the EIS studied traffic volumes projected from the full build‐out of the
Maplewood re‐development project and the resulting impacts on Mitchell Street, Maple Avenue and
nearby intersections. The study included an analysis of existing conditions, along with no‐build and
build scenarios. The 327 Eddy Street Mixed Use Apartment Building, Dryden South Mixed Use
Project, Collegetown Crossing, Collegetown Terrace Apartments and 209‐215 Dryden Road projects
(all located in the City of Ithaca) were taken into account in the calculations, as these nearby projects
had either been recently approved, were under construction or were under review by the City of
Ithaca Planning Board at the time of the Maplewood EIS Scoping process. In addition, the study
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
6
examined the cumulative impacts of the Maplewood project combined with approved and recently
completed projects within an approximate 2/3 mile radius of the project.
According to the traffic study, the Maplewood project will generate approximately 78 entering/68
exiting vehicle trips during the weekday AM peak hour and 55 entering/68 exiting vehicle trips during
the PM peak hour. These increases and the differences between 2016 Existing Conditions, 2018 No
Action Conditions and Maplewood Full Development are reflected in the study results shown in
Tables 3.4‐2, 3.4‐4 and 3.4‐5 of the DEIS and the revised traffic study results on pages 103 and 104 of
the FEIS. The tables show that nearly all study intersections currently operate and will continue to
operate at level of service (LOS) C or better, with the exception of the Pine Tree Road/Maple Ave
intersection (in the eastbound left movement) which currently operates at LOS D. That intersection
will remain at LOS D after full buildout of the Maplewood project, so the project will not have a
significant impact on that intersection. The only intersection in the traffic study that showed a change
in LOS from the 2018 No Action Conditions to Full Development was the Maple Avenue/Veteran’s
Place, where the AM and PM peak Northbound‐Veteran’s Place movement both fell from a LOS A to a
LOS B.
Although the project does not significantly affect the LOS efficiency at the study intersections, traffic
generated by the project will exacerbate existing problems with speeding on Mitchell Street and
Maple Avenue. To mitigate this, the FEIS notes a number of streetscape improvements that contain
perceptual traffic calming measures, such as curbing and landscaping. These improvements, coupled
with raised crosswalks and other mitigations, will frame the roadway and narrow the field of vision,
thereby influencing driver behavior. The improvements include:
Installation of curbing and associated drainage, asphalt milling and repaving, landscaping and
street trees on Mitchell Street and Maple Avenue along the project frontage
Installation of street trees and other landscaping in front of Cornell’s High Voltage Lab on
Mitchell Street
Installation of raised crosswalks at the intersections of the East Ithaca Recreation Way at
Mitchell Street and Maple Avenue
Additionally, the applicant proposes to contribute $30,000 toward the installation of traffic calming
measures located outside of the project area, along Mitchell Street and Maple Avenue, including:
Speed humps on the 700 block of Mitchell Street and other areas determined by the town/city
Signage on Mitchell Street to alert motorists of the need for reduced speed entering the
project area
Regarding the existing and proposed pedestrian and bicycle network, the project’s internal elements
will include a system of sidewalks and connections throughout the site. Along the frontage, the
project will include a new sidewalk along Maple Avenue that will connect to the existing sidewalk on
that road in the City of Ithaca, and a redeveloped sidewalk along Mitchell Street. The East Ithaca
Recreation Way traverses through the project site and will be enhanced with landscaping as part of
the project. The proposed cross walks noted above will improve the connections to the East Ithaca
Recreation Way.
As there will be an increase in the population at Maplewood, the project also includes an increase in
the number of parking spaces on the site. The EIS indicates that the 887‐bed project will generate a
need for up to 424 parking spaces, given the historic parking needs and trends of the Maplewood
graduate/professional student population, and the presence and heavy use of existing public transit
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
7
and other alternative modes of transportation readily accessible in the area. The project includes the
implementation of a “Traffic Demand Management” plan (TDM) to mitigate any potential impacts
related to the lack of on‐site parking for the project. TDMs will also help alleviate the demand on the
road network. As part of the site plan review, the Planning Board should require that the applicant
commit to implementing the list of TDM strategies that are recommended on pages 3‐42 and 3‐43 of
the DEIS.
Regarding public transit service and access, the area currently contains many designated transit stops
for the Tompkins Consolidated Area Transit (TCAT) bus service along Maple Avenue, including at least
two that are located within ¼ mile of the project. The northern portion of the project is well served
by TCAT routes 82 and 92. There is no TCAT bus service along Mitchell Street, so residents living
along the south end of the Maplewood development will need to walk approximately 1,000 feet (less
than ¼ mile) to the Maple Avenue stops to catch the bus to Cornell, East Hill Plaza, and downtown
Ithaca. The northern portion of the Maplewood project that is located within the City of Ithaca
municipal boundary includes the installation of a new bus shelter and bus turnaround area to serve
the residents of the development.
Discussion and Findings
The Town Board finds that:
Except for the Mitchell Street/Ithaca Road intersection, the levels of service (LOS) for the study
intersections do not fall below LOS C. However, at many intersections, additional seconds of delay
will occur as a result of the project. The additional delays will add to the existing traffic issues and
frustrations noted by many residents who have commented orally and in writing through the EIS
process.
The EIS includes a number of strategies that will mitigate the impacts of the projected increase in
traffic related to the project and also slow traffic down as it enters the larger Belle Sherman and
Bryant Park neighborhoods. The EIS also includes several solutions to offset the reduced parking that
will be supplied for the project. The Planning Board is expected to require the relevant mitigation
measures noted above and in the EIS to be incorporated into the project as part of the site plan
review, as the proposed measures will minimize adverse environmental impacts related to
transportation to the maximum extent practicable.
E. Utilities
Impacts and Proposed Mitigation
Water: The project site lies within the Town of Ithaca Water Improvement Areas, with water being
supplied by the Southern Cayuga Lake Intermunicipal Water Commission (Bolton Point) for domestic
use and firefighting purposes. The Pine Tree Road water storage tank services this area. The Town
hired GHD, Inc. as a consultant to study the water demands of the East Hill service area. GHD, Inc.
evaluated existing and future conditions, including future demands from the Maplewood project
(draft report entitled Town of Ithaca's East Hill Water Study). The study indicates that there is
adequate pressure and flow to service the new Maplewood Project and surrounding service area,
however, the required 3‐day water storage capacity cannot be met because the 200,000 gallon Pine
Tree water storage tank is undersized.
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
8
The GHD, Inc. study indicates that the Town requires a 400,000 gallon tank to meet the current 3‐day
storage capacity demand. The Maplewood development will add an additional daily demand of
45,900 gallons per day (x 3‐day storage capacity = approx. 140,000 gallons per day). The overall
combined demand will necessitate a 600,000 gallon tank in order to accommodate the Maplewood
development, additional small‐scale development on Park Lane, Strawberry Hill Road and Slaterville
Road, and other infrastructure upgrades.
Discussions have commenced with the Project Sponsor and representatives of Cornell University to
ensure that the East Hill Water System be upgraded with an approximately 600,000 gallon water
storage tank. Cornell University will convey land to the Town to provide a site on which the new
water storage tank will be located. The parties are working cooperatively towards a solution to the
water storage capacity inadequacy issue. To assure that demands for the new water service can be
met, no occupancy of the Maplewood development should be allowed until the new 600,000 gallon
tank is installed and operational.
The water system for the existing Maplewood Apartments will be replaced with 1,700+/‐ feet of new
8‐inch ductile iron water main, a new fire meter to improve flow rates during fire events, new
hydrants and other system improvements. The sequencing of removing the old infrastructure and
replacing it with new infrastructure needs to be carefully planned so that fire protection is
maintained throughout the site during project demolition and construction phases. Specific existing
hydrants must remain active during demolition and foundation installation, and wood framing must
not be permitted until the new hydrants on the new distribution system are installed and active.
Sewer: The proposed development will require new sewer infrastructure. The plan includes 2,000+/‐
feet of 8‐inch PVC sewer main with each apartment building and townhome having a separate sewer
lateral. The existing connection to the sanitary sewer line, located along the East Ithaca Recreation
Way, will be maintained. The DEIS analyzed the capacity of the sewer system to handle the
additional sanitary sewer load from the development. The analysis determined that there is
sufficient capacity in the Town of Ithaca sewer pipe mains to convey the additional flows from the
project site to the jointly‐owned Town and City of Ithaca Mitchell Street interceptors. Based on
communications with the City of Ithaca, it was also determined that there is sufficient capacity in the
existing jointly owned sewer interceptor (the main containing City and Town combined flows) to
convey the additional flows to the Ithaca Area Wastewater Treatment Plant (IAWWTP).
Analysis of cumulative flows for approved, but yet to be developed projects in the City, with the
Maplewood project, confirmed City of Ithaca staff’s determination that there is available capacity in
the interceptor sewer lines of the existing mains from the City/Town line to the IAWWTP for these
future flows. Based on these determinations, no significant impacts to the sewer supply or
connections are anticipated.
Telephone, Cable TV, Internet: The DEIS indicates that updated telecommunications facilities will
provide service to the development and that they will be served by an independent
telecommunications provider. Given the availability of these services to the site, no deficiency in the
provision of telecommunications facilities is anticipated.
Lighting: Outdoor lighting will include lighting for sidewalks, drive lanes, and parking areas. With
proper planning and design, light spillage onto neighboring property can be minimized while still
providing adequate lighting for public safety. Proposed outdoor light fixture details (cut sheets) will
need to be submitted as part of the site plan submission to ensure compliance with the Town’s
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
9
Outdoor Lighting Law and a photometric plan will also need to be reviewed by the Planning Board to
insure light trespass to neighboring properties is minimized.
Discussion and Findings
The Town Board finds that:
No adverse impacts related to utility services are anticipated if the above described mitigation
elements and site plan requirements are implemented. The proposed mitigations will serve to
minimize adverse environmental impacts related to utilities to the maximum extent practicable, and
are expected to be incorporated as conditions of Planning Board site plan approval.
F. Aesthetic Resources and Neighborhood Character
Impacts and Proposed Mitigation
The character of the neighborhood surrounding the project is a mix of single‐family homes,
apartment complexes, and industrial/institutional structures of varying heights, architectural styles
and building massing. The DEIS states that there is no predominant architectural style in the
neighborhood around the Maplewood project, when in fact the Craftsman, Farmhouse and Bungalow
styles are predominant architectural housing styles in the overall neighborhood, accounting for 35%
of all structures that make up the neighborhood (or more than 40%, if including the “vinyl” craftsman
styles in the adjacent Belle Sherman cottages project – designs that were specifically chosen to blend
in with the surrounding neighborhood).
The applicant originally chose the “Warehouse or Railroad Vernacular” style for the entire
Maplewood project. According to the neighborhood assessment in the DEIS, this style was among
the least dominant architectural styles found in the neighborhood, and was particularly out of
character with the residential buildings along the Mitchell Street frontage.
The FEIS, however, contains a modified architectural design for the Mitchell Street frontage that is in
character with the existing historic neighborhood along Mitchell Street. The new plan also includes
smaller townhomes and similar architectural features for two of the apartment buildings along the
East Ithaca Recreation Way that face Worth Street in the City of Ithaca.
In terms of visual impacts, there are no scenic resources identified in the Town of Ithaca Scenic
Resource Inventory that will be impacted by the proposed development. The development will be
very visible from Mitchell Street, Maple Avenue, the Belle Sherman Cottages development located
immediately west of the project, and also along some of the adjacent residential streets in the City of
Ithaca. However, the visual impacts of the project will be significantly mitigated by these measures
described in the DEIS and FEIS: (1) re‐designing the architectural styles of the Mitchell Street
structures to better blend in with the existing Mitchell Street neighborhood, (2) setting the project
further back from the East Ithaca Recreation Way and having smaller town homes and buildings with
similarly re‐designed features across from Worth Street and (3) adding significant and varied
landscaping throughout the project and along all sides of the property. These mitigation measures,
along with other site elements such as signage and lighting, will be evaluated by the Planning Board
as part of site plan review.
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
10
Discussion and Findings
The Town Board finds that:
The project’s impact on views will be significantly mitigated by the architectural re‐designs, additional
setbacks, smaller townhomes, and vegetative buffering noted above and further described in the
DEIS and FEIS for the project. The proposed mitigations will serve to minimize adverse environmental
impacts related to aesthetic resources and neighborhood character to the maximum extent
practicable, and are expected to be incorporated as conditions of Planning Board site plan approval.
G. Community Services
Impacts and Proposed Mitigation
The increase in the Maplewood resident population will increase demands on community services
such as police and fire protection, solid waste management, educational services, health care services
and recreation. The EIS adequately documents that full development of the Maplewood
development will not have a significant impact on these services.
The Ithaca Fire Department is responsible for fire and emergency medical service calls to East Hill in
the Town of Ithaca (Bangs ambulance also responds to emergency medical calls). The two
development entrances will be easily accessed by Ithaca Fire Department (IFD) apparatus. Final
project road designs will be evaluated by the IFD during site plan review.
In terms of police services, the EIS contains correspondence from Jamie Williamson of the Ithaca
Police Department (IPD), stating that IPD is more than capable of handling the added police services
anticipated from the Maplewood project. The Tompkins County Sheriff’s Department and NYS Police
will respond to the portion of the site in the Town of Ithaca utilizing the “closest car” concept.
Regarding solid waste management, the Tompkins County Recycling and Solid Waste Center has
indicated in the EIS that they have the capacity to handle the additional waste generated by the
project. The Center is currently operating at 18% of the facility’s solid waste capacity and 35% of its
recyclables capacity.
In terms of educational services, the EIS notes that the existing Maplewood project has had an
average of 4 elementary school‐aged children over the last 5 years. The EIS anticipates that number
to increase to 10 total elementary school‐aged children with the increase in Maplewood residents.
The Belle Sherman Elementary School can accommodate 360 students and currently enrolls 334. The
increase in elementary school‐age children will not have a significant impact on the Ithaca City School
District capacity or operations.
Related to health care services, all of the residents of Maplewood will be connected to Cornell
University, with access to Gannett Health Services and health insurance through Cornell. The project
is not increasing the number of graduate and professional students that are attending Cornell.
Gannett Health Services has sufficient capacity to accommodate all of the graduate and professional
students, whether they all live in Maplewood or in other areas.
Finally, with regard to recreational facilities, the existing East Ithaca Recreation Way will be enhanced
with new landscaping, fencing and other amenities, which will be a positive impact for users of the
trail. The overall re‐development of the Maplewood site will allow for several new recreational paths
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
11
throughout the development, along with landscaped seating areas, new playgrounds, open areas for
passive recreation and other features.
Discussion and Findings
The Town Board finds that:
The Maplewood project will provide adequate police and fire protection, solid waste management,
educational services and health care services. These services, along with the increase in recreational
amenities related to the development, will serve to minimize adverse environmental impacts on
community services to the maximum extent practicable.
H. Greenhouse Gas Emissions/Effect of Proposal on the Use and Conservation of Energy
Impacts and Proposed Mitigation
According to the DEIS, the existing Maplewood development generated 1,258,000 kg CO2 per year in
greenhouse gas (GHG) emissions, utilizing natural gas as the primary energy source. The proposed
development, with more than double the population and a significant increase in the number of
buildings and potential energy usage, will generate 1,388,000 kg CO2 per year. The DEIS included an
analysis of the amount of GHG emissions related to the construction of the project, including the
energy used to prepare the site and construct the buildings, and the number of vehicular miles
traveled by workers coming to and from the site from their residences.
The DEIS and FEIS state that the developer of the Maplewood project is committed to using only
electricity as the project’s energy source and that the project will further incorporate many of the
mitigation measures listed in the NYSDEC’s “Guide For Assessing Energy Use And Greenhouse Gas
Emissions In An Environmental Impact Statement.” Additionally, the project will incorporate all of the
energy conservation measures listed in Table 5.2 of the DEIS (Chapter 5, page 5‐4).
The FEIS expands upon the energy commitment by stating that the developer will (1) obtain Energy
Star certification for the project, which includes third party testing and inspections, and (2) purchase
100% of the energy used for the project from renewable sources, with “renewable source” defined as
a source that is not depleted when it is used, such as solar, wind and hydro power.
Discussion and Findings
The Town Board finds that:
The proposal to commit to obtain Energy Star certification and purchase renewable energy for 100%
of the project, combined with constructing buildings to Zero Energy Building standards and
incorporating the majority of the NYSDEC’s mitigation measures listed in the guide noted above, will
serve to minimize adverse environmental impacts related to greenhouse gas emissions to the
maximum extent practicable. These mitigation measures are expected to be incorporated as
conditions of Planning Board site plan approval.
I. Construction and Demolition Activities
Impacts and Proposed Mitigation
Construction‐related traffic to and from the project site will be generated by workers, material and
equipment delivery, and hauled‐away site materials related to the demolition of the existing
Maplewood development. The number and type of vehicles will vary, depending on the phase of
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
12
construction. As mentioned in Section B‐Soils and Topography (above), construction of this project
will take place in several phases over the course of 18 months. Phases 1‐4 will include the demolition
of the existing Maplewood structures, followed by site preparation, which will include clearing
vegetation, establishing access roadways and construction staging areas, and installing temporary
erosion control measures, foundation drains and permanent stormwater basins.
Construction of the project will generate noise, dust and vibration from equipment, construction
vehicles, worker traffic, and delivery vehicles. Noise levels caused by construction activities will also
vary depending on the phase of construction. To mitigate noise impacts to adjacent and nearby
residences, noise‐producing construction‐related activities on the site at or above 85 decibels “will be
limited to the hours of 8am to 6pm, Monday ‐ Friday/Saturday” (Draft EIS, page 4‐9).
The Final EIS (Response 29D, page 68 and Response73F, page 71) states that the developer
anticipates that there will be a need to work weekends. This means that there is a chance that the
project could potentially produce significant levels of noise between 8am and 6pm every day of the
week for an unspecified amount of time (as it depends upon on the phase of construction).
The project will employ various methods of control to minimize excessive dust associated with earth
moving, such as site grading, back filling, and excavation. These methods include the use of soil
compaction, water sprinkling, and the use of crushed stone or gravel along construction roads. By
controlling the sources of dust, no significant adverse impacts are expected to occur.
Construction staging can be accommodated on site, so there is no anticipated queuing of
construction related traffic on area roadways and no long‐term street closures. In order to maintain
safe traffic conditions during construction, the project construction team will supply a person to wave
traffic with flags during any construction activities that could impact traffic or pedestrian travel.
Contractor parking, on the other hand, cannot be accommodated on site. The proposal includes
parking for contractors and workers in the former Courtside Fitness Center parking lot located off of
Pine Tree Road (the lot behind and next to the existing Rite Aid pharmacy). The lot has been left
vacant since the fitness center was demolished in 2008. The location is not only large enough to
accommodate the vehicles while not impacting the nearby commercial businesses, but is within easy
walking distance to the project.
In order to haul materials and deliveries into and out of the site with the least impact to the adjacent
city neighborhoods, the project includes a truck routing plan that uses Mitchell Street as the primary
route east to either Ellis Hollow Road or to Pine Tree Road and out to NYS Route 79 East. The
secondary traffic route includes using Maple Avenue to Pine Tree Road to Ellis Hollow Road and out
to Game Farm Road. The variation of routes will disperse truck traffic so that no one street will bear
the full amount of construction traffic related to the project.
Discussion and Findings
The Town Board finds that:
The impacts related to construction traffic, dust, and noise will be temporary in nature and will entail
several mitigation measures. Nevertheless, the noise and vibrations from construction have not been
mitigated and they could occur every day of the week for an unspecified amount of time. To
adequately mitigate noise and vibration impacts to the adjacent residences around the project during
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
13
construction, construction should be prohibited all day on Sundays and Federal holidays and work
should not be routinely scheduled for Saturdays, but could be permitted if required by extenuating
circumstances, such as severe weather, subject to approval by the Director of Code Enforcement.
The SWPPP that is submitted for the project will include mitigation for dust and debris related to the
project. The SWPPP will be reviewed and approved by the Town of Ithaca Public Works Department
and the NYSDEC as part of the site plan review process. The proposed truck routing plan will need to
comply with the Town of Ithaca Road Preservation Law for any portions of the plan that traverse
Town of Ithaca roads.
The proposed contractor parking site is an ideal location, as it is close enough for workers to walk to
the job site without having to take a shuttle or park on city or town streets near the site. The Planning
Board may condition approvals related to contractor parking during site plan review of the project.
Such conditions of approval could require that the parking be temporary only, with no time‐
extensions beyond completion of the Maplewood project, and site restoration once the project is
completed.
The proposed mitigations above will serve to minimize adverse environmental impacts related to
construction and demolition to the maximum extent practicable, and are expected to be
incorporated as conditions of Planning Board site plan approval.
III. DISCUSSION OF ALTERNATIVES
Several alternative development plans were presented and evaluated in the EIS, including:
A. No Action Alternative, in which the project site remains undeveloped
B. As‐of‐Right/Development In Accordance With Existing Zoning Alternative
C. Reduced‐Scale And Alternative Layout Development Scenarios
D. Reduction in Greenhouse Gas Emissions Alternative
Below is a discussion of each alternative:
A. No‐Action Alternative: An evaluation of the No‐Action Alternative is required under 6 NYCRR
617.9(b)(5) and involves the scenario where the Maplewood property remains undeveloped.
Under this scenario, none of the impacts identified in the EIS would occur. There would be no
impacts to soils and topography, water resources, vegetation, traffic, community facilities and
utilities, or greenhouse gas emissions. The existing development would continue to degrade,
as the quality of the development was built for a 25‐year lifetime.
The Town’s Comprehensive Plan indicates that this property is appropriate for residential
development, particularly high density development, and it is currently zoned as such. Public
water and sewer, along with bicycle and pedestrian facilities and public transit, are all
available to the site. Additionally, the property is very close to the Cornell campus and other
community services, making it a walkable and easily accessible area for residential
development. The No‐Action Alternative is not a reasonable alternative, given the viability of
this site for development and the current zoning and availability of public amenities that
support it.
B. Development In Accordance with Existing Zoning Alternative: This Alternative includes
developing the entire Maplewood property to full build out in accordance with the current
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
14
density for the High Density Residential (HDR) Zone and not considering the topographic
constraints or any other environmental conditions of the site. Under the existing zoning,
roughly 16.23+/‐ acres would remain in the HDR Zone, which permits single and two‐family
homes on 9,000 square foot lot sizes. The homes would be various styles, sizes and heights,
with maximum heights of 36‐feet from the lowest exterior grade, and would contain
individual driveways along an internal roadway system. By following the existing zoning, there
could be up to 118 units in this Alternative. As there would be no provision for preserving the
slopes, the Mitchell family cemetery or any other environmentally sensitive characteristics of
the property, this Alternative would be an environmentally damaging one.
Additionally, the development of the Maplewood project in accordance with existing
zoning would not meet the goals of the recently adopted Town of Ithaca Comprehensive
Plan, which has identified the project site as appropriate for High Density “Traditional
Neighborhood Development” (TND) that would allow for significantly higher density than
allowed by current zoning. Therefore, this Alternative is not preferred.
C. Reduced‐Scale and Alternative Layout Development Scenarios: As a result of continued
review of the plans during the EIS process, the project applicants revised their original plan,
and the revised plan became the proposed action that was evaluated in the Final EIS. The
Draft and Final EIS explored several scenarios involving either a reduction in scale or
alternative layout and design, including:
1. Shorter buildings along Mitchell Street (no more than 3 stories tall)
2. Residential style architecture for buildings along Mitchell Street (example photo with
gabled rooflines, front porches, residential windows‐fewer windows, etc.)
3. Fewer units, along with fewer corresponding parking spaces
4. Building mass variation for any apartment buildings along Mitchell Street
5. Re‐orientation of buildings to maximize solar access
A discussion of the scenarios is provided below:
1, 2, and 4 ‐ Shorter buildings along Mitchell Street; Residential style architecture; Building
mass variation for any apartment buildings along Mitchell Street ‐ The original plan for the
project, found in the Draft EIS, proposed 4‐story apartment buildings along Mitchell Street,
with modern designs, flat roofs and other non‐residential features that made the project look
institutional and out of character with the Mitchell Street neighborhood.
The revised plan found in the Final EIS removed the 4‐story apartment building along Mitchell
Street and replaced it with 2½ and 3 story townhomes containing pitched roofs, dormers,
porches, and other craftsman and bungalow residential style architectural features that make
the project blend in with the existing Mitchell Street neighborhood. As the revised plan
eliminated the apartment building, the need to vary the building massing along Mitchell Street
(#4 above) was no longer required. The revised plan similarly replaced the large apartment
buildings that face Worth Street on the west side of the project, located adjacent to the East
Ithaca Recreation Way, with the same 2½ and 3‐story townhomes as those planned for
Mitchell Street.
For the Maple Ave portion of the project, the proposed apartment building in the revised plan
retained its modern look, but was broken into two shorter apartment buildings, thereby
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
15
reducing façade length and building massing. The building massing was further reduced
through building design elements, including base‐middle‐top articulation, projected masonry
bays that create a look of a predominantly 3‐story building with an attic level, hyphens and
building material variations. Finally, the apartment buildings along Maple Avenue and
throughout the remainder of the project were modified to include balconies, porches and
other residential features.
The revised plan found in the Final EIS is preferable to the original plan found in the Draft EIS
because the aesthetic and neighborhood impacts associated with the revised plan are
significantly reduced. The revised plan blends in architecturally and is more in scale with the
residential character of the Mitchell Street neighborhood and the residences located adjacent
to East Ithaca Recreation Way, thereby mitigating negative impacts to those areas. Thus, the
revised plan has become the proposed action.
3. Fewer units, along with fewer corresponding parking spaces – The Final EIS notes that, with
the introduction of the reduced‐scale townhomes along the Mitchell Street frontage noted
above, the original 474‐unit, 887‐bed plan was reduced to 443 units and 873 beds, amounting
to a 6.5% reduction of units. The parking spaces related to the project were also reduced
proportionally with the reduced number of units, resulting in a reduction in overall impervious
project area and a more efficient site layout to accommodate the topography. This Alternative
coincides with the revised plan, which is the proposed action.
5. Re‐orientation of buildings to maximize solar access – This Alternative explored the option of
re‐orienting the site layout such that the buildings could maximize solar PV access. As noted in
the Draft EIS, the property is located on a diagonal grid to true north‐south and the buildings
follow multiple orientations, depending on their location. The EIS found that re‐orienting the
buildings to maximize solar access would be negligible in terms of energy savings but that the
cost to install PV on the site was found to significantly exceed the cost of purchasing renewable
energy sources for the project. The overall goal of renewable energy use and energy efficiency
has been adequately addressed in the Draft and Final EIS (as described in Section H of this
Findings Statement) and has been achieved with the developer’s commitment to obtaining
Energy Star certification, incorporating all of the energy conservation measures for a Zero
Energy Building, and purchasing 100% of its energy from renewable sources. Therefore, this
Alternative is not preferred.
D. Reduction in Greenhouse Gas Emissions (GHG) Alternative: This Alternative discussed the
total annual GHG emissions for the proposed action (including proposed mitigation measures)
and included a quantitative comparison to the total GHG emissions of the alternatives listed
above, where practicable. The Draft EIS adequately explained which alternatives listed above
were rejected and the reasons for the rejection.
The revised project plan, described in the Final EIS and noted as the proposed action amongst
the Alternatives above, will incorporate many of the mitigation measures listed in the
NYSDEC’s “Guide For Assessing Energy Use And Greenhouse Gas Emissions In An
Environmental Impact Statement.” Additionally, the project will incorporate all of the energy
conservation measures for a Zero Energy Building listed in Table 5.2 of the DEIS (Chapter 5,
page 5‐4) and will obtain Energy Star certification. These mitigations, coupled with the
developer’s commitment to purchase 100% of the energy used for the project from
Town Board Draft Findings Statement – Maplewood Redevelopment Project, December 12, 2016
16
renewable sources, with “renewable source” defined as a source that is not depleted when it
is used, such as solar, wind and hydro power, will successfully reduce the total annual GHG
emissions for the project.
Based on an analysis of the Alternatives, the Town Board finds that:
The revised plan proposed by the applicant in the Final EIS, combined with the mitigations
proposed by the applicant in the Draft and Final EIS or required by this Findings Statement,
minimizes or mitigates adverse environmental impacts to the greatest extent practicable. The
project is consistent with the Town of Ithaca’s Comprehensive Plan.
The project will result in a denser development that will be walkable to the Cornell campus,
the Belle Sherman Elementary School, and the East Hill Plaza commercial area and
Collegetown. Residents of the development will have easy access to public transit and trails,
and will live in a development that blends in with the surrounding neighborhood, making the
development part of the existing community. In terms of traffic impacts, with one exception,
the levels of service for the study intersections are not currently below LOS C, and the levels
of service are not projected to fall below LOS C in the Build scenarios. The traffic mitigations
listed in the Draft and Final EIS and this Findings Statement will help to reduce the additional
delays at intersections and driveways the project would otherwise cause and will also help
address speeding that currently exists on Mitchell Street.
IV. CERTIFICATION OF FINDINGS TO APPROVE
Having considered the Draft and Final Environmental Impact Statements, and having considered the
preceding written facts and conclusions relied on to meet the requirements of 6 NYCRR Part 617, this
Statement of Findings certifies that:
1. The requirements of 6 NYCRR Part 617 have been met; and
2. Consistent with social, economic, and other essential considerations from among the
reasonable alternatives available, the action is one that avoids or minimizes adverse
environmental impacts to the maximum extent practicable, and that adverse
environmental impacts will be avoided or minimized to the maximum extent practicable by
incorporating as conditions to the decision those mitigative measures that were identified
as practicable.
Town of Ithaca Town Board
_____________________________ ____William Goodman___________
Signature of Responsible Official Name of Responsible Official
_________Town Supervisor_______ _______________________________
Title of Responsible Official Date
Town of Ithaca Town Board
Town of Ithaca Town Hall
215 North Tioga Street
Ithaca, NY 14850
11/8/2016 COMMERCIAL RENOVATION/AL 60.-1-8.2 240 Pine Tree Rd APPROVED2016-0522
Description:Niemand Softball Field - installation of new score boards w/electrical to disconnect & reconnect score boards.
MKELLY 26000.00
11/15/2016 ROOFING 57.-1-1 203 PINE TREE ROAD APPROVED2016-0523
Description:Garage/workshop/studio - replace missing / damaged roof panels w/ metal roof panels to match existing.
MKELLY 400.00
11/15/2016 FOUNDATION ONLY 52.-1-20 403 Coddington Rd APPROVED2016-0524
Description:FOUNDATION ONLY.
BBATES
11/15/2016 ELECTRICAL ONLY 36.-1-4.5 1150-1154 Danby Rd APPROVED2016-0525
Description:Universal charging station: Tesla 50 amp 240 volt single phase / universal 40 amp 240 volt single phase
DMAGNUSO
11/15/2016 ELECTRICAL ONLY 28.-1-15.1 1381 Mecklenburg Rd APPROVED2016-0526
Description:Replace service and grounding.
NYSEG Job# 10300301528
DMAGNUSO
11/16/2016 ACCESSORY STRUCTURE 57.-1-8.17 104 REGENCY LANE APPROVED2016-0527
Description:Build 24' x 24' 2-car garage on slab w/electrical: reconfigure electric meters on main house - 60amp service underground to new garage.
MKELLY 22500.00
11/16/2016 TEMPORARY MEMBRANE STRU 33.-3-2.10 122 Ithaca Beer Dr WITHDRAW2016-0528
Description:Erect 30' x 60' frame poles & canopy, side all around (probably heater too).
BBATES
11/16/2016 COMMERCIAL RENOVATION/AL 60.-1-7 957 Mitchell St APPROVED2016-0529
Description:Renovations to an existing building
DMAGNUSO 59970.00
11/16/2016 SINGLE FAMILY RENOVATION/A 56.-3-13.5 123 Park Ln APPROVED2016-0530
Description:Remodel kitchen. Relocate laundry from first floor to second floor. Electrical: rewiring lights & receptacles in kitchen and laundry. Gas: install new
gas line for dryer to extend to second floor.
DMAGNUSO 22000.00
11/17/2016 ACCESSORY STRUCTURE 23.-1-35 1429 Trumansburg Rd APPROVED2016-0531
Description:Build an 12' x 20' x 6' sheet metal carport.
SWILLIAMS 1500.00
11/17/2016 ROOFING 24.-3-3.5 1257 Trumansburg Rd APPROVED2016-0532
Description:Re-roof Broome Development Day Treatment.
SWILLIAMS 150000.00
Date Type StatusLegal AddressApplication #SBL
11/1/2016From:To:11/30/2016
Permit Application Report
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
12/2/2016
Inspector
Page 1 of 3
Cost
Construction
11/17/2016 TWO FAMILY RESIDENCE RENO 73.-1-9.11 4 Sanctuary Dr PENDING2016-0533
Description:Interior work to create enclosed computer desk work space; improvement to guest bathroom 1st floor to make it handicap accessible; improvement
to basement to make employee rest area with half bath, utility sink space for small range/microwave & small fridge; improvement to driveway to
make it safe for handicap accessible vehicles to turn around.
BBATES 65000.00
11/17/2016 SOLAR 29.-6-13.5 200 West Haven Dr APPROVED2016-0534
Description:Install a 5.45 kw ground mounted photovoltaic system.
DMAGNUSO 21574.00
11/17/2016 SINGLE FAMILY RENOVATION/A 59.-2-20.11 118 Homestead Cir APPROVED2016-0535
Description:Install bathroom, new electric, and relocate laundry room in basement. Add shelving in the basement and replace existing sunroom door.
DMAGNUSO 39000.00
11/18/2016 SINGLE FAMILY RENOVATION/A 31.-4-4.2 726 Five Mile Dr PENDING2016-0536
Description:Interior has been gutted - Level 2 alteration of entire structure.
SWILLIAMS 30000.00
11/22/2016 COMMERCIAL RENOVATION/AL 67.-1-10.2 240 Farrier Rd PENDING2016-0537
Description:Create private offices in Suite A1100 of AHDC per drawings titled ''Cornell University College of Vet Medicine''; project 2016-263-001; dated
11/19/16; provided by Delta
MKELLY 40000.00
11/23/2016 ROOFING 41.-1-30.2 134 Conservatory Dr APPROVED2016-0538
Description:Remove EPDM roofing from roof and layover new EPDM membrane and 3'' polysocyanate insulation over existing insulation per manufacturers
recommendation
SWILLIAMS 190000.00
11/28/2016 ROOFING 33.-2-7.1 706 Elmira Rd PENDING2016-0539
Description:Remove existing shingles & install metal roof system. Install gutters & gutter covers.
DMAGNUSO 19729.00
11/28/2016 ROOFING 33.-2-7.1 706 Elmira Rd PENDING2016-0540
Description:Re-roof pavilion with metal roof; install gutters & gutter covers.
DMAGNUSO 13000.00
11/28/2016 COMMERCIAL RENOVATION/AL 39.-1-1.22 950 Danby Rd APPROVED2016-0541
Description:Modifications to Suite 105 to add a conference room.
Electrical: Relocate lights and add switches in Suite 105 (1235 sq ft).
SWILLIAMS 5000.00
11/30/2016 SOLAR 66.-3-3.14 29 Fairway Dr PENDING2016-0542
Description:Install a 7.83 Kw roof mount photovoltaic system w/electrical.
Electrical: Installation of code-compliant, roof-mount, and grid-tied photovoltaic system.
DMAGNUSO 18978.00
Date Type StatusLegal AddressApplication #SBL
11/1/2016From:To:11/30/2016
Permit Application Report
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
12/2/2016
Inspector
Page 2 of 3
Cost
Construction
Permit Application Report - Totals
ACCESSORY STRUCTURE 2
COMMERCIAL RENOVATION/ALTERATION 4
ELECTRICAL ONLY 2
FOUNDATION ONLY 1
ROOFING 5
SINGLE FAMILY RENOVATION/ALTERATION 3
SOLAR 2
TEMPORARY MEMBRANE STRUCTURE 1
TWO FAMILY RESIDENCE RENOVATION/ALT 1
21Total:
Permit Type Count
11/1/2016From:To:11/30/2016
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 3 of 3
11/1/2016 COMMERCIAL NEW OPEN
Desc:
54.-2-1
Construct new 20,000 s.f. Structural Steel Manufacturing Building with NFPA 13 Sprinkler System. .
2016-0452 1000 Hudson St Ext SWILLIAMS 2500000.00
11/1/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
71.-7-5
kitchen/ bath/ laundry remodel; minor framing, insulation, drywall, tire floors, cabinet installation, custom shower.
Electrical: kitchen & bath electric update.
2016-0510 1031 Hanshaw Rd DMAGNUSO 19480.00
11/2/2016 HEATING AND COOLING UNIT OPEN
Desc:
67.-1-2.1
AHU replacement per CU FE drawing titled: ''Hasbrouck Community Center Air Handling Unit Replacement'' (20 ton cooling) dated 9/30/16, #9233898.
Electrical: per drawing titled ''Hasbrouck Community Center Air Handling Unit Replacement'' - Disconnect and reconnect of existing power supply to
accommodate AHU replacement.
Cornell ID# 3131
2016-0509 121 Pleasant Grove Rd - H MKELLY 60000.00
11/3/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
39.-1-1.22
Demising Suite 50 into Suite 50 and Suite 51
w/electrical: add outlets & lighting to create Suite 50 - Ithaca College Gallery space.
2016-0517 950 Danby Rd SWILLIAMS 12000.00
11/4/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
71.-1-4
Add basement laundry sink & pump; add 2 basement window wells & change windows/sizes.
w/electrical: install 1 new circuit to serve laundry pump.
2016-0514 217 Texas Ln Ext DMAGNUSO 15095.00
11/4/2016 SINGLE FAMILY RENOVATION/ALTERATION CLOSED
Desc:
49.-1-6
Replace 2 exterior doors, 1 sliding exterior door and 2 windows.
2016-0515 620 Coddington Rd DMAGNUSO 9925.00
11/7/2016 SOLAR CLOSED
Desc:
26.-4-25
Install 3.36kW Photovoltaic roof mounted solar system
2016-0519 1117 Trumansburg Rd DMAGNUSO 10046.00
11/7/2016 SINGLE FAMILY RESIDENCE ADDITION OPEN
Desc:
19.-2-18
Demolish existing water front facing attached porch, & replace with a 2 story, 20 ft wide by 15 ft deep addition of living space, plus a 12 ft wide by 5 ft deep
second floor balcony, w/ associated electric and heat pump HVAC. Plus new toilet room in existing space next to East side door.
2016-0511 1020 EAST SHORE DRIVEMKELLY 140880.00
11/8/2016 ELECTRICAL ONLY OPEN
Desc:
58.1-1-71
Replace 100 amp underground service from utility to meter only
NYSEG Job# 10300293840
2016-0504 71 Lois Ln MKELLY
11/10/2016 FOUNDATION ONLY OPEN
Desc:
43.-2-10
Foundation only. Dormitory Buildings 1
2016-0503 203 Tibet Dr BBATES 475000.00
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 1 of 4
11/10/2016 FOUNDATION ONLY OPEN
Desc:
43.-2-10
Foundation Only. Dormitory 2
2016-0518 207 TIBET DR BBATES 475000.00
11/14/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
60.-1-8.2
Niemand Softball Field - replace existing score board w/electrical to disconnect & reconnect score board. Same size, same location.
2016-0522 240 PINE TREE ROAD MKELLY 26000.00
11/17/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
60.-1-7
Renovations to an existing building including new roof, new vinyl windows, new gutters and down spouts. Interior alterations to include: upgrade and relocate
existing 100A electrical service to a 200A, update lighting, upgrade insulation to R-38 in attic space; upgrade bathrooms, one bathroom to be ADA compliant,
handicap ramp installation.
2016-0529 957 Mitchell St DMAGNUSO 59970.00
11/17/2016 ELECTRICAL ONLY CLOSED
Desc:
28.-1-15.1
Replace service and grounding.
NYSEG Job# 10300301528
2016-0526 1381 Mecklenburg Rd DMAGNUSO
11/18/2016 ROOFING OPEN
Desc:
24.-3-3.5
Re-roof Broome Development Day Treatment.
2016-0532 1257 Trumansburg Rd SWILLIAMS 150000.00
11/18/2016 ROOFING OPEN
Desc:
57.-1-1
Garage/workshop/studio - replace missing / damaged roof panels w/ metal roof panels to match existing.
2016-0523 203 PINE TREE ROAD MKELLY 400.00
11/21/2016 FOUNDATION ONLY OPEN
Desc:
52.-1-20
FOUNDATION ONLY.
2016-0524 403 Coddington Rd BBATES 18000.00
11/21/2016 ACCESSORY STRUCTURE OPEN
Desc:
57.-1-8.17
Build 24' x 24' 2-car garage on slab w/electrical: reconfigure electric meters on main house - 60 amp service underground to new garage.
2016-0527 104 REGENCY LANE MKELLY 22500.00
11/28/2016 ACCESSORY STRUCTURE OPEN
Desc:
23.-1-35
Build an 12' x 20' x 6' sheet metal carport.
2016-0531 1429 Trumansburg Rd SWILLIAMS 1500.00
11/28/2016 SOLAR OPEN
Desc:
29.-6-13.5
Install a 5.45 kw ground mounted photovoltaic system.
2016-0534 200 West Haven Dr DMAGNUSO 21574.00
11/29/2016 ELECTRICAL ONLY OPEN
Desc:
36.-1-4.5
Universal charging station: Tesla 50 amp 240 volt single phase / universal 40 amp 240 volt single phase
2016-0525 1150-1154 Danby Rd DMAGNUSO
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 2 of 4
11/29/2016 ROOFING OPEN
Desc:
41.-1-30.2
Remove EPDM roofing from roof and layover new EPDM membrane and 3'' polysocyanate insulation over existing insulation per manufacturers
recommendation
2016-0538 134 Conservatory Dr SWILLIAMS 190000.00
11/30/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
59.-2-20.11
Install new bathroom in basement. Install new electric circuits for new bathroom including a dedicated circuit for a 9A grinder pump. Relocate laundry room in
basement. Add shelving in the basement and replace existing sunroom door on main level.
2016-0535 118 Homestead Cir DMAGNUSO 39000.00
11/30/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
39.-1-1.22
Modifications to Suite 105 to add a conference room.
Electrical: Relocate lights and add switches in Suite 105 (1235 sq ft).
2016-0541 950 Danby Rd SWILLIAMS 5000.00
11/30/2016 OPERATING PERMIT OPEN
Desc:
39.-1-1.31
Multiple residence 3 or more units
Health Care Facility more than 10 units
119 persons Dining Room
81 persons Dining Area
Multi-purpose Childcare Facility
Multi-purpose Physical Therapy
2016-0520 1 Bella Vista Dr LKOFOID
Total 25
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 3 of 4
Page 4 of 4
12/2/2016
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
11/30/2016To:From:11/1/2016
CountPermit Type
ACCESSORY STRUCTURE 2
COMMERCIAL NEW 1
COMMERCIAL RENOVATION/ALTERATION 4
ELECTRICAL ONLY 3
FOUNDATION ONLY 3
HEATING AND COOLING UNIT 1
OPERATING PERMIT 1
ROOFING 3
SINGLE FAMILY RENOVATION/ALTERATION 4
SINGLE FAMILY RESIDENCE ADDITION 1
SOLAR 2
25Total:
Permits Issued - Totals
11/1/2016 CC2016-0494 53.-1-15.25 108 Pineview Terr ISSUEDDMAGNUSO
11/1/2016 CC2016-0195 56.-2-1.1 1551 Slaterville Rd ISSUEDDMAGNUSO
11/7/2016 CC2016-0457 28.-1-34.46 108 Vera Cir ISSUEDDMAGNUSO
11/7/2016 CC2015-0706 70.-10-1.23 107 BIRCHWOOD DRIVE ISSUEDMKELLY
11/8/2016 CC2015-0589 31.-2-25.2 651 Five Mile Dr ISSUEDMKELLY
11/10/2016 CO8558 26.-5-2 170 Williams Glen Rd ISSUEDSWILLIAMS
11/10/2016 CO2015-0643 46.-1-15.18 116 Southwoods Dr ISSUEDSWILLIAMS
11/10/2016 CC2016-0463 57.-1-8.17 104 REGENCY LANE ISSUEDMKELLY
11/14/2016 CC2016-0493 29.-8-5.3 617 Elm St Ext ISSUEDSWILLIAMS
11/16/2016 CC2016-0519 26.-4-25 1117 Trumansburg Rd ISSUEDDMAGNUSO
11/16/2016 CC2016-0495 60.-1-13 152 Honness Ln ISSUEDDMAGNUSO
11/17/2016 CC2016-0515 49.-1-6 620 Coddington Rd ISSUEDDMAGNUSO
11/22/2016 CC2016-0526 28.-1-15.1 1381 Mecklenburg Rd ISSUEDDMAGNUSO
11/22/2016 CO2016-0508 57.-1-8.167 207 Tudor Rd ISSUEDDMAGNUSO
11/29/2016 CC2016-0326 17.-3-37 1 Renwick Pl ISSUEDDMAGNUSO
11/29/2016 CC2016-0325 17.-3-37 1 Renwick Pl ISSUEDDMAGNUSO
11/30/2016 CO2014-0316 70.-1-7 212 MURIEL ST ISSUEDMKELLY
11/30/2016 CO2015-0607 16.-2-3 117 RENWICK DRIVE ISSUEDMKELLY
Date Type StatusLegal AddressCert. #SBL
11/1/2016From:To:11/30/2016
Temp
Certificates Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 2
Inspector
Totals by Type and Status
CC 13
CO 5
Total:18
ISSUED 18
Certificate Type Count
11/1/2016From:To:11/30/2016
Certificate Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 2 of 2
Certificate Status
11/1/2016 FIRE SAFETY VIOLATIONS 39.-1-1.22 OPEN950 Danby Rd
Desc:
11/2/2016 LOCAL LAW OPEN615 Five Mile Dr
Desc:outside wash Bay no permit for commercial washing
11/10/2016 LOCAL LAW 70.-10-1.18 OPEN110 Birchwood Dr
Desc:No CC for permit 2014-0391
11/15/2016 PROPERTY MAINTENANCE OPEN542 Warren Rd
Desc:542 Warren Rd #2. He's got a leaky stove since they moved in (moved in June 2016). Stove fails to
read bpu's. Half of the windows don't open and the ones that do are drafty. There's also unfinished
concrete towards the back of the building with pipes sticking out. He's complained to management
every month and they only go look at it, but do nothing about it. He spoke to them about it again today
and management deflected their concerns with other issues they have with tenant.
11/16/2016 FIRE SAFETY VIOLATIONS OPEN1 Bella Vista Dr
Desc:Facility has new fire alarm system. Knox keys need to be updated to include new panel key. In
addition, directions for reset procedure need to be posted (multiple boxes involved). Facility supervisor
stated he would pass request to facility manager.
11/16/2016 BUILDING WITHOUT A PER OPEN1257 Trumansburg Rd
Desc:Observed re-roofing work underway and building services were suspended while construction was
underway. Spoke with Mike Lacey of Hayner Hoyt and advised that they must stop work until a BP is
obtained.
11/17/2016 FIRE SAFETY VIOLATIONS 24.-3-3.5 CLOSED1257 Trumansburg Rd
Desc:Simplex key needed to reset pull stations to knox box
11/28/2016 LOCAL LAW OPEN189 PLEASANT GROVE RD
Desc:Failure to obtain an Operating Permit
11/28/2016 LOCAL LAW OPEN229 CODDINGTON RD
Desc:Failure to obtain an Operating Permit
11/28/2016 BUILDING WITHOUT A PER 22.-2-7 OPEN152 Indian Creek Rd
Desc:small mobile structure greater than 144-square feet constructed in side yard without permit.
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Received Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 3
11/28/2016 SIGN LAW 24.-3-1 CLOSED105 Dubois Rd
Desc:Christmas tree farm sign from 3105 Dubois Road posted on this parcel.
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301 G Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Received Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 2 of 3
Totals by Complaint Type & Status
BUILDING WITHOUT A PERMIT 2
FIRE SAFETY VIOLATIONS 3
LOCAL LAW 4
PROPERTY MAINTENANCE 1
REPORT OF FIRE 3
SIGN LAW 1
14Total:
5CLOSED
9OPEN
ComplaintType Count
11/1/2016From:To:11/30/2016
Complaints Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 3 of 3
Complaint Status
11/17/2016 FIRE SAFETY VIOLATIONS 24.-3-3.5 CLOSED1257 Trumansburg Rd
Desc:Simplex key needed to reset pull stations to knox box
11/28/2016 SIGN LAW 24.-3-1 CLOSED105 Dubois Rd
Desc:Christmas tree farm sign from 3105 Dubois Road posted on this parcel.
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301 G Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Closed Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 2
Totals by Complaint Type & Status
FIRE SAFETY VIOLATIONS 1
REPORT OF FIRE 3
SIGN LAW 1
5Total:
5CLOSED
ComplaintType Count
11/1/2016From:To:11/30/2016
Complaints Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 2 of 2
Complaint Status
11/8/2016 COMMERCIAL RENOVATION/AL 60.-1-8.2 240 Pine Tree Rd APPROVED2016-0522
Description:Niemand Softball Field - installation of new score boards w/electrical to disconnect & reconnect score boards.
MKELLY 26000.00
11/15/2016 ROOFING 57.-1-1 203 PINE TREE ROAD APPROVED2016-0523
Description:Garage/workshop/studio - replace missing / damaged roof panels w/ metal roof panels to match existing.
MKELLY 400.00
11/15/2016 FOUNDATION ONLY 52.-1-20 403 Coddington Rd APPROVED2016-0524
Description:FOUNDATION ONLY.
BBATES
11/15/2016 ELECTRICAL ONLY 36.-1-4.5 1150-1154 Danby Rd APPROVED2016-0525
Description:Universal charging station: Tesla 50 amp 240 volt single phase / universal 40 amp 240 volt single phase
DMAGNUSO
11/15/2016 ELECTRICAL ONLY 28.-1-15.1 1381 Mecklenburg Rd APPROVED2016-0526
Description:Replace service and grounding.
NYSEG Job# 10300301528
DMAGNUSO
11/16/2016 ACCESSORY STRUCTURE 57.-1-8.17 104 REGENCY LANE APPROVED2016-0527
Description:Build 24' x 24' 2-car garage on slab w/electrical: reconfigure electric meters on main house - 60amp service underground to new garage.
MKELLY 22500.00
11/16/2016 TEMPORARY MEMBRANE STRU 33.-3-2.10 122 Ithaca Beer Dr WITHDRAW2016-0528
Description:Erect 30' x 60' frame poles & canopy, side all around (probably heater too).
BBATES
11/16/2016 COMMERCIAL RENOVATION/AL 60.-1-7 957 Mitchell St APPROVED2016-0529
Description:Renovations to an existing building
DMAGNUSO 59970.00
11/16/2016 SINGLE FAMILY RENOVATION/A 56.-3-13.5 123 Park Ln APPROVED2016-0530
Description:Remodel kitchen. Relocate laundry from first floor to second floor. Electrical: rewiring lights & receptacles in kitchen and laundry. Gas: install new
gas line for dryer to extend to second floor.
DMAGNUSO 22000.00
11/17/2016 ACCESSORY STRUCTURE 23.-1-35 1429 Trumansburg Rd APPROVED2016-0531
Description:Build an 12' x 20' x 6' sheet metal carport.
SWILLIAMS 1500.00
11/17/2016 ROOFING 24.-3-3.5 1257 Trumansburg Rd APPROVED2016-0532
Description:Re-roof Broome Development Day Treatment.
SWILLIAMS 150000.00
Date Type StatusLegal AddressApplication #SBL
11/1/2016From:To:11/30/2016
Permit Application Report
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
12/2/2016
Inspector
Page 1 of 3
Cost
Construction
11/17/2016 TWO FAMILY RESIDENCE RENO 73.-1-9.11 4 Sanctuary Dr PENDING2016-0533
Description:Interior work to create enclosed computer desk work space; improvement to guest bathroom 1st floor to make it handicap accessible; improvement
to basement to make employee rest area with half bath, utility sink space for small range/microwave & small fridge; improvement to driveway to
make it safe for handicap accessible vehicles to turn around.
BBATES 65000.00
11/17/2016 SOLAR 29.-6-13.5 200 West Haven Dr APPROVED2016-0534
Description:Install a 5.45 kw ground mounted photovoltaic system.
DMAGNUSO 21574.00
11/17/2016 SINGLE FAMILY RENOVATION/A 59.-2-20.11 118 Homestead Cir APPROVED2016-0535
Description:Install bathroom, new electric, and relocate laundry room in basement. Add shelving in the basement and replace existing sunroom door.
DMAGNUSO 39000.00
11/18/2016 SINGLE FAMILY RENOVATION/A 31.-4-4.2 726 Five Mile Dr PENDING2016-0536
Description:Interior has been gutted - Level 2 alteration of entire structure.
SWILLIAMS 30000.00
11/22/2016 COMMERCIAL RENOVATION/AL 67.-1-10.2 240 Farrier Rd PENDING2016-0537
Description:Create private offices in Suite A1100 of AHDC per drawings titled ''Cornell University College of Vet Medicine''; project 2016-263-001; dated
11/19/16; provided by Delta
MKELLY 40000.00
11/23/2016 ROOFING 41.-1-30.2 134 Conservatory Dr APPROVED2016-0538
Description:Remove EPDM roofing from roof and layover new EPDM membrane and 3'' polysocyanate insulation over existing insulation per manufacturers
recommendation
SWILLIAMS 190000.00
11/28/2016 ROOFING 33.-2-7.1 706 Elmira Rd PENDING2016-0539
Description:Remove existing shingles & install metal roof system. Install gutters & gutter covers.
DMAGNUSO 19729.00
11/28/2016 ROOFING 33.-2-7.1 706 Elmira Rd PENDING2016-0540
Description:Re-roof pavilion with metal roof; install gutters & gutter covers.
DMAGNUSO 13000.00
11/28/2016 COMMERCIAL RENOVATION/AL 39.-1-1.22 950 Danby Rd APPROVED2016-0541
Description:Modifications to Suite 105 to add a conference room.
Electrical: Relocate lights and add switches in Suite 105 (1235 sq ft).
SWILLIAMS 5000.00
11/30/2016 SOLAR 66.-3-3.14 29 Fairway Dr PENDING2016-0542
Description:Install a 7.83 Kw roof mount photovoltaic system w/electrical.
Electrical: Installation of code-compliant, roof-mount, and grid-tied photovoltaic system.
DMAGNUSO 18978.00
Date Type StatusLegal AddressApplication #SBL
11/1/2016From:To:11/30/2016
Permit Application Report
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
12/2/2016
Inspector
Page 2 of 3
Cost
Construction
Permit Application Report - Totals
ACCESSORY STRUCTURE 2
COMMERCIAL RENOVATION/ALTERATION 4
ELECTRICAL ONLY 2
FOUNDATION ONLY 1
ROOFING 5
SINGLE FAMILY RENOVATION/ALTERATION 3
SOLAR 2
TEMPORARY MEMBRANE STRUCTURE 1
TWO FAMILY RESIDENCE RENOVATION/ALT 1
21Total:
Permit Type Count
11/1/2016From:To:11/30/2016
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 3 of 3
11/1/2016 COMMERCIAL NEW OPEN
Desc:
54.-2-1
Construct new 20,000 s.f. Structural Steel Manufacturing Building with NFPA 13 Sprinkler System. .
2016-0452 1000 Hudson St Ext SWILLIAMS 2500000.00
11/1/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
71.-7-5
kitchen/ bath/ laundry remodel; minor framing, insulation, drywall, tire floors, cabinet installation, custom shower.
Electrical: kitchen & bath electric update.
2016-0510 1031 Hanshaw Rd DMAGNUSO 19480.00
11/2/2016 HEATING AND COOLING UNIT OPEN
Desc:
67.-1-2.1
AHU replacement per CU FE drawing titled: ''Hasbrouck Community Center Air Handling Unit Replacement'' (20 ton cooling) dated 9/30/16, #9233898.
Electrical: per drawing titled ''Hasbrouck Community Center Air Handling Unit Replacement'' - Disconnect and reconnect of existing power supply to
accommodate AHU replacement.
Cornell ID# 3131
2016-0509 121 Pleasant Grove Rd - H MKELLY 60000.00
11/3/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
39.-1-1.22
Demising Suite 50 into Suite 50 and Suite 51
w/electrical: add outlets & lighting to create Suite 50 - Ithaca College Gallery space.
2016-0517 950 Danby Rd SWILLIAMS 12000.00
11/4/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
71.-1-4
Add basement laundry sink & pump; add 2 basement window wells & change windows/sizes.
w/electrical: install 1 new circuit to serve laundry pump.
2016-0514 217 Texas Ln Ext DMAGNUSO 15095.00
11/4/2016 SINGLE FAMILY RENOVATION/ALTERATION CLOSED
Desc:
49.-1-6
Replace 2 exterior doors, 1 sliding exterior door and 2 windows.
2016-0515 620 Coddington Rd DMAGNUSO 9925.00
11/7/2016 SOLAR CLOSED
Desc:
26.-4-25
Install 3.36kW Photovoltaic roof mounted solar system
2016-0519 1117 Trumansburg Rd DMAGNUSO 10046.00
11/7/2016 SINGLE FAMILY RESIDENCE ADDITION OPEN
Desc:
19.-2-18
Demolish existing water front facing attached porch, & replace with a 2 story, 20 ft wide by 15 ft deep addition of living space, plus a 12 ft wide by 5 ft deep
second floor balcony, w/ associated electric and heat pump HVAC. Plus new toilet room in existing space next to East side door.
2016-0511 1020 EAST SHORE DRIVEMKELLY 140880.00
11/8/2016 ELECTRICAL ONLY OPEN
Desc:
58.1-1-71
Replace 100 amp underground service from utility to meter only
NYSEG Job# 10300293840
2016-0504 71 Lois Ln MKELLY
11/10/2016 FOUNDATION ONLY OPEN
Desc:
43.-2-10
Foundation only. Dormitory Buildings 1
2016-0503 203 Tibet Dr BBATES 475000.00
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 1 of 4
11/10/2016 FOUNDATION ONLY OPEN
Desc:
43.-2-10
Foundation Only. Dormitory 2
2016-0518 207 TIBET DR BBATES 475000.00
11/14/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
60.-1-8.2
Niemand Softball Field - replace existing score board w/electrical to disconnect & reconnect score board. Same size, same location.
2016-0522 240 PINE TREE ROAD MKELLY 26000.00
11/17/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
60.-1-7
Renovations to an existing building including new roof, new vinyl windows, new gutters and down spouts. Interior alterations to include: upgrade and relocate
existing 100A electrical service to a 200A, update lighting, upgrade insulation to R-38 in attic space; upgrade bathrooms, one bathroom to be ADA compliant,
handicap ramp installation.
2016-0529 957 Mitchell St DMAGNUSO 59970.00
11/17/2016 ELECTRICAL ONLY CLOSED
Desc:
28.-1-15.1
Replace service and grounding.
NYSEG Job# 10300301528
2016-0526 1381 Mecklenburg Rd DMAGNUSO
11/18/2016 ROOFING OPEN
Desc:
24.-3-3.5
Re-roof Broome Development Day Treatment.
2016-0532 1257 Trumansburg Rd SWILLIAMS 150000.00
11/18/2016 ROOFING OPEN
Desc:
57.-1-1
Garage/workshop/studio - replace missing / damaged roof panels w/ metal roof panels to match existing.
2016-0523 203 PINE TREE ROAD MKELLY 400.00
11/21/2016 FOUNDATION ONLY OPEN
Desc:
52.-1-20
FOUNDATION ONLY.
2016-0524 403 Coddington Rd BBATES 18000.00
11/21/2016 ACCESSORY STRUCTURE OPEN
Desc:
57.-1-8.17
Build 24' x 24' 2-car garage on slab w/electrical: reconfigure electric meters on main house - 60 amp service underground to new garage.
2016-0527 104 REGENCY LANE MKELLY 22500.00
11/28/2016 ACCESSORY STRUCTURE OPEN
Desc:
23.-1-35
Build an 12' x 20' x 6' sheet metal carport.
2016-0531 1429 Trumansburg Rd SWILLIAMS 1500.00
11/28/2016 SOLAR OPEN
Desc:
29.-6-13.5
Install a 5.45 kw ground mounted photovoltaic system.
2016-0534 200 West Haven Dr DMAGNUSO 21574.00
11/29/2016 ELECTRICAL ONLY OPEN
Desc:
36.-1-4.5
Universal charging station: Tesla 50 amp 240 volt single phase / universal 40 amp 240 volt single phase
2016-0525 1150-1154 Danby Rd DMAGNUSO
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 2 of 4
11/29/2016 ROOFING OPEN
Desc:
41.-1-30.2
Remove EPDM roofing from roof and layover new EPDM membrane and 3'' polysocyanate insulation over existing insulation per manufacturers
recommendation
2016-0538 134 Conservatory Dr SWILLIAMS 190000.00
11/30/2016 SINGLE FAMILY RENOVATION/ALTERATION OPEN
Desc:
59.-2-20.11
Install new bathroom in basement. Install new electric circuits for new bathroom including a dedicated circuit for a 9A grinder pump. Relocate laundry room in
basement. Add shelving in the basement and replace existing sunroom door on main level.
2016-0535 118 Homestead Cir DMAGNUSO 39000.00
11/30/2016 COMMERCIAL RENOVATION/ALTERATION OPEN
Desc:
39.-1-1.22
Modifications to Suite 105 to add a conference room.
Electrical: Relocate lights and add switches in Suite 105 (1235 sq ft).
2016-0541 950 Danby Rd SWILLIAMS 5000.00
11/30/2016 OPERATING PERMIT OPEN
Desc:
39.-1-1.31
Multiple residence 3 or more units
Health Care Facility more than 10 units
119 persons Dining Room
81 persons Dining Area
Multi-purpose Childcare Facility
Multi-purpose Physical Therapy
2016-0520 1 Bella Vista Dr LKOFOID
Total 25
Date Type StatusSBLLegal AddressPerm #
Permits Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Inpector Cnst. Cost
Page 3 of 4
Page 4 of 4
12/2/2016
Town of Ithaca
215 N. Tioga Street
Ithaca, NY 14850
11/30/2016To:From:11/1/2016
CountPermit Type
ACCESSORY STRUCTURE 2
COMMERCIAL NEW 1
COMMERCIAL RENOVATION/ALTERATION 4
ELECTRICAL ONLY 3
FOUNDATION ONLY 3
HEATING AND COOLING UNIT 1
OPERATING PERMIT 1
ROOFING 3
SINGLE FAMILY RENOVATION/ALTERATION 4
SINGLE FAMILY RESIDENCE ADDITION 1
SOLAR 2
25Total:
Permits Issued - Totals
11/1/2016 CC2016-0494 53.-1-15.25 108 Pineview Terr ISSUEDDMAGNUSO
11/1/2016 CC2016-0195 56.-2-1.1 1551 Slaterville Rd ISSUEDDMAGNUSO
11/7/2016 CC2016-0457 28.-1-34.46 108 Vera Cir ISSUEDDMAGNUSO
11/7/2016 CC2015-0706 70.-10-1.23 107 BIRCHWOOD DRIVE ISSUEDMKELLY
11/8/2016 CC2015-0589 31.-2-25.2 651 Five Mile Dr ISSUEDMKELLY
11/10/2016 CO8558 26.-5-2 170 Williams Glen Rd ISSUEDSWILLIAMS
11/10/2016 CO2015-0643 46.-1-15.18 116 Southwoods Dr ISSUEDSWILLIAMS
11/10/2016 CC2016-0463 57.-1-8.17 104 REGENCY LANE ISSUEDMKELLY
11/14/2016 CC2016-0493 29.-8-5.3 617 Elm St Ext ISSUEDSWILLIAMS
11/16/2016 CC2016-0519 26.-4-25 1117 Trumansburg Rd ISSUEDDMAGNUSO
11/16/2016 CC2016-0495 60.-1-13 152 Honness Ln ISSUEDDMAGNUSO
11/17/2016 CC2016-0515 49.-1-6 620 Coddington Rd ISSUEDDMAGNUSO
11/22/2016 CC2016-0526 28.-1-15.1 1381 Mecklenburg Rd ISSUEDDMAGNUSO
11/22/2016 CO2016-0508 57.-1-8.167 207 Tudor Rd ISSUEDDMAGNUSO
11/29/2016 CC2016-0326 17.-3-37 1 Renwick Pl ISSUEDDMAGNUSO
11/29/2016 CC2016-0325 17.-3-37 1 Renwick Pl ISSUEDDMAGNUSO
11/30/2016 CO2014-0316 70.-1-7 212 MURIEL ST ISSUEDMKELLY
11/30/2016 CO2015-0607 16.-2-3 117 RENWICK DRIVE ISSUEDMKELLY
Date Type StatusLegal AddressCert. #SBL
11/1/2016From:To:11/30/2016
Temp
Certificates Issued
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 2
Inspector
Totals by Type and Status
CC 13
CO 5
Total:18
ISSUED 18
Certificate Type Count
11/1/2016From:To:11/30/2016
Certificate Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 2 of 2
Certificate Status
11/1/2016 FIRE SAFETY VIOLATIONS 39.-1-1.22 OPEN950 Danby Rd
Desc:
11/2/2016 LOCAL LAW OPEN615 Five Mile Dr
Desc:outside wash Bay no permit for commercial washing
11/10/2016 LOCAL LAW 70.-10-1.18 OPEN110 Birchwood Dr
Desc:No CC for permit 2014-0391
11/15/2016 PROPERTY MAINTENANCE OPEN542 Warren Rd
Desc:542 Warren Rd #2. He's got a leaky stove since they moved in (moved in June 2016). Stove fails to
read bpu's. Half of the windows don't open and the ones that do are drafty. There's also unfinished
concrete towards the back of the building with pipes sticking out. He's complained to management
every month and they only go look at it, but do nothing about it. He spoke to them about it again today
and management deflected their concerns with other issues they have with tenant.
11/16/2016 FIRE SAFETY VIOLATIONS OPEN1 Bella Vista Dr
Desc:Facility has new fire alarm system. Knox keys need to be updated to include new panel key. In
addition, directions for reset procedure need to be posted (multiple boxes involved). Facility supervisor
stated he would pass request to facility manager.
11/16/2016 BUILDING WITHOUT A PER OPEN1257 Trumansburg Rd
Desc:Observed re-roofing work underway and building services were suspended while construction was
underway. Spoke with Mike Lacey of Hayner Hoyt and advised that they must stop work until a BP is
obtained.
11/17/2016 FIRE SAFETY VIOLATIONS 24.-3-3.5 CLOSED1257 Trumansburg Rd
Desc:Simplex key needed to reset pull stations to knox box
11/28/2016 LOCAL LAW OPEN189 PLEASANT GROVE RD
Desc:Failure to obtain an Operating Permit
11/28/2016 LOCAL LAW OPEN229 CODDINGTON RD
Desc:Failure to obtain an Operating Permit
11/28/2016 BUILDING WITHOUT A PER 22.-2-7 OPEN152 Indian Creek Rd
Desc:small mobile structure greater than 144-square feet constructed in side yard without permit.
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Received Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 3
11/28/2016 SIGN LAW 24.-3-1 CLOSED105 Dubois Rd
Desc:Christmas tree farm sign from 3105 Dubois Road posted on this parcel.
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301 G Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Received Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 2 of 3
Totals by Complaint Type & Status
BUILDING WITHOUT A PERMIT 2
FIRE SAFETY VIOLATIONS 3
LOCAL LAW 4
PROPERTY MAINTENANCE 1
REPORT OF FIRE 3
SIGN LAW 1
14Total:
5CLOSED
9OPEN
ComplaintType Count
11/1/2016From:To:11/30/2016
Complaints Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 3 of 3
Complaint Status
11/17/2016 FIRE SAFETY VIOLATIONS 24.-3-3.5 CLOSED1257 Trumansburg Rd
Desc:Simplex key needed to reset pull stations to knox box
11/28/2016 SIGN LAW 24.-3-1 CLOSED105 Dubois Rd
Desc:Christmas tree farm sign from 3105 Dubois Road posted on this parcel.
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301 G Maple Ave
Desc:Fire reported
11/30/2016 REPORT OF FIRE CLOSED301E Maple Ave
Desc:Fire reported
Date Type DispositionLegal AddressTax Parcel #
11/1/2016From:To:11/30/2016
Complaints Closed Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca 12/2/2016
Page 1 of 2
Totals by Complaint Type & Status
FIRE SAFETY VIOLATIONS 1
REPORT OF FIRE 3
SIGN LAW 1
5Total:
5CLOSED
ComplaintType Count
11/1/2016From:To:11/30/2016
Complaints Report
Ithaca, NY 14850
215 N. Tioga Street
Town of Ithaca
12/2/2016
Page 2 of 2
Complaint Status
TOWN OF ITHACA
Public Works Department
Months of October/November Board Report
December 12, 2016 Town Board Meeting
Roads:
Shoulder material was installed on Ridgecrest Road and Stone Quarry Road.
Storm sewer repairs at two locations on Wildflower Drive were completed.
We assisted Towns of Enfield, Lansing and Danby.
Completed work at Peachtree Road turn-around.
Brush and limbs were trimmed back at various locations in Town.
Fall brush collection was completed the week of October 17-21.
Stone for 2016 projects continues to be stockpiled.
The last group of three long-term seasonal employees ended work on November 16th.
Leaf vacuuming was completed. This included a second pass around the whole town due to
late leaf drop. Leaf bag collection continued for the month of November.
Leaf vacuuming of ditches, gutters, catch basins and other sensitive areas continued using the
new leaf box for the Parks crew truck.
The trucks and equipment were switched over to snow removal mode upon completion of leaf
collection.
Our snow plow drivers and sidewalk crews attended a training seminar in Trumansburg.
Our tub grinding contractor mulched up the brush pile on Monday, November 21st. Village of
Cayuga Heights assisted with their front-end loader and operator.
Night shift began November 20th.
Parks, Trails, and Preserves:
Weekly site inspections were performed.
Consultant continued planting native trees and shrubs at the East Ithaca Recreation Way
section between Honness Lane and Mitchell Street.
Hazardous tree removals at various park and trail sites and various locations in Town
proceeded as weather allowed.
Winterizing of West Hill Community Garden water delivery system was completed.
The Park Manager and a representative from the Finger Lakes Land Trust completed the
required annual site inspection of the Pine Tree Preserve on October 19th.
Marsha’s Woods Preserve was walked by Parks staff and Mike Smith from the Planning
Department to get familiar with the property.
Final mowing at most of the sites was completed. We resumed mowing of the Bostwick
Cemetery upon direction of the Town Board.
Leaf blowing of trails and parks was done.
Delineator staking of trails was completed for guiding the snow plow equipment.
Maintenance of the new sections of Pine Tree Paths trail was begun. The trail will get snow
removal.
Water:
Various water valve box repairs were completed using new sewer truck for excavation. This
included some in the new Hanshaw Road walkway.
Water main breaks were repaired at Maple Avenue and Winthrop Drive.
Provide traffic control for PRV maintenance on Stone Quarry Road with Bolton Point.
Hydrants markers were installed.
Crews cleared trees and brush over water mains on Ridgecrest Rd and several parcels on E.
King Rd.
A hydrant was repaired on Pennsylvania Avenue.
Sewer:
A total of 162 Dig Safely New York mark-outs were completed.
Weekly sewer pump station checks were completed.
Preventative maintenance on sewer pump stations was done with the assistance of ITT Flygt
contractor.
Crews jetted sanitary sewer in Southwoods and College Circle.
Sanitary easements cleared along Penny Lane and East King Road.
The driveway at Wonderland sewer pump station was boxed out and new crushed gravel
installed to improve access.
Manhole risers were installed at Troy Road and Wonderland pump station to help eliminated
ground water infiltration at the sanitary sewer.
Engineering:
o Inspected 18 simple SWPPPs
o Current Projects in Design
o 2016 South Hill Trail Culvert Rehab-Discussion with vendors, vetting options
o 2017 Cliff Street Water main Replacement-Survey/Coordination w/ City/PRV Location
o MS4 (Municipal Separate Storm Sewer System):
o Completed inventory of in-house files
o Organization and archiving of documents
o Current Development Inspections Underway:
o College Crossings--SWPPP
o Westview Subdivision – SWPPP, Roadway installation/inspections
o Clare Bridge—SWPPP
o Cayuga Meadows SWPPP, Water, Sewer, and Road
o St. Catherine’s Parish Center SWPPP, Water, Sewer
o Therm-Sanitary Sewer re-alignment
o Projects Under Review/Out to bid:
o Christopher Circle water main Replacement-Updated Project Cost
o Sapsucker Woods water main Replacement-Updated Project Cost
o Bids Received and Construction Underway:
o Park Lane water main Reconstruction-Approx. 98% complete-2 months behind
schedule. Working through final punch-list items.
o East Hill Water Study-Awaiting Final Report
o Edgewood Sanitary Sewer Abandonment Project-Bids received-under budget, awaiting
award
o Completed Projects:
o 2015 Sanitary Manhole Rehabilitation
o 2016 Trumansburg Tank Replacement/THM Removal System
o Development Review:
o Amabel Proposal; Five Mile Drive-Sanitary Sewer Review
o College Crossings Modifications
o Maple Hill Apartments Cornell-DEIS Preparation, Utility Review
o Chain Works
o 635 Elmira Road/Hotel-Preliminary Site Plan review
o Attended Meetings
o Personnel Committee
o Public Works Committee
o Town Board
o Planning Board
o Bolton Point E & O
o Tompkins County Storm water Coalition
December/January Projects:
Continue brush and limb trimming with lift along road rights-of-way
Snow and ice removal
Sign maintenance
Weekly site inspections for parks and trails
Weekly sewer pump station checks
Haul materials for the stock piles
Vehicle and equipment maintenance
Continue invasive species removal at East Ithaca Recreation Way from Honness Lane to
Mitchell Street