No preview available
HomeMy WebLinkAbout2025 Town Of Ithaca Stormwater Management Plan - DRAFT_Reduced Town of Ithaca Stormwater Management Program Plan Permit GP-0-24-001 Revision Date: March 2025 DRAF T Contents Introduction………………………………………………………………………………………………...7 Appendix List ................................................................................................................................................. 7 Introduction .................................................................................................................................................. 9 I.B.3 Documentaon Necessary to demonstrate discharge eligibility. ......................................................... 9 II.A Noce of Intent ..................................................................................................................................... 10 II.B.4 Electronic NOI waiver, if applicable.................................................................................................... 10 Not Applicable. ............................................................................................................................................ 10 III.A.3 Correcve Acons Implemented to Correct a Violaon of an Applicable WQ Standard ................. 10 IV.A.1b Inventory of Enes Assisng in Permit Implementaon .............................................................. 10 IV.A.2 Staffing Plan/Organizaonal Chart .................................................................................................... 10 IV.B.1 Stormwater Program Coordinator Name, Title and Contact Informaon ........................................ 10 IV.B.2.a Documentaon that Current SWMP Plan Made Available within 6 months of EDC ..................... 11 IV.D Comprehensive System Mapping ........................................................................................................ 11 IV. E Adopon of Local Laws ........................................................................................................................ 11 IV.F.1 Enforcement Response Plan (ERP) ..................................................................................................... 11 IV.F.2 Enforcement Tracking ........................................................................................................................ 11 V.B.1.b Reporng Electronic Submission Waiver ........................................................................................ 11 V.B.2.a Annual Report Submission to NYSDEC ............................................................................................ 11 V.B.3.a Interim Progress Cerficaons ........................................................................................................ 11 V.C Evaluaon of the SWMP ........................................................................................................................ 11 VI.A Minimum Control Measure 1: Public Education and Outreach on Stormwater Impacts .................. 12 VI.A1.a Focus Areas ..................................................................................................................................... 12 VI.A.1b Target audiences(s) and pollutant generang acvies for each focus area ................................. 12 VI.A1.c Educaon and Outreach Topics and Reducon of Pollutants from Focus Area.............................. 12 VI.A.1.d Illicit Discharge Educaon ............................................................................................................. 13 VI.A.2.a Method(s) Used to Distribute Educaon messages ...................................................................... 13 VI.A.2.b Documentaon of Educaonal Message to each Target Audience ............................................... 15 VI.A.2.c Updates to Public Educaon and Outreach ................................................................................... 15 VI.B Minimum Control Measure 2: Public Involvement / Participation .................................................... 15 VI.B.1.a Opportunity Provided for Public Involvement/Parcipaon in Development and Implementaon of SWMP ..................................................................................................................................................... 15 VI.B.1.b Method Used to Inform Public on Opportunity for their involvement/parcipaon in SWMP and how to be involved (annually) ..................................................................................................................... 16 DRAF T VI.B.1.c Local Point of Contact to Receive and Respond to Public Concerns Regarding Stormwater Management and Compliance with Permit Requirements ........................................................................ 16 VI.B.2.a Opportunity for Public to Review and Comment on SWMP Plan .................................................. 16 VI.B.2.b.i Opportunity for Public to Review and Comment on Dra Annual Report .............................. 16 VI.B.2.c.i Summary of Comment Received on SWMP Plan and Dra Annual Report ............................. 16 VI.C Minimum Control Measure 3: Illicit Discharge Detection and Elimination ......................................... 17 VI.C.1.a.i Public Contact for the public to report illicit discharges .......................................................... 17 VI.C.1.a.ii Documentaon of Report of Illicit Discharges ........................................................................ 17 VI.C.1.c.i Inventory of Monitoring Locaons ........................................................................................... 17 VI.C.1.d.iii Monitoring Locaon Priorizaon Updated .......................................................................... 18 VI.C.1.e Monitoring Locaons Inspecon and Sampling Program .......................................................... 18 VI.C.1.e.i Monitoring Locaons Inspecon and Sampling Procedures (January 2026)........................... 18 VI.C.1.e.i.b Completed Monitoring Locaon Inspecons and Sampling Results (January 2026) ........... 19 Completed monitoring locaon inspecons and any sampling results will be documented by using the Monitoring Locaons Inspecon and Sampling Field Sheet and found here. ........................................ 19 VI.C.1.e.ii Training Provisions for MS4’s monitoring locaon and sampling procedures ........................ 19 VI.C.1.e.iii Names, Title and Contact Informaon for Individuals who received monitoring locaon and sampling procedures training ................................................................................................................. 19 VI.C.1.e.iv Monitoring Locaon Inspecon and Sampling Procedures Review and Updated ................. 19 VI.C.2 Illicit Discharge Track Down Program ............................................................................................... 19 VI.C.2.a Illicit Discharge Track Down Procedures .................................................................................... 20 VI.C.2.b Training Provision for the MS4 Operator’s Illicit Discharge Track Down Procedures ................ 20 VI.C.2.c Names, Titles and Contact Informaon for Individuals who received Illicit Discharge Track Down Procedures Training ...................................................................................................................... 20 VI.C.2.d Review and Update Illicit Discharge Track Down Procedures .................................................... 21 VI.C.3 Illicit Discharge Eliminaon Program ................................................................................................ 21 VI.C.3.a Illicit Discharge Eliminaon Procedures ..................................................................................... 21 VI.C.3.b Training Provisions for MS4 Operator’s Illicit Discharge Eliminaon Procedures ...................... 21 VI.C.3.c Names, Title and Contact Informaon for Individuals who have received illicit discharge eliminaon procedures training .............................................................................................................. 21 VI.C.3.d Illicit Discharge Eliminaon Procedures Reviewed and Updated (January 2026) ..................... 21 VI.D Minimum Control Measure 4: Construction Site Stormwater Runoff Control ................................... 22 VI.D.2.a Email or phone number for the public to report complaints related to construcon stormwater acvity ................................................................................................................................. 22 VI.D.2.b Reports of Construcon Site Complaints .................................................................................. 22 DRAF T VI.D.3 Construcon Oversight Program ...................................................................................................... 22 VI.D.3.a Construcon oversight procedures ........................................................................................... 22 VI.D.3.b Training provision for the MS4 Operator’s construcon oversight procedures ........................ 22 VI.D.3.c Names, tles, and contact informaon for the individuals who have received construcon oversight procedures training ................................................................................................................. 23 VI.D.3.d Procedures to ensure those involved in the construcon acvity itself have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a SWCD or other Department endorsed enty ......................................................................................... 23 The Town of Ithaca requests a copy of the four hours of department endorsed training in proper erosion and sediment control principles for those involved in the construcon acvity at the pre- construcon meeng. ............................................................................................................................. 23 VI.D.3.e The Construcon oversight procedures were reviewed and updated ...................................... 23 VI.D.4.a Inventory of construcon sites .................................................................................................. 23 VI.D.5.c The construcon site priorizaon was updated in the inventory............................................ 23 VI.D.6.a Individuals responsible for reviewing SWPPPs for acceptance have received the required training .................................................................................................................................................... 23 VI.D.6.d Names, tles, and contact informaon for the individuals who have received four hours of department endorsement training in proper erosion and sediment control principles from a Soil & Water Conservaon District, or other Department endorsed enty, for individuals responsible for reviewing SWPPPs ................................................................................................................................... 24 VI.D.6.e SWPPP review documentaon .................................................................................................. 24 VI.D.7 Date and Content of pre-construcon inspecon/meeng ......................................................... 24 VI.D.8.a Individuals responsible for construcon site inspecons have receives the required training 24 VI.D.8.d Names, tles, and contact informaon for the individuals who have received four hours of departmental endorsement training in proper erosion and sediment control principles from a Soil & Water Conservaon District, or other Department endorsed enty, for individuals responsible for construcon site inspecons .................................................................................................................. 25 VI.D.8.e Completed Construcon Site Inspecon Reports ..................................................................... 25 VI.D.9.a Completed Final Construcon Site Inspecon Reports ............................................................. 25 VI.E Minimum Control Measure 5: Post-Construction Stormwater Management ................................... 25 VI.E.2.d .................................................................................................................................................... 25 VI.E.2.e Inventory of post- construcon SMPs ........................................................................................ 26 VI.E.4 Post-Construcon inspecon and maintenance program ............................................................ 26 VI.E.4.a Post-Construcon SMP inspecon and maintenance procedures ............................................. 26 VI.E.4.a.ii Post-Construcon SMP inspecon documentaon ................................................................ 26 DRAF T For all Post-Construcon SMP’s annual inspecons are either performed or reviewed by Town Staff. The Post Construcon SMP inspecon must are submied using the Post Construcon SMP Inspecon Checklist or an equivalent form containing the same informaon. The inspecons are then filed and stored on the Town server with the project record. ............................................................................... 26 VI.E.4.b Training provisions for the MS4 Operator's post-construcon SMP inspecon and maintenance procedures ........................................................................................................................ 26 VI.E.4.c Names, tles, and contact informaon for the individuals who have received post-construcon SMP inspecon and maintenance procedures training .......................................................................... 27 VI.E.4.d The post-construcon SMP inspecon and maintenance procedures were reviewed and updated ................................................................................................................................................... 27 VI.F Minimum Control Measure 6: Pollution Prevention and Good Housekeeping ................................ 27 VI.F.1 BMPs incorporated into the municipal facility program and municipal operaons program ....... 27 VI.F.1.a.ii.d) No Exposure Cerficaon(s) ................................................................................................ 27 VI.F.2.a Municipal facility program .......................................................................................................... 28 VI.F.2.a.i Municipal facility procedures ................................................................................................... 28 VI.F.2.a.ii Training provisions for the MS4 Operator’s municipal facility procedures ............................. 28 VI.F.2.a.iii Names, tles, and contact informaon for the individuals who have received municipal facility procedures training ..................................................................................................................... 28 VI.F.2.a.iv The municipal facility procedures were reviewed and updated ............................................. 28 VI.F.2.b.i Inventory of municipal facilies ............................................................................................... 28 VI.F.2.c.i Within three years of the EDC, (January 2027), the MS4 Operator must priorize all known municipal facilies as follows: ................................................................................................................. 29 VI.F.2.c.iii The municipal facility priorizaon was updated in the inventory ........................................ 29 VI.F.2.d.i. Within five years of the EDC, (January 2029), the MS4 operators must develop and implement a municipal facility specific SWPPP for each high priority municipal facility. ....................... 29 VI.F.2.d.ii.c) Completed comprehensive site assessments (e.g., the completed Municipal Facility/Operaon Assessment Forms) for high priority municipal facilies .......................................... 29 VI.F.2.e.ii.c) Completed comprehensive site assessments (e.g., the completed Municipal Facility/Operaon Assessment Forms) for low priority municipal facilies ........................................... 29 VI.F.3.a Municipal operaons program ................................................................................................... 29 VI.F.3.a.i Municipal operaons procedures............................................................................................. 30 VI.F.3.a.ii Training provisions for the MS4 Operator's municipal operaons procedures ....................... 30 VI.F.3.a.iii Names, tles, and contact informaon for the individuals who have received municipal operaons procedures training ............................................................................................................... 30 VI.F.3.a.iv The municipal operaons procedures were reviewed and updated ...................................... 31 I.F.3.c.i Catch Basin Inspecon and Maintenance ................................................................................... 31 DRAF T VI.F.3.d.i Roads, bridges, parking lots, and right of way sweeping procedures ...................................... 31 VI.F.3.d.i.a) Roads, bridges, parking lots, and right of ways have been swept ....................................... 31 VI.F.3.d.i.b) Roads in business districts and commercially zoned areas have been swept ..................... 32 DRAF T Appendix List Appendix A – MS4 Notice of Intent Appendix B – Intermunicipal Agreements Appendix C – Organization Charts Appendix D – Comprehensive System Mapping Appendix E – Illicit Discharge Detection and Elimination Appendix F – MS4 Interim Progress Report Appendix G – Illicit Discharge Detection and Elimination Inventory Appendix H – Construction Site Complaints Appendix I – Construction Oversight Program Appendix J – Active SPDES Permits Construction Projects Appendix K – Post Construction Practice Inventory Appendix L – Roads Sweeping Inventory Appendix M – Enforcement Response Plan DRAF T LIST OF ACRONYMS/DEFINITIONS BMP Best Management Practice Defined by DEC as scheduled activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the state. BMPs also include treatment requirements, operating procedures, and practices to control runoff, spillage and leaks, sludge or waste disposal, or drainage from areas that could contribute pollutants to stormwater discharges. BMPs are referred to in EPA’s fact sheets and other materials. BMPs are also referred to as ‘activities’ or ‘management practices’ throughout the DEC SPDES general permit. BSD Better Site Design CSI Community Science Institute DEC Department of Environmental Conservation EPA Environmental Protection Agency GH Good Housekeeping GP General Permit IDDE Illicit Discharge Detection and Elimination IO Cayuga Lake Watershed Intermunicipal Organization LID Low Impact Development MCM Minimum Control Measure MEP Maximum Extent Practicable Defined by DEC as a technology-based standard established by Congress in the Clean Water Act §402(p)(3)(B)(iii). Because no precise definition of MEP exists, it allows for maximum flexibility on the part of MS4 operators as they develop their programs. MS4 Municipal Separate Storm Sewer System NYS New York State POC Pollutant of Concern PP Pollution Prevention SPDES State Pollutant Discharge Elimination System SWMP Stormwater Management Plan SWPPP Stormwater Pollution Prevention Plan TCSWCD Tompkins County Soil and Water Conservation District DRAF T Introduction This Stormwater Management Program (SWMP) Plan has been developed to comply with the New York State Department of Environmental Conservation General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4; GP-0-24-001) for a Traditional Land Use Control Municipality. US Environmental Protection Agency Stormwater Phase II Rule, issued in 1999, requires MS4 owners and operators, in US Census-defined urbanized areas and in additionally designated areas, to develop a Stormwater Management Program. There are six program elements designed to reduce the discharge of pollutants to the maximum extent practicable (MEP). The program elements, referred to as Minimum Control Measures (MCMs), include the following: MCM 1. Public Education and Outreach; MCM 2. Public Involvement / Participation; MCM 3. Illicit Discharge Detection and Elimination; MCM 4. Construction Site Runoff Control; MCM 5. Post-Construction Stormwater Management; MCM 6. Pollution Prevention / Good Housekeeping for Municipal Operations. This document describes each MCM and the Best Management Practices (BMPs) that have been implemented to maintain compliance with the NYSDEC GP-0-24-001. The SWMP Plan will be reviewed on an annual basis and updated as necessary to account for progress made and in order to take into consideration the latest technologies and information while maintaining compliance with the NYSDEC GP-0-24-001. The Town of Ithaca is a suburban community located on the Southern end of Cayuga Lake and located in the center of Tompkins County. The total land area is approximately 30.3 square miles, and the 2020 Census reported approximately 22,300 people, with a resulting population density of 735 people per square mile. All of the land area within the Town drains to Cayuga Lake. Major watersheds include the following: West Lake Shore, Buttermilk Creek, Cayuga Inlet, Six Mile Creek, Cascadilla Creek, Fall Creek, and East Shore Section 2. The landscape ranges from very steep slopes along the lake, to open fields, wooded stream corridors, wetland areas, and semi dense suburban neighborhoods. A large portion of the Town is located within the Ithaca Urbanized Area as defined by the US EPA for purposes of designating communities containing Municipal Separate Storm Sewer Systems. Although there are parts of the Town that are outside of the MS4 boundaries, the Town has designated itself as a Town-Wide MS4. Parts of the SWMP that are indicated in grey are items that are requirements of the MS4 Permit that are not due yet. These are items that we will be working on completing to comply with the MS4 Permit. I.B.3 Documentation Necessary to demonstrate discharge eligibility. DRAF T Not Applicable. II.A Notice of Intent Information from NYSDEC acknowledging previous coverage or designation can be found under Appendix A. II.B.4 Electronic NOI waiver, if applicable Not Applicable. III.A.3 Corrective Actions Implemented to Correct a Violation of an Applicable WQ Standard If the Town of Ithaca becomes aware that a discharge causes or contributes to the violation of an applicable water quality standard, the Town will implement corrective actions, and this will be documented here. IV.A.1b Inventory of Entities Assisting in Permit Implementation Stormwater Coalition of Tompkins County - The Town of Ithaca works with the Stormwater Coalition of Tompkins County to implement components of the permit. The coalition primarily works together on MCM 1 and MCM 2. The Stormwater Coalition of Tompkins County includes the following municipalities: Town of Ithaca, Tompkins County, City of Ithaca, Town of Lansing, Village of Lansing, Town of Newfield, Town of Ulysses, Village of Cayuga Heights, Town Dryden, and Town of Caroline. Discover Cayuga – The Stormwater Coalition provides funding to Discover Cayuga which provides education and outreach programs to the areas surrounding Cayuga Lake. **Permit requirement being implemented/performed by the entity IV.A.1d Agreements for Alternative Implementation Options All agreements for alternative implementation options can be found under Appendix B. IV.A.2 Staffing Plan/Organizational Chart The Town of Ithaca has developed an organizational chart including the roles and responsibilities of each person corresponding to the required elements of the SWMP. This is found under Appendix C. IV.B.1 Stormwater Program Coordinator Name, Title and Contact Information David O’Shea P.E., Town Engineer/Stormwater Management Officer, (607) 273-1656, Engineering@townithacany.gov DRAF T IV.B.2.a Documentation that Current SWMP Plan Made Available within 6 months of EDC The SWMP Plan was available during normal business hours upon request. IV.B.2.b A copy of the current SWMP Plan was made available for public inspection during normal business hours at the Public Works Department. IV.D Comprehensive System Mapping The Town of Ithaca develops and maintains the comprehensive system mapping to include the mapping components within the MS4 Operator’s automatically designated area or an additionally designated area subject to Criterion 1 or 2 of the Additional Designation Criteria. The comprehensive system mapping includes the MS4 outfalls, interconnections, preliminary storm-sewer shed boundaries, MS4 infrastructure, basemap information, land use, roads and topography. A copy of this map is available upon request or can be found under Appendix D. IV. E Adoption of Local Laws Found under Town Code Chapter 227- Storm Sewer System and Surface Waters Protection. Town of Ithaca, NY Storm Sewer System and Surface Waters Protection IV.F.1 Enforcement Response Plan (ERP) The Town of Ithaca has developed and implemented an ERP that describes the actions to be taken for violations that the MS4 Operator has identified for illicit discharges, construction activities, and post- construction practices. This is available upon request or can be found under Appendix E. IV.F.2 Enforcement Tracking The Town of Ithaca tracks instances of non-compliance and can be found under Appendix E. V.B.1.b Reporting Electronic Submission Waiver All reports are submitted electronically to the NYSDEC. V.B.2.a Annual Report Submission to NYSDEC Documentation that the annual report was submitted will be found in Appendix F. The first annual report will be submitted by April 1st in accordance with the MS4 permit. V.B.3.a Interim Progress Certifications Documentation on the MS4 Interim Progress Certification- 6 Month Requirement can be found under Appendix F. V.C Evaluation of the SWMP The Town of Ithaca will evaluate the SWMP for compliance with the terms and conditions of the SPDES general permit once every five years. We will look at the effectiveness or deficiencies of components of the individual SWMP Plan, and the status of achieving the requirements outlined in this SPDES general permit. The SWMP evaluation will be documented in the SWMP Plan. DRAF T VI.A Minimum Control Measure 1: Public Education and Outreach on Stormwater Impacts The Public Education and Outreach MCM consists of BMPs that focus on the development of educational materials, demonstration activities, and training sessions designed to inform the public about the impacts that stormwater discharges have on local water bodies. The Public Education and Outreach program and BMPs, in combination, are expected to reach all of the constituents within the MS4’s permitted boundary. VI.A1.a Focus Areas Within three (3) years of the EDP/EDC (January 2027), the MS4 Operator must identify and document the focus areas in the SWMP Plan. The focus areas to be considered are as follows: i. Areas contributing to waterbodies of significant value (i.e., drinking water supply, public bathing beaches, shellfishing, high recreation value); ii. Sewersheds for impaired waters listed in Appendix C (subject to Part VIII requirements); iii. TMDL watersheds (subject to Part IX requirements); iv. Areas with construction activities; v. Areas where stormwater flows have potential to cause erosion (e.g., areas with steep slopes, inactive construction sites, unvegetated soil, sand stockpiles for road application); vi. Areas with onsite wastewater systems subject to Part VIII or Part IX requirements; vii. Residential, commercial, and industrial areas; viii. Stormwater hotspots; and ix. Areas with illicit discharges. VI.A.1b Target audiences(s) and pollutant generating activities for each focus area Within three (3) years of the EDP/EDC, (January 2027), the MS4 Operator must identify and document the applicable target audience(s) and associated pollutant generating activities that the outreach and education will address for each focus area identified by the MS4 Operator in Part VI.A.1.a in the SWMP Plan. The target audiences are as follows: i. Residents; ii. Commercial: Business owners and staff; iii. Institutions: Managers, staff, and students; iv. Construction: Developers, contractors, and design professionals; v. Industrial: Owners and staff; and vi. MS4 Operator’s municipal staff. VI.A1.c Education and Outreach Topics and Reduction of Pollutants from Focus Area Within three (3) years of the EDP/EDC, (January 2027) the MS4 Operator must identify and document in the SWMP Plan the education and outreach topics and how the education and outreach topics will reduce DRAF T the potential for pollutants to be generated by the target audience(s) (Part VI.A.1.b.) for the focus area(s) (PartVI.A.1.a.). VI.A.1.d Illicit Discharge Education The Town of Ithaca has information related to the prevention of Illicit Discharges, available to municipal employees, businesses, and the public including the following; i. What types of discharges are allowable (Part I.A.3.); ii. What is an illicit discharge and why is it prohibited (Part VI.C.); iii. The environmental hazards associated with illicit discharges and improper disposal of waste; iv. Proper handling and disposal practices for the most common behaviors within the community (e.g., septic care, car washing, household hazardous waste, swimming pool draining, or other activities resulting in illicit discharges to the MS4); and v. How to report illicit discharges they may observe (Part VI.C.1.) Information on Illicit Discharges can be found on the Town of Ithaca eCode as well as the Stormwater Coalition of Tompkins County website (Illicit Discharge Detection and Elimination Laws - Stormwater Coalition of Tompkins County). Illicit discharges should be reported to the Town Engineer/Stormwater Management Officer. Complaints can be sent to via email to engineering@townithacany.gov, or by calling the Department of Public Works office at (607) 273-1656. Complaints can also be filed on our website at the following address: https://townithacany.gov/contact/. VI.A.2.a Method(s) Used to Distribute Education messages Once a permit term, (Every 5 years) the MS4 Operator must identify and document in the SWMP Plan which of the following method(s) are used for the distribution of educational messages: i. Printed materials (e.g., mail inserts, brochures, and newsletters, etc.); ii. Electronic materials (e.g., websites, email listservs, etc.); iii. Mass media (e.g., newspapers, public service announcements on radio or cable, etc.); iv. Workshops or focus groups; v. Displays in public areas (e.g., town halls, library, parks, etc.); or vi. Social Media (e.g., Facebook, Twitter, blogs, etc.). Discover Cayuga (Floating Classroom): Discover Cayuga offers educational programs to local schools and the general public both in the classroom and aboard their boat, the M.V. Haendel. Educational programs offered include:  Floating Classroom Trips for area schools – Students receive pre-cruise classroom presentations on watersheds and stormwater, plus 3 hours of programming on the lake. DRAF T  Eco-Cruises –the Floating Classroom offers “Eco-cruises” to the general public on the weekends. The cruise features elements of a narrated tour and optional hands-on activities for all ages. The goal of the cruises is to help everyone develop an understanding of Cayuga Lake and the role it plays in our communities.  Trout in the Classroom – from late October through May of the following year, Floating Classroom sets up cold-water trout aquariums in participating classrooms throughout Tompkins County. Over 6 months, the students raise the trout, from eggs to fry, in their classroom. They care for the trout, monitor aquarium water quality, and learn about streams. In the spring, the class releases the surviving trout fingerlings into adopted streams in their community. Coalition Sponsored Trainings: The Stormwater Coalition of Tompkins County provides trainings to municipal members/staff and town/village/county boards on stormwater related topics. The following trainings have been offered: Green Infrastructure training focusing on green infrastructure practices and runoff reduction calculations (target municipal officials, consultants preparing SWPPP with post-construction controls), green infrastructure tour (targeting planning board members), and illicit discharge detection and elimination training. Contractor Trainings: TCSWCD sponsors multiple NYSDEC endorsed 4-Hour Erosion and Sediment Control Trainings for contractors and municipal staff a year. Tompkins County Highway holds an annual training for contractors who are interested in receiving training. Newsletter: TCSWCD issues a newsletter once a year. The newsletter contains stormwater related articles, announcements of stormwater trainings, announcements of recycling events/pollution prevention events (tire recycling), and notification of tree/shrub sale. Coalition Website: The Stormwater Coalition of Tompkins County (www.tcstormwater.org) developed a website in 2012 to provide information to the public and contractors in Tompkins County. The website went live in February 2013. The website has been updated to include more information for the public that outlines good housekeeping practices for protecting the watershed. The website is being further developed to include all local stormwater laws, procedures for SWPPP review, and actions homeowners can take to reduce stormwater pollution. Town of Ithaca Website: The Town of Ithaca website (https://www.town.ithaca.ny.us/departments/engineering/) is currently being updated to provide the public with a user friendly platform where they can find information regarding stormwater permitting as well as a description of the MS4 program. DRAF T VI.A.2.b Documentation of Educational Message to each Target Audience Within 5 years, and once every 5 years, the MS4 must deliver an educational message to each target audience for each focus area. VI.A.2.c Updates to Public Education and Outreach Annual review and update the focus areas, target audiences, and/or education and outreach topics Following the completion of Part VI.A.1.a, Part VI.A.1.b, and Part VI.A.1.c, annually, within thirty (30) days of the annual evaluation of the SWMP (Part V.C.), the MS4 Operator must update/modify the focus areas, target audiences, and/or education and outreach topics as recommended by the annual evaluation of the SWMP and document the completion of this requirement in the SWMP Plan. VI.B Minimum Control Measure 2: Public Involvement / Participation VI.B.1.a Opportunity Provided for Public Involvement/Participation in Development and Implementation of SWMP For members of the public interested in developing, implementing, or reviewing the SWMP annually, the SWMP Plan will be presented at the Town Board meeting. It is also available at the Town of Ithaca Public Works Facility from the Stormwater Management Officer. The Draft SWMP and MS4 Annual Report will also be uploaded to the Town of Ithaca website for public review and comment. The Town will also inform the Public of the opportunity to comment on the Draft SWMP and Draft Annual report in our Monthly newsletter. Other program elements described below provide an opportunity for the public to get involved and learn about stormwater management. Water Quality Monitoring: The Community Science Institute (CSI) facilitates a network of water quality monitors and they have the ability to processes water samples brought in by the public. Pharmaceutical Collection: The Coalition for Safe Medicine Disposal holds multiple events throughout the year to collect unwanted medication from households in Tompkins County. The medication is sent for incineration. By incinerating the collected medications, they are removing the pollutant risk to water resources. The Coalition is made up of community volunteers and representative from: Community Coalition for Healthy Youth, Ithaca Area Wastewater Treatment Facility, Lifelong, Tompkins County Administration, Tompkins County Health Department, and Tompkins County Sheriff’s Department. Household Hazardous Waste Collection: The Tompkins County Solid Waste Management Division (TCSWMD) offers a permanent location to accept HHW from Tompkins County residents and qualified businesses and organizations that are Conditionally Exempt Small Quantity Generators (CESQG). Material is accepted at the Recycling and Solid Waste Center's D.E.P.O.T. - Don't Empty Pollutants in Our Trash. Approximately 6 events are held throughout the year. DRAF T Discover Cayuga: The Discover Cayuga offers educational programs to local schools and the general public aboard their boat, the M.V. Haendel. Educational programs offered include:  Floating Classroom Trips for area schools – Students receive pre-cruise classroom presentations on watersheds and stormwater, plus 3 hours of programming on the lake.  Eco-Cruises –the Floating Classroom offers “Eco-cruises” to the general public on the weekends. The cruise features elements of a narrated tour and optional hands-on activities for all ages. The goal of the cruises is to help everyone develop an understanding of Cayuga Lake and the role it plays in our communities.  Trout in the Classroom – from late October through May of the following year, Discover Cayuga sets up cold-water trout aquariums in participating classrooms throughout Tompkins County. Over 6 months, the students raise the trout, from eggs to fry, in their classroom. They care for the trout, monitor aquarium water quality, and learn about streams. In the spring, the class releases the surviving trout fingerlings into adopted streams in their community. VI.B.1.b Method Used to Inform Public on Opportunity for their involvement/participation in SWMP and how to be involved (annually) The public will be informed of their opportunity for involvement and participation of the SWMP through the Town of Ithaca Website annually. VI.B.1.c Local Point of Contact to Receive and Respond to Public Concerns Regarding Stormwater Management and Compliance with Permit Requirements Town Engineer/Stormwater Management Officer, (607) 273-1656, engineering@townithacany.gov VI.B.2.a Opportunity for Public to Review and Comment on SWMP Plan Annually, the Town of Ithaca will provide an opportunity for the public to review and comment on the publicly available SWMP Plan. The public will have the ability to ask questions and submit comments on the SWMP Plan on the Town of Ithaca website. The SWMP Plan will be presented at the Town Board meeting. VI.B.2.b.i Opportunity for Public to Review and Comment on Draft Annual Report Annually, the Town of Ithaca will provide an opportunity for the public to review and comment on the Draft Annual Report which will be posted on our website. The public will have the ability to ask questions and submit comments. VI.B.2.c.i Summary of Comment Received on SWMP Plan and Draft Annual Report None at this time. DRAF T VI.C Minimum Control Measure 3: Illicit Discharge Detection and Elimination VI.C.1.a.i Public Contact for the public to report illicit discharges Complaints can be filed with the Town Engineer/Stormwater Management Officer either on the Town of Ithaca website or via email at engineering@townithacany.gov. The Town Engineer can also be contacted by calling the Town of Ithaca Public Works Department at (607) 273-1656. VI.C.1.a.ii Documentation of Report of Illicit Discharges Within 30 days of an illicit discharge, each report will be documented and included in Appendix G with the following information; a) Name/contact information of the reporting individual; b) Date of the report; c) Location of the illicit discharge; d) Nature of the illicit discharge; e) Follow up actions taken or needed (including response times); and f) Inspection outcomes and any enforcement taken. VI.C.1.c.i Inventory of Monitoring Locations The monitoring locations used to detect illicit discharges are identified as follows: a) MS4 outfalls; b) Interconnections; and c) Locations where stormwater is conveyed from the MS4 Operator’s municipal facility to the MS4 Operator’s own MS4. The Town currently maintains an inventory of the monitoring locations in the SWMP Plan. The following information is included in the inventory: a) Inventory information for MS4 outfalls  ID;  Prioritization (high or low) (Part VI.C.1.d.);  Type of monitoring location (Part VI.C.1.b.);  Name of municipal facility, if located at a municipal facility;  Receiving waterbody name and class;  Land use in drainage area;  Type of conveyance (open drainage, closed pipe);  Material;  Shape;  Dimensions;  Submerged in water; and  Submerged in sediment. DRAF T b) Inventory information for interconnections  ID;  Prioritization (high or low) (Part VI.C.1.d.);  Type of monitoring location (Part VI.C.1.b.);  system of MS4 Operator receiving discharge or private storm system;  Name of MS4 Operator’s municipal facility, if located at a municipal facility; and  Receiving waterbody name and class. c) Inventory information for locations where stormwater is conveyed from a municipal facility to the MS4 Operator’s own MS4  ID;  Prioritization (high or low) (Part VI.C.1.d.);  Type of monitoring location (Part VI.C.1.b.);  Name of MS4 Operator’s municipal facility, if located at a municipal facility; and  Receiving waterbody name and class. Town of Ithaca Outfall Reconnaissance Inventory: The Town of Ithaca currently performs Annual Illicit Discharge Detection and Elimination inspections through the Outfall Reconnaissance Inventory Program. The basis for our inspection checklist is the EPA ORI checklist which we have converted into an electronic application. The Town is currently using ESRI Survey123 to perform the field reconnaissance inventory which stores the inspections in a database that corresponds to our Outfall Map. Once all of the inspections have been completed, they are exported to individual pdf documents and stored on our Town server. VI.C.1.d.iii Monitoring Location Prioritization Updated MS4 Operator must update the monitoring location prioritization in the inventory based on information gathered as part of the monitoring location inspection and sampling program. (By January 2027) VI.C.1.e Monitoring Locations Inspection and Sampling Program Within 2 years, (January 2026), the MS4 must develop and implement a monitoring locations inspection and sampling program. Must be documented in the SWMP Plan. VI.C.1.e.i Monitoring Locations Inspection and Sampling Procedures (January 2026) Outfall mapping started in 2007 by the Town of Ithaca. The Town has Additionally Designated Area and therefore the Town has mapped all the outfalls within the Town of Ithaca municipal boundaries using ArcGIS mapping software. The Town is currently in the process of updating our Monitoring Locations to include the new requirements outlined in GP-0-24-001. DRAF T VI.C.1.e.i.b Completed Monitoring Location Inspections and Sampling Results (January 2026) Completed monitoring location inspections and any sampling results will be documented by using the Monitoring Locations Inspection and Sampling Field Sheet and found here. VI.C.1.e.ii Training Provisions for MS4’s monitoring location and sampling procedures As new staff are added, training on the monitoring locations inspection and sampling procedures will be given prior to inspection and sampling. For existing staff, training on monitoring locations inspection and sampling procedures will be given prior to conduction inspection and sampling once every 5 years. If monitoring locations inspection and sampling procedures are updated, training on the updates will be given to all staff prior to monitoring inspections and sampling. VI.C.1.e.iii Names, Title and Contact Information for Individuals who received monitoring location and sampling procedures training Monitoring Location and Sampling Procedures Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.C.1.e.iv Monitoring Location Inspection and Sampling Procedures Review and Updated See Appendix E for the Illicit Discharge Detection and Elimination track down procedure. VI.C.2 Illicit Discharge Track Down Program The Illicit Discharge Track Down Program has been developed and implemented to identify the source of illicit discharges and the responsible party. Responding to Illicit Discharge Complaints County Health Department: Tompkins County Health Department has a system in place to respond to complaints of failed septic systems and conduct complaint investigations related to the County Sanitary Code. Complaints as well as septic system replacements are tracked and the Code Enforcement Officer (CEO) receives copies of septic replacements and complaint investigations are copied to both the CEO and Town supervisor. Responding to Illicit Discharge Complaints Town: Currently, the Town system for reporting Illicit Discharges is that the public would report the illicit discharge to the Town Stormwater Officer. The Town would then conduct an investigation in accordance with the Local Laws to verify and resolve the complaint. Public Complaint Procedure: See the flow chart below: DRAF T VI.C.2.a Illicit Discharge Track Down Procedures The illicit discharge track down procedures including: i. Procedures as described in Chapter 13 of the Illicit Discharge Detection and Elimination Manual by the Center for Watershed Protection dated 2004. ii. The following timeframes to initiate illicit discharge track down: a) Within twenty-four (24) hours of discovery, the MS4 Operator must initiate track down procedures for flowing MS4 monitoring locations with obvious illicit discharges; b) Within two (2) hours of discovery, the MS4 Operator must initiate track down procedures for obvious illicit discharges of sanitary wastewater that would affect bathing areas during bathing season, shell fishing areas or public water intakes and report orally or electronically to the Regional Water Engineer and local health department; and c) Within five (5) days of discovery, the MS4 Operator must initiate track down procedures for suspect illicit discharges. VI.C.2.b Training Provision for the MS4 Operator’s Illicit Discharge Track Down Procedures As new staff are added, training on the MS4 Operator’s illicit discharge track down procedures will be given prior to conducting illicit discharge track downs. For existing staff, training on the MS4 Operator’s illicit discharge track down procedures will be given prior to conducting illicit discharge track downs and once every five years. If the illicit discharge track down procedures are updated, training on the updates will be given to all staff prior to conducting illicit discharge track downs. VI.C.2.c Names, Titles and Contact Information for Individuals who received Illicit Discharge Track Down Procedures Training Prior to conducting Illicit Discharge Detection and Elimination inspections all pertinent town staff receive training in the standard outfall reconnaissance procedure. Below is a list of employees who are trained in Illicit Discharge Detection. IDDE Staff Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov DRAF T Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.C.2.d Review and Update Illicit Discharge Track Down Procedures IDDE procedures will be reviewed on an annual basis. VI.C.3 Illicit Discharge Elimination Program VI.C.3.a Illicit Discharge Elimination Procedures The enforcement procedures for eliminating illicit discharges can be found in the Town of Ithaca Town Code. Once an illicit discharge has been verified the Town will issue a notice to remedy to the party responsible for resolving the illicit discharge. Public Education: A website is currently under development for the Town of Ithaca. One of the pages will specifically address illicit discharges and improper disposal of waste. The website will highlight the County programs already in place to prevent illicit discharges such as the household hazardous waste recycling program and the pharmaceutical collection program. Additional information on illicit discharge elimination can be found on the Tompkins County Stormwater Coalition website. VI.C.3.b Training Provisions for MS4 Operator’s Illicit Discharge Elimination Procedures As new staff are added, training on the MS4 Operator’s illicit discharge elimination procedures will be given prior to conducting illicit discharge eliminations. For existing staff, training on the MS4 Operator’s illicit discharge elimination procedures will be given prior to conducting illicit discharge eliminations and once every five years. If the illicit discharge elimination procedures are updated, training on the updates will be given to all staff prior to conducting illicit discharge eliminations. VI.C.3.c Names, Title and Contact Information for Individuals who have received illicit discharge elimination procedures training IDDE Staff Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.C.3.d Illicit Discharge Elimination Procedures Reviewed and Updated (January 2026) Annually by April 1, the illicit discharge procedures will be reviewed and updated. DRAF T VI.D Minimum Control Measure 4: Construction Site Stormwater Runoff Control The Construction Site Stormwater Runoff MCM consists of BMPs that focus on the reduction of pollutants to the MS4 from construction activities that result in a land disturbance of greater than one acre. The Town of Ithaca Stormwater Law requires any project disturbing more than 50 cubic yards or 10,000 square feet to submit a SWPPP Application for review. Reduction of stormwater discharges from construction activities disturbing less than 50 cubic yards or 10,000 square feet will be considered if they have the potential for adversely impacting the waterways. The Town currently has an inventory listing all construction sites that were required to gain coverage through a SPDES General Permit. The inventory includes both current construction projects as well as projects that have been completed. VI.D.2.a Email or phone number for the public to report complaints related to construction stormwater activity All stormwater-related complaints will go to the Town Stormwater Management Officer; the contact information can be found below or on the Town of Ithaca website under the Stormwater Page. All construction related stormwater complaints are included in the SWMP see Appendix H. Complaints can also be found on the contact page on the Twon of Ithaca website. Town Engineer/Stormwater Management Officer, (607) 273-1656, engineering@townithacany.gov VI.D.2.b Reports of Construction Site Complaints Construction site complaints will be documented with the following information:  Date of report,  Location of construction site,  Nature of complaint,  Follow up actions needed or taken,  Inspection outcomes and any enforcement taken. VI.D.3 Construction Oversight Program The Town has developed and implemented a construction oversight program. Please see Appendix I. VI.D.3.a Construction oversight procedures The Construction Oversight procedures are listed in the Construction Oversight Program under Appendix I including the following information; when the construction site stormwater control program applies, what types of construction activity require a SWPPP, the procedures for submission of SWPPPs, SWPPP review requirements, pre-construction oversight requirements, construction and inspection requirements, enforcement process/expectations for compliance, and other procedures associated with the control of stormwater runoff from applicable construction activities VI.D.3.b Training provision for the MS4 Operator’s construction oversight procedures As new staff are added, training on the MS4 Operator’s construction oversight procedures will be given prior to conducting any construction oversight activities. For existing staff, training on the MS4 Operator’s DRAF T construction oversight procedures will be given prior to conducting any construction oversight activities and once every five years. If the construction oversight procedures are updated, training on the updates will be given to all staff prior to conducting construction oversight. VI.D.3.c Names, titles, and contact information for the individuals who have received construction oversight procedures training Construction Oversight Procedure Staff Training Name Title Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.D.3.d Procedures to ensure those involved in the construction activity itself have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a SWCD or other Department endorsed entity The Town of Ithaca requests a copy of the four hours of department endorsed training in proper erosion and sediment control principles for those involved in the construction activity at the pre-construction meeting. VI.D.3.e The Construction oversight procedures were reviewed and updated Annually, the Town of Ithaca will review and update the construction oversight procedures. VI.D.4.a Inventory of construction sites The Town currently maintains an inventory of all the projects that require a SPDES General Permit in an excel document. The inventory includes the location of the construction site, the owner/operator contact information, receiving waterbody name and class, prioritization (high or low), SPDES Permit identification number, MS4 Acceptance date, current project status, and inspection history. See Appendix J. VI.D.5.c The construction site prioritization was updated in the inventory If the prioritization of the construction site changes priority based on information gathered as part of the construction oversight program, the MS4 Operator must comply with the requirements that apply to that prioritization. VI.D.6.a Individuals responsible for reviewing SWPPPs for acceptance have received the required training Staff that are responsible for reviewing SWPPPs for acceptance receive the four hours of department endorsed training in proper erosion and sediment control principles from a Soil & Water Conservation District, or other Department endorsed entity. This training will be completed within three years of the EDC (January 2027) and every three years. DRAF T VI.D.6.d Names, titles, and contact information for the individuals who have received four hours of department endorsement training in proper erosion and sediment control principles from a Soil & Water Conservation District, or other Department endorsed entity, for individuals responsible for reviewing SWPPPs Four Hour Proper Erosion and Sediment Control Principles Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.D.6.e SWPPP review documentation See Appendix J for the list of active construction sites. In the appendix there is a column titled MS4 Acceptance along with a date of when the MS4 review was completed/approved. VI.D.7 Date and Content of pre-construction inspection/meeting Prior to commencement of construction activities, the Town of Ithaca will ensure a pre-construction meeting is conducted. The date and content of the preconstruction inspection/meeting will be documented in the SWMP Plan. The owner/operator, contractors and qualified inspectors must attend the meeting in order to:  Confirm the approved project has received, or will receive, coverage under the CGP or an individual SPDES permit  Verify contractors and subcontractors selected by the owner/operator have identified at least one individual that has received four hours of Department endorsed training in proper erosion and sediment control principles.  Review the construction oversight program and expectations for compliance. VI.D.8.a Individuals responsible for construction site inspections have receives the required training Four hours of Department endorsed training in proper erosion and sediment control principles from a Soil & Water Conservation District, or other Department endorsed entity. This training must be completed, within three years of the EDC (January 2027) and every three years. Document the completion of this requirement in the SWMP Plan. DRAF T VI.D.8.d Names, titles, and contact information for the individuals who have received four hours of departmental endorsement training in proper erosion and sediment control principles from a Soil & Water Conservation District, or other Department endorsed entity, for individuals responsible for construction site inspections All Town employees in the Engineering Department receive the NYSDEC Endorsed 4-hour Erosion and Sediment Control Training on a 3-year cycle. All employees that will be reviewing SWPPP’s will attend a SWPPP review training at least once per permit term (5 years). Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.D.8.e Completed Construction Site Inspection Reports All inspections will be documented using the Construction Site Inspection Report Form or an equivalent form containing the same information. The completed Construction Site Inspection Reports will be included in the SWMP Plan. VI.D.9.a Completed Final Construction Site Inspection Reports The Town will ensure a final construction site inspection is conducted and documentation of the final construction site inspection will be maintained in the SWMP Plan. The final construction site inspection will be documented using the Construction Site Inspection Form or accept the construction site owner/operators qualified inspector final inspection certification required by the CGP. VI.E Minimum Control Measure 5: Post-Construction Stormwater Management The Post Construction Stormwater Management MCM consists of goals that focus on the prevention or minimization of water quality impacts from both new and re-development projects that disturb one acre or more. This includes projects less than one acre that are part of a larger common plan of development, or sale that discharge to the MS4. VI.E.2.d Within five years of the EDC (January 2029), the following information must be included in the inventory either by using the MS4 operator maintenance records or by verification of maintenance records provided by the owner of the post-construction SMP: DRAF T 1) Street address or tax parcel 2) Type 3) Receiving waterbody name and class 4) Receiving waterbody WI/PWL segment ID 5) Date of installation or discovery 6) Ownership 7) Responsible party for maintenance 8) Contract information for party responsible for maintenance 9) Location of documentation depicting O&M requirements and legal agreements for post-construction SMP 10) Frequency for inspection of post-construction SMP 11) Reason for installation 12) Date of last inspection 13) Inspection results 14) Any corrective actions identified and completed. VI.E.2.e Inventory of post- construction SMPs The Town has created a Post Construction Practice inventory of all the post construction stormwater practices (public and private) that are located within the Town of Ithaca. All new post construction stormwater practices are mapped using ArcGIS once the project has been completed. See Appendix K. VI.E.4 Post-Construction inspection and maintenance program As part of the Final Site Plan approval for all projects that require a Full SPDES Permit with Post Construction Stormwater Management Practices, owners/applicants are required to enter into a Stormwater Operations and Maintenance Reporting Agreement which requires them to hire a Professional Engineer to conduct annual inspections of each post construction practice and provide them to the Town for review. Once the Town has reviewed the annual inspections, we issue deficiency letters to the owner/applicant to repair the deficiencies indicated in the inspection. VI.E.4.a Post-Construction SMP inspection and maintenance procedures Enforcement actions are taken if an annual inspection is not provided to the Town. Letters will be sent out, then violation notices. All deficiencies will need to be addressed. The Town has provisions to initiate follow up actions within 30 days of post-construction SMP inspection and provisions to initiate enforcement within 60 days of the inspection if follow up actions are not complete. VI.E.4.a.ii Post-Construction SMP inspection documentation For all Post-Construction SMP’s annual inspections are either performed or reviewed by Town Staff. The Post Construction SMP inspection must are submitted using the Post Construction SMP Inspection Checklist or an equivalent form containing the same information. The inspections are then filed and stored on the Town server with the project record. VI.E.4.b Training provisions for the MS4 Operator's post-construction SMP inspection and maintenance procedures If new staff are added, training on the MS4 Operator’s post-construction SMP inspection and maintenance procedures and procedures outlined in the Department endorsed program will be given prior to conducting any post-construction SMP inspection and maintenance. For existing staff, training on the MS4 Operator’s DRAF T post-construction SMP inspection and maintenance procedures and procedures outlined in the Department endorsed program will be given prior to conducting any post-construction SMP inspection and maintenance and once every five years. If the post-construction SMP inspection and maintenance procedures are updated, training on the updates will be given to all staff prior to conducting post-construction SMP inspection and maintenance. VI.E.4.c Names, titles, and contact information for the individuals who have received post- construction SMP inspection and maintenance procedures training Post- Construction SMP Inspection and Maintenance procedures Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.E.4.d The post-construction SMP inspection and maintenance procedures were reviewed and updated VI.F Minimum Control Measure 6: Pollution Prevention and Good Housekeeping The Pollution Prevention / Good Housekeeping (PP/GH) minimum control measure consists of Best Management Practices (BMPs) that focus on training and the prevention or reduction of pollutant runoff from municipal operations. VI.F.1 BMPs incorporated into the municipal facility program and municipal operations program Within three years of the EDC, (January 2027), the MS4 Operator must incorporate best management practices. BMPs to consider include: minimize exposure, follow preventative maintenance program, spill prevention and response procedure, erosion and sediment controls, manage vegetated areas and open space on municipal property, salt storage piles or pile containing salt, waste, garbage and floating debris, and alternative implementation options. VI.F.1.a.ii.d) No Exposure Certification(s) Not applicable. DRAF T VI.F.2.a Municipal facility program Within three years of the EDC, (January 2027), the MS4 Operator must develop and implement a municipal facility program. VI.F.2.a.i Municipal facility procedures Including: the BMPs incorporated, the high priority municipal facility requirements, low priority municipality requirements VI.F.2.a.ii Training provisions for the MS4 Operator’s municipal facility procedures If new staff are added, training on the MS4 Operator’s municipal facility procedures will be given prior to conducting municipal facility procedures. For existing staff, training on the MS4 Operator’s municipal facility procedures will be given prior to conducting municipal facility procedures and once every five years. If the municipal facility procedures are updated, training on the updates will be given to all staff prior to conducting municipal facility procedures. Training for Highway Department Staff: All members of the highway staff are required to attend “MSDS” and “Right to Know” training on a yearly basis. The MSDS training covers substances that are used and can be found in Town facilities and how to appropriately handle these substances and what to do if a spill occurs. The Right to Know training covers the Town’s responsibilities in relation to what information needs to be given to employees and where the information is located. VI.F.2.a.iii Names, titles, and contact information for the individuals who have received municipal facility procedures training Municipal Facility Procedures Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov VI.F.2.a.iv The municipal facility procedures were reviewed and updated Annually, by April 1, the MS4 Operator must review and update the municipal facility procedures. VI.F.2.b.i Inventory of municipal facilities MS4 Operator must develop and maintain an inventory of all municipal facilities in the SWMP Plan within two years, (January 2026), including: name of municipal facility, street address, type of municipal facility, prioritization, receiving waterbody name and class, receiving waterbody WI/PWL segment ID, contact information, responsible department, location of SWPPP, type of activities present on site, acres of facility, date of last assessment, BMPs identified, and projected date of next comprehensive site assessment. DRAF T VI.F.2.c.i Within three years of the EDC, (January 2027), the MS4 Operator must prioritize all known municipal facilities as follows: 1) High Priority- Storage materials, fueling stations, vehicle or equipment maintenance/repair 2) Low Priority- Any municipal facility that do not meet the criteria for a high priority municipal facility. 3) High Priority which qualifies for a no exposure certification are low priority municipal facilities VI.F.2.c.iii The municipal facility prioritization was updated in the inventory MS4 Operator must annually update the municipal facility prioritization in the inventory based on information gathered as part of the municipal facility program, including cases where a No Exposure Certification ceases to apply. Completion of this permit requirement must be documented in the SWMP Plan. VI.F.2.d.i. Within five years of the EDC, (January 2029), the MS4 operators must develop and implement a municipal facility specific SWPPP for each high priority municipal facility. The SWPPP must contain the Stormwater Pollution Prevention Team, General Site Description, summary of potential pollutant sources, spills and releases, site map, Stormwater BMPs, Municipal Facility Assessments. VI.F.2.d.ii.c) Completed comprehensive site assessments (e.g., the completed Municipal Facility/Operation Assessment Forms) for high priority municipal facilities Completed a minimum of once per permit cycle following the most recent assessment. Must document that: the municipal facility is in compliance with the terms and conditions of this SPDES general permit, deficiencies were identified and all reasonable steps will be taken to minimize any discharge in violation of the permit, which has a reasonable likelihood of adversely affecting human health or the environment, deficiencies were identified and all reasonable steps will be taken to minimize any discharge in violation of the permit, which does not have a reasonable likelihood of adversely affecting human health or the environment. The Municipal Facility/Operation Assessment Forms have been completed for all Town Facilities. VI.F.2.e.ii.c) Completed comprehensive site assessments (e.g., the completed Municipal Facility/Operation Assessment Forms) for low priority municipal facilities Completed a minimum of once per permit cycle following the most recent assessment. Must document that: the municipal facility is in compliance with the terms and conditions of this SPDES general permit, deficiencies were identified and all reasonable steps will be taken to minimize any discharge in violation of the permit, which has a reasonable likelihood of adversely affecting human health or the environment, deficiencies were identified and all reasonable steps will be taken to minimize any discharge in violation of the permit, which does not have a reasonable likelihood of adversely affecting human health or the environment. The Municipal Facility/Operation Assessment Forms have been completed for all Town Facilities. VI.F.3.a Municipal operations program These include: street and bridge maintenance; winter road maintenance; MS4 maintenance; open space maintenance; solid waste management; new construction and land disturbances; right‐of‐way maintenance; DRAF T marine operations; or hydrologic habitat modification. Within 3 years, (January 2027), MS4 operators must develop and implement a municipal operations program VI.F.3.a.i Municipal operations procedures Salting Operations: The Town of Ithaca has a salt storage barn that is used to keep the material under cover and protect it from the elements. Asphalt Cold Patch Storage: Cold patch material is stored in the main garage building when onsite to prevent contamination due to runoff. Any contaminated material runoff would flow into our garage drain and then through the oil separator before entering the sanitary sewer system. Spill Prevention Plan: The Town currently has an outdated Spill Prevention, Control, and Countermeasure (SPCC) plan in place for an emergency spill event at our facility. Material Storage at Public Works: There are several larger material stockpiles at the Public Works facility ranging from compost to crushed stone to asphalt millings. The majority of the material storage area flows toward a small stormwater pond. There is curbing along the northern property line to prevent runoff from escaping the site and directing to the stormwater pond. Pesticides: The Town of Ithaca Parks and Trails Department uses pesticides on some projects. While the pesticides are not being used, they are stored inside of the Public Works Facility in a locked cabinet that is not accessible to the general staff to ensure that the products are not spilled. Fertilizers: The Town of Ithaca Parks Department uses fertilizer for lawn maintenance activities at our baseball field, the materials are stored in the maintenance building when not in use to protect the material from the weather and reduce nutrient from leaching into the watershed. VI.F.3.a.ii Training provisions for the MS4 Operator's municipal operations procedures As new staff are added, training on the MS4 Operator’s municipal operations procedures must be given prior to conducting municipal operations procedures. For existing staff, training on the MS4 Operator’s municipal operations procedures must be given prior to conducting municipal operations procedures and once every five years. If the municipal operations procedures are updated, training on the updates must be given to all staff prior to conducting municipal operations procedures. VI.F.3.a.iii Names, titles, and contact information for the individuals who have received municipal operations procedures training Municipal Operations Procedures Training Name Title Contact Phone Email Justin McNeal Civil Engineer 607-273-1656 jmcneal@townithacany.gov Sam Harris Civil Engineer 607-273-1656 sharris@ townithacany.gov Emily Rodgers Civil Engineer 607-273-1656 Erodgers@townithacany.gov Connor Crandall Engineering Technician 607-273-1656 ccrandall@ townithacany.gov Madison Clapp Engineering Technician 607-273-1656 mclapp@townithacany.gov David O’Shea, P.E. Director of Engineering, Stormwater Management Officer 607-273-1656 doshea@ townithacany.gov DRAF T VI.F.3.a.iv The municipal operations procedures were reviewed and updated Annually, by April 1, the MS4 operator must review and update the municipal operations procedures and document the completion. I.F.3.c.i Catch Basin Inspection and Maintenance Within 3 years of the EDC (January 2027), the MS4 Operator must: i. Identify when catch basin inspection is needed with consideration for:  Areas with construction activities  Residential, commercial and industrial areas  Recurring or history of issues  Confirmed citizen complaints on 3 or more separate occasions in the last 12 months ii. Inventory catch basin inspection information including; date of inspection, approximate level of trash, sediment, and/or debris, depth of structure and sump and date of clean out iii. Based on inspection results, clean out catch basins within the following timeframes:  Within six (6) months after the catch basin inspection, catch basins which had trash, sediment, and/or debris exceeding 50% of the depth of the sump as a result of a catch basin inspection must be cleaned out;  Within one (1) year after the catch basin inspection, catch basins which had trash, sediment, and/or debris at less than 50% of the depth of the sump as a result of a catch basin inspection must be cleaned out; an MS4 Operators are not required to clean out catch basins if the catch basins are operating properly and there is no trash, sediment, and/or debris in the catch basin; or the sump depth of the catch basin is less than or equal to two (2) feet. Catch Basin Inventory and Inspection Program: The Town currently has a storm sewer map in ArcGIS that has all of the town owned catch basins and storm pipes. On an annual basis, the highway department goes around the Town with a vacuum truck to remove the sediment from all of the catch basins within the Town. They record the inspection dates, deficiencies, and sediment quantity removed in our ArcGIS online map. VI.F.3.d.i Roads, bridges, parking lots, and right of way sweeping procedures Within 6 months, MS4 operator must develop and implement procedures for sweeping/cleaning municipal streets, bridges, parking lots, and right of ways owned/operated by the MS4 operator. Street Sweeping: The Town has started a program to sweep all of the Town roads that have curbing and/or gutter drains on them. The Town currently rents the street sweeper/vacuum truck to perform this work. The Town is currently using ArcGIS Online to track the annual maintenance in the field as the streets are cleaned. See Appendix L for our Road Sweeping Inventory. VI.F.3.d.i.a) Roads, bridges, parking lots, and right of ways have been swept All roads, bridges, parking lots, and right of ways must be swept and/or cleaned once per permit cycle in the spring. This requirement is not applicable to: Uncurbed roads with no catch basins, High-speed limited access highways; or Roads defined as interstates, freeways and expressways, or arterials by the United DRAF T States Department of Transportation, Federal Highway Administration, Highway Functional Classification Concepts, Criteria and Procedures. See Appendix L for a list of the roads that have been swept. VI.F.3.d.i.b) Roads in business districts and commercially zoned areas have been swept Annually, from April 1 through October 31, roads in business and commercial areas must be swept. This requirement is not applicable to: Uncurbed roads with no catch basins; High-speed limited access highways; or Roads defined as interstates, freeways and expressways, or arterials by the USDOT 2013. See Appendix L for a list of the roads that have been swept. DRAF T APPENDICES DRAF T Appendix A: MS4 Notice of Intent DRAF T MS4 Notice of Intent version 1.3 (Submission #: HQ0-DY1Y-E46J8, version 3) Details Submitted 2/11/2025 (0 days ago) by Daniel Thaete Alternate Identifier NYR20A134 Submission ID HQ0-DY1Y-E46J8 Status Submitting Form Input MS4 Operator Information Yes Permit ID #: NYR20A134 Traditional land use control Traditional Land Use Control Traditional land use control MS4 Operator requirements are found in Part VI of the MS4 General Permit. Municipality Name or Legal Entity Name Town of Ithaca MS4 Legal Municipal/Entity Mailing address 215 N. Tioga St ITHACA, NY 14850 Tompkins Ranking Official Official Title First and Last Name Phone Email Town Supervisor Rod Howe 6072731721 engineering@townithacany.gov NOI Preparer NOI Preparer Title First and Last Name Phone Email Stormwater Program Coordinator David O'Shea 6072731656 engineering@townithacany.gov Municipal Engineer Justin McNeal 6072731656 jmcneal@townithacany.gov Stormwater Program Coordinator Coordinator Title First and Last Name Phone Email Stormwater Program Coordinator David O'Shea 607-273-1656 doshea@townithacany.gov NAICS Codes Is this NOI for an MS4 Operator continuing coverage? MS4 Operator Type 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 1/6 DRAF T Federal, State or Local Government - 924110 Military Bases - 928110 Highway, road or other thoroughfare system - 237310 Large Hospitals - 622110 Public Colleges and Universities - 611310 Correctional Institutions - 922140 NAICS Code Lookup 924110 No No MS4 Location Information MS4 Facility Name Town of Ithaca MS4 CORRECTION REQUEST (APPROVED) Facility Name Add "MS4" after the MS4 facility name. Created on 2/21/2024 3:18 PM by Audra Beach On the map below, place the pin at the center of the MS4 Operator. This can be either the geographic center or the population center. Central point of the MS4 Operator 42.41031618657542,-76.5421450138092 Waterbody Information (1 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Cayuga Lake, Southern End - 0705-0040 Yes An MS4 discharging to a waterbody listed in Appendix C must meet the requirements of Part VIII. for the pollutant(s) of concern listed in Appendix C. Phosphorus Silt/Sediment No NAICS Code Is the MS4 Operator working with other MS4 Operators to implement the Stormwater Management Program? Does the MS4 Operator have any facilities that need to obtain MSGP coverage under MSGP permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? For which pollutant(s) of concern is the waterbody impaired? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 2/6 DRAF T Waterbody Information (2 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Cascadilla Creek and tribs - 0705-0035 No No Waterbody Information (3 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Six Mile Creek and tribs - 0703-0042 No No Waterbody Information (4 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Cayuga Inlet, Upper, and minor tribs - 0705-0059 No No Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 3/6 DRAF T Waterbody Information (5 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Fall Creek, Upper, and tribs - 0705-0056 No No Waterbody Information (6 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Buttermilk Creek, Lower, and tribs - 0705-0061 No No Waterbody Information (7 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Minor Tribs to Cayuga Lake, Southeastern - 0705-0055 No No Waterbody Information (8 of 9) Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 4/6 DRAF T If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Minor Tribs to Cayuga Lake, Southwestern - 0705-0068 No No Waterbody Information (9 of 9) If the MS4 Operator discharges to multiple waterbodies, all waterbodies must be listed. Use the 'Duplicate Waterbody Information' or 'Add New Waterbody Information' buttons to add as many waterbodies as necessary. To find the names of waterbodies, including any impaired waterbodies, use the DEC's Stormwater Interactive Map. Under the Permit Related Layers check the box for the Impaired Waterbodies for MS4GP and the box for Waterbody Inventory/Priority Waterbodies List. Stormwater Interactive Map Waterbody name and segment receiving MS4 Operator discharges Cayuga Inlet, Lower, and minor tribs - 0705-0041 No No CERTIFICATION Yes No Attach completed certification form. Updated MS4 Cert Form eNOI 01-17-25.pdf - 01/17/2025 01:51 PM Comment Attachments Date Attachment Name Context User 1/17/2025 1:51 PM Updated MS4 Cert Form eNOI 01-17-25.pdf Attachment Daniel Thaete 2/26/2024 9:19 AM MS4 eNOI Acknowledgement.pdf Generated Document Audra Beach Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? Is this waterbody segment listed in Appendix C (List of Impaired Waters) of the MS4 General Permit? Is this waterbody segment listed in Table 3 (Approved TMDL Watersheds with MS4 Contribution) of the MS4 General Permit? The MS4 Operator has read and understands the SPDES MS4 General Permit, GP-0-24-001, as it pertains to permit requirements as well as the timeframes for compliance set forth in the permit. I am the ranking elected official or Principal Executive Officer for the MS4 Operator and will be signing the form electronically. NONE PROVIDED 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 5/6 DRAF T Status History User Processing Status 1/17/2025 9:01:06 AM Daniel Thaete Draft 2/11/2025 1:16:11 PM Daniel Thaete Submitting 2/11/2025 1:16:23 PM Daniel Thaete Submitted Audit Event Event Description Event By Event Date MS4 eNOI Acknowledgement The MS4 eNOI Acknowledgement document has been generated and is available for download. Audra Beach 2/26/2024 9:19 AM Processing Steps Step Name Assigned To/Completed By Date Completed Form Submitted Daniel Thaete 2/11/2025 1:16:22 PM Revisions Revision Revision Date Revision By Revision 1 1/5/2024 8:16 AM Daniel Thaete Revision 2 2/23/2024 8:03 AM Daniel Thaete Revision 3 1/17/2025 9:01 AM Daniel Thaete 2/11/25, 1:16 PM NYSDEC eBusiness Portal System - MS4 Notice of Intent. Revision 3 https://nform-prod.dec.ny.gov/app/#/submissionversion/5622b37c-3cc7-4c96-b068-ea8bf193c29e/overview 6/6 DRAF T Appendix B: Intermunicipal Agreement DRAF T DRAF T DRAF T DRAF T Addendum Contact Person Represenng TCSWCD Jon Negley 170 Bostwick Road Ithaca, NY 14850 (607) 257-2340 Acvies TCSWCD Responsible For Compiling informaon necessary for annual reporng, inpung necessary informaon into annual reporng forms and subming to NYSDEC. Assisng with permit quesons and how to comply. Chair stormwater coalion meengs MCM 1- Public Educaon and Outreach Program  TCSWCD will work with the coalion to post relevant and required informaon on the stormwater coalion website.  TCSWCD will create or assist with the creaon of printed, electronic, mass media, workshops, or displays for distribuon of educaonal messages.  TCSWCD will work with contracted enes to gather informaon about educaon efforts conducted and numbers educated.  Organizing specific educaonal training events for municipalies. Examples of trainings held in the past include green infrastructure maintenance, stormwater management pond maintenance, Illicit Discharge Detecon and Eliminaon Monitoring. MCM 2- Public Involvement/Parcipaon  TCSWCD will present the stormwater annual report at a Tompkins County Water Resources Council meeng to allow for input from County representaves and the public. DRAF T Appendix C: Organizational Chart DRAF T Name Title Department Phone Number Email MCM's Training Organization Role David O'Shea, PE Director of Engineering/Stormwater Management Officer Engineering 607-273-1656 doshea@townithacany.gov All Main contact for stormwater complaints and stormwater enforcement. Reviewing entity for construction sites requiring a SPDES Permit through NYSDEC. Justin McNeal Civil Engineer Engineering 607-273-1656 jmcneal@townithacany.gov All IDDE Secondary contact for stormwater complaints. Will be the main party investigating stormwater complaints along with enforcement. Reviewing entity for all construction projects for conformance with NYSDEC requirements Max Villanueva GIS Specialist Engineering 607-273-1656 3,4,5,6 Maintains all MS4 related mapping within the Town. Emily Rodgers Civil Engineer Engineering 607-273-1656 erodgers@townithacany.gov All Sam Harris Civil Engineer Engineering 607-273-1656 sharris@townithacany.gov All IDDE Madison Clapp Engineering Technician Engineering 607-273-1656 mclapp@townithacany.gov All Connor Crandall Engineering Technician Engineering 607-273-1656 ccrandall@townithacany.gov All IDDE Joseph Slater Highway Superintendent Public Works 607-273-1656 jslater@townithacany.gov 3,5,6 Mike Beach Highway Supervisor Public Works 607-273-1656 mbeach@townithacany.gov 3,5,6 Joseph Talbut Parks Supervisor/ Deputy Highway Superintendent Public Works 607-273-1656 jtalbut@townithacany.gov 3,5,6 Sam Martinez Highway Working Supervisor Public Works 607-273-1656 smartinez@townithacany.gov 3,5,6 Monty Mouillesseaux Parks Working Supervisor Public Works 607-273-1657 MMouillesseaux@townithacany.gov Dustin Thomas Highway Working Supervisor Public Works 607-273-1656 dthomas@townithacany.gov 3,5,6 Angel Hinickle Stormwater Coalition Program Coordinator SWC 607-257-2340 ahinickle@tompkins-co.org 1,2 Responsible for performing contractor trainings as well as managing the public outreach component of the MS4 Permit. Maintenance/Implementation of Public Works related items, such as catch basin inspection/cleaning as well as maintenance on Town owned Permanent Practices. Will be the involved in resolving stormwater issues resulting from complaints if they are Public Works Related. Will be involved with scheduling work related the MS4 Annual Requirements. Town of Ithaca Organization Chart for MS4 Requirements Will be the involved in investigating stormwater complaints along with enforcement. Will be involved in reviewing construction projects for conformance with NYSDEC requirements. Will be responsible for miscellaneous site inspections as well as implementation of our Outfall reconnaissance inventory. DRAF T MS4 GP24 Administration SWMP Plan Reviews/Updates Town of Ithaca___ STORMWATER MANAGEMENT PROGRAM ORGANIZATIONAL STRUCTURE Town Board MS4/ROW/Bridges/ Parking Maintenance High Priority Facx Ops/Maintenance/Monitoring Facility Operations/Maintenance Operations BMPs Facilities BMPs MCM6 ~ GH/PP Records Mgmt. SWPPP Review Site Inspections CEO/SMO ENFORCEMENT CEO/SMO Post-Construction Mgmt Highway/ Public Works/Parks&Rec Depts Intermunicipal Program Monitoring & Enforcement Complaints Public Contact/Input SWMP Plan Highway Supt./ DPW Commissioner STORMWATER PROGRAM COORDINATOR (SPC) Engineering Department DRAF T Appendix D: Comprehensive System Mapping DRAF T DRAF T DRAF T DRAF T DRAF T Appendix E: Illicit Discharge, Detection, and Elimination Program DRAF T ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM Health Department: The Tompkins County Health Department annually reports illicit discharges in the form of sewage system replacement permits. These are permits where a documented surface discharge is observed whether by complaint or the owner’s permit application. Onsite sewage systems are regulated under the sanitary code, the responsibility for both abatement and enforcement lies with the Health Department. Town of Ithaca IDDE Inspections: The Town of Ithaca has an Outfall Reconnaissance Investigation Program (ORI) in which we conduct inspections of all outfalls within the MS4 boundaries including the additionally designated areas once per permit cycle. The ORI procedure was based on Illicit Discharge Detection and Elimination Manual by the Center for Watershed Protection dated 2004. We have incorporated the field inspection form into ESRI Survey 123, a web-based software with GPS coordinate capabilities to make the field inspection portion more user friendly. Once the inspections have been completed, they are then exported to pdf files and saved on our Town server by year. Illicit discharges not directly related to the ORI Program would be handled on a complaint basis, see IDDE flow chart below. For further enforcement actions see Appendix M A copy of the original Outfall Reconnaissance Inventory Inspection sheet can be found below. Appendix F: MS4 Interim Progress Certification DRAF T MS4 Interim Progress Certification—6 Month Requirements version 1.0 (Submission #: HQ6-Q8Z6-ECM8A, version 1) Details Originally Started By David O'Shea Alternate Identifier NYR20A134 Submission ID HQ6-Q8Z6-ECM8A Status Submitting Active Steps Form Submitted Form Input MS4 Operator Information Municipality Name or Legal Entity Name Town of Ithaca MS4 Permit ID #: NYR20A134 Traditional land use control Town Traditional Land Use Control Traditional land use control MS4 Operator requirements are found in Part VI of the MS4 General Permit. Legal Municipal/Entity Mailing address 215 N. Tioga St ITHACA, NY 14850 Tompkins Ranking Official Official Title First and Last Name Phone Email Town Supervisor Rod Howe 6072731721 rhowe@town.ithaca.ny.us Report Preparer Report Preparer Title First and Last Name Phone Email Stormwater Program Coordinator David O'Shea 6072731656 doshea@towithacany.gov Municipal Engineer Justin McNeal 6072731656 jmcneal@towithacany.gov Stormwater Program Coordinator MS4 Operator Type Traditional Land Use Control 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 1/6 DRAF T Coordinator Title First and Last Name Phone Email Stormwater Program Coordinator David O'Shea 6072731656 doshea@towithacany.gov Part I-V MS4 General Permit Resources Use the following webpages for more information on the permit and fact sheet: MS4 Permit Webpage MS4 Toolbox Part II Obtaining Permit Coverage Yes Part IV Administrative Yes SWMP Plan Yes Yes Mapping Yes Legal Authority Yes Enforcement Measures & Tracking Has a complete Notice of Intent (NOI) been submitted? (Part II.A.) Has a written staffing/organizational chart, which includes job titles and other entities as identified in Part IV.A.1, and the roles and responsibilities for each, corresponding to the required elements of the SWMP been developed? (Part IV.A.2.) Has the current SWMP Plan, and any documentation associated with the implementation of the SWMP Plan, been made available during normal business hours? (Part IV.B.2.a.) Is a copy of the current SWMP Plan available for public inspection during normal business hours at a location that is accessible to the public, or on a public website? (Part IV.B.2.b.) Are the required components included in the comprehensive system mapping? (Part IV.D.1.) Has adequate legal authority been maintained? (Part IV.E.) 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 2/6 DRAF T Yes Yes Yes Please enter any comments related to the questions in this section below: NONE PROVIDED Part VI & VII Minimum Control Measure 1 Yes Minimum Control Measure 2 Yes Minimum Control Measure 3 Yes Minimum Control Measure 4 Yes Yes Minimum Control Measure 5 Yes Yes Minimum Control Measure 6 Has an enforcement response plan (ERP) which clearly describes the action(s) to be taken for violations that the MS4 Operator has enacted for illicit discharge been developed? (Part IV.F.1.) Has an enforcement response plan (ERP) which clearly describes the action(s) to be taken for violations that the MS4 Operator has enacted for construction been developed? (Part IV.F.1.) Has an enforcement response plan (ERP) which clearly describes the action(s) to be taken for violations that the MS4 Operator has enacted for post-construction been developed? (Part IV.F.1.) Has information related to the prevention of illicit discharges been made available? (Part VI/VII.A.1.d.) Has a local point of contact to receive and respond to public concerns regarding stormwater management and compliance with permit requirements been identified? (Part VI/VII.B.1.c.) Has an email or phone number to allow the public to report illicit discharges been established? (Part VI/VII.C.1.a.i.) Has an email or phone number to allow the public to report complaints related to construction stormwater activity been established? (Part VI/VII.D.2.a.) Has a construction site inventory been developed? (Part VI/VII.D.4.a.) Has the inventory of post-construction stormwater management practices (SMPs) been maintained from previous iterations of this SPDES general permit? (Part VI/VII.E.2.a.i.) Has the inventory of post-construction stormwater management practices (SMPs) been developed as they are approved/discovered or after the owner/operator of the construction activity has filed the Notice of Termination? (Part VI/VII.E.2.a.ii.) 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 3/6 DRAF T Yes Please enter any comments related to the questions in this section below: NONE PROVIDED Part VIII Yes Phosphorus Silt/Sediment Phosphorus No Please clarify the reason for selecting "No" or "N/A" for this item. The TMDL was just passed in July. We are currently working through the process of including the new TMDL requirements into our local law. Silt/Sediment Yes Please enter any comments related to the questions in this section below: NONE PROVIDED Part IX No Please enter any comments related to the questions in this section below: NONE PROVIDED Compliance Schedule Review Compliance Schedule Resources Use the following links for more information on the permit and compliance schedule: MS4 Permit Webpage MS4 Toolbox What is the status for compliance items due within one year of effective date of coverage (EDC), January 2, 2025? Have procedures for sweeping and/or cleaning of municipal streets, bridges, parking lots, and right of ways been developed? (Part VI/VII.F.3.d.i.) Does the MS4 Operator discharge to an impaired water listed in Appendix C of GP-0-24-001? For which pollutant(s) is the waterbody impaired? Select the pollutants for all the impaired waters listed in Appendix C of GP-0-24-001 to which the MS4 Operator discharges. Has information on how phosphorus is being addressed by implementation of the MS4 Operator’s local law or legal mechanism with content equivalent to the model local law been made available? (Part VIII.A.2.a.) Has information on how silt/sediment is being addressed by implementation of the MS4 Operator’s local law or legal mechanism with content equivalent to the model local law been made available? (Part VIII.B.2.a.) Does the MS4 Operator discharge to a TMDL listed in Table 3 of GP-0-24-001? 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 4/6 DRAF T Citation Compliance Items Compliance Progress Part VI/VII.D.3.Develop and implement a construction oversight program Completed Part VI/VII.D.5.a.Prioritize construction sites In Progress Part VI/VII.E.4.Develop and implement a post-construction stormwater management practice inspection and maintenance program In Progress Part VIII.C.7.b.iv.Evaluate the effectiveness of deterrents, population controls, and other measures that may reduce bird related pathogen contributions Not Applicable Part VIII.C.7.c.Make dog waste receptacles available in areas where pets/domestic animals may frequent Not Applicable Part IX.A.6.f.i.a. and IX.B.6.f.i.a. Submit to the Department a retrofit plan that identifies the required components Not Started Please clarify the reason for selecting "Not Applicable" for one or more of the compliance items above. Part VIII.C.7.b.iv and VIII.C.7.c are not applicable, Cayuga Lake is not pathogen impaired. Part IX.A.6.f.i.a and IX.B.6.f.i.a. are not applicable. Cayuga Lake is not listed in either of the TMDL's listed in the permit (Croton Watershed TMDL or Greenwood Lake Watershed TMDL Plan) Yes Yes Yes Yes Yes Please enter any comments related to the questions in this section. NONE PROVIDED Certification Yes As the Ranking Elected Official or Principal Executive Officer, please download the certification form using the link below. Complete and sign the certification. Then, upload the certification form to this Interim Progress Certification and/or Annual Report. Certification Form Attach completed certification form. Town of Ithaca MS4 Certification for Interim Report.pdf - 09/30/2024 09:58 AM Comment NONE PROVIDED Attachments Have you reviewed compliance items due within two years of EDC, January 2, 2026? Have you reviewed compliance items due within three years of EDC, January 2, 2027? Have you reviewed compliance items due within four years of EDC, January 2, 2028? Have you reviewed compliance items due within five years of EDC, January 2, 2029? Have you reviewed compliance items which need to be completed routinely (annually, every five (5) years, etc.)? I am the ranking elected official or Principal Executive Officer for the MS4 Operator and will be signing the form electronically. 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 5/6 DRAF T Date Attachment Name Context User 9/30/2024 9:58 AM Town of Ithaca MS4 Certification for Interim Report.pdf Attachment David O'Shea Status History User Processing Status 9/17/2024 2:37:38 PM David O'Shea Draft 9/30/2024 10:38:18 AM David O'Shea Submitting Processing Steps Step Name Assigned To/Completed By Date Completed Form Submitted Review 9/30/24, 10:38 AM NYSDEC eBusiness Portal System - MS4 Interim Progress Certification—6 Month Requirements. Revision 1 https://nform-prod.dec.ny.gov/app/#/submissionversion/471ff1a8-2edf-4956-a24a-60d45e0cf457/overview 6/6 DRAF T Appendix G: Illicit Discharge, Detection, And Elimination Inventory DRAF T 1 OBJECTID Northing Easting Elevation Outfall ID Last Inspection Inspected 2021 Channel Depth (in.) Channel Top Width (in.) Channel Bottom Width (in.) Survey Equipment Subwatershed Industrial Land Use Open Space Land Use Institutional Land Use Suburban/Reside ntial Land Use Commercial Land Use LandUse_Ultra_U rb Land Use Town Area Outfall Type Channel Material Pipe Shape Pipe Material Channel Shape Horizontal Diameter of Pipe Pipe Diameter (in) Vertical Diameter of Pipe Outfall Width (in) Outfall Height Owner IDDE Characterization FieldVeri fied 1 875578.559 847482.351 1293.939 RIDGECREST ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) RIDGECREST ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 2 876122.255 848082.235 1213.862 WHITETAIL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) WHITETAIL ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 3 877436.241 846909.569 1213.312 MARCY ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) MARCY ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 4 877504.586 847249.136 1213.448 TETON ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) TETON ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 5 874446.638 851600.064 1079.269 OLD GORGE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) OLD GORGE ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 6 884193.441 845659.54 801.427 CODDINGTON ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CODDINGTON ES1 Subwatershed No No Yes Yes No No 3,4 South Hill Closed Pipe Circular HDPE 36 Town of Ithaca Unlikely Yes 7 884204.078 845669.832 798.874 CODDINGTON ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) CODDINGTON ES2 Subwatershed No No Yes Yes No No 3,4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 8 885515.134 850196.453 810.444 SUNNYHILL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) SUNNYHILL ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 22 Town of Ithaca Unlikely Yes 9 885508.78 850202.281 808.613 SUNNYHILL ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) SUNNYHILL ES2 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 12 Town of Ithaca Unlikely Yes 10 887723.153 851802.935 921.929 MITCHELL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) MITCHELL ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 36 Town of Ithaca Potential Yes 11 883628.415 855246.984 1134.076 HUNGERFORD HILL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) HUNGERFORD HILL ES1 Subwatershed No No Yes Yes No No 4,3 East Hill Closed Pipe Circular HDPE 8 Town of Ithaca Unlikely Yes 12 874190.294 843144.459 1183.296 LARISA ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) LARISA ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 13 874103.122 843144.475 1183.924 LARISA ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) LARISA ES2 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 15 876277.861 846741.376 1281.008 SAUNDERS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) SAUNDERS ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 16 876235.395 846732.109 1280.387 SAUNDERS ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) SAUNDERS ES2 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 17 875996.205 846502.211 1288.093 CHASE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CHASE ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 18 876006.258 846458.07 1288.802 CHASE ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) CHASE ES2 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 19 883994.528 856423.537 1215.763 DOVE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) DOVE ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 15 Town of Ithaca Unlikely Yes 20 883117.371 855105.538 1088.002 EASTERN HTS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) EASTERN HTS ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 48 Town of Ithaca Unlikely Yes 21 883554.388 854736.776 1083.909 EASTERN HTS ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) EASTERN HTS ES2 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 22 883454.818 855320.777 1133.356 SNYDER HILL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) SNYDER HILL ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 25 890420.41 850794.175 836.861 DRYDEN ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) DRYDEN ES1 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular CMP 32 Town of Ithaca Unlikely Yes 26 890546.261 850726.369 831.899 DRYDEN ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) DRYDEN ES2 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular CMP 24 Town of Ithaca Unlikely Yes 27 893740.513 850613.35 819.869 FOREST HOME ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) FOREST HOME ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 28 892438.607 849781.629 809.655 PLANTATIONS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) PLANTATIONS ES1 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 29 892424.077 849813.852 805.281 PLANTATIONS ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) PLANTATIONS ES2 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular HDPE 36 Town of Ithaca Unlikely Yes 30 890638.892 850436.211 829.336 SYNCHROTRON ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) SYNCHROTRON ES1 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular CMP 15 Town of Ithaca Unlikely Yes 34 882239.428 842638.388 880.398 IC ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES1 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 35 882172.7 842830.134 890.758 IC ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES2 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular RCP 24 Town of Ithaca Unlikely Yes 36 882173.81 842826.544 889.823 IC ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES3 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular CMP 18 Town of Ithaca Unlikely Yes 37 883960.451 844147.47 858.885 IC ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES4 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 38 883713.025 843993.614 857.692 IC ES5 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES5 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 39 883738.745 844087.466 859.597 IC ES6 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES6 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 41 883794.407 845393.831 864.532 IC ES8 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES8 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular RCP 12 Town of Ithaca Potential Yes 42 884074.837 845543.447 817.158 IC ES9 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES9 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 43 883776.858 845856.861 816.759 IC ES10 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES10 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 44 879513.214 842468.862 1035.598 IC ES11 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES11 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 36 Town of Ithaca Unlikely Yes 45 879747.246 842457.053 1028.906 IC ES12 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES12 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 46 880147.793 842024.213 974.834 DANBY ES5 2020 No 0 0 0 Survey Grade (SP80 RTK) DANBY ES5 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular CMP 24 Town of Ithaca Potential Yes 47 879542.831 842982.647 1070.697 IC ES13 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES13 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 48 879228.005 842341.565 1024.824 IC ES14 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES14 Subwatershed No No Yes Yes No No 3,4 South Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 49 879142.857 842280.894 1024.591 IC ES15 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES15 Subwatershed No No Yes Yes No No 3,4 South Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 59 893288.176 851192.28 827.471 FOREST HOME ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) FOREST HOME ES3 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular CMP 30 Town of Ithaca Unlikely Yes 60 899300.251 853800.847 1033.735 SALEM ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) SALEM ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 61 899760.982 854548.943 1054.787 MAPLEWOOD ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) MAPLEWOOD ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 63 900425.631 854856.799 1065.962 BIRCHWOOD ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) BIRCHWOOD ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 64 900757.135 854108.662 1058.96 WINSTON ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) WINSTON ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular CMP 15 Town of Ithaca Unlikely Yes 65 902596.852 853911.263 1062.129 WINSTON ES2 2019 No 0 0 0 Survey Grade (SP80 RTK) WINSTON ES2 Subwatershed 0 0 0 0 0 0 North East Closed Pipe Eliptical HDPE 12 12 Town of Ithaca Unlikely Yes 67 901109.888 853503.37 1049.129 TAREYTON ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) TAREYTON ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 68 900549.747 853519.088 1039.64 TAREYTON ES2 2020 Yes 0 0 0 Survey Grade (SP80 RTK) TAREYTON ES2 Subwatershed No No No Yes No No 4 North East Open Drainage Circular HDPE 30 Town of Ithaca Unlikely Yes 70 901405.8 853235.254 1047.179 ROSEHILL ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) ROSEHILL ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 8 Town of Ithaca Unlikely Yes 71 898288.129 851093.04 950.479 ROAT ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) ROAT ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 72 900550.415 851184.587 963.329 CHRISTOPHER CIRCLE ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK)CHRISTOPHER CIRCLE ES1 SubwatershedNo No No Yes No No 4 North East Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 74 900559.561 849748.596 925.873 SIENA ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) SIENA ES1 Subwatershed No No No Yes No No 4 North East In Stream Circular HDPE 42 Town of Ithaca Unlikely Yes 75 900610.923 849734.811 930.253 SIENA ES2 2020 Yes 0 0 0 Survey Grade (SP80 RTK) SIENA ES2 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 76 899562.051 851339.503 957.325 KAY ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) KAY ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 90 899229.634 832160.635 853.419 HARRIS B DATES ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) HARRIS B DATES ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 91 900997.031 831919.149 823.194 HARRIS B DATES ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) HARRIS B DATES ES2 Subwatershed No No Yes Yes No No 4,3 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 92 902198.636 829886.534 900.607 EVERGREEN ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) EVERGREEN ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 93 902262.812 829865.686 900.289 EVERGREEN ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) EVERGREEN ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 94 902688.851 828175.786 966.357 WOOLF ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) WOOLF ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 95 902690.301 828177.922 965.812 WOOLF ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) WOOLF ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular CMP 15 Town of Ithaca Unlikely Yes 96 903135.301 829581.241 893.677 WOOLF ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) WOOLF ES3 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 97 903137.117 829578.514 893.595 WOOLF ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) WOOLF ES4 Subwatershed No No No Yes Yes No 4 West Hill Closed Pipe Circular CMP 18 Town of Ithaca Unlikely Yes 98 898443.843 831938.312 883.138 WEST HILL DR ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) WEST HILL DR ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 100 896355.146 832812.366 895.335 PERRY ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) PERRY ES1 Subwatershed No No No Yes No 0 4 West Hill Closed Pipe Earth Circular HDPE Trapezoid 24 Town of Ithaca Unlikely Yes 102 895075.21 836109.13 684.384 HOPKINS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) HOPKINS ES1 Subwatershed No No No Yes No 0 4 West Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 103 892340.638 835404.274 829.724 CONIFER CIRCLE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CONIFER CIRCLE ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 104 892698.718 835250.61 842.104 CONIFER CIRCLE ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) CONIFER CIRCLE ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 105 893189.855 834145.843 904.284 CONIFER DR ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CONIFER DR ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 106 893320.919 834177.139 883.622 CONIFER DR ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) CONIFER DR ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 107 886546.307 833582.194 738.754 COY GLEN ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) COY GLEN ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 30 Town of Ithaca Unlikely Yes 108 888079.224 829127.246 972.392 ELM ES1 2020 No 24 100 48 Survey Grade (SP80 RTK) ELM ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 109 887583.903 834996.016 697.347 ELM ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) ELM ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 30 Town of Ithaca Unlikely Yes 110 896926.202 843631.867 463.69 RENWICK HTS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) RENWICK HTS ES1 Subwatershed No No No Yes No No 4 East Lake Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 112 880447.025 839905.372 834.952 STONE QUARRY ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) STONE QUARRY ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 36 Town of Ithaca Unlikely Yes 115 884696.017 846600.491 710.555 KENDALL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) KENDALL ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular RCP 24 Town of Ithaca Unlikely Yes 116 884921.13 845486.702 745.094 PENN AVE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) PENN AVE ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 120 880646.645 854880.898 832.323 SLATERVILLE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) SLATERVILLE ES1 Subwatershed No Yes No Yes No No 4,1 East Hill Closed Pipe Circular HDPE 36 Town of Ithaca Unlikely Yes 123 879699.274 856103.888 834.493 BURNS WAY ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) BURNS WAY ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 15 Town of Ithaca Unlikely Yes 127 881283.848 854506.097 860.549 SLATERVILLE ES8 2020 No 0 0 0 Survey Grade (SP80 RTK) SLATERVILLE ES8 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 42 Town of Ithaca Unlikely Yes 134 884624.881 852284.888 907.325 WESTVIEW ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) WESTVIEW ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 136 889042.896 851694.109 915.391 MAPLE AVE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) MAPLE AVE ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 18 Town of Ithaca Unlikely Yes 138 885594.521 852686.74 953.561 PINE TREE ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) PINE TREE ES4 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 139 885135.648 851272.51 859.426 TERRACE VIEW ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) TERRACE VIEW ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 140 885150.13 850845.378 833.601 HONNESS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) HONNESS ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 141 886171.303 850406.51 844.194 STRAWBERRY HILL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) STRAWBERRY HILL ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 18 Town of Ithaca Unlikely Yes 142 885120.281 850294.881 788.215 HONNESS ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) HONNESS ES2 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 143 885009.331 849634.737 729.065 WINNERS CIRCLE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) WINNERS CIRCLE ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 144 883183.66 854246.69 1023.08 JOANNE ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) JOANNE ES1 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 145 882648.247 854704.251 1031.113 PARK ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) PARK ES2 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 42 Town of Ithaca Unlikely Yes 146 884777.528 852266.656 916.25 HONNESS ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) HONNESS ES3 Subwatershed No No No Yes No No 4 East Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 147 900116.154 833007.241 766.546 CAYUGA MEDICAL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CAYUGA MEDICAL ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 30 Town of Ithaca Unlikely Yes 152 901760.152 851881.25 1019.851 WARREN ES2 2020 Yes 0 0 0 Survey Grade (SP80 RTK) WARREN ES2 Subwatershed No No Yes Yes No No 4,3 North East Closed Pipe Circular RCP 32 Town of Ithaca Unlikely Yes 153 900943.169 852101.922 1011.05 WINTHROP ES6 2020 Yes 0 0 0 Survey Grade (SP80 RTK) WINTHROP ES6 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 155 895917.03 850975.196 932.979 WARREN ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) WARREN ES3 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular HDPE 10 Town of Ithaca Unlikely Yes 156 896143.796 850975.152 934.786 WARREN ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) WARREN ES4 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular HDPE 6 Town of Ithaca Unlikely Yes 164 902292.969 849857.059 958.622 LEXINGTON ES1 2020 Yes 0 0 0 Survey Grade (SP80 RTK) LEXINGTON ES1 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular CMP 21 Town of Ithaca Unlikely Yes 165 893750.024 850752.369 823.065 FOREST HOME ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) FOREST HOME ES4 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 166 892899.841 851593.445 826.78 CALDWELL ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) CALDWELL ES1 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular RCP 24 Town of Ithaca Unlikely Yes 167 894222.761 850280.139 869.915 PLEASANT GROVE ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) PLEASANT GROVE ES2 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular CMP 12 Town of Ithaca Unlikely Yes 168 892907.009 851311.392 845.145 CALDWELL ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) CALDWELL ES2 Subwatershed No No Yes No No No 3 North East Closed Pipe Circular RCP 21 Town of Ithaca Unlikely Yes 169 892879.652 851361.966 853.215 CALDWELL ES3 2020 No 0 0 0 Survey Grade (SP80 RTK) CALDWELL ES3 Subwatershed No No Yes No No No 3 North East Closed Pipe Box RCP 24 6 Town of Ithaca Unlikely Yes 170 900833.179 850118.105 940.219 WINTHROP ES7 2020 Yes 0 0 0 Survey Grade (SP80 RTK) WINTHROP ES7 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular Steel 36 Town of Ithaca Unlikely Yes 178 882585.605 843402.079 893.933 IC ES17 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES17 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular RCP 30 Town of Ithaca Unlikely Yes 179 882744.968 843650.716 890.021 IC ES18 2020 No Survey Grade (SP80 RTK) IC ES18 Subwatershed No No Yes No No No 3 South Hill In Stream Town of Ithaca Unlikely Yes 180 884304.25 843628.806 823.753 IC ES19 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES19 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular HDPE 15 Town of Ithaca Unlikely Yes 181 884762.042 843707.929 799.855 IC ES20 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES20 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular CMP 12 Town of Ithaca Unlikely Yes 182 883780.775 844151.758 863.006 IC ES21 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES21 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Eliptical HDPE 26 18 Town of Ithaca Unlikely Yes 183 883738.478 844103.107 863.002 IC ES22 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES22 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular PVC 21 Town of Ithaca Unlikely Yes 184 883023.94 847658.024 791.986 JUNIPER ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) JUNIPER ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 185 882700.188 847420.4 832.713 PINEVIEW ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) PINEVIEW ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 186 881385.199 847047.84 918.232 NORTHVIEW ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) NORTHVIEW ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 12 Town of Ithaca Unlikely Yes 187 881322.095 847698.518 898.82 NORTHVIEW ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) NORTHVIEW ES2 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Earth Circular Steel Trapezoid 24 Town of Ithaca Unlikely Yes 188 880756.688 847882.308 925.414 RICH ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) RICH ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 18 Town of Ithaca Unlikely Yes 190 875716.608 851659.803 999.234 E KING ES4 2020 No 0 0 0 Survey Grade (SP80 RTK) E KING ES4 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 30 Town of Ithaca Unlikely Yes 199 884148.258 846392.73 758.087 PENN AVE ES2 2020 No 0 0 0 Survey Grade (SP80 RTK) PENN AVE ES2 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular HDPE 24 Town of Ithaca Unlikely Yes 200 878881.666 855317.859 0 BURNS ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) BURNS ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular CMP 36 Town of Ithaca Unlikely Yes 203 883767.382 844152.329 860.67 IC ES7 2020 No 0 0 0 Survey Grade (SP80 RTK) IC ES7 Subwatershed No No Yes No No No 3 South Hill Closed Pipe Circular PVC 20 Town of Ithaca Unlikely Yes 204 875633.973 848858.792 1185.186 E KING ES1 2020 No 0 0 0 Survey Grade (SP80 RTK) E KING ES1 Subwatershed No No No Yes No No 4 South Hill Closed Pipe Circular CMP 42 Town of Ithaca Unlikely Yes 207 897647.737 831946.92 912.5 ASTER ES2 2020 No Inaccurate (iPhone/Tablet GPS)ASTER ES2 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE 24 Town of Ithaca Yes 213 0 0 0 WINSTON ES4 2020 Yes Inaccurate (iPhone/Tablet GPS)WINSTON ES4 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 12 Town of Ithaca Yes 214 896432.538 834696.786 775.49 BUNDY ES1 2020 No Inaccurate (iPhone/Tablet GPS)BUNDY ES1 Subwatershed No No No Yes No No 4 West Hill Closed Pipe Circular HDPE Trapezoid 18 Town of Ithaca Yes 216 0 0 0 SALEM ES4 Yes Inaccurate (iPhone/Tablet GPS)SALEM ES4 Subwatershed No No No Yes No No 4 North East Closed Pipe Circular HDPE 12 Town of Ithaca Yes 218 SEVEN MILE DRIVE ES1 No 48 140 108 Inaccurate (iPhone/Tablet GPS) 0 0 Yes 0 0 0 4 South Hill Closed Pipe Earth Eliptical HDPE Trapezoid 48 30 30 48 30 Town of Ithaca Yes 250 No 75 200 84 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Trapezoid 60 60 63 68 63 Town of Ithaca Yes 257 No Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular HDPE Trapezoid Town of Ithaca Yes MONITORING LOCATION INVENTORY - OUTFALLS Monitoring Locations Spreadsheet DRAF T 2 260 No 16 84 60 Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 36 36 Town of Ithaca Yes 263 No 18 96 60 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular HDPE Trapezoid 18 18 18 20 20 Town of Ithaca Yes 264 No 22 84 44 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular CMP Trapezoid 32 32 32 32 32 Town of Ithaca Yes 275 No 6 54 22 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 276 No 20 96 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Eliptical RCP Parabolic 29 29 17 36 25 Town of Ithaca Yes 280 No 12 108 36 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular HDPE Parabolic 12 12 12 14 14 Town of Ithaca Yes 283 No Closed Pipe Town of Ithaca 288 No 60 100 160 Inaccurate (iPhone/Tablet GPS) East Hill Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 292 No 24 72 30 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Parabolic 15 15 15 17 17 Town of Ithaca Yes 295 No 24 90 56 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Eliptical CMP Trapezoid 20 20 20 20 20 Town of Ithaca Yes 296 No 10 96 70 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular CMP Trapezoid 24 24 24 24 Town of Ithaca Yes 301 No Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular RCP Parabolic 12 12 12 13 13 Town of Ithaca Yes 361 No 12 108 48 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 24 24 24 28 28 Town of Ithaca Yes 366 No Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Parabolic Town of Ithaca Yes 372 No 36 44 40 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular Steel Trapezoid 36 36 36 36 36 Town of Ithaca Yes 373 No 36 130 120 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 30 30 30 34 34 Town of Ithaca Yes 374 No Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 14 14 14 16 16 Town of Ithaca Yes 375 No 48 120 48 Inaccurate (iPhone/Tablet GPS) West Hill Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 378 No 30 80 50 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular Steel Trapezoid 24 24 24 24 24 Town of Ithaca Yes 383 No Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 16 16 16 16 16 Town of Ithaca Yes 384 No Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid Town of Ithaca Yes 385 No 20 66 90 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 386 No 18 58 40 Inaccurate (iPhone/Tablet GPS) West Hill Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 387 No 18 52 32 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 388 No 24 84 50 Inaccurate (iPhone/Tablet GPS) West Hill Earth Circular CMP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 389 No 15 50 30 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 394 No 50 156 156 Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Circular Steel Trapezoid 50 50 50 50 50 Town of Ithaca Yes 397 No 40 48 90 Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Box RCP Trapezoid 20 15 15 20 15 Town of Ithaca Yes 401 No 20 60 40 Inaccurate (iPhone/Tablet GPS) East Lake Closed Pipe Earth Box RCP Parabolic 32 20 20 32 20 Town of Ithaca Yes 410 No 57 62 54 Inaccurate (iPhone/Tablet GPS) East Lake Earth Circular Steel Trapezoid 36 36 36 36 36 Town of Ithaca Yes 418 No 48 240 180 Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Circular RCP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 421 No 10 60 12 Inaccurate (iPhone/Tablet GPS) North East Rip_Rap Circular CMP Parabolic 4 4 4 4 4 Town of Ithaca Yes 422 No Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular CMP Parabolic 16 16 16 16 16 Town of Ithaca Yes 425 No 30 84 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular CMP Trapezoid 15 15 15 15 15 Town of Ithaca Yes 427 No 72 180 120 Inaccurate (iPhone/Tablet GPS) North East Earth Circular RCP Trapezoid 36 36 36 36 36 Town of Ithaca Yes 431 No 24 36 24 Inaccurate (iPhone/Tablet GPS) North East Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 435 No 18 84 24 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 436 No 30 108 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 437 No 48 120 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 439 No 36 48 48 Inaccurate (iPhone/Tablet GPS) North East Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 440 No 20 54 24 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 12 12 12 Town of Ithaca Yes 443 No 18 84 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular CMP Parabolic 18 18 18 18 18 Town of Ithaca Yes 444 No 30 72 24 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 445 No 36 108 36 Inaccurate (iPhone/Tablet GPS) North East Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 446 No 17 28 28 Inaccurate (iPhone/Tablet GPS) North East Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 448 No 36 120 48 Inaccurate (iPhone/Tablet GPS) North East Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 450 No 24 156 72 Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 452 No 9 48 18 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 454 No Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular Steel Trapezoid 16 16 16 17 17 Town of Ithaca Yes 466 No Inaccurate (iPhone/Tablet GPS) East Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 484 No Town of Ithaca Yes 485 No Town of Ithaca Yes 486 No Town of Ithaca Yes 487 No Inaccurate (iPhone/Tablet GPS) East Hill Town of Ithaca Yes 490 No Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid Town of Ithaca Yes 501 No 14 56 36 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 12 12 12 14 14 Town of Ithaca Yes 502 No 9 44 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 15 15 15 15 15 Town of Ithaca Yes 511 No 24 84 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 10 10 10 10 10 Town of Ithaca Yes 516 No 15 70 36 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 517 No 15 24 55 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 518 No 25 85 55 Inaccurate (iPhone/Tablet GPS) East Hill Closed Pipe Earth Circular PVC Trapezoid 6 6 6 6 6 Town of Ithaca Yes 520 No 32 120 60 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 22 22 22 22 22 Town of Ithaca Yes 521 No 24 84 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 12 12 12 12 12 Town of Ithaca Yes 522 No 20 84 48 Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 523 No 18 108 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 524 No 15 100 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 525 No 24 60 36 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 28 28 28 28 28 Town of Ithaca Yes 526 No 12 36 20 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 20 20 20 20 20 Town of Ithaca Yes 527 No 6 96 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Parabolic 24 24 24 24 24 Town of Ithaca Yes 528 No 36 120 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Parabolic 18 18 18 18 18 Town of Ithaca Yes 529 No 32 72 36 In Stream Earth Circular HDPE Trapezoid 12 12 12 14 14 Town of Ithaca Yes 530 No 36 72 30 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 17 17 17 19 19 Town of Ithaca Yes 533 No 15 80 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Eliptical CMP Parabolic 14 8 8 14 8 Town of Ithaca Yes 536 No 36 36 108 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 537 No 10 36 24 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 545 No Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 547 No 18 84 40 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 548 No 20 80 50 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 549 No 36 108 36 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 10 10 10 10 10 Town of Ithaca Yes 550 No 8 48 24 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 556 No 30 72 48 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 559 No 30 120 80 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Trapezoid 31 31 31 31 31 Town of Ithaca Yes 561 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 18 18 18 18 Town of Ithaca Yes 562 No 6 60 72 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 563 No 18 108 30 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Eliptical HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 564 No 24 80 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Trapezoid 25 25 25 25 25 Town of Ithaca Yes 574 No 33 100 48 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular Steel Trapezoid 18 18 18 18 18 Town of Ithaca Yes 575 No 40 110 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Eliptical CMP Trapezoid 50 40 40 50 40 Town of Ithaca Yes 580 No 30 80 30 Inaccurate (iPhone/Tablet GPS) South Hill Circular CMP Trapezoid 15 15 15 15 15 Town of Ithaca Yes 586 No 20 60 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 14 14 14 14 14 Town of Ithaca Yes 589 No 12 70 36 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 595 No 24 96 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Trapezoid 16 16 16 16 16 Town of Ithaca Yes 596 No 36 96 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 598 No 30 80 40 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 35 35 35 35 35 Town of Ithaca Yes 599 No 48 40 40 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP 40 40 42 40 42 Town of Ithaca Yes 600 No 18 48 25 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 20 20 20 20 20 Town of Ithaca Yes 601 No 30 75 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 602 No 30 75 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 20 20 20 20 20 Town of Ithaca Yes 603 No 27 90 44 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular CMP Trapezoid 24 24 24 24 24 Town of Ithaca Yes 608 No 45 132 27 Inaccurate (iPhone/Tablet GPS) South Hill Open Drainage Earth Circular HDPE Parabolic 30 30 30 30 30 Town of Ithaca Yes 612 No 36 120 66 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 34 34 34 34 34 Town of Ithaca Yes 613 No 45 168 84 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 614 No 9 30 10 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 7 7 7 7 7 Town of Ithaca Yes 616 No 30 110 50 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 617 No 10 50 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 30 30 30 30 30 Town of Ithaca Yes 619 No Inaccurate (iPhone/Tablet GPS) South Hill Town of Ithaca Yes 628 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 9 9 9 9 9 Town of Ithaca Yes 629 No 18 90 26 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 630 No 16 110 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 631 No 15 120 50 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 632 No 18 95 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 9 9 9 9 9 Town of Ithaca Yes 633 No 20 96 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 635 No 36 144 36 Closed Pipe Earth Circular Steel Parabolic 20 20 20 20 20 Town of Ithaca Yes 636 No 60 120 72 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 640 No 30 85 50 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 641 No 25 100 30 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 642 No 24 48 84 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Trapezoid 12 12 12 12 12 Town of Ithaca Yes 644 No 20 25 80 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 645 No 15 60 24 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 646 No 15 60 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 647 No 24 108 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 20 20 20 20 20 Town of Ithaca Yes 648 No 36 144 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 649 No 8 84 24 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 650 No 36 130 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 651 No 30 96 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 652 No 25 36 105 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 653 No 18 84 24 Inaccurate (iPhone/Tablet GPS) South Hill Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 654 No 18 75 30 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular Steel Parabolic 12 12 12 12 12 Town of Ithaca Yes 655 No 20 66 32 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 656 No Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Parabolic Town of Ithaca Yes Monitoring Locations Spreadsheet DRAF T 3 657 No 20 64 48 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 658 No 15 108 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 659 No 15 108 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 660 No Inaccurate (iPhone/Tablet GPS) South Hill Town of Ithaca Yes 661 No 18 65 25 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 662 No 15 70 65 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 30 30 30 30 30 Town of Ithaca Yes 664 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP 42 42 42 42 42 Town of Ithaca Yes 665 No 20 130 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 36 36 36 36 36 Town of Ithaca Yes 666 No 25 130 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 667 No 36 108 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Concrete Eliptical CMP Trapezoid 48 32 32 48 32 Town of Ithaca Yes 668 No 36 108 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Concrete Circular RCP Trapezoid 30 30 30 30 30 Town of Ithaca Yes 669 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP 12 12 12 12 12 Town of Ithaca Yes 670 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 36 36 36 36 36 Town of Ithaca Yes 672 No 50 132 65 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular RCP Trapezoid 24 24 24 24 24 Town of Ithaca Yes 673 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 6 6 6 6 6 Town of Ithaca Yes 674 No Inaccurate (iPhone/Tablet GPS) South Hill Town of Ithaca Yes 675 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular RCP Parabolic 18 18 18 18 18 Town of Ithaca Yes 676 No 21 54 24 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular RCP Parabolic 18 18 18 18 18 Town of Ithaca Yes 677 No 36 80 20 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular RCP Trapezoid 24 24 24 24 24 Town of Ithaca Yes 678 No Town of Ithaca No 686 No Closed Pipe Circular HDPE Town of Ithaca Yes 687 No 15 88 75 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 689 No 16 48 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 695 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP 46 46 46 46 46 Town of Ithaca Yes 696 No 24 170 156 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular RCP Trapezoid 46 46 46 46 46 Town of Ithaca Yes 702 No 25 90 24 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 13 12 12 12 Town of Ithaca Yes 706 No 16 50 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 707 No 6 84 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 20 20 20 20 20 Town of Ithaca Yes 713 No 30 120 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 714 No 18 110 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 715 No 18 96 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 716 No 25 105 45 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 24 24 24 24 24 Town of Ithaca Yes 717 No 48 170 100 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 718 No 48 170 100 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 719 No 48 170 100 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 720 No 36 150 105 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 721 No 36 105 150 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 14 14 14 14 14 Town of Ithaca Yes 722 No 15 110 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 10 10 10 10 10 Town of Ithaca Yes 725 No 70 96 72 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Concrete Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 726 No Inaccurate (iPhone/Tablet GPS) Closed Pipe Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 727 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 20 20 20 20 20 Town of Ithaca Yes 728 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Parabolic Town of Ithaca Yes 729 No 24 55 18 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 730 No 30 85 50 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 731 No 36 96 32 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 732 No 30 80 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 22 22 22 22 22 Town of Ithaca Yes 733 No 24 75 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 734 No 30 80 24 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 16 16 16 16 16 Town of Ithaca Yes 735 No 30 72 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 736 No 36 84 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 737 No 24 80 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 738 No 24 70 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Eliptical HDPE Parabolic 18 8 8 18 8 Town of Ithaca Yes 739 No 98 36 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Trapezoid 48 48 48 48 48 Town of Ithaca Yes 740 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 30 30 30 30 30 Town of Ithaca Yes 741 No 30 66 32 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 742 No 15 72 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 20 20 20 20 20 Town of Ithaca Yes 743 No 30 60 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 744 No 30 90 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 16 16 16 16 16 Town of Ithaca Yes 745 No 24 85 30 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 746 No 45 86 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 747 No 36 96 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 748 No 25 80 20 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 749 No 24 80 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 750 No 150 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 48 48 48 48 48 Town of Ithaca Yes 751 No 60 96 240 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 760 No Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular CMP Trapezoid 72 Town of Ithaca Yes 762 No Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 764 No 12 120 90 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 765 No 24 84 48 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular Steel Trapezoid 40 40 40 41 41 Town of Ithaca Yes 768 No 30 132 72 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular CMP Parabolic 15 15 15 16 16 Town of Ithaca Yes 771 No 12 96 66 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 772 No 72 144 48 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 48 48 48 48 48 Town of Ithaca Yes 773 No 12 36 24 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular CMP Parabolic 9 9 9 9 9 Town of Ithaca Yes 774 No 24 60 30 Inaccurate (iPhone/Tablet GPS) West Hill Earth Circular CMP Trapezoid 30 30 30 30 30 Town of Ithaca Yes 776 No 36 60 36 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular Steel Trapezoid 18 18 18 18 18 Town of Ithaca Yes 777 No 48 60 36 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular CMP Trapezoid 36 36 36 36 36 Town of Ithaca Yes 780 No Inaccurate (iPhone/Tablet GPS) West Hill Town of Ithaca Yes 781 No 36 100 72 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 50 50 50 50 50 Town of Ithaca Yes 782 No 15 55 24 Inaccurate (iPhone/Tablet GPS) West Hill Earth Eliptical CMP Trapezoid 12 9 9 12 9 Town of Ithaca Yes 783 No 30 48 90 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 803 No Inaccurate (iPhone/Tablet GPS) East Hill Closed Pipe Circular HDPE Town of Ithaca Yes 805 No 12 84 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 806 No 15 72 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 807 No 30 80 30 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Eliptical CMP Parabolic 10 10 10 10 10 Town of Ithaca Yes 808 No 8 120 84 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Eliptical CMP Parabolic 16 7 7 16 7 Town of Ithaca Yes 809 No 32 90 36 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 810 No 6 54 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 811 No 12 100 60 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 24 24 24 24 24 Town of Ithaca Yes 812 No 12 100 60 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular CMP Trapezoid 12 12 12 12 12 Town of Ithaca Yes 821 No 24 84 48 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 20 20 20 20 20 Town of Ithaca Yes 834 No 30 120 70 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 839 No Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Trapezoid 63 40 40 63 40 Town of Ithaca Yes 840 No 90 120 50 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular Steel Trapezoid 40 40 40 40 40 Town of Ithaca Yes 846 No 36 64 64 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular RCP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 847 No 60 200 120 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 48 48 48 52 52 Town of Ithaca Yes 852 No 24 110 95 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 857 No 15 45 12 Inaccurate (iPhone/Tablet GPS) West Hill Earth Circular CMP Parabolic 12 12 12 12 12 Town of Ithaca Yes 862 No 40 120 72 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 865 No 28 204 144 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular HDPE Trapezoid 48 48 48 48 48 Town of Ithaca Yes 866 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Trapezoid 20 20 20 20 20 Town of Ithaca Yes 867 No Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Parabolic 72 72 72 72 96 Town of Ithaca Yes 868 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 869 No 54 192 72 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Trapezoid 72 72 120 72 120 Town of Ithaca Yes 874 No 15 78 72 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular Trapezoid 36 36 36 38 38 Town of Ithaca Yes 884 No 25 80 30 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 885 No 24 48 72 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Eliptical HDPE Trapezoid 70 40 40 70 40 Town of Ithaca Yes 888 No 18 100 50 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Parabolic 14 14 14 14 14 Town of Ithaca Yes 889 No 15 85 55 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 892 No 12 70 54 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular RCP Trapezoid 36 36 36 40 40 Town of Ithaca Yes 893 No 28 174 64 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular HDPE Trapezoid 48 48 48 58 58 Town of Ithaca Yes 894 No 12 76 18 Inaccurate (iPhone/Tablet GPS) West Hill In Stream Earth Circular Steel Parabolic 12 12 12 12 12 Town of Ithaca Yes 895 No 84 132 72 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Eliptical Steel Trapezoid 30 26 26 30 26 Town of Ithaca Yes 897 No 24 120 80 Inaccurate (iPhone/Tablet GPS) West Hill Earth CMP Trapezoid Town of Ithaca Yes 901 No Inaccurate (iPhone/Tablet GPS) South Hill Town of Ithaca Yes 903 No 48 132 110 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Trapezoid 110 48 48 110 48 Town of Ithaca Yes 904 No Inaccurate (iPhone/Tablet GPS) East Hill Town of Ithaca Yes 906 No 24 108 36 In Stream Earth Box RCP Trapezoid 48 48 48 60 60 Town of Ithaca Yes 907 No 4 72 24 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 5 5 5 5 5 Town of Ithaca Yes 913 No 6 120 110 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Eliptical CMP Trapezoid 60 42 42 60 42 Town of Ithaca Yes 915 No 24 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular Steel Trapezoid 24 24 24 24 24 Town of Ithaca Yes 917 No 150 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Box RCP Trapezoid 48 48 50 48 50 Town of Ithaca Yes 918 No 22 68 32 Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Eliptical CMP Parabolic 28 15 15 28 15 Town of Ithaca Yes 920 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 15 15 15 15 15 Town of Ithaca Yes 921 No Closed Pipe Town of Ithaca No 923 No 50 72 120 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 927 No Inaccurate (iPhone/Tablet GPS) East Hill Town of Ithaca Yes 928 No 20 90 50 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Trapezoid 18 18 18 18 18 Town of Ithaca Yes 930 No 36 144 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular CMP Parabolic 21 21 20 21 20 Town of Ithaca Yes 931 No 54 168 60 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth CMP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 932 No 28 72 36 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes Monitoring Locations Spreadsheet DRAF T 4 933 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 934 No 48 120 96 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 938 No Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Trapezoid Town of Ithaca Yes 940 No 20 60 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 941 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Parabolic 21 21 21 21 21 Town of Ithaca Yes 942 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 15 15 15 15 15 Town of Ithaca Yes 943 No 18 108 48 Inaccurate (iPhone/Tablet GPS) South Hill In Stream Earth Circular Steel Trapezoid 18 18 18 18 18 Town of Ithaca Yes 947 No 14 44 20 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular CMP Trapezoid 15 15 15 15 15 Town of Ithaca Yes 948 No Inaccurate (iPhone/Tablet GPS) East Hill In Stream Earth Circular Steel Trapezoid Town of Ithaca Yes 949 No 40 96 24 Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 950 No 30 120 55 Closed Pipe Earth Circular Steel Parabolic 25 25 25 25 25 Town of Ithaca Yes 951 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 5 5 5 5 5 Town of Ithaca Yes 952 No In Stream Earth Box CMP Trapezoid 72 72 45 Town of Ithaca Yes 953 No 20 72 48 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 5 5 5 5 5 Town of Ithaca Yes 954 No 20 48 72 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 5 5 5 5 5 Town of Ithaca Yes 955 No 12 60 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 8 8 8 8 8 Town of Ithaca Yes 956 No 12 60 35 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 8 8 8 8 8 Town of Ithaca Yes 957 No 55 105 60 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 20 20 20 20 20 Town of Ithaca Yes 958 No 36 84 36 Inaccurate (iPhone/Tablet GPS) South Hill Circular Steel Trapezoid 30 30 30 30 30 Town of Ithaca Yes 959 No 15 36 18 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Eliptical CMP Trapezoid 9 6 6 6 9 Town of Ithaca Yes 960 No 15 80 36 Closed Pipe Earth Circular Steel Parabolic 9 9 9 9 9 Town of Ithaca Yes 961 No 45 144 24 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 962 No 48 65 32 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 36 36 36 36 36 Town of Ithaca Yes 963 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Parabolic 16 16 16 16 16 Town of Ithaca Yes 964 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP 8 8 8 8 8 Town of Ithaca Yes 965 No 31 70 30 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular Steel Trapezoid 6 6 6 6 6 Town of Ithaca Yes 966 No 30 75 18 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 4 4 4 4 4 Town of Ithaca Yes 967 No 10 18 18 Inaccurate (iPhone/Tablet GPS) South Hill Open Drainage Concrete Box RCP Trapezoid Town of Ithaca Yes 968 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE 15 15 15 15 15 Town of Ithaca Yes 969 No 16 48 36 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 18 18 18 18 18 Town of Ithaca Yes 970 No 60 172 72 Inaccurate (iPhone/Tablet GPS) South Hill Earth Circular HDPE Trapezoid 30 30 30 30 30 Town of Ithaca Yes 971 No 24 65 32 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular CMP Trapezoid 6 6 6 6 6 Town of Ithaca Yes 972 No 18 72 32 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular CMP Parabolic 15 15 15 15 15 Town of Ithaca Yes 973 No 8 72 36 Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 974 No North East Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 975 No North East Closed Pipe Earth Circular CMP Trapezoid 24 24 24 24 24 Town of Ithaca Yes 976 No Closed Pipe Earth Circular CMP Trapezoid 24 Town of Ithaca Yes 977 No 36 168 84 West Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 978 No 30 66 40 Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 979 No 30 96 48 South Hill Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 980 No Inaccurate (iPhone/Tablet GPS) South Hill Closed Pipe Earth Circular HDPE Parabolic 24 24 24 24 24 Town of Ithaca Yes 981 No 24 80 30 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 982 No 20 60 24 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 983 No 18 55 24 Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 984 No 20 60 18 North East Closed Pipe Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 985 No 20 80 20 Inaccurate (iPhone/Tablet GPS) North East Closed Pipe Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 986 No 48 108 30 North East Closed Pipe Earth Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 987 No Inaccurate (iPhone/Tablet GPS) East Lake Closed Pipe Earth Box RCP Parabolic Town of Ithaca Yes 988 No Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Circular HDPE Trapezoid 24 24 24 24 24 Town of Ithaca Yes 989 No Inaccurate (iPhone/Tablet GPS) East Lake In Stream Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 990 No Inaccurate (iPhone/Tablet GPS) East Lake Closed Pipe Earth Eliptical CMP Trapezoid 40 28 28 40 28 Town of Ithaca Yes 991 No 15 96 60 Inaccurate (iPhone/Tablet GPS) North East In Stream Earth Circular RCP Trapezoid 12 12 12 12 12 Town of Ithaca Yes 992 No 12 72 36 West Hill In Stream Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 993 No Closed Pipe Earth Circular CMP Trapezoid 15 15 15 15 15 Town of Ithaca Yes 994 No 18 84 36 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Circular HDPE Parabolic 12 12 12 12 12 Town of Ithaca Yes 995 No West Hill Closed Pipe Earth Eliptical CMP Trapezoid 36 30 30 36 30 Town of Ithaca Yes 996 No Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Earth Eliptical CMP Trapezoid 36 30 30 36 30 Town of Ithaca Yes 997 No 30 100 45 Inaccurate (iPhone/Tablet GPS) Closed Pipe Rip_Rap Circular HDPE Trapezoid 12 12 12 12 12 Town of Ithaca Yes 998 No 21 96 48 Inaccurate (iPhone/Tablet GPS) Closed Pipe Earth Circular RCP Trapezoid 18 18 18 18 Town of Ithaca Yes 999 No Town of Ithaca Yes 1000 No Closed Pipe Earth Circular HDPE Trapezoid 42 42 42 42 42 Town of Ithaca Yes 1001 No East Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 1002 No 15 48 24 Inaccurate (iPhone/Tablet GPS) West Hill Closed Pipe Concrete Circular CMP Parabolic 24 24 24 24 24 Town of Ithaca Yes 1003 No 24 96 48 Closed Pipe Earth Circular CMP Trapezoid 18 18 18 18 18 Town of Ithaca Yes 1004 No Inaccurate (iPhone/Tablet GPS) Closed Pipe Earth Circular HDPE 15 15 15 15 15 Town of Ithaca Yes 1005 No Inaccurate (iPhone/Tablet GPS) Closed Pipe Earth Circular CMP 24 24 24 24 24 Town of Ithaca Yes 1006 No Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 1007 No 30 90 24 East Hill Closed Pipe Earth Circular HDPE Trapezoid 18 18 18 18 18 Town of Ithaca Yes 1008 No 30 90 24 East Hill Closed Pipe Earth Circular HDPE Trapezoid 15 15 15 15 15 Town of Ithaca Yes 1009 No 20 96 24 Inaccurate (iPhone/Tablet GPS) East Hill Closed Pipe Earth Circular HDPE Parabolic 15 15 15 15 15 Town of Ithaca Yes 1010 Inaccurate (iPhone/Tablet GPS) East Hill Closed Pipe Earth Circular CMP 24 24 24 24 24 Town of Ithaca Yes Monitoring Locations Spreadsheet DRAF T 1 OBJECTID Discharging_MS4 Receiving_MS4 Interconnect_Type CreationDate Creator EditDate Editor Field Verified 16 Town of Ithaca Tompkins County Highway 2024-04-11 15:52:06 sharris_TOI 2024-04-11 15:52:06 sharris_TOI No 17 Town of Ithaca Tompkins County Highway Closed Pipe 2024-04-11 15:52:19 sharris_TOI 2024-04-11 15:52:19 sharris_TOI No 18 Town of Ithaca Tompkins County Highway Closed Pipe 2024-04-11 17:06:46 sharris_TOI 2024-04-11 17:06:46 sharris_TOI No 19 Town of Ithaca Tompkins County Highway Closed Pipe 2024-04-11 17:06:57 sharris_TOI 2024-04-11 17:06:57 sharris_TOI No 20 Town of Ithaca BOCES Open Drainage 2024-04-11 17:09:57 sharris_TOI 2024-04-11 17:09:57 sharris_TOI No 21 Town of Ithaca BOCES Open Drainage 2024-04-11 17:10:07 sharris_TOI 2024-04-11 17:10:07 sharris_TOI No 23 Town of Ithaca BOCES Open Drainage 2024-04-11 17:12:28 sharris_TOI 2024-04-11 17:12:51 sharris_TOI No 24 Town of Ithaca Ithaca City School District Open Drainage 2024-04-11 17:13:58 sharris_TOI 2024-04-11 17:13:58 sharris_TOI No 25 Town of Ithaca Ithaca City School District Closed Pipe 2024-04-11 17:14:09 sharris_TOI 2024-04-11 17:14:09 sharris_TOI No 26 Town of Ithaca Village of Cayuga Heights Open Drainage 2024-04-11 17:15:47 sharris_TOI 2024-04-11 17:15:47 sharris_TOI No 27 Town of Ithaca Village of Cayuga Heights Open Drainage 2024-04-11 17:15:56 sharris_TOI 2024-04-11 17:15:56 sharris_TOI No 28 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:16:48 sharris_TOI 2024-04-11 17:16:48 sharris_TOI No 29 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:16:56 sharris_TOI 2024-04-11 17:16:56 sharris_TOI No 30 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:17:11 sharris_TOI 2024-04-11 17:17:11 sharris_TOI No 31 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:17:19 sharris_TOI 2024-04-11 17:17:19 sharris_TOI No 32 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:17:53 sharris_TOI 2024-04-11 17:17:53 sharris_TOI No 33 Town of Ithaca Village of Cayuga Heights Closed Pipe 2024-04-11 17:18:15 sharris_TOI 2024-04-11 17:18:15 sharris_TOI No 34 Town of Ithaca Village of Cayuga Heights Open Drainage 2024-05-08 17:58:49 sharris_TOI 2024-05-08 17:58:49 sharris_TOI No 35 Town of Ithaca Village of Cayuga Heights 2024-05-08 18:01:09 sharris_TOI 2024-05-08 18:01:09 sharris_TOI No 36 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:04:09 sharris_TOI 2024-05-08 18:04:09 sharris_TOI No 37 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:05:05 sharris_TOI 2024-05-08 18:05:05 sharris_TOI No 38 Town of Ithaca Tompkins County Highway 2024-05-08 18:05:58 sharris_TOI 2024-05-08 18:05:58 sharris_TOI No 39 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:06:08 sharris_TOI 2024-05-08 18:06:08 sharris_TOI No 40 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:06:31 sharris_TOI 2024-05-08 18:06:31 sharris_TOI No 42 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-08 18:13:45 sharris_TOI 2024-05-08 18:13:45 sharris_TOI No 43 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-08 18:14:06 sharris_TOI 2024-05-08 18:14:06 sharris_TOI No 44 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-08 18:15:08 sharris_TOI 2024-05-08 18:15:08 sharris_TOI No 45 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:15:41 sharris_TOI 2024-05-08 18:15:41 sharris_TOI No 47 Town of Ithaca Open Drainage 2024-05-08 18:17:09 sharris_TOI 2024-05-08 18:17:09 sharris_TOI No 50 Town of Ithaca Closed Pipe 2024-05-08 18:19:03 sharris_TOI 2024-05-08 18:19:03 sharris_TOI No 51 Town of Ithaca NYS DOT 2024-05-08 18:20:03 sharris_TOI 2024-05-08 18:20:03 sharris_TOI No 52 Town of Ithaca City of Ithaca Closed Pipe 2024-05-08 18:22:21 sharris_TOI 2024-05-08 18:22:21 sharris_TOI No 53 Town of Ithaca City of Ithaca Closed Pipe 2024-05-08 18:22:32 sharris_TOI 2024-05-08 18:22:32 sharris_TOI No 55 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:24:29 sharris_TOI 2024-05-08 18:24:29 sharris_TOI No 58 Town of Ithaca City of Ithaca Closed Pipe 2024-05-08 18:29:37 sharris_TOI 2024-05-08 18:29:37 sharris_TOI No 59 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:30:42 sharris_TOI 2024-05-08 18:30:42 sharris_TOI No 60 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-08 18:30:51 sharris_TOI 2024-05-08 18:31:08 sharris_TOI No 61 Town of Ithaca Ithaca City School District Open Drainage 2024-05-09 16:16:17 sharris_TOI 2024-05-09 16:18:43 sharris_TOI No 64 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:19:41 sharris_TOI 2024-05-09 16:19:41 sharris_TOI No 65 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 16:20:03 sharris_TOI 2024-05-09 16:20:03 sharris_TOI No 66 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:21:16 sharris_TOI 2024-05-09 16:21:16 sharris_TOI No 67 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:21:39 sharris_TOI 2024-05-09 16:21:39 sharris_TOI No 68 Town of Ithaca City of Ithaca Open Drainage 2024-05-09 16:22:22 sharris_TOI 2024-05-09 16:22:22 sharris_TOI No 69 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:25:31 sharris_TOI 2024-05-09 16:25:31 sharris_TOI No 70 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:26:55 sharris_TOI 2024-05-09 16:26:55 sharris_TOI No 71 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:27:09 sharris_TOI 2024-05-09 16:27:09 sharris_TOI No 72 Town of Ithaca NYS DOT Open Drainage 2024-05-09 16:27:52 sharris_TOI 2024-05-09 16:27:52 sharris_TOI No 73 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 16:29:21 sharris_TOI 2024-05-17 14:06:19 sharris_TOI No 75 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 16:37:06 sharris_TOI 2024-05-09 16:37:06 sharris_TOI No 81 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 16:43:05 sharris_TOI 2024-05-09 16:43:05 sharris_TOI No 82 Town of Ithaca In Stream 2024-05-09 17:13:33 sharris_TOI 2024-05-09 17:13:33 sharris_TOI No 83 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 17:13:44 sharris_TOI 2024-05-09 17:13:44 sharris_TOI No 84 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:15:06 sharris_TOI 2024-05-09 17:15:06 sharris_TOI No 85 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:17:08 sharris_TOI 2024-05-09 17:17:08 sharris_TOI No 86 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:20:09 sharris_TOI 2024-05-09 17:20:09 sharris_TOI No MONITORING LOCATION INVENTORY - INTERMUNICIPAL CONNECTIONS Monitoring Locations Spreadsheet DRAF T 2 87 Town of Ithaca In Stream 2024-05-09 17:20:35 sharris_TOI 2024-05-09 17:20:35 sharris_TOI No 88 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:21:20 sharris_TOI 2024-05-09 17:21:20 sharris_TOI No 90 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:23:17 sharris_TOI 2024-05-09 17:23:17 sharris_TOI No 91 Town of Ithaca In Stream 2024-05-09 17:24:09 sharris_TOI 2024-05-09 17:24:09 sharris_TOI No 93 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:27:09 sharris_TOI 2024-05-09 17:27:09 sharris_TOI No 94 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:27:56 sharris_TOI 2024-05-09 17:27:56 sharris_TOI No 95 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:30:18 sharris_TOI 2024-05-09 17:30:18 sharris_TOI No 96 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:31:25 sharris_TOI 2024-05-09 17:31:25 sharris_TOI No 97 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:31:39 sharris_TOI 2024-05-09 17:31:39 sharris_TOI No 99 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:34:04 sharris_TOI 2024-05-09 17:34:04 sharris_TOI No 101 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:38:20 sharris_TOI 2024-05-09 17:38:20 sharris_TOI No 103 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:40:14 sharris_TOI 2024-05-09 17:40:14 sharris_TOI No 104 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 17:40:33 sharris_TOI 2024-05-09 17:40:33 sharris_TOI No 105 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:41:07 sharris_TOI 2024-05-09 17:41:07 sharris_TOI No 106 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:42:31 sharris_TOI 2024-05-09 17:42:31 sharris_TOI No 108 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:45:43 sharris_TOI 2024-05-09 17:45:43 sharris_TOI No 109 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-09 17:45:52 sharris_TOI 2024-05-09 17:45:52 sharris_TOI No 111 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 17:47:30 sharris_TOI 2024-05-09 17:47:30 sharris_TOI No 113 Town of Ithaca NYS DOT Open Drainage 2024-05-09 17:51:49 sharris_TOI 2024-05-09 17:51:49 sharris_TOI No 114 Town of Ithaca NYS DOT Open Drainage 2024-05-09 17:51:55 sharris_TOI 2024-05-09 17:51:55 sharris_TOI No 115 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 17:54:26 sharris_TOI 2024-05-09 17:54:26 sharris_TOI No 116 Town of Ithaca NYS DOT Open Drainage 2024-05-09 17:54:33 sharris_TOI 2024-05-09 17:54:33 sharris_TOI No 118 Town of Ithaca City of Ithaca Open Drainage 2024-05-09 17:57:06 sharris_TOI 2024-05-09 17:57:06 sharris_TOI No 120 Town of Ithaca City of Ithaca Closed Pipe 2024-05-09 18:04:34 sharris_TOI 2024-05-17 14:45:15 sharris_TOI No 127 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:51:01 sharris_TOI 2024-05-09 18:51:01 sharris_TOI No 128 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:52:01 sharris_TOI 2024-05-09 18:52:01 sharris_TOI No 129 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:53:11 sharris_TOI 2024-05-09 18:53:11 sharris_TOI No 130 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:53:19 sharris_TOI 2024-05-09 18:53:19 sharris_TOI No 131 Town of Ithaca Open Drainage 2024-05-09 18:53:56 sharris_TOI 2024-05-09 18:53:56 sharris_TOI No 132 Town of Ithaca NYS DOT Closed Pipe 2024-05-09 18:54:47 sharris_TOI 2024-05-09 18:54:47 sharris_TOI No 133 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:56:50 sharris_TOI 2024-05-09 18:56:50 sharris_TOI No 134 Town of Ithaca NYS DOT Open Drainage 2024-05-09 18:56:55 sharris_TOI 2024-05-09 18:57:03 sharris_TOI No 136 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-09 19:00:22 sharris_TOI 2024-05-09 19:00:22 sharris_TOI No 137 Town of Ithaca In Stream 2024-05-09 19:01:48 sharris_TOI 2024-05-09 19:01:48 sharris_TOI No 139 Town of Ithaca City of Ithaca Closed Pipe 2024-05-09 19:03:17 sharris_TOI 2024-05-09 19:03:17 sharris_TOI No 140 Town of Ithaca City of Ithaca Closed Pipe 2024-05-09 19:03:29 sharris_TOI 2024-05-09 19:03:29 sharris_TOI No 143 Town of Ithaca NYS DOT Open Drainage 2024-05-09 19:08:01 sharris_TOI 2024-05-09 19:08:01 sharris_TOI No 144 Town of Ithaca Tompkins County Highway 2024-05-17 14:08:07 sharris_TOI 2024-05-17 14:08:07 sharris_TOI No 145 Town of Ithaca Tompkins County Highway 2024-05-17 14:23:37 sharris_TOI 2024-05-17 14:23:37 sharris_TOI No 146 Town of Ithaca City of Ithaca Closed Pipe 2024-05-20 17:53:34 sharris_TOI 2024-05-20 17:53:34 sharris_TOI No 148 Town of Ithaca NYS DOT Open Drainage 2024-05-20 17:57:15 sharris_TOI 2024-05-20 17:57:15 sharris_TOI No 149 Town of Ithaca NYS DOT Open Drainage 2024-05-20 17:58:07 sharris_TOI 2024-05-20 17:58:07 sharris_TOI No 150 Town of Ithaca NYS DOT Closed Pipe 2024-05-20 17:58:40 sharris_TOI 2024-05-20 17:58:40 sharris_TOI No 151 Town of Ithaca NYS DOT Open Drainage 2024-05-20 17:59:18 sharris_TOI 2024-05-20 17:59:18 sharris_TOI No 152 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-20 18:01:51 sharris_TOI 2024-05-20 18:01:51 sharris_TOI No 153 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-20 18:02:02 sharris_TOI 2024-05-20 18:02:02 sharris_TOI No 154 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-20 18:06:58 sharris_TOI 2024-05-20 18:06:58 sharris_TOI No 155 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-20 18:07:22 sharris_TOI 2024-05-20 18:07:22 sharris_TOI No 156 Town of Ithaca Tompkins County Highway Open Drainage 2024-05-20 18:22:06 sharris_TOI 2024-05-20 18:22:06 sharris_TOI No 157 Town of Ithaca Tompkins County Highway Closed Pipe 2024-05-20 18:22:17 sharris_TOI 2024-05-20 18:22:17 sharris_TOI No 158 Town of Ithaca NYS DOT Closed Pipe 2024-05-20 18:24:50 sharris_TOI 2024-05-20 18:24:50 sharris_TOI No 159 Town of Ithaca NYS DOT Closed Pipe 2024-05-20 18:24:58 sharris_TOI 2024-05-20 18:24:58 sharris_TOI No Monitoring Locations Spreadsheet DRAF T Appendix H: Construction Site Complaints No construction related complaints received to date. DRAF T Appendix I: Construction Oversight Program DRAF T Construction Oversight Program i. When the construction site stormwater control program applies (Part VI.D.1.); The Construction site stormwater control program will apply to all construction projects that exceed the following minimum conditions;  Any land development activity with an area of disturbance of 10,000 square feet or more.  Any land development activity that involves excavation, filling, or a combination of excavation and filling, resulting in the movement of more than 50 cubic yards of fill, sod, loam, sand, gravel, stone or similar materials.  Any activity that involves the laying, replacing, or enlarging of an underground pipe or other underground facility for a distance of 300 feet or more.  The disturbance of the vegetative cover of a road ditch, drainage swale, or other channel, for a distance of 30 feet or more.  Any land development activity, regardless of size, that the NYSDEC, Town Engineer, Code Enforcement Officer, or Director of Planning determines likely to cause adverse impacts to an environmentally sensitive area (including, but not limited to, wetlands, steep slopes, swimming beaches, fisheries, and important habitats), or may violate any other stormwater control standards set forth in this chapter. ii. What types of construction activity require a SWPPP;  Any soil disturbance activity that exceeds the thresholds outlined above. Exemptions: A project may be exempted from the construction oversight program if the activity meets all of the following criteria: o Does not exceed 1 acre of disturbance. o Does not exceed 250 cubic yards of soil excavation or fill. o The activity takes place on level grade (less than 2% slope). o The activity does not take place within 20 feet of a roadside ditch. o The activity does not take place within 50 feet of a stream or wetland o The activity is surrounded by no less than a fifty-foot-wide perimeter of woody or grassy vegetation that will remain undisturbed. o Lawful farm operations on lands the principal use of which is as a farm, if the farm operations: occupy three acres or more of land; or occupy less than three acres of land and are located within a county agricultural district created under the provisions of Article 25-AA of the New York State Agriculture and Markets Law. Notwithstanding the foregoing, this term shall not include the construction of new structures associated with such farm operations. o Logging activity undertaken pursuant to an approved timber harvesting plan prepared by the New York State Department of Environmental Conservation, or DRAF T a New York State Cooperating Forester, which is to be made available on site for review by the Town and in which recommended best management practices for water quality protection have been developed and are implemented, except that landing areas and log haul roads are subject to this chapter. o Cemetery graves. o Installation of fence, sign, telephone, and electric poles, mailbox and newspaper posts, and other kinds of posts or poles, not including structural pilings, that will not alter existing terrain or drainage patterns. o Emergency activity immediately necessary to protect life, property or natural resources as authorized by the Stormwater Management Officer and/or as the situation dictates. o Activities of an individual engaging in home gardening by growing flowers, vegetables, and other plants primarily for use by that person and his or her family. o Maintenance of landscaping or lawn areas associated with a one- or two-family dwelling. iii. The procedures for submission of SWPPPs.  The applicant will complete a SWPPP application via the Town of Ithaca OpenGov Permit and Licensing Software.  Once submitted, OpenGov notifies the Engineering Department of the application.  Based on the application materials the Engineering Department will reach out to the applicant for additional information and/or procedures.  When a project requires a SPDES permit: o A SWPPP review fee is required for review and approval. o The applicant has an obligation to obtain permit coverage from NYSDEC. o The applicant must upload copies of the NOI Acknowledgement and Signed MS4 SWPPP Acceptance Form. iv. SWPPP review requirements (Part VI.D.6.) o All required materials must be submitted; must receive hard copy o All SWPPPs and associated proposed temporary and permanent erosion control practices are reviewed for criteria in accordance with the Construction General Permit (CGP) and Sediment and Erosion Control Manual. o If required by the Construction General Permit or deemed necessary by the town engineer, modeling hydraulic calculations will be reviewed by the town engineer. v. Pre-construction oversight requirements (Part VI.D.7.) DRAF T  Pre-construction meetings are scheduled once all temporary erosion and sediment control practices have been installed but prior to construction work starting.  Mass Earth Disturbance activity cannot take place until the SWPPP is approved, and the site is inspected. vi. Construction site inspection requirements (Part VI.D.8.);  Town conducts SWPPP inspections for all projects not required to provide inspections. Inspections are reported on OpenGov Permit and Licensing platform where the town staff will comment on any deficiencies that were seen on site where maintenance is needed.  For all Active Construction sites requiring a SPDES Permit, inspections are conducted by a qualified inspector documenting the effectiveness of all erosion and sediment control practices. Town engineering staff will review the inspection report for violations and follow up with the Owner when necessary. vii. Construction site close-out requirements (Part VI.D.9.);  When required, the applicant must submit “as-built” drawings. The town does inspection of the site prior to closeout.  Final site stabilization inspection in accordance with NYS CGP. viii. Enforcement process/expectations for compliance; and  All contractors and owners are expected and required to comply with the Town of Ithaca codes, NYS DEC Construction General Permit, NYS DEC MS4 permit and the Sediment and Erosion Control Manual.  Town-conducted inspections are provided to the owner and outlines deficiencies observed.  See Enforcement Response Plan (ERP) o Verbal warnings, o Violation letters, o Stop work orders, o Citations and fines, o Civil penalty and injunction. ix. Other procedures associated with the control of stormwater runoff from applicable construction activities. DRAF T Appendix J: Active SPDES Permit Construction Project Inventory DRAF T Amabel Pocket Neighborhood West Hill Five Mile Dr Susan Cosentini New Earth Living, LLC 619 Five Mile Dr. Ithaca, NY coznewearth@gmail.com 12/14/2015 7/29/2019 9/14/2018 Carrowmoor Solar West Hill 1358 Mecklenburg Rd Ryan McCune Nexamp Solar LLC 101 Summer St, Floor 2 Boston, MA 02110 rmccune@nexamp.com High Coddington Road Community Center South Hill 920 Coddington Road Heather Mount Coddington Road Community Center 920 Coddington Rd Ithaca, NY CRCCdirector@coddingtonroad.org 3/4/2024 CU CALS GREENHOUSE 6/26/2007 Northeast Cornell University David Vanderpoorten Cornell University 119 Humphreys Service BuildingIthaca, NY dv264@cornell.edu 11/4/2021 CU Multidisciplinary Building 6/26/2007 East Hill Cornell University Ram Venkat Cornell University 102 Humphreys Service BuildingIthaca, NY rv93@cornell.edu 11/15/2021 CU New Baseball Field 6/26/2007 East Hill Cornell University David Vanderpoorten Cornell University 119 Humphreys Service BuildingIthaca, NY dv264@cornell.edu High CU Robert Trent Jones Golf Course Renovations No Post Northeast 213 Warren Road Joe Solomon Cornell University 223 Thurston Ave Ithaca, NY jds83@cornell.edu 12/5/2022 CU Indoor Sports & Recreation Center and Sports Field Northeast 313 Tower Road Elisabete Godden Cornell University 102 Humphreys Service BuildingIthaca, NY egodden@cornell.edu 11/8/2024 Ithaca Estates III South Hill Danby Rd Paul Alexander Ithaca College 602 Hancock St Ithaca, NY The Learning Farm West Hill 272 Enfield Falls Rd Christa Nunez Christa Nunez 272 Enfield Falls Rd Ithaca, NY christanunez@gmail.com 4/19/2024 6/17/2024 4/19/2024 Sleep Inn Hotel 9/11/2018 West Hill 635 Elmira Rd Pratik Ahir Ramji Hospitality, LLC 654 Elmira Rd Ithaca, NY pahir05@ahirhotels.com 5/29/2018 5/21/2018 Westview Subdivision South Hill Schickel Rd Boris Simkin Westview Partners 217 Buttermilk Lane Ithaca, NY PROJECT NAME O&M TOWN AREA PROJECT LOCATION CONTACT NAME EMERGENCY ACTION PLANN.O.IEMAILCOMPANY NAME CONTACT LOCATION CONTACT CITY NOTN.O.I. ACKNOWLEDGEME MS4 ACCEPTANC Prioritization (High or DRAF T Appendix K: Post Construction Practice Inventory DRAF T 1 OBJECTID ProjectName Type Owner PracticeID Latitude Longitude Address Year Installed Year Inspected Date Inspected 1 St Catherine's Parish Center Catch Basin Other Private 42.4688092 -76.47099958 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 2 St Catherine's Parish Center Swale Other Private 42.46932127 -76.47210328 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 3 St Catherine's Parish Center Catch Basin Other Private 42.46904375 -76.47101398 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 4 St Catherine's Parish Center Catch Basin Other Private 42.46926258 -76.47100821 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 5 St Catherine's Parish Center Catch Basin Other Private 42.46943802 -76.47079813 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 6 St Catherine's Parish Center Outlet Other Private 42.46964373 -76.47073646 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 7 St Catherine's Parish Center Outlet Other Private 42.46849892 -76.47123359 302 St. Catherine Circle, Ithaca NY 14850 2017 2022 2022-06-17 8 IC3 Outlet Other Private 42.47733108 -76.46679436 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 9 IC3 Swale Other Private 42.47734383 -76.46670946 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 10 IC3 Pond Other Private 42.47752202 -76.46684274 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 11 IC3 Outlet Other Private 42.47750938 -76.46681509 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 12 IC3 Catch Basin Other Private 42.47756527 -76.46689019 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 13 IC3 Outlet Other Private 42.4775485 -76.46686848 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 14 IC3 Outlet Other Private 42.47756062 -76.46680399 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 15 IC3 Outlet Other Private 42.47750243 -76.46680176 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 16 IC3 Outlet Other Private 42.47767625 -76.46678068 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 17 IC3 Catch Basin Other Private 42.47776138 -76.46679643 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 18 IC3 Bioretention Other Private 42.47775622 -76.46680408 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 19 IC3 Outlet Other Private 42.47772203 -76.46690701 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 20 IC3 Catch Basin Other Private 42.4775524 -76.46597906 579 Warren Rd, Ithaca NY 14850 2021 2022 2022-10-25 21 Dewitt Pond Pond Town of Ithaca 42.47500377 -76.47008816 560 Warren Rd, Ithaca NY 14850 1981 22 Belle Sherman Cottages Catch Basin Other Private 42.43810379 -76.47377263 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 23 Belle Sherman Cottages Catch Basin Other Private 42.43782882 -76.47353916 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 24 Belle Sherman Cottages Catch Basin Other Private 42.43779549 -76.47368883 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 25 Belle Sherman Cottages Catch Basin Other Private 42.43782207 -76.47399673 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 26 Belle Sherman Cottages Outlet Other Private 42.43786754 -76.47412746 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 27 Belle Sherman Cottages Culvert Other Private 42.43785774 -76.47415803 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 28 Belle Sherman Cottages Outlet Control StructureOther Private 42.43786742 -76.47425113 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 29 Belle Sherman Cottages Outlet Other Private 42.43801779 -76.47427995 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 30 Belle Sherman Cottages Catch Basin Other Private 42.43888581 -76.47417018 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 31 Belle Sherman Cottages Catch Basin Other Private 42.43903062 -76.47433036 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 32 Belle Sherman Cottages Catch Basin Other Private 42.43899296 -76.47439101 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 33 Belle Sherman Cottages Catch Basin Other Private 42.43915107 -76.47432961 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 34 Belle Sherman Cottages Catch Basin Other Private 42.43920494 -76.47408963 Walnut St, Ithaca NY 14850 2015 2022 2022-09-27 35 Maplewood Redevelopment Outlet Cornell University 42.44110722 -76.47481249 36 Maplewood Redevelopment Bioretention Cornell University 42.44086854 -76.47487303 37 Maplewood Redevelopment Catch Basin Cornell University 42.44077529 -76.47483178 38 Maplewood Redevelopment Outlet Cornell University 42.44024909 -76.47455083 39 Maplewood Redevelopment Catch Basin Cornell University 42.43987159 -76.47426323 40 Maplewood Redevelopment Outlet Cornell University 42.43985367 -76.47430103 41 Maplewood Redevelopment Catch Basin Cornell University 42.43982296 -76.47422973 42 Maplewood Redevelopment Rain Garden Cornell University 42.44001487 -76.47419081 43 Maplewood Redevelopment Rain Garden Cornell University 42.43997367 -76.47415084 44 Maplewood Redevelopment Catch Basin Cornell University 42.44003052 -76.47391276 45 Maplewood Redevelopment Catch Basin Cornell University 42.43999312 -76.47385116 47 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.44039257 -76.47383826 48 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.44110402 -76.47377681 49 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.44104326 -76.47405568 50 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.44089581 -76.47393446 51 Maplewood Redevelopment Swale Cornell University 42.44086322 -76.47398641 52 Maplewood Redevelopment Catch Basin Cornell University 42.44079084 -76.47407444 53 Maplewood Redevelopment Catch Basin Cornell University 42.44084072 -76.47418941 54 Maplewood Redevelopment Catch Basin Cornell University 42.44006809 -76.47319896 55 Maplewood Redevelopment Catch Basin Cornell University 42.43981131 -76.47282869 56 Maplewood Redevelopment Catch Basin Cornell University 42.43961962 -76.47265883 57 Maplewood Redevelopment Rain Garden Cornell University 42.43961357 -76.47264508 58 Maplewood Redevelopment Rain Garden Cornell University 42.43959599 -76.47263348 59 Maplewood Redevelopment Outlet Cornell University 42.43974881 -76.47417975 60 Maplewood Redevelopment Catch Basin Cornell University 42.43972822 -76.47410949 61 Maplewood Redevelopment Bioretention Cornell University 42.43952962 -76.47399171 POST CONSTRUCTION PRACTICE LIST Post Construction Attribute Table DRAF T 2 62 Maplewood Redevelopment Catch Basin Cornell University 42.43953417 -76.4738616 63 Maplewood Redevelopment Catch Basin Cornell University 42.43932044 -76.47389316 64 Maplewood Redevelopment Outlet Cornell University 42.43926376 -76.4738353 65 Maplewood Redevelopment Outlet Control StructureCornell University 42.43921974 -76.47383179 66 Maplewood Redevelopment Outlet Cornell University 42.43914349 -76.4738142 67 Maplewood Redevelopment Catch Basin Cornell University 42.43875864 -76.47204271 68 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43932992 -76.47243065 69 Maplewood Redevelopment Rain Garden Cornell University 42.43842514 -76.47279696 70 Maplewood Redevelopment Rain Garden Cornell University 42.43843411 -76.47272265 71 Maplewood Redevelopment Rain Garden Cornell University 42.43835179 -76.47264536 72 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43859542 -76.47312643 73 Maplewood Redevelopment Bioretention Cornell University 42.43880022 -76.47345373 74 Maplewood Redevelopment Outlet Cornell University 42.43850557 -76.47330386 75 Maplewood Redevelopment Outlet Cornell University 42.43809817 -76.47294111 76 Maplewood Redevelopment Outlet Cornell University 42.43794117 -76.47293678 77 Maplewood Redevelopment Catch Basin Cornell University 42.43792094 -76.47289058 78 Maplewood Redevelopment Catch Basin Cornell University 42.43804119 -76.47200696 79 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43823391 -76.47200103 80 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43825929 -76.47178541 81 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43831317 -76.471663 82 Maplewood Redevelopment Below Ground Detention BasinCornell University 42.43809207 -76.47135946 83 Longview Patio Homes Outlet Other Private 42.41488723 -76.50543927 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 84 Longview Patio Homes Swale Other Private 42.41483636 -76.50547109 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 85 Longview Patio Homes Bioretention Other Private 42.41475815 -76.5057461 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 86 Longview Patio Homes Outlet Control StructureOther Private 42.4146356 -76.5061113 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 87 Longview Patio Homes Pond Other Private 42.41470618 -76.50609302 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 88 Longview Patio Homes Outlet Control StructureOther Private 42.41493318 -76.5060898 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 89 Longview Patio Homes Weir Other Private 42.41497318 -76.50609849 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 90 Longview Patio Homes Outlet Other Private 42.41464581 -76.50572142 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 91 Longview Patio Homes Outlet Other Private 42.4145603 -76.50566962 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 92 Longview Patio Homes Swale Other Private 42.4145919 -76.50575009 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 93 Longview Patio Homes Swale Other Private 42.41467215 -76.50547354 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 94 Longview Patio Homes Swale Other Private 42.41446133 -76.50561282 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 95 Longview Patio Homes Swale Other Private 42.41458963 -76.50611847 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 96 Longview Patio Homes Swale Other Private 42.41443119 -76.50562771 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 97 Longview Patio Homes Swale Other Private 42.41464746 -76.50478579 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 98 Longview Patio Homes Swale Other Private 42.4143664 -76.50467502 Bella Vista Cir, Ithaca NY 14850 2010 2022 2022-09-30 99 Therm Manufacturing Expansion Outlet Control StructureOther Private 42.42943179 -76.48742134 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 100 Therm Manufacturing Expansion Bioretention Other Private 42.42958018 -76.48741627 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 101 Therm Manufacturing Expansion Swale Other Private 42.42962541 -76.48740249 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 102 Therm Manufacturing Expansion Outlet Other Private 42.42931704 -76.48714629 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 103 Therm Manufacturing Expansion Outlet Other Private 42.42904633 -76.48712549 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 104 Therm Manufacturing Expansion Bioretention Other Private 42.42897489 -76.48717218 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 105 Therm Manufacturing Expansion Swale Other Private 42.42890649 -76.48776689 1000 Hudson St Ext, Ithaca NY 14850 2017 2022 2022-08-26 106 Cleveland Estates Outlet Other Private 42.41066645 -76.5049206 Birdseye View Dr, Ithaca NY 14850 2021 2021 2021-04-06 107 Cleveland Estates Pond Other Private 42.41088556 -76.50511012 Birdseye View Dr, Ithaca NY 14850 2021 2021 2021-04-06 108 Cleveland Estates Catch Basin Other Private 42.41065401 -76.50483434 Birdseye View Dr, Ithaca NY 14850 2021 2021 2021-04-06 109 Cleveland Estates Catch Basin Other Private 42.41058528 -76.50463134 Birdseye View Dr, Ithaca NY 14850 2021 2021 2021-04-06 110 Cleveland Estates Swale Other Private 42.41051663 -76.50439527 Birdseye View Dr, Ithaca NY 14850 2021 2021 2021-04-06 111 Holly Creek Subdivision Swale Other Private 42.40630493 -76.50449477 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 112 Holly Creek Subdivision Catch Basin Other Private 42.40627596 -76.50452874 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 114 Holly Creek Subdivision Outlet Other Private 42.40646648 -76.50515097 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 115 Holly Creek Subdivision Outlet Other Private 42.4069796 -76.50511387 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 116 Holly Creek Subdivision Swale Other Private 42.40707253 -76.50498847 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 117 Holly Creek Subdivision Outlet Other Private 42.40771541 -76.50515435 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 118 Holly Creek Subdivision Swale Other Private 42.4076619 -76.50541012 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 119 Holly Creek Subdivision Pond Other Private 42.40765146 -76.50566325 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 120 Holly Creek Subdivision Pond Other Private 42.40773055 -76.50564 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 121 Holly Creek Subdivision Outlet Control StructureOther Private 42.4078725 -76.50565507 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 122 Holly Creek Subdivision Swale Other Private 42.4079045 -76.50490235 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 123 Holly Creek Subdivision Swale Other Private 42.407292 -76.50496215 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 124 Holly Creek Subdivision Outlet Other Private 42.4064329 -76.5052643 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 125 Holly Creek Subdivision Pond Other Private 42.40640473 -76.5056076 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 Post Construction Attribute Table DRAF T 3 126 Holly Creek Subdivision Outlet Control StructureOther Private 42.40662028 -76.50564867 Holly Creek Ln, Ithaca NY 14850 2014 2022 2022-08-25 127 La Tourelle Resort Swale Other Private 42.40123668 -76.50380157 128 La Tourelle Resort Outlet Other Private 42.40122753 -76.50381617 129 La Tourelle Resort Pond Other Private 42.40117892 -76.503769 130 La Tourelle Resort Outlet Other Private 42.40104156 -76.50367687 131 La Tourelle Resort Culvert Other Private 42.40085525 -76.50397227 132 La Tourelle Resort Outlet Control StructureOther Private 42.40085995 -76.50398965 133 La Tourelle Resort Outlet Other Private 42.40081228 -76.50400334 135 La Tourelle Resort Outlet Other Private 42.402061 -76.50348449 136 La Tourelle Resort Outlet Other Private 42.40220036 -76.50325587 137 La Tourelle Resort Swale Other Private 42.40217973 -76.50325531 138 La Tourelle Resort Outlet Other Private 42.40205815 -76.5035534 139 La Tourelle Resort Pond Other Private 42.40203185 -76.50356599 140 La Tourelle Resort Swale Other Private 42.40216453 -76.5037376 141 La Tourelle Resort Swale Other Private 42.40225758 -76.50381075 142 La Tourelle Resort Pond Other Private 42.40202086 -76.50377355 143 La Tourelle Resort Outlet Other Private 42.40225113 -76.50392689 144 Ecovillage TREE Pond Other Private 42.44260954 -76.54346942 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 145 Ecovillage TREE Swale Other Private 42.44388088 -76.54244956 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 146 Ecovillage TREE Catch Basin Other Private 42.44359068 -76.54208772 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 148 Ecovillage TREE Pond Other Private 42.44359586 -76.54146446 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 149 Ecovillage TREE Swale Other Private 42.44354993 -76.54138461 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 150 Ecovillage TREE Swale Other Private 42.44316109 -76.54134481 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 152 Ecovillage TREE Culvert Other Private 42.44257128 -76.54206254 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 153 Ecovillage TREE Culvert Other Private 42.44252426 -76.54221291 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 154 Ecovillage TREE Catch Basin Other Private 42.44283373 -76.54207424 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 155 Ecovillage TREE Catch Basin Other Private 42.44325974 -76.54215441 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 156 Ecovillage TREE Catch Basin Other Private 42.44324031 -76.54209084 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 157 Ecovillage TREE Catch Basin Other Private 42.44285169 -76.54228676 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 158 Ecovillage TREE Catch Basin Other Private 42.44287408 -76.54253524 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 159 Ecovillage TREE Catch Basin Other Private 42.44297979 -76.54266674 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 160 Ecovillage TREE Catch Basin Other Private 42.44300126 -76.54267322 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 161 Ecovillage TREE Catch Basin Other Private 42.44297313 -76.54274521 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 162 Ecovillage TREE Catch Basin Other Private 42.44296283 -76.54289076 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 163 Ecovillage TREE Swale Other Private 42.44299549 -76.54311194 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 164 Ecovillage TREE Swale Other Private 42.44297564 -76.54319307 115 Rachel Carson Way, Ithaca NY 14850 2015 2022 2022-09-06 169 Montessori Field of Dreams Outlet Other Private 42.40801995 -76.49909294 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 170 Montessori Field of Dreams Outlet Control StructureOther Private 42.40840025 -76.49904454 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 171 Montessori Field of Dreams Pond Other Private 42.40847823 -76.49879177 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 172 Montessori Field of Dreams Pond Other Private 42.40832543 -76.49897254 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 173 Montessori Field of Dreams Outlet Other Private 42.4081786 -76.49887406 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 174 Montessori Field of Dreams Outlet Other Private 42.40807855 -76.49900472 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 175 Montessori Field of Dreams Swale Other Private 42.40846891 -76.49928046 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 176 Montessori Field of Dreams Catch Basin Other Private 42.40779415 -76.49915401 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 178 Montessori Field of Dreams Swale Other Private 42.40787028 -76.49886027 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 179 Montessori Field of Dreams Catch Basin Other Private 42.40789266 -76.49887714 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 180 Montessori Field of Dreams Catch Basin Other Private 42.407998 -76.49851326 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 183 Montessori Field of Dreams Permeable PavementOther Private 42.40740915 -76.49892517 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 184 Montessori Field of Dreams Permeable PavementOther Private 42.407367 -76.49892622 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 185 Montessori Field of Dreams Permeable PavementOther Private 42.40741816 -76.49904547 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 186 Montessori Field of Dreams Catch Basin Other Private 42.40749098 -76.49909272 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 187 Montessori Field of Dreams Catch Basin Other Private 42.40758673 -76.49911436 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 188 Montessori Field of Dreams Catch Basin Other Private 42.40762578 -76.49908899 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 189 Montessori Field of Dreams Catch Basin Other Private 42.4076088 -76.49900691 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 190 Montessori Field of Dreams Catch Basin Other Private 42.40756568 -76.49903716 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 191 Montessori Field of Dreams Catch Basin Other Private 42.40745395 -76.49951486 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 193 Montessori Field of Dreams Catch Basin Other Private 42.40731075 -76.49969469 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 194 Montessori Field of Dreams Catch Basin Other Private 42.4074668 -76.49949302 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 196 Montessori Field of Dreams Outlet Other Private 42.40747603 -76.50030007 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 197 Montessori Field of Dreams Catch Basin Other Private 42.40805948 -76.49925587 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 198 Montessori Field of Dreams Catch Basin Other Private 42.40788933 -76.49901781 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 200 Montessori Field of Dreams Catch Basin Other Private 42.40777491 -76.49917891 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 201 Montessori Field of Dreams Catch Basin Other Private 42.40775488 -76.49911651 120 King Rd E, Ithaca NY 14850 2008 2022 2022-09-02 Post Construction Attribute Table DRAF T 4 202 Namgyal Monastery Catch Basin Other Private 42.40453025 -76.49747952 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 203 Namgyal Monastery Catch Basin Other Private 42.40444466 -76.49698117 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 204 Namgyal Monastery Catch Basin Other Private 42.40426583 -76.49703282 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 205 Namgyal Monastery Catch Basin Other Private 42.4042524 -76.49721557 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 206 Namgyal Monastery Catch Basin Other Private 42.4039993 -76.49728672 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 207 Namgyal Monastery Outlet Other Private 42.40389168 -76.49772847 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 208 Namgyal Monastery Swale Other Private 42.40384631 -76.49696851 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 209 Namgyal Monastery Pond Other Private 42.40441018 -76.49653012 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 210 Namgyal Monastery Catch Basin Other Private 42.4044796 -76.49658271 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 211 Namgyal Monastery Inlet Other Private 42.4049467 -76.49701162 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 212 Namgyal Monastery Outlet Other Private 42.40499978 -76.49756979 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 213 Namgyal Monastery Catch Basin Other Private 42.40476396 -76.49758536 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 214 Namgyal Monastery Catch Basin Other Private 42.40491505 -76.49786074 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 215 Namgyal Monastery Outlet Other Private 42.40457375 -76.49784796 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 216 Namgyal Monastery Pond Other Private 42.40466258 -76.50148736 Tibet Dr, Ithaca NY 14850 2009 2022 2022-09-26 217 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44911402 -76.52855479 218 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44909737 -76.52835219 219 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44931406 -76.52824859 220 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44891991 -76.52825961 221 Linderman Creek Apartments Phase I Outlet Other Private 42.44881026 -76.52830356 222 Linderman Creek Apartments Phase I Swale Other Private 42.44878729 -76.52827394 223 Linderman Creek Apartments Phase I Outlet Other Private 42.44876741 -76.52813833 224 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44901951 -76.52768233 225 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44923527 -76.52769334 226 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44946514 -76.52783054 227 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44897614 -76.52756243 228 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44920962 -76.52721071 229 Linderman Creek Apartments Phase I Outlet Other Private 42.44921074 -76.52703429 230 Linderman Creek Apartments Phase I Catch Basin Other Private 42.44958796 -76.52728454 231 Linderman Creek Apartments Phase I Outlet Other Private 42.44959039 -76.52707566 232 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45010739 -76.52779184 233 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45013481 -76.52767836 234 Linderman Creek Apartments Phase I Outlet Other Private 42.45017717 -76.52757014 235 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45009519 -76.52791344 236 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45008979 -76.52839154 237 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45031979 -76.52840916 238 Linderman Creek Apartments Phase I Catch Basin Other Private 42.45003739 -76.52853254 240 Linderman Creek Apartments Phase II Catch Basin Other Private 42.45003384 -76.53298654 241 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44987762 -76.53318849 242 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44973482 -76.53302924 243 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44954669 -76.53314081 244 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44967199 -76.53238584 245 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44963979 -76.53239859 246 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44953524 -76.53227554 247 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44997829 -76.53228426 248 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44970174 -76.53174274 249 Linderman Creek Apartments Phase II Catch Basin Other Private 42.45001076 -76.53192849 250 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44988841 -76.53195242 251 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44985237 -76.53192906 252 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44996297 -76.53157494 253 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44974184 -76.53158558 254 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44973787 -76.53127746 255 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44876352 -76.53314221 256 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44885241 -76.53327241 257 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44911887 -76.53325446 258 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44905889 -76.53313199 259 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44873017 -76.53271488 260 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44897254 -76.53286076 261 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44918424 -76.53293041 262 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44924392 -76.53310169 263 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44902792 -76.53269096 264 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44902614 -76.53221959 265 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44890761 -76.53209276 Post Construction Attribute Table DRAF T 5 266 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44876097 -76.53250544 267 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44904331 -76.53189069 268 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44904331 -76.53189069 269 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44927537 -76.53162154 270 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44934989 -76.53151434 271 Linderman Creek Apartments Phase II Catch Basin Other Private 42.44938119 -76.53124931 272 Linderman Creek Apartments Phase II Swale Other Private 42.44942412 -76.53085429 273 Linderman Creek Apartments Phase II Swale Other Private 42.44945432 -76.53090344 274 Linderman Creek Apartments Phase II Outlet Other Private 42.44973359 -76.53064046 275 Linderman Creek Apartments Phase II Outlet Other Private 42.44966134 -76.53066764 276 Linderman Creek Apartments Phase II Culvert Other Private 42.44976729 -76.53055721 277 Linderman Creek Apartments Phase II Outlet Other Private 42.44959899 -76.53043964 278 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45144526 -76.53284334 279 Linderman Creek Apartments Phase IV Swale Other Private 42.45114697 -76.53283461 280 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45074559 -76.53270737 281 Linderman Creek Apartments Phase IV Outlet Other Private 42.45052652 -76.53258296 282 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45153667 -76.53252814 283 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45111037 -76.53193779 284 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45127214 -76.53195224 285 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45149747 -76.53202701 286 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45165147 -76.53209071 287 Linderman Creek Apartments Phase IV Inlet Other Private 42.45169542 -76.53218266 289 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45166176 -76.53201006 290 Linderman Creek Apartments Phase IV Outlet Other Private 42.45187329 -76.53158163 291 Linderman Creek Apartments Phase IV Pond Other Private 42.45189582 -76.53158864 292 Linderman Creek Apartments Phase IV Pond Other Private 42.45186782 -76.53148954 293 Linderman Creek Apartments Phase IV Outlet Other Private 42.45150899 -76.53166746 294 Linderman Creek Apartments Phase IV Swale Other Private 42.45148201 -76.53164706 295 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45079271 -76.53124766 296 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45079404 -76.53108798 297 Linderman Creek Apartments Phase IV Outlet Other Private 42.45079677 -76.53111281 298 Linderman Creek Apartments Phase IV Catch Basin Other Private 42.45073507 -76.53106858 299 Linderman Creek Apartments Phase IV Pond Other Private 42.45063334 -76.53096839 300 Linderman Creek Apartments Phase IV Outlet Other Private 42.45019801 -76.53061968 301 Ithaca Beer Addition Catch Basin Other Private 42.41738078 -76.53494358 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 302 Ithaca Beer Addition Catch Basin Other Private 42.41736415 -76.53523633 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 303 Ithaca Beer Addition Below Ground Detention BasinOther Private 42.41723913 -76.53535746 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 304 Ithaca Beer Addition Outlet Other Private 42.41732743 -76.53544261 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 305 Ithaca Beer Addition Catch Basin Other Private 42.41728463 -76.53468561 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 306 Ithaca Beer Addition Infiltration Basin Other Private 42.41723088 -76.53459134 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 307 Ithaca Beer Addition Swale Other Private 42.41705703 -76.5344056 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 308 Ithaca Beer Addition Infiltration Basin Other Private 42.41687218 -76.53443906 122 Ithaca Beer Dr, Ithaca NY 14850 2016 2022 2022-10-28 309 Ithaca Beer Addition Catch Basin Other Private 42.4168581 -76.53414659 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 310 Ithaca Beer Addition Outlet Other Private 42.41667581 -76.53387376 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 311 Ithaca Beer Addition Bioretention Other Private 42.41668445 -76.53396543 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 312 Ithaca Beer Addition Bioretention Other Private 42.41657556 -76.53405823 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 313 Ithaca Beer Addition Swale Other Private 42.41658311 -76.53401073 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 314 Ithaca Beer Addition Outlet Other Private 42.41637581 -76.53452416 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 315 Ithaca Beer Addition Catch Basin Other Private 42.4164607 -76.53463331 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 316 Ithaca Beer Addition Catch Basin Other Private 42.41664596 -76.53490949 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 317 Ithaca Beer Addition Bioretention Other Private 42.41617358 -76.53586363 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 318 Ithaca Beer Addition Catch Basin Other Private 42.4161044 -76.53577466 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 319 Ithaca Beer Addition Catch Basin Other Private 42.4159997 -76.53516008 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 320 Ithaca Beer Addition Swale Other Private 42.41606598 -76.53453414 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 321 Ithaca Beer Addition Outlet Other Private 42.41603038 -76.53455911 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 322 Ithaca Beer Addition Outlet Other Private 42.4161798 -76.53361061 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 323 Ithaca Beer Addition Catch Basin Other Private 42.41637573 -76.53378389 122 Ithaca Beer Dr, Ithaca NY 14850 2013 2022 2022-10-28 325 Overlook Apartments Catch Basin Other Private 42.46636432 -76.5441586 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 326 Overlook Apartments Catch Basin Other Private 42.46601497 -76.54398184 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 327 Overlook Apartments Catch Basin Other Private 42.46590629 -76.54367745 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 328 Overlook Apartments Catch Basin Other Private 42.46595199 -76.54366929 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 329 Overlook Apartments Outlet Control StructureOther Private 42.46589329 -76.54326994 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 330 Overlook Apartments Catch Basin Other Private 42.4660708 -76.54343039 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 Post Construction Attribute Table DRAF T 6 331 Overlook Apartments Catch Basin Other Private 42.46624512 -76.54348545 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 332 Overlook Apartments Catch Basin Other Private 42.46444107 -76.54287625 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 333 Overlook Apartments Catch Basin Other Private 42.46454815 -76.54298164 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 335 Overlook Apartments Outlet Other Private 42.46476864 -76.54344357 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 336 Overlook Apartments Catch Basin Other Private 42.46511504 -76.54359945 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 337 Overlook Apartments Outlet Other Private 42.46486124 -76.5438257 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 339 Overlook Apartments Catch Basin Other Private 42.4655538 -76.54368274 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 340 Overlook Apartments Swale Other Private 42.46558859 -76.54412339 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 342 Overlook Apartments Pond Other Private 42.46600095 -76.54304024 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 343 Overlook Apartments Catch Basin Other Private 42.46659967 -76.54268517 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 344 Overlook Apartments Catch Basin Other Private 42.46637002 -76.54229032 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 345 Overlook Apartments Catch Basin Other Private 42.46627989 -76.54218205 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 346 Overlook Apartments Swale Other Private 42.46562464 -76.54237027 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 347 Overlook Apartments Catch Basin Other Private 42.46579727 -76.54193195 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 348 Overlook Apartments Catch Basin Other Private 42.46601529 -76.54167785 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 349 Overlook Apartments Catch Basin Other Private 42.46579714 -76.54137492 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 350 Overlook Apartments Outlet Other Private 42.46595759 -76.54087104 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 351 Overlook Apartments Outlet Other Private 42.46551407 -76.54146577 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 353 Overlook Apartments Pond Other Private 42.4660549 -76.53989129 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 354 Overlook Apartments Outlet Other Private 42.46626195 -76.53933379 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 355 Overlook Apartments Outlet Other Private 42.46593879 -76.53912321 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 356 Overlook Apartments Catch Basin Other Private 42.46608312 -76.53891594 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 357 Overlook Apartments Inlet Other Private 42.46611429 -76.53904509 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 358 Overlook Apartments Catch Basin Other Private 42.46628979 -76.53963135 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 359 Overlook Apartments Catch Basin Other Private 42.46644257 -76.53975734 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 360 Overlook Apartments Outlet Other Private 42.46651832 -76.53975966 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 361 Overlook Apartments Catch Basin Other Private 42.46606689 -76.54001511 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 362 Overlook Apartments Catch Basin Other Private 42.46578864 -76.54019269 West Hill Cir, Ithaca NY 14850 2007 2022 2022-11-29 363 Cayuga Meadows Senior Housing Inlet Other Private 42.46356481 -76.54007842 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 364 Cayuga Meadows Senior Housing Bioretention Other Private 42.46362004 -76.54012316 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 365 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46374759 -76.54019537 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 366 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46365642 -76.53995487 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 367 Cayuga Meadows Senior Housing Outlet Other Private 42.46371245 -76.53979504 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 368 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46388411 -76.54024727 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 369 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46394521 -76.54014441 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 370 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46410019 -76.54033451 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 371 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46397817 -76.5406745 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 372 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46393176 -76.54057979 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 373 Cayuga Meadows Senior Housing Bioretention Other Private 42.46395692 -76.54039759 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 374 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46397699 -76.54081694 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 375 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46389464 -76.54074087 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 376 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46402269 -76.54077291 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 377 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46382937 -76.54113654 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 378 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46413184 -76.54097451 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 379 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46421379 -76.54085937 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 380 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46421061 -76.54086472 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 381 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46442547 -76.54101515 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 382 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46450839 -76.54114989 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 383 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46446369 -76.54128255 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 384 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46455409 -76.54138709 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 385 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46481792 -76.54115981 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 386 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46490634 -76.54108314 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 387 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46486624 -76.5407658 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 388 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46503335 -76.54091775 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 389 Cayuga Meadows Senior Housing Catch Basin Other Private 42.46507997 -76.54085259 108 Aster Ln, Ithaca NY 14850 2018 2022 2022-11-29 390 Clare Bridge Crossing Swale Other Private 42.45990082 -76.53084546 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 391 Clare Bridge Crossing Catch Basin Other Private 42.45939002 -76.53069894 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 392 Clare Bridge Crossing Catch Basin Other Private 42.45911907 -76.53002496 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 393 Clare Bridge Crossing Swale Other Private 42.45898094 -76.53034691 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 394 Clare Bridge Crossing Catch Basin Other Private 42.45892409 -76.53008359 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 395 Clare Bridge Crossing Catch Basin Other Private 42.45888269 -76.53007537 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 396 Clare Bridge Crossing Catch Basin Other Private 42.45883844 -76.52996578 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 397 Clare Bridge Crossing Catch Basin Other Private 42.45886141 -76.52976981 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 Post Construction Attribute Table DRAF T 7 398 Clare Bridge Crossing Catch Basin Other Private 42.45882947 -76.52973856 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 399 Clare Bridge Crossing Catch Basin Other Private 42.45886072 -76.52918054 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 400 Clare Bridge Crossing Catch Basin Other Private 42.45888189 -76.52917569 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 401 Clare Bridge Crossing Outlet Other Private 42.45882917 -76.52927339 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 402 Clare Bridge Crossing Catch Basin Other Private 42.45892576 -76.52968047 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 403 Clare Bridge Crossing Catch Basin Other Private 42.45912089 -76.52980251 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 404 Clare Bridge Crossing Catch Basin Other Private 42.45921034 -76.52979119 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 405 Clare Bridge Crossing Outlet Other Private 42.45899789 -76.52909894 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 406 Clare Bridge Crossing Forebay Other Private 42.45897069 -76.52858019 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 407 Clare Bridge Crossing Pond Other Private 42.45903002 -76.52857766 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 408 Clare Bridge Crossing Bioretention Other Private 42.45925977 -76.52839719 103 Bundy Rd, Ithaca NY 14850 2018 2022 2022-05-23 409 Cayuga Medical Center Catch Basin Other Private 42.46791844 -76.53810096 101 Dates Dr, Ithaca NY 14850 2004 2022 2022-08-26 410 Cayuga Medical Center Bioretention Other Private 42.46786255 -76.53803819 101 Dates Dr, Ithaca NY 14850 2004 2022 2022-08-26 411 Cayuga Medical Center Outlet Control StructureOther Private 42.46820264 -76.53809446 101 Dates Dr, Ithaca NY 14850 2004 2022 2022-08-26 412 Cayuga Medical Center Pond Other Private 42.47053162 -76.53584616 101 Dates Dr, Ithaca NY 14850 2019 2022 2022-08-26 413 Cayuga Medical Center Outlet Other Private 42.47030664 -76.53547354 101 Dates Dr, Ithaca NY 14850 2019 2022 2022-08-26 414 Cayuga Medical Center Permeable PavementOther Private 42.46929024 -76.53645429 101 Dates Dr, Ithaca NY 14850 2013 2022 2022-08-26 415 Cayuga Medical Center Green Roof Other Private 42.46888599 -76.53647519 101 Dates Dr, Ithaca NY 14850 2013 2022 2022-08-26 421 Cornell Friedman Wrestling Center Bioretention Cornell University 42.44588924 -76.47447483 Tower Rd, Ithaca NY 14850 2020 2022 2022-07-07 422 Cornell Friedman Wrestling Center Bioretention Cornell University 42.44603992 -76.47443941 Tower Rd, Ithaca NY 14850 2020 2022 2022-07-07 423 Cornell Stocking Hall Permeable PavementCornell University 42.44738299 -76.47069863 411 Tower Rd, Ithaca NY 14853 2016 2022 2022-08-03 424 Cornell Stocking Hall Catch Basin Cornell University 42.44734254 -76.47106748 411 Tower Rd, Ithaca NY 14853 2016 2022 2022-08-03 425 Cornell Stocking Hall Green Roof Cornell University 42.44722851 -76.47133055 411 Tower Rd, Ithaca NY 14853 2016 2022 2022-08-03 426 Cornell Stocking Hall Permeable PavementCornell University 42.44683214 -76.47100891 411 Tower Rd, Ithaca NY 14853 2016 2022 2022-08-03 427 Cornell Peterson Parking Permeable PavementCornell University 42.44790634 -76.47041449 Tower Rd, Ithaca NY 14850 2018 2022 2022-08-04 428 Cornell Botanic Gardens Infiltration Basin Cornell University 42.44870052 -76.47230598 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 429 Cornell Botanic Gardens Infiltration Basin Cornell University 42.44877174 -76.47256448 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 430 Cornell Botanic Gardens Bioretention Cornell University 42.44919764 -76.47293806 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 431 Cornell Botanic Gardens Permeable PavementCornell University 42.44926999 -76.47256263 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 432 Cornell Botanic Gardens Catch Basin Cornell University 42.44940627 -76.47191396 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 433 Cornell Botanic Gardens Catch Basin Cornell University 42.44954897 -76.47263658 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 434 Cornell Botanic Gardens Catch Basin Cornell University 42.44968952 -76.47232705 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 435 Cornell Botanic Gardens Catch Basin Cornell University 42.44971629 -76.47228728 124 Comstock Knoll Dr, Ithaca NY 14850 2011 2022 2022-08-04 437 Cornell Animal Health Diagnostic Center Infiltration Basin Cornell University 42.44900087 -76.46372101 240 Farrier Rd, Ithaca NY 14853 2009 2022 2022-06-07 438 Cornell Animal Health Diagnostic Center Infiltration Basin Cornell University 42.44895744 -76.46390958 240 Farrier Rd, Ithaca NY 14853 2009 2022 2022-06-07 439 Cornell Animal Health Diagnostic Center Infiltration Basin Cornell University 42.44887259 -76.46457693 240 Farrier Rd, Ithaca NY 14853 2009 2022 2022-06-07 440 Cornell LARTU Infiltration Basin Cornell University 42.44542062 -76.46479526 Dryden Rd, Ithaca NY 14850 2005 2022 2022-08-03 441 Cornell LARTU Infiltration Basin Cornell University 42.44629494 -76.46588178 Dryden Rd, Ithaca NY 14850 2005 2022 2022-08-03 442 Cornell LARTU Infiltration Basin Cornell University 42.44704324 -76.46636758 Dryden Rd, Ithaca NY 14850 2005 2022 2022-08-03 443 Cornell LARTU Infiltration Basin Cornell University 42.44670092 -76.46686383 Dryden Rd, Ithaca NY 14850 2005 2022 2022-08-03 444 Cornell LARTU Infiltration Basin Cornell University 42.44580276 -76.46708115 Dryden Rd, Ithaca NY 14850 2005 2022 2022-08-03 445 Cornell CU Oxley Development (Parking) Swale Cornell University 42.44426837 -76.47405948 Dryden Rd, Ithaca NY 14850 2001 2022 2022-08-06 447 Cornell Teaching Dairy Barn Bioretention Cornell University 42.44588589 -76.45520557 225 Tulip Tree Dr, Ithaca NY 14850 2015 2022 2022-08-02 448 Cornell Teaching Dairy Barn Pond Cornell University 42.44581014 -76.45419215 225 Tulip Tree Dr, Ithaca NY 14850 2015 2022 2022-08-02 449 Cornell Teaching Dairy Barn Bioretention Cornell University 42.44622292 -76.45370893 225 Tulip Tree Dr, Ithaca NY 14850 2015 2022 2022-08-02 450 Cornell Teaching Dairy Barn Pond Cornell University 42.44580817 -76.45480522 225 Tulip Tree Dr, Ithaca NY 14850 2015 2022 2022-08-02 451 Cornell CU Fleet Parking Lot Swale Cornell University 42.44618479 -76.45957593 248 Solidago Rd, Ithaca NY 14850 2016 2022 2022-08-02 452 Cornell CU Fleet Parking Lot Swale Cornell University 42.44381086 -76.45527012 248 Solidago Rd, Ithaca NY 14850 2016 2022 2022-08-02 453 Cornell CU Fleet Parking Lot Swale Cornell University 42.44288139 -76.45542898 248 Solidago Rd, Ithaca NY 14850 2016 2022 2022-08-02 454 Cornell CU Fleet Parking Lot Swale Cornell University 42.4424285 -76.45692073 248 Solidago Rd, Ithaca NY 14850 2016 2022 2022-08-02 455 Cornell CU Fleet Parking Lot Swale Cornell University 42.44256657 -76.45692818 248 Solidago Rd, Ithaca NY 14850 2016 2022 2022-08-02 456 Cornell Rite Aid at Pine Tree Road Pond Cornell University 42.43745802 -76.46720416 380 Pine Tree Rd, Ithaca NY 14850 2007 2022 2022-07-07 457 Cornell McGowan Fields Swale Cornell University 42.43772324 -76.45161602 Game Farm Rd, Ithaca NY 14850 2006 2022 2022-08-06 458 Cornell McGowan Fields Pond Cornell University 42.43942269 -76.45284367 Game Farm Rd, Ithaca NY 14850 2006 2022 2022-08-06 459 Cornell McGowan Fields Pond Cornell University 42.43948009 -76.45041002 Game Farm Rd, Ithaca NY 14850 2006 2022 2022-08-06 460 Neimand-Robinson Softball Fields Bioretention Cornell University 42.43433044 -76.46677575 461 Cornell Merrill Family Sailing Center Infiltration Basin Cornell University 42.47036014 -76.50283657 1000 East Shore Dr, Ithaca NY 14850 2008 2022 2022-07-07 463 Cornell Field Hockey Game and Practice VenueSwale Cornell University 42.44680352 -76.4747617 Tower Rd, Ithaca NY 14850 2008 2022 2022-07-12 464 Cornell NCRE Swale Cornell University 42.4567031 -76.47423918 121 Triphammer Rd, Ithaca NY 14850 2022 465 Cornell NCRE Swale Cornell University 42.45622727 -76.47498483 121 Triphammer Rd, Ithaca NY 14850 2022 466 Cornell NCRE Bioretention Cornell University 42.45592522 -76.47492986 121 Triphammer Rd, Ithaca NY 14850 2022 467 Cornell NCRE Bioretention Cornell University 42.45552839 -76.47453924 121 Triphammer Rd, Ithaca NY 14850 2022 468 Cornell NCRE Swale Cornell University 42.4554413 -76.47411198 121 Triphammer Rd, Ithaca NY 14850 2022 Post Construction Attribute Table DRAF T 8 469 Cornell NCRE Swale Cornell University 42.45552472 -76.47380243 121 Triphammer Rd, Ithaca NY 14850 2022 470 Cornell NCRE Swale Cornell University 42.45546872 -76.47390494 121 Triphammer Rd, Ithaca NY 14850 2022 471 Cornell NCRE Bioretention Cornell University 42.45470939 -76.47432431 121 Triphammer Rd, Ithaca NY 14850 2022 472 Cornell NCRE Bioretention Cornell University 42.45466789 -76.47435001 121 Triphammer Rd, Ithaca NY 14850 2022 473 Cornell NCRE Bioretention Cornell University 42.45406982 -76.47428488 121 Triphammer Rd, Ithaca NY 14850 2022 474 Cornell NCRE Bioretention Cornell University 42.45374824 -76.47428424 121 Triphammer Rd, Ithaca NY 14850 2022 475 Cornell NCRE Bioretention Cornell University 42.45361964 -76.47482929 121 Triphammer Rd, Ithaca NY 14850 2022 476 Cornell NCRE Bioretention Cornell University 42.45389937 -76.47470826 121 Triphammer Rd, Ithaca NY 14850 2022 477 Cornell NCRE Bioretention Cornell University 42.45420674 -76.47481428 121 Triphammer Rd, Ithaca NY 14850 2022 478 Cornell NCRE Bioretention Cornell University 42.45473589 -76.47481451 121 Triphammer Rd, Ithaca NY 14850 2022 479 Cornell NCRE Bioretention Cornell University 42.45513009 -76.47459108 121 Triphammer Rd, Ithaca NY 14850 2022 480 IC Chapel Pond Pond Ithaca College 42.42322895 -76.4966639 481 IC A&E - Remote Parking, South Hill PondPond Ithaca College 42.42576965 -76.49497311 482 IC Circle Apartments Pond Ithaca College 42.41316963 -76.50141349 483 IC Circle Apartments Below Ground Detention BasinIthaca College 42.4108635 -76.5025726 484 IC Circle Apartments Swale Ithaca College 42.41474284 -76.50084619 485 IC Circle Apartments Bioretention Ithaca College 42.41543811 -76.50078872 486 IC Park Center for Business Green Roof Ithaca College 42.42202367 -76.49742042 487 IC Williams Center Permeable PavementIthaca College 42.42150432 -76.49859097 488 IC Williams Center Green Roof Ithaca College 42.42189011 -76.49877881 489 IC Williams Center Bioretention Ithaca College 42.42193118 -76.49928476 490 IC Williams Center Bioretention Ithaca College 42.42246918 -76.49801812 491 IC A&E Center Pond Ithaca College 42.42599302 -76.48855291 492 IC A&E Center - Remote Parking Bioretention Ithaca College 42.42817633 -76.49185411 493 IC C-Lot, A&E Center - Remote Parking Infiltration Basin Ithaca College 42.42470719 -76.49113047 494 IC A&E Center Bioretention Ithaca College 42.42468566 -76.49084428 495 IC A&E Center Bioretention Ithaca College 42.42446462 -76.49050721 496 IC A&E Center Bioretention Ithaca College 42.42422333 -76.49045674 497 IC A&E Center Bioretention Ithaca College 42.42291509 -76.48930844 498 IC A&E Center Bioretention Ithaca College 42.4223794 -76.48887747 499 IC A&E Center Bioretention Ithaca College 42.42185896 -76.49080883 500 IC A&E Center Bioretention Ithaca College 42.42185426 -76.49153789 501 IC A&E Center Bioretention Ithaca College 42.4231792 -76.48823885 502 IC A&E Center - Remote Parking Rain Garden Ithaca College 42.42109427 -76.50049097 503 IC Butterfield Stadium Permeable PavementIthaca College 42.4190269 -76.49876772 504 IC Butterfield Stadium Permeable PavementIthaca College 42.4179636 -76.50089757 505 King Rd Park Outlet Town of Ithaca 42.40334233 -76.48280958 506 King Rd Park Culvert Town of Ithaca 42.40338903 -76.48294328 507 King Rd Park Bioretention Town of Ithaca 42.40354508 -76.48307831 508 King Rd Park Bioretention Town of Ithaca 42.40349153 -76.48294423 509 King Rd Park Bioretention Town of Ithaca 42.40357943 -76.48335799 510 King Rd Park Swale Town of Ithaca 42.40409735 -76.48301223 511 King Rd Park Outlet Town of Ithaca 42.40399685 -76.48242178 512 King Rd Park Culvert Town of Ithaca 42.4039033 -76.48026221 513 King Rd Park Inlet Town of Ithaca 42.4046117 -76.48291228 514 King Rd Park Outlet Town of Ithaca 42.40475433 -76.48306364 515 King Rd Park Culvert Town of Ithaca 42.40624908 -76.48518881 516 King Rd Park Culvert Town of Ithaca 42.40565628 -76.48551396 517 Wedemeyer Horse Farm Pond Other Private 42.47539909 -76.5583505 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 518 Wedemeyer Horse Farm Forebay Other Private 42.4752085 -76.55815381 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 519 Wedemeyer Horse Farm Forebay Other Private 42.47568992 -76.55894673 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 520 Wedemeyer Horse Farm Weir Other Private 42.4758526 -76.55869935 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 521 Wedemeyer Horse Farm Swale Other Private 42.47581374 -76.55919088 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 522 Wedemeyer Horse Farm Bioretention Other Private 42.47599739 -76.560725 1458 Trumansburg Rd, Ithaca NY 14850 2018 2022 2022-09-10 523 Southwoods Pond Town of Ithaca 42.40308747 -76.46857426 Post Construction Attribute Table DRAF T Appendix L: Road Sweeping Inventory DRAF T OBJECTID FullStreet ZipLeft Maintenance Length (ft)Road Miles Sweeping 2024 Date Swept 393 WARREN RD 14850 Tompkins County 303.73 0.0575248 Complete 5/30/2024 1797 SNYDER HILL RD 14850 Town 563.27 0.1066797 Needed 6/27/2023 486 WARREN RD 14850 Tompkins County 749.54 0.1419578 Complete 5/30/2024 532 GROVE RD 14850 Town 332.42 0.0629579 Needed 6/28/2023 533 WOOLF LN 14850 Town 2200.75 0.416807 Needed 6/28/2023 534 WOOLF LN 14850 Town 569.60 0.1078785 Needed 6/28/2023 712 WARREN RD 14850 Tompkins County 901.45 0.170729 Complete 5/30/2024 725 ELM ST EXT 14850 Town 1004.56 0.1902574 Needed 727 ELM ST EXT 14850 Town 1619.09 0.306646 Needed 871 ELM ST EXT 14850 Town 2092.58 0.3963206 Needed 1342 JUDD FALLS RD 14850 Town 458.09 0.0867585 Complete 5/28/2024 1601 SNYDER HILL RD 14850 Town 542.16 0.1026812 Needed 6/27/2023 1699 WARREN RD 14850 Tompkins County 1060.61 0.2008719 Complete 5/30/2024 1718 SNYDER HILL RD 14850 Town 170.98 0.0323834 Needed 6/27/2023 1723 HONNESS LN 14850 Town 321.18 0.0608303 Complete 5/16/2024 892 SNYDER HILL RD 14850 Town 722.56 0.1368479 Needed 6/27/2023 893 SNYDER HILL RD 14850 Town 49.77 0.009426 Needed 6/27/2023 1083 WARREN RD 14850 Tompkins County 755.07 0.1430051 Complete 5/30/2024 1196 MURIEL ST 14850 Town 1354.08 0.2564531 Complete 5/30/2024 2196 SNYDER HILL RD 14850 Town 338.42 0.0640943 Needed 6/27/2023 2204 SNYDER HILL RD 14850 Town 1625.29 0.307819 Needed 6/27/2023 2255 MURIEL ST 14850 Town 1086.08 0.2056959 Complete 5/30/2024 2305 JUDD FALLS RD 14850 Town 525.25 0.0994786 Complete 5/28/2024 2412 JUDD FALLS RD 14850 Town 406.59 0.0770054 Complete 5/28/2024 2603 MAPLE AVE 14850 Town 1214.10 0.2299427 Complete 5/29/2024 3513 PERRY LN 14850 Town 1010.86 0.1914497 Complete 5/23/2024 2871 GROVE PL 14850 Town 288.80 0.0546968 Needed 6/28/2023 2928 STONE QUARRY RD 14850 Town 5351.21 1.0134847 Complete 5/28/2024 4128 MURIEL ST 14850 Town 282.22 0.0534499 Needed 4285 HONNESS LN 14850 Town 1219.16 0.2309018 Complete 5/16/2024 4286 HONNESS LN 14850 Town 369.32 0.0699469 Complete 5/16/2024 4370 BUNDY RD 14850 Town 6463.37 1.2241205 Needed 6/29/2023 3690 CALDWELL RD 14850 Town 394.94 0.0747999 Complete 5/29/2024 3745 W NORTHVIEW RD 14850 Town 896.31 0.1697548 Needed 6/27/2023 3911 BUNDY RD 14850 Town 3033.77 0.5745766 Needed 6/29/2023 3915 UPDIKE RD 14850 Town 1982.93 0.375555 Needed 6/27/2023 6536 STRAWBERRY HILL CIR 14850 Town 333.26 0.0631166 Complete 5/16/2024 6582 MAPLE AVE 14850 Town 1155.39 0.2188227 Complete 5/29/2024 26356 BUNDY RD 14850 Town 417.43 0.0790581 Complete 5/23/2024 30 FOREST HOME DR 14850 Town 143.23 0.027127 Complete 5/28/2024 156 SALEM DR 14850 Town 339.68 0.0643336 Needed 6/27/2023 196 SALEM DR 14850 Town 791.48 0.1499007 Needed 6/27/2023 260 SALEM DR 14850 Town 605.57 0.1146917 Needed 6/27/2023 397 FOREST HOME DR 14850 Town 209.36 0.0396518 Complete 5/28/2024 428 SALEM DR 14850 Town 219.00 0.0414775 Needed 6/27/2023 4862 HOPKINS PL 14850 Town 145.77 0.0276086 Needed 6/29/2023 4866 CAMPBELL AVE 14850 Town 499.74 0.0946477 Needed 6/29/2023 4994 JUDD FALLS RD 14853 Town 819.00 0.1551131 Complete 5/28/2024 4998 JUDD FALLS RD 14853 Town 629.55 0.1192336 Complete 5/28/2024 5012 JUDD FALLS RD 14850 Town 88.38 0.0167377 Complete 5/28/2024 5014 JUDD FALLS RD 14853 Town 566.38 0.1072684 Complete 5/28/2024 5051 STRAWBERRY HILL CIR 14850 Town 121.43 0.0229981 Complete 5/16/2024 5052 STRAWBERRY HILL CIR 14850 Town 287.02 0.0543589 Complete 5/16/2024 5053 HARWICK RD 14850 Town 385.83 0.073074 Complete 5/16/2024 5054 HONNESS LN 14850 Town 354.56 0.0671506 Complete 5/16/2024 5055 HONNESS LN 14850 Town 342.12 0.0647954 Complete 5/16/2024 5056 SNYDER HILL RD 14850 Town 1155.97 0.2189339 Needed 5209 WEST HILL CIR 14850 Town 631.97 0.1196903 Complete 5/23/2024 5210 WEST HILL CIR 14850 Town 608.62 0.1152685 Complete 5/23/2024 5213 MARCY CT 14850 Town 849.84 0.1609536 Complete 5/28/2024 581 FOREST HOME DR 14850 Town 105.66 0.0200109 Complete 5/28/2024 665 SALEM DR 14850 Town 355.34 0.0672993 Needed 6/27/2023 780 FOREST HOME DR 14850 Town 197.85 0.0374718 Complete 5/29/2024 847 SALEM DR 14850 Town 362.79 0.0687097 Needed 6/27/2023 965 RENWICK DR 14850 Town 1565.91 0.2965728 Complete 5/29/2024 966 RENWICK DR 14850 Town 624.78 0.1183296 Complete 5/29/2024 1199 FOREST HOME DR 14850 Town 2446.01 0.4632589 Complete 5/29/2024 1204 BRANDYWINE DR 14850 Town 433.14 0.0820337 Needed 6/27/2023 1287 BRANDYWINE DR 14850 Town 364.53 0.0690395 Needed 6/27/2023 1316 FOREST HOME DR 14850 Town 649.80 0.1230684 Complete 5/28/2024 Road Sweeping Inventory DRAF T 1360 RENWICK DR 14850 Town 377.50 0.0714958 Complete 5/29/2024 1674 SALEM DR 14850 Town 428.23 0.0811048 Needed 6/27/2023 2344 SALEM DR 14850 Town 347.05 0.0657284 Needed 6/27/2023 2836 HARRIS B DATES DR 14850 Town 2525.34 0.4782826 Complete 5/17/2024 2846 FOREST HOME DR 14850 Town 637.24 0.1206889 Complete 5/29/2024 3269 WHITETAIL DR 14850 Town 940.59 0.1781408 Complete 5/28/2024 3310 WHITETAIL DR 14850 Town 757.53 0.1434716 Complete 5/28/2024 4620 WILDFLOWER DR 14850 Town 567.56 0.1074924 Complete 5/16/2024 5198 WILDFLOWER DR 14850 Town 299.06 0.0566397 Complete 5/16/2024 5199 WILDFLOWER DR 14850 Town 227.74 0.0431322 Complete 5/16/2024 4522 W KING RD 14850 Town 105.30 0.0199435 Complete 5/28/2024 4545 BUNDY RD 14850 Town 1507.32 0.285477 Complete 5/23/2024 4619 STRAWBERRY HILL CIR 14850 Town 968.95 0.1835121 Complete 5/16/2024 4684 RENWICK HEIGHTS RD 14850 Town 773.63 0.146521 Needed 4688 WINNERS CIR 14850 Town 524.47 0.0993308 Complete 5/29/2024 5381 GROVE RD 14850 Town 447.81 0.0848124 Needed 6/28/2023 5450 CALDWELL RD 14853 Town 830.72 0.1573334 Complete 5/29/2024 5799 HARRIS B DATES DR 14850 Town 88.07 0.0166793 Needed 6/28/2023 6177 ASTER LN 14850 Town 725.08 0.1373252 Complete 5/23/2024 DRAF T Appendix M: Enforcement Response Plan (ERP) DRAF T ENFORCEMENT RESPONSE PLAN (ERP) In accordance with the MS4 permit, the Town of Ithaca is required to develop an Enforcement Response Plan (ERP) to outline the enforcement actions to be taken for violations that the MS4 Operator has enacted for illicit discharge, construction, and post-construction activities. The ERP sets forth a protocol to address repeat and continuing violations through progressively stricter responses as needed to achieve compliance with the terms and conditions of this SPDES general permit. Illicit Discharge Detection and Elimination: The follow actions are to be taken for violations of the Illicit Discharge Law enacted by the Town of Ithaca: a) Inspection of Potential Illicit Discharge: The Town of Ithaca may find an illicit discharge from site inspections, staff observations, or complaints from the public. Once a potential illicit discharge complaint has been received a member of the Town Engineering staff will conduct a field inspection in accordance with the Town Outfall Reconnaissance Inventory Program. If upon inspection, the outfall in question appears to be a potential illicit discharge, the inspector would take a field sample which would then be sent in for laboratory testing. Based on the results the inspector would follow the illicit discharge track down procedures outlined in the Illicit Discharge Detection and Elimination Manual by the Center for Watershed Protection dated 2004. b) Notice of Violation: The Town of Ithaca will send out written notices or order compliance by Notice of Violations. Such notice may require, without limitation: i. The performance of monitoring, analyses, and reporting; ii. The elimination of illicit connections or illicit discharges iii. That violating discharges practices, or operations cease and desist; iv. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property; and/or v. The implementation of source control or treatment best management practices. c) Remediation: If abatement of a violation and/or restoration of affected property is required, the notice of violation shall set forth a deadline within which such remediation or restoration must be completed. Said notice of violation shall further advise that, should the violator fail to remediate or restore within the established deadline, the work may be done by a designated governmental agency or a contractor, with the expense thereof to be charged to the violator and/or to become a lien against the premises. DRAF T I. Town's Performance of Remediation and Restoration. a) If any remedial or restoration measures are not completed to the satisfaction of the SMO within the period set forth in the Town's notice of violation or Town Board's decision after any appeal thereof pursuant to, the Town may enter the premises to undertake the remedial or restoration measures or cause them to be made. The Town's entry onto such premises shall be pursuant to an agreement between the Town and the landowner. If no agreement exists or can be obtained in a timely manner, the Town may enter such property to remove an imminent danger to life, property or safety of the public caused by the activities that violate this chapter. The Town further may seek a warrant from a court of competent jurisdiction for access to the premises and/or may seek a court order requiring or authorizing all actions reasonably necessary to abate the violation and/or restore the property, with the costs of such actions the sole responsibility of the violator. b) The Town shall present the landowner with a bill for all costs and expenses incurred by the Town in connection with the remedial and restoration measures. If the landowner shall fail to pay such costs and expenses within 15 days after the demand for same, or within 30 days of the final decision on any administrative or judicial contest the landowner may pursue, then such unpaid costs, expenses and interest (at the statutory interest rate for money judgments in New York State courts) incurred from the date of the remedial and restoration measures shall constitute a lien upon the land on which such measures were undertaken. A legal action or proceeding may be brought to collect such costs, expenses, interest, and recoverable attorney's fees or to foreclose such lien. As an alternative to the maintenance of any such action, the Town may file a certificate with the Tompkins County Department of Assessment stating the costs and expenses incurred and interest accruing as aforesaid, together with a statement identifying the property and landowner. The Tompkins County Department of Assessment shall in the preparation of the next assessment roll assess such unpaid costs, expenses and interest upon such property. Such amount shall be included as a special ad valorem levy (administered as a move tax) against such property, shall constitute a lien, and shall be collected and enforced in the same manner, by the same proceedings, at the same time, and under the same penalties as are provided by law for collection and enforcement of real property taxes in the Town of Ithaca. The assessment of such costs, expenses and interest shall be effective even if the property would otherwise be exempt from real estate taxation. II. Fines, penalties and injunctive relief a) Fines and imprisonment i. A violation is considered an offense, with conviction of a first offense punishable by a fine of up to $500 or imprisonment not to exceed 15 days, or both. For conviction of a second or subsequent offense which was committed within a period of five years from the commission of the DRAF T prior offense, a violator shall be subject to a fine of up to $1,000 or imprisonment not to exceed 15 days, or both. ii. Each day a violation exists shall constitute a separate violation. iii. Any police officer, peace officer, Town Code Enforcement Officer, or any other person who may be lawfully designated by the Town Board shall have the authority to issue appearance tickets in connection with such violations. b) Civil penalties and injunctions. i. Violations shall be liable for a civil penalty of up to $500 for a first violation and up to $1,000 for a second or subsequent violation which was committed within a period of five years from the commission of the prior violation. ii. Each day a violation exists shall constitute a separate violation. iii. The Attorney for the Town or his or her designee may commence an action or special proceeding against the violator in a court of competent jurisdiction to collect these penalties, together with costs, disbursements and recoverable attorney's fees, and/or to compel compliance with this chapter or restrain by injunction any such violation. III. Withholding of building permits and certificates of occupancy or certificates of compliance. If any activity is undertaken or a condition exists in violation of this chapter, the SMO or Town Code Enforcement Officer may withhold or revoke any building permit or withhold a certificate of occupancy or certificate of compliance. IV. Alternative remedies. a) Upon the recommendation of the Attorney for the Town and concurrence of the SMO, the Town and any violator of this chapter may agree that the violator will voluntarily be subject to alternative remedies in lieu of the Town's seeking a civil penalty. Such an agreement is appropriate where: i. The violation was unintentional; ii. The violator has no history of previous violations of this chapter; iii. Environmental damage did not occur or was minimal; iv. The violator acted quickly to remedy the violation; and v. The violator cooperated in the investigation and the violation's resolution. b) Alternative remedies may consist of one or more of the following: i. Attendance at compliance workshops. ii. Storm drain stenciling or storm drain marking. iii. River, stream or creek cleanup activities. iv. Any other activity deemed by the Town to be a significant contribution to the health, safety and welfare of the Town, its citizens and/or the environment. V. Violations deemed a public nuisance DRAF T a) In addition to the enforcement processes and penalties provided in this chapter, any condition caused or permitted to exist in violation of any of the provisions of this chapter is hereby deemed and declared to be a threat to public health, safety, and welfare and is declared and deemed a nuisance and may be summarily abated or restored at the violator's expense, and/or a civil action to abate, enjoin, or otherwise compel the cessation of such nuisance may be undertaken by the Town in its sole discretion. Active Construction Sites: The following actions are to be taken for violations against the Town of Ithaca Stormwater Management Law: A. Notice of Violation: I. When the Town of Ithaca determines that the requirements of this chapter are not being met, it may issue a written notice of violation to the landowner and, in the discretion of the Town, to any applicant, developer, or owner or operator of stormwater management practices. The notice of violation shall contain: a) The name and address of the landowner and of any applicant, developer, or owner or operator of the stormwater management practices receiving the notice of violation. b) The address, when available, or a description of the building, structure or land upon which the violation is occurring. c) A statement specifying the nature of the violation. d) A description of the remedial measures necessary to bring the violation into compliance with this chapter and a time schedule for the completion of such remedial action. e) A statement of the fines and penalties applicable to such violations. II. If the remedial measures are not completed to the satisfaction of the Town's Stormwater Management Officer within the period set forth in the Town's notice of violation, the Town may enter the property to undertake the remedial measures or cause them to be made. The Town's entry onto such private property shall be pursuant to an agreement between the Town and landowner. If no agreement exists or can be obtained in a timely manner, the Town may enter such property to remove an imminent danger to life, property or safety of the public caused by the inadequate operation or repair of the stormwater management practices. DRAF T III. The Town shall present the landowner with a bill for all costs and expenses incurred by the Town in connection with the remedial measures. If the landowner shall fail to pay such costs and expenses within 10 days after the demand for same, or within 30 days of the final decision on any administrative or judicial contest the landowner may pursue, then such unpaid costs, expenses and interest at the per annum rate of 9% incurred from the date of the remedial measures shall constitute a lien upon the land on which the stormwater management practices are located. A legal action or proceeding may be brought to collect such costs, expenses, interest, and recoverable attorney's fees, or to foreclose such lien. As an alternative to the maintenance of any such action, the Town may file a certificate with the Tompkins County Department of Assessment stating the costs and expenses incurred and interest accruing as aforesaid, together with a statement identifying the property and landowner. The Tompkins County Department of Assessment shall, in the preparation of the next assessment roll, assess such unpaid costs, expenses and interest upon such property. Such amount shall be included as a special ad valorem levy (administered as a move tax) against such property, shall constitute a lien, and shall be collected and enforced in the same manner, by the same proceedings, at the same time, and under the same penalties as are provided by law for collection and enforcement of real property taxes in the Town of Ithaca. The assessment of such costs, expenses and interest shall be effective even if the property would otherwise be exempt from real estate taxation. IV. The Town's rights to undertake remedial measures and recover the costs from the landowner are in addition to all other rights and remedies allowed by this chapter or by law or in equity. B. Stop-work orders. I. Authority to issue. The Stormwater Management Officer or Code Enforcement Officer is authorized to issue stop-work orders under this chapter for violations of this chapter. II. Content of stop-work orders. Stop-work orders shall be in writing, be dated and signed by the issuing officer, state the reason or reasons for issuance, and if applicable, state the conditions which must be satisfied before work will be permitted to resume. III. Service of stop-work orders. The issuing officer shall cause the stop-work order, or a copy thereof, to be served on the owner of the affected property personally or by certified mail. The issuing officer shall be permitted, but not required, to cause the stop-work order, or a copy thereof, to be served personally or by certified mail on any applicant, developer, tenant, contractor, subcontractor, construction superintendent, owner or operator of stormwater DRAF T management practices, or his or her agents, or any other person or entity taking part or assisting in work affected by the stop-work order; provided, however, that failure to serve any person or entity mentioned in this sentence shall not affect the efficacy of the stop-work order. IV. Effect and duration of stop-work order. Upon the issuance of a stop-work order, the owner of the affected property, applicant, and any other person or entity receiving said order or performing, taking part in or assisting in the work, shall immediately halt all on-site work and activities, except for those activities that address the violations leading to the stop-work order, and except for such work as may be necessary to mitigate or control stormwater and erosion. The stop-work order shall be and shall remain in effect until the Town confirms that the land development activity is in compliance and the violation has been satisfactorily addressed. V. Violations of stop-work orders. In addition to any other right or remedy allowed by this chapter or by law or in equity, failure to comply with a stop- work order in a timely manner is a violation of this chapter and may result in civil penalties, criminal fines, imprisonment and/or injunctive relief in accordance with the provisions of this chapter. VI. Remedy not exclusive. The issuance of a stop-work order shall not be the exclusive remedy available to address violations of this chapter, and the authority to issue a stop-work order shall be in addition to, and not in substitution for or limitation of, the right and authority to pursue any other remedy or impose any other penalty under other sections of this chapter, under any other applicable local law or state law, or in equity. Any such other remedy or penalty may be pursued at any time, whether prior to, at the time of, or after the issuance of a stop-work order. C. Violations. Any land development activity that is commenced or is conducted contrary to this chapter, and all other violations of this chapter, may be abated in any manner provided by law. D. Fines, penalties and injunctive relief. I. Fines and imprisonment. a) A violation of this chapter's requirements to obtain or comply with the terms of a full SWPPP is hereby declared to be an offense, with conviction punishable by a fine of up to $1,000 or imprisonment not to exceed 15 days, or both. b) A violation of this chapter's requirements to obtain or comply with the terms of a basic SWPPP is hereby declared to be an offense, with conviction punishable by a fine of up to $500 or imprisonment not to exceed 15 days, or both. DRAF T c) A violation of this chapter's requirements to obtain or comply with a simple erosion and sedimentation control plan is hereby declared to be an offense, with conviction punishable by a fine of up to $250 or imprisonment not to exceed 15 days, or both. d) Any other violation of this chapter's requirements is hereby declared to be an offense, with conviction punishable by a fine of up to $1,000 or imprisonment not to exceed 15 days, or both. e) Each day a violation exists shall constitute a separate violation. f) Any police officer or peace officer or any person who may be lawfully designated by the Town Board shall have the authority to issue appearance tickets in connection with such violations. II. Civil penalties and injunctions. a) Persons and other entities that violate this chapter's requirements to obtain or comply with the terms of a full SWPPP shall be liable for a civil penalty of up to $1,000 for each such violation. b) Persons and other entities that violate this chapter's requirements to obtain or comply with the terms of a basic SWPPP shall be liable for a civil penalty of up to $500 for each such violation. c) Persons and other entities that violate this chapter's requirements to obtain or comply with the terms of a simple erosion and sedimentation control plan shall be liable for a civil penalty of up to $250 for each such violation. d) Persons and other entities that violate any other requirements of this chapter shall be liable for a civil penalty of up to $1,000 for each such violation. e) Each day a violation exists shall constitute a separate violation. f) The Attorney for the Town or his or her designee may commence an action or special proceeding against the violator in a court of competent jurisdiction to collect these penalties, together with costs, disbursements and recoverable attorneys' fees, and/or to compel compliance with this chapter or restrain by injunction any such violation. E. Withholding of issuance of building permit, certificate of occupancy or certificate of compliance, or inspections. If any building or land development activity is installed or conducted in violation of this chapter, the Stormwater Management Officer or Code Enforcement Officer may withhold any building permit or certificate of occupancy or certificate of compliance, and/or prevent the occupancy of said building or land. Enforcement Tracking The MS4 Operator must track instances of non-compliance in the SWMP Plan. The enforcement case documentation must include, at a minimum, the following: DRAF T a) Name of the owner/operator of the facility or site of the violation (can be redacted from the publicly available SWMP Plan); b) Location of the stormwater source (e.g., construction project); c) Description of the violation; d) Schedule for returning to compliance; e) Description of enforcement response used, including escalated responses if repeat violations occur or violations are not resolved in a timely manner; f) Accompanying documentation of enforcement response (e.g., notices of noncompliance, notices of violations); g) Any referrals to different departments or agencies; and h) Date violation was resolved DRAF T