Loading...
HomeMy WebLinkAboutPWC Agenda 2024-11-19 and PacketAGENDA PUBLIC WORKS COMMITTEE November 19th, 2024, 9:00a.m. ZOOM Link: https://us06web.zoom.us/j/81695207215 1. Approval of Minutes a. September 17, 2024 2. Member Comments/Concerns a. Consider Modifications to Agenda 3. Engineering Team Intro – Dave O’Shea 4. Babcock Ridge Trail Update – Mike Smith 5. Sewer Agreements 6. OpenGov – Asset Management Demo – Joe Talbut 7. Project Updates – a. Streetlights b. King Rd West Culvert c. PWF MEP Updates d. TH Clerks/Mezz Update e. Town Hall Weatherization f. Site Design Manual g. Forest Home PS1 DAVID O'SHEA, P.E. DIRECTOR OF ENGINEERING TOWN ENGINEER STORM WATER MANAGEMENT OFFICER ENGINEERING DEPARTMENT RESPONSIBILITIES:DEPARTMENT MANAGEMENTBUDGETINGFULL SWPPP PERMIT APPROVALDESIGN APPROVALDEVELOPMENT REVIEW BECKY JORDAN ADMINISTRATIVE ASSISTANT IV RESPONSIBILITIES: ACCOUNTING FILE MANAGEMENT TRANSACTIONAL ASSIGNMENTS REBECCA WRIGHT ADMINISTRATIVE ASSISTANT I RESPONSIBILITIES: FILE MANAGEMENT COMMUNICATION VISITOR ASSISTANCE CLERICAL DUTIES BEN COAKLEY GIS ANALYST RESPONSIBILITIES: DEVELOPMENT, MAINTENANCE, AND DEPLOYMENT OF GIS JUSTIN MCNEAL CIVIL ENGINEER RESPONSIBILITIES: PROJECT DESIGN AND REVIEW MS4 PROGRAM BASIC & FULL SWPPP REVIEW EMILY RODGERS CIVIL ENGINEER RESPONSIBILITIES: PROJECT DESIGN AND REVIEW SIMPLE SWPPPs SPDES REVIEW SAM HARRIS CIVIL ENGINEER RESPONSIBILITIES: PROJECT DESIGN AND REVIEW EXTERNAL PLUMBING PERMIT APPROVAL HIGHWAY MAINTENANCE DESIGN CONNOR CRANDALL ENGINEERING TECHNICIAN RESPONSIBILITIES: U DIG MARKOUTS DATA COLLECTION & SURVEYDRAFTINGPROJECT INSPECTIONEXTERNAL PLUMBING INSPECTIONS MADISON CLAPP ENGINEERING TECHNICIAN RESPONSIBILITIES: U DIG MARKOUTS DATA COLLECTION & SURVEYDRAFTINGPROJECT INSPECTIONEXTERNAL PLUMBING INSPECTIONS item #3 1/3PAGE:Ithaca, NY / Concept DesignSeptember 30, 2024 Babcock Ridge Trail at Culver Road Preserve Basemap 200’0’400’ Feet 600’ CU L V E R R O A D CU L V E R R O A D VIEW TO VIEW TO BUTTERMILK FALLSBUTTERMILK FALLS VA L L E Y VA L L E Y VI E W VI E W VIEW TO VIEW TO ITHACA C O L L E G E ITHACA C O L L E G E CORNELL CORNELL UNIVERSITYUNIVERSITYBOTANIC GARDENS PROPERTYBOTANIC GARDENS PROPERTY BABCOCKBABCOCKRIDGERIDGE CU L V E R R O A D CU L V E R R O A D 9 15 14 13 12 1110 7 8 6 5 4 3 21 16 16 9 Upper parking area notes: 1. Plan for 6+ spaces 2. Preserve mature trees as feasible 3. Parking spaces between trees? 50’ between trees (left) 40’ between trees (right) Lower parking area notes: 1. Plan for 6+ spaces 2. Relatively flat area 3. Could be phased - TBD LEGEND1. Upper parking area - el. 1,065’ 2. Gate/barrier required to limit access3. Bowl/depression 4. Gentle slopes/existing paths 5. Maintain buffer at property edge6. Steep slope - 15%7. Vantage point - el. 955’8. Steep ridge / drop-off9. Existing Residence10. Potential woods trail11. Existing informal ridge trail12. Pavilion plateau - VIEWS, el. 825’13. Potential switchback area14. Steep slope - 15%15. Lower parking area - el. 735’16. Potential future phase(s) Note: All measurements are approximate Item #4 2/3PAGE:Ithaca, NY / Concept DesignSeptember 30, 2024 Babcock Ridge Trail at Culver Road Preserve Trail Layout 200’0’400’ Feet 600’ CU L V E R R O A D CU L V E R R O A D CU L V E R R O A D CU L V E R R O A D 1 2 2 3 5 4 LEGEND1. Upper parking lot2. Buffer at property line3. One entry to plateau area4. Future pavilion location5. Lower Parking Lot Key Takeaways• Slope ranges from less than 5% to 15% maximum.• Total elevation change: 280 ft• Total length: 0.7 miles• 0.25 miles from lower parking area to pavilion 125 ’ 70’ 11 0 ’ 3/3PAGE:Ithaca, NY / Concept DesignSeptember 30, 2024 Babcock Ridge Trail at Culver Road Preserve 100’0’200’ Feet 300’ Trail Grading CU L V E R R O A D CU L V E R R O A D LEGEND <5% <5%<5% 15% 10% 10% 10% 10% 10% 12.5% 12.5% 12.5% 15% 1. Dark Green trail: Less than 5% gradient 2. Light Green trail: 5-10% gradient 3. Yellow trail: 12.5% gradient 4. Red trail: 15% gradient 2024 Inlet Valley Sewer Improvement Project 11/8/2024 Pump station and conveyance route imrpovements 10/25/2024 Total:1,278,685$ Design:$45,496.00 Contract:$33,571.00 Resolution:2024-118? Change Order:0 End Date:1/1/2026 Total:$33,571.00 Contract:$8,525.00 Resolution:2024-118? Part B Change Order:0 End Date:1/1/2026 Total:$8,525.00 Contract:Resolution: Change Order:End Date: Total: Summary: D.O'Shea 11/8/2024 Project Progress Summary TB 2024-095; TB 2024-101; TB 2024-118? Project: Contractor/Design Professional: Account Number(s): Resolutions: RFP Bid Date: Barton and Loguidice Type: CIP Budget: Date: Project has gone through SEQR, and PIO. Permissive referendum period has eneded. B&L has been awarded the design contract for the Eletrical and Mechanical portion of the project. Amendment Value: Amendment Value: Contract Authorized Value: Part A Completed to Date:$0.00 Completed to Date:$0.00 Completed to Date: Sanitary Sewer Rehabilation Project NE 11/8/2024 Sewer Rehabilaton 9/27/2024 G8120.564 Total:$300,000.00 Bid:$246,812.80 Contract:$246,812.80 Resolution:2024-106 Change Order:$24,681.28 End Date:5/1/2025 Total:$271,494.08 Contract:Resolution: Change Order:End Date: Total: Contract:Resolution: Change Order:End Date: Total: Summary: D.O'Shea 11/8/2024 2024-106 Type: Budget: Date: Account Number(s): Resolutions: The project was awarded to Sewer Speacialty Service Company. Awaiting project schedule and submittals. Amendment Value: Amendment Value: Contract Authorized Value: Completed to Date:$0.00 Completed to Date: Completed to Date: Project Progress Summary Sewer Specialty Service Company, INC Project: Contractor/Design Professional: Bid Date: Townline Rd Bridge Replacement Design 11/8/2024 Bridge Replacement/BridgeNY for County 1/1/2024 Total:$2,342,000.00 Design:$323,000.00 Contract:$323,000.00 Resolution:2023-173 Change Order:0 End Date:12/1/2025 Total:$323,000.00 $50,924.63 Contract:Resolution: Change Order:End Date: Total: Contract:Resolution: Change Order:End Date: Total: Summary: D.O'Shea 11/8/2024 Date: Completed to Date: Engineer is working through alternatives and creation of the Draft Design Approval Document (DDAD). Project Progress Summary 443 Electronic Parkway, Syracuse NY 13088 Barton & Loguidice, DPC 2023-173 Project: Contractor/Design Professional: Account Number(s): Amendment Value: Resolutions: Amendment Value: Contract Authorized Value: Completed to Date: Completed to Date: Type: CIP Budget: Bid Date: