HomeMy WebLinkAboutPWC Minutes 1994-08-25 FINAL
7.oti�I Highvay and Parke Deppartaent
F`"' '' . TOWN OF ITHACA Ie6 Senn Ithaca,tlite Drive
f` 4•� og4 126 EAST SENECA STREET, ITHACA, N.Y. 14850
TOWN CLERK 273-1721 HIGHWAY 273-1656 PARKS 273-8035 ENGINEERING 273-1747 PLANNING 273-1747 ZONING 273-1783
Town of Ithaca Public Works Committee Meeting
August 25 , 1994, 8:00 a.m.
Town of Ithaca Highway Barn
•
1. Approval of Minutes May 25 , 1994 David
June 23, 1994
July 25 , 1994
2 . Discussion of Permits for Work in Town Right-
Of-Way Fred
3. Progress of Tompkins County Five Year Bridge Plan Fred
4 . Discussion Regarding Highway Fari1iti w Fred
5. Discussion of Updating Road Specifications
for Town Highways Dan and Fred
6 . Initial Project Proposal (IPP ) Submission for 1995 Dan
. 7 . Metropolitan Planning Organization (MPO )
Project Proposal Dan
•
8 . West Hill Sewer Update Dan
ghk
pc : Mary Bryant, Admin ' strative Secretary
Jon Kanter, Town Planner
George Frantz, Assistant Town Planner
Andrew Frost, Code Enforcement Officer
FINAL
TOWN OF ITHACA
Public Works Committee Meeting Minutes
August 25. 1994
Present: Fred Noteboom; Rich Schoch; Dan Walker; John Whitcomb;
David Klein, Chairperson; and Ed Conley
Meeting began at 8 : 05 a. m.
Because of the recent storm, drainage problems throughout the Town
consumed a considerable amount of time at this meeting. John
received two separate letters from homeowners on Whitetail Drive
regarding the drainage problems in the Deer Run sub-division which
led to the following discussion.
David asked if there are any provisions for reviewing acceptable
drainage when a building/home is being planned. Dan indicated that
usually there are no drainage plans drawn up before a building/home
is built. It was asked if the Code Enforcement Officer (Andy) has
the authority to see a drainage plan before a building/home is
approved. Dan indicated that he did, but Andy was not exercising
that authority . IL wab decided to ask the Code Enforcement Officer
to include some type of drainage plan along with all new building
plans .
Dan said that the new section of Deer Run sub-division will have
better drainage .
The Committee also discussed the drainage problems on Ridgecrest
and E . King Roads. John asked if the County was going to do
anything about the drainage problems . Fred indicated that the
County would be making the ditches deeper. Dan also indicated
there is a diversion ditch in the building plans for Saunders Road
sub-division which will help with drainage problems in Whitetail
Drive .
At this point in the meeting, Fred Noteboom asked to discuss the
current culvert pipe policy, although it was not on the agenda.
Before this was done , Fred explained that the part of the County' s
Five Year Bridge plan that effects the Town of Ithaca include
rebuilding Forest Home Drive Bridge in 1995 , designing a new King
Road bridge (near Upper Buttermilk Falls State Park) in 1996 , and
rebuilding it in 1997 .
Next there was a motion. by David . to approve the minutes from May.
June , and July. John seconded it. and they were approved.
Fred then discussed devising a permit for working in the Town
right-of-way. He indicated that at present homeowners put
plantings and walls in the Town right-of-way which can obscure
•
Pubic Works Committee Meeting Minutes Page 2
vision and make plowing ( in the winter) harder. Fred also
indicated that in the Town most of the rights-of-way are 60 feet
but some are 50 feet. He also indicated that at present the Town
only requires a permit if there will be any cutting of pavement or
digging in the right-of-way (Culvert Pipe Permit) . Fred said that
if builders would talk to the Highway Department about landscaping
in the Town right-of-way, we would be willing to discuss where the
appropriate place to put plantings, etc is.
David said that homeowners were responsible for replacing culvert
pipes. David indicated that in the Village of Cayuga Heights the
homeowner is responsible to replace culvert pipes. The County
policy is that the homeowner provides the pipe and the County puts
it in, but they will only put gravel down on top (no blacktop) .
Dan said that one of the reasons there is a flooding problem on.
King Road is because the ditches and culverts were changed from the
south side of the road to the north side of the road, and now there
has been development on the north side. David indicated that the
Town was responsible for drainage , and John asked if the County was
going to be involved in resolving the drainage problems. Fred
indicted the County would.
The letter from Mark Bianconi was discussed. John felt that the
Town should replace the 12" culvert pipe with a 15" culvert pipe.
It was agreed that the Town would, and the Highway Superintendent
will contact Mr. Bianconi with regards to this. It was also
indicated that the job should be completed within the next two
weeks.
The Committee also discussed that a better system of logging
complaints was needed within the Town. It was suggested that
duplicating message pads be used.
Getting back to the issue of who pays for a culvert pipe, David
felt that the Town should make it clear by saying that if there is
a major project to be completed that would include replacement of
culvert pipes or if replacement is in the Town' s best interest, the
Town Board shall authorize it. If not, the homeowner shall pay for
the culvert pipe , but the Town can help install it. This coincides
with the current policy.
John indicated that 104 Birchwood Drive was in need of a new
culvert pipe , but did not feel the Town should pay for it because
it is old. David agreed.
Dan asked about having permits for the Town right-of-way with
regard to landscaping projects. John felt that Dan, Fred, and Andy
should get together and come up with ideas regarding this issue .
Dan indicated that when a building permit is issued, the builder is
informed of the permit system and asked to consult with the Highway
•
Pubic Works Committee Meeting Minutes Page 3
Department if any landscaping (beside general grass seedings) is to
be done .
David asked about Whitetail Drive and the drainage problems. Dan
indicated that he and Fred will work on this problem, and that they
had met with the County regarding this. David suggested that Ed
and Fred meet with the homeowners of Whitetail Drive to discuss the
problems. Ed will set this up.
John brought up the drainage issue on Sky-vue . Fred indicated that
the Highway Department will clear out the ditches on Sky-vue as
soon as the Gradeall is fixed. John asked if that would solve the
drainage problems, and Fred said the homeowner should look into
drainage in the back of the home , as it may not.
Highway Facility
Dan indicated that the appraisal from the property, which the Town
is trying to acquire , was $47 ,000, the asking price was $75 ,000,
and the assessment was $42 , 400.
David felt that since the Town Board has already authorized the
purchase, that we could go ahead a make an offer. It was decided
to make an offer of $47 ,000 contingent on the Town Board' s final
approval . Fred indicated that this purchase is in the best
interest of the Town because soon the DEC will require that sand
and salt mix be under cover, as is salt.
David made a motion to have John Whitcomb put in an offer
contingent on the Town Board' s approval.
John asked Fred to update the reasons the Town needs this property
and building including the DEC regulation.
Road Specifications
Dan said we need to have the Town Board approve the current road
specifications. David indicated that this was already done . Dan
said that what needs to be done is to update and revise the wording
of the current specifications. David said to do that and take them
to the Board for approval.
Initial Project Proposal and Metropolitan Planning Organization
Dan indicated that the next two items on the agenda were related
and discussed them at the same time . Dan said that Forest Home
Drive had already been approved for Initial Project Proposal (IPP )
funding along with Stone Quarry Road.
John asked about setting aside money for the Northeast Connector.
Pubic Works Committee Meeting Minutes Page 4
Dan also indicated that to be eligible for a Metropolitan Planning
Organization (MPO ) grant there must be access to an interstate
highway, and the Town has no plans for major road work right now.
Fred indicated that Caldwell Hill Road was also slated for funding
from IPP but that will be tabled until the Northeast Connector
Study is complete .
David asked if the local government must put in funds for these
projects. Dan said yes.
West Hill Sewer Project Update
•
Dan informed the Committee that there was a sewer break this week
by Candlewyck Apartments .
John asked if the West Hill Sewer project construction was spread
out over a three to four year period, would it continue to hold up
or would there be problems.
Dan indicted that the sewer and water mains on West Hill were
cleared out and now the utility access holes needed work to repair
them. There are other problems to be addressed too.
Dan said that the Town will need to decide how the project will be
completed and paid for-3 or 4 years or bonding—this year. John
indicated that we may need to use a bond to pay for it. Dan will
do a study.
The meeting was adjourned at 9 : 30 a. m.
ghk