Town of Ithaca Public Works Committee Meeting
December 7, 1995 , 8 : 00 a.m.
Town of Ithaca Highway/Parks Facility
1 . Approval of Minutes David
2 . Discussion of Resolution of Support for CHIPS
Program Fred
3 . Discussion of Vehicle Purchases Fred
4 . Highway/Parks 1996 Work Plan Fred/Rich
5 . Discussion of Pump Stations Failures in
Forest Home Dan
6 . Discussion of Capital Improvement Project Status Dan
7 . Discussion of Forest Home Bridge Dan
ghk
pc : Mary Bryant, Administrative Secretary
Joan Lent Noteboom, Town Clerk
Jon Kanter, Town Planner
Andrew Frost, Code Enforcement Officer
DISPOSITION DATE
TOWN OF ITHACA
y
Public Works Committee Meeting Minutes
December 7, 1995
Present : David Klein, Chairperson; Dan Walker; Rich Schoch, and
Fred Noteboom
Guests : Jonathan Kanter and George Frantz
The meeting began at 8 : 00 a.m.
The October minutes were approved with no changes .
Resolution of Support for CHIPS Program
Fred Noteboom informed the Committee that a resolution supporting
the continuation of the CHIPS Program Committee was being sent to
the Town Board for their approval .
Vehicle Purchases for 1996
Fred handed out a list of the vehicle purchases to be made by the
Highway/Parks Department in 1996 . Rich Schoch informed the
Committee that because the Department has held off on pick up truck
purchases, this list seems large .
David Klein asked what was in the 1996 budget . Fred said that
between Highway and Parks line items there is $179, 000, and we will
also have revenues from the sale of equipment at the auction.
David then asked if this would be put on the January agenda, and
Fred said that the purchase of the pickups would be from State Bid
so we do not need to have a resolution for bidding from the Board.
The Leaf Vac and the Plow Truck can wait until around March.
Highway/Parks 1996 Work Plan
Rich started the discussion by explaining the list of projects to
be completed for the Parks staff . These include: ADA upgrades,
work at Eastern Heights Park, surface treating some trails,
continue work on the Annex building, and work on Chase Trail .
David asked what were the ADA upgrades that needed to be performed
on the parks . Rich indicated that parking areas need to be
designated for handicapped parking, play structures need to be
changed, along with picnic tables and a hard surface from the
parking area to the play structures .
Rich indicated that the YCC students will be returning to help in
1996 to work at Eastern Heights Park. Dan Walker indicated that
Public Works Committee Meeting Minutes Page 2
the Town of Dryden will be putting $10, 000 in escrow for the
Eastern Heights Park upgrades namely a new basketball court .
David asked if the estimates on the handout were for labor and
materials . Rich said they were for materials only. Labor is
already figured in the budget .
Dan asked if we should be paving the court ourselves or contracting
it out . Rich said it is possible to contract it out, but we can do
our own pavement striping.
Fred informed the Committee that we are attempting to put oil and
stone maintenance, of trails, on a schedule.
Rich said we were continuing work on the Annex building. David
asked if there was heat in the building yet, and Rich said we were
working on it .
Rich said we will be working on Chase Trail in 1996 . Fred asked
Dan if the easements have been established. Dan said we need one
from Ed Hallberg and that we were waiting for the attorney to
review it . George Frantz said that that easement will save the
Town money when building the trail. Dan will pursue this more.
Rich discussed that there are several minor projects to be worked
on in 1996 . They include starting to clear the Tomlinson Park site
and the Vincenzo Iacovelli park site. We will try to use the YCC
students to work on the Vincenzo Iacovelli site.
Rich said we need to improve the signage throughout the Town parks,
and we need to work on the exercise equipment on the Dewitt trail.
Rich indicated that since the ball fields are being used a lot more
we will need to do some work on them this year. We will also be
relocating and cleaning up the brush and leaf drop-off site at the
Town Highway/Parks facility.
David asked if the plans to rebuild the Pump House at Christopher
Circle Water Tank has been started. Dan said they were requesting
contractor quotes.
Rich also said that we would like to make a permanent map for major
entrance points at the South Hill Trail. George said that we have
distributed around 1, 500 paper maps this year.
David asked if this work plan will be on 'the January Board agenda.
Fred indicated that it would be made part of the Town Work Plan.
Fred also indicated that the Highway Work Plan will be brought to
the Town Board' s January meeting in hopes of fulfilling the law,
which stated that the "Agreement for Expenditures of Money" be
adopted by the Board at the January meeting.
Public Works Committee Meeting Minutes Page 3
7—`
David said that the paving operation this year is heavily
concentrated in the Northeast . Fred said this was done in an
attempt to save money since time is wasted if materials and
vehicles have to be sent to different sections of the Town each
year.
Fred pointed out that Chase Lane is on the schedule to be paved
this year. He also indicated that Chase Lane is an example of why
the Town had to tighten up the specifications of building a road.
Fred said that we will be recycling the current pavement into a
cold mix for the base (on each road) and then putting a hot mix
pavement on top. David asked about the shoulders of these roads .
Fred said that he would like to extend the pavement surface 2 feet
on each side for the shoulders . David asked what the visual
appearance of this will be. Fred said it will look like the road
is wider.
David then asked George what type of material he would use on the
shoulders. George did not know. Dan suggested paving the road and
chip sealing the shoulders . . George commented that the appearance
of Harris B . Dates Drive is ugly but has held up really well. Rich
suggested bank run gravel with trail mix.
Fred explained that General Repair work was more for preventative
maintenance, and we are trying to start a six year cycle for this .
George asked if the work estimate on Pearsall Place included the
drainage . Fred said no, but we will be working on the drainage in
that area.
David then asked about the "Other" projects. He asked about the
status of the Park Lane road cut . Dan explained that this is part
of the agreement with the Quicks.
David then asked if any of these projects had dollar amounts for
them, and Fred said no they were basically fixed costs (labor and
equipment) .
David asked the status of the Dewitt Pond project, and Dan said
that the school owns the property and we will be surveying it this
fall .
Fred said that he would like to pipe the ditch on Brandywine Drive.
David asked if it should be put on the Plan, and Dan said it will
probably have to be blasted out since there is bedrock there.
David asked about the drainage by Carol Anderson' s property. Dan
said that he has talked to Brent Cross, Village of Cayuga Heights,
about this.
Public Works Committee Meeting Minutes Page 4
David said that it seems that some drainage issues are more
important than paving and should be made apart of the Plan.
Pump Stations Failures in Forest Home
Dan discussed that the five pump stations in Forest Home were
damaged in the recent snow storm. He said that the power outages
resulted in the coils in the motor starter to burn out. Because
the pumps are old, we are having a hard time getting parts. Dan
said that for a couple days, we had to manually pump the sewer out.
David asked if there were any backups in any of the homes, and Dan
said no. Fred indicated that we had to "build" a road, with fabric
and crushed lime stone, to the pump station so that the City' s
truck could get to it. Dan suggested the road stay there. Dan
also said that he will be proposing a rebuild of the pump stations .
David asked if Dan will be asking the Town Board to pay for the
repairs, and Dan said yes.
Capital Improvement Project Status
Dan said that he is working on a priority list for water and sewer.
He said that the Town is working on designing "Master Meters" for
Bolton Points use.
Dan said that Bolton Point wants to build a water tank, in
conjunction with the Town on Burdick Hill. Dan said he would like
to have one built on East Hill instead.
Dan said that Bolton Point solicitated bids for design work, which
the Town of Ithaca can do. It would cost the Town about $11, 000
whereas it would cost TG Miller' s $24, 000, and Lozier $34, 000 . Dan
said that the original agreement says that the municipalities can
do the work with 1.3 direct salary.
Dan said that the major projects to be worked on are: Route 96
Water, East Hill Water Tank, Burdick Hill Water Tank, East Shore
Drive Water Main, and Northeast Sanitary station (Monitoring
station) . David asked if this would be presented at the January
meeting, and Dan said yes.
Forest Home Bridge Update
Dan handed out two correspondence from the County regarding Forest
Home Bridge. He said they redesigned the abutments and went with
the original concept. This will save about $130, 000. David asked
what the Town' s share will be. Dan said the Town' s share will be
$40, 000 plus the utilities .
David asked if the ISTEA money will still be available.. Fred said
that it would be for a percentage of the work, but not our part .
David indicated that the cost to redo the trusses is about half of
Public Works Committee Meeting Minutes Page 5
what they applied for in the ISTEA grant . George indicated that
the ISTEA money will only pay 80 percent of the cost, whether or
not the original grant is more.
Fred indicated that Caldwell Hill Road needs to have some work done
on it . Dan said we need to work with the Cornell Plantations on
this .
Dan indicated that we will be surveying the area on Judd Falls Road
around the Byway. We will be rebuilding that area. He feels we
should talk to the successful bidder for the bridge project and see
what they would charge to do that . If the cost is acceptable to
the Town, we can let them do the work, if not, Town forces can do
the work.
David asked what our costs for the Forest Home Bridge will be. Dan
said we will not know until the bids are in. David asked if the
bidding will be done in January. Dan said probably not. We need
to get a new schedule.
Fred indicated that the stone wall on Judd Falls Road will not be
reconstructed this year, and the pole is still there.
Protect Applications for ISTEA Funding
Jonathan Kanter said that the Town would like to submit proposals
to receive ISTEA funding.
George continued with the presentation by showing the proposed
projects on a map. The two projects discussed were the William and
Hannah Pew Bikeway and the Maple Avenue link.
George said that the William and Hannah Pew Bikeway would make a
trail from Route 79 to Park Lane to Honness Lane to the East Ithaca
Recreation Way. George discussed the need to put in underground
drainage on Honness Lane so that people can travel along Honness
Lane to the trail. This would allow 7' over the drainage, a 4'
shoulder and a 12'. travel lane. -
George estimated that the bikeway and culverts will cost
approximately $60, 000 . David asked if this was an in-house work
force estimate or outside. George said an outside.
George said that the other part of the bikeway to be developed is
along Pine Tree Road.
This is just part of the William and Hannah Pew Bikeway.
The other project proposal is the Maple Avenue link that would
connect the two sides of the East Ithaca Recreation Way. Dan
Public Works Committee Meeting Minutes Page 6
asked when this funding would be available. George said in 1997.
George estimated the Town' s share of the cost at $30, 000 .
Dan asked if these projects were part of a Capital Plan that will
have the costs included. They are not yet .
George also talked about the trail that the City was going to
collaborate with the Town on. This trail would link the South Hill
Trail with Buttermilk Falls State Park and the Black Diamond Trail .
The problem so far is that Emerson Electric owns some of the
property the trail would go on. George said he would like to see
the section between Spencer Road to Buttermilk Falls Road worked
on. He figures the estimated cost at $35, 000 . This would include
the bridge over Elmira Road. The estimated cost of the bridge is
$135, 000 . He would like to see this construction started in 1998 .
Town Hall
Dan said that information regarding Town Hall will be in the Board
packets . He summarized the layout as such: Two floors and a
basement . The basement would have storage, an employee' s lounge,
and bathrooms. The first floor would have the Courts, Conference
Rooms, Administration, and bathrooms . The second floor would have
the Board Rooms, Conference Rooms, Technical staff, and bathrooms.
The cost is estimated at $1.2 million which includes a 15 percent
design contingency.
The meeting was adjourned at 10 :20 a.m.