HomeMy WebLinkAboutPWC Minutes 1995-03-23 �OFIT Highway and Parks Department
�' rI NAi106 Seven Mile Drive
_- ` V. TOWN OF ITHACA r 'V L Ithaca, NY 14850
21044
126 EAST SENECA STREET, ITHACA, N.Y. 14850 Fax#: (607) 273-9239
TOWN CLERK 273-1721 HIGHWAY 273-1656 PARKS 273-8035 ENGINEERING 273-1747 PLANNING 273-1747 ZONING 273-1783
Town of Ithaca Public Works Committee Meeting
March 23 , 1995
Town of Ithaca Highway Facility
1 . Approval of Minutes David
2 . Discuss Policy and Procedure
for Letter of Credit Fred
3 . Study for Sewer Extension to Salvatore
Grippi' s Area Dan
4 . Update Judd Falls Road Dan/Fred
5 . Update Forest Home Drive Bridge Dan/Fred
6 . Discuss Preventive Maintenance Procedures
for Town Vehicles . Fred
7 . Discuss Christopher Circle/Christopher Lane
Project . Fred
ghk
pc : . Bryant,, Administrative Secretary
Jon Kanter, Town Planner
Andrew Frost, Code Enforcement Officer
FINAL
TOWN OF ITHACA
Public Works Committee Meeting Minutes
March 23 , 1995
Present : David Klein, Chairperson; Ed Conley; Dan Walker; John
Whitcomb; Rich Schoch, and Fred Noteboom
The meeting began at 8 : 00 a.m.
Minutes
The February meeting minutes were approved.
Policy and Procedure for Letter of Credit
Fred Noteboom asked the Committee what direction they want the Town
to go with regards to the policy and procedures for Letters of
Credit . Currently, if a new development is being constructed, the
road must be completed and approved by the Town, before building
permits can be issued.
Dan Walker indicated that normally one building permit can be
issued for a new sub-division before improvements are completed
because it is treated as one lot as long as adequate road frontage
exists without the new road.
Dan and Fred would like to continue with the current policy.
David asked what were the repercussions if a developer put up model
homes and moved someone in before the road was built , and Fred
indicated that drainage problems may occur if the housing is in
place before the road.
David indicated that the Town should keep the policy the way it is,
although it should be put in writing and made very clear. David
wondered if it should be made a part of the sub-division
regulations .
The Committee has asked that this policy be put in writing, and Dan
will look into incorporating it into sub-division regulations .
Study for Sewer Extension of Grippi Area
Dan showed the Committee letters from 1991 in regards to having the
sewer extended to the Grippi parcel . He also showed the Committee
a map from 1993 .
Dan indicated that it would cost the Town $125, 000 to extend the
sewer to the Grippi parcel . It would cost another $125, 000 to
'1',Ili
•
Public works Committee Meeting Minutes page 2
extend sewer from Indian Creek Road to Hayts Road, and $70, 000 to
extend it from Indian Creek Road to Woolf Road.
David asked how many properties will be served by extending the
sewer lines to the Grippi parcel . Dan indicated that there are
five parcels of land (Grippi' s-2, Kyong' s-1, and Cornell
University' s-2) that would be served. Also, if the sewer is
extended to the Grippi parcel, other people will want to have it
extended to them.
John feels that the Town should wait until the current sewer
projects are completed and debt is retired. John also indicated
that the Town should "plot out" a five or ten year plan to include
this area, and let Mr. Grippi know that it will be around five
years before sewer is put in, unless a developer decided to develop
property around there and help pay for sewer extension.
Dan also suggested that Mr. Grippi could (with owner' s permission)
tie into the Professional Building' s sewer. The Town could help
with designing and planning, but Mr. Grippi would be responsible
for costs . Dan also indicated that the Health Department does not
see a problem the Grippi parcel .
Judd Falls Road Update
Dan indicated that the plans were in place, with the estimated cost
of $260, 000 for the whole project . The Town' s cost is estimated at
$185, 000 . Dan also indicated that the Town' s cost is higher
because we extended the project to go up to Tower Road and it will
include drainage upgrades.
Cornell University will be reimbursing the Town for- the work done
on their part of the project . David asked who will be liable for
their part of the project, and Dan indicated they would.
Fred took the time to explain that since the Judd Falls Road
project was estimated to cost more than expected, Judd Falls Road
would be the only permanent improvement on the Agreement of
Expenditure of Highway Funds . Maple Avenue work will be another
year.
Dan indicated that the bids will be advertized around March 29,
with the bid opening to be April 14'
Forest Home Drive Bridge
Dan indicated that the County has not changed their proposed time
line with regards to reconstructing the Forest Home Drive Bridge.
-m Fred indicated that John Lampman, from the County, has not reviewed
1` any new design work.
•
Public Works Committee Meeting Minutes page 3
1
Dan indicated that John had received a fax from Barbara Blanchard.
Dan will be reviewing that and the fax indicated that the bid
opening for the project will be April 21, 1995 . Dan indicated that
he has not seen plans yet but that he would like to see them before
the April Board meeting.
Preventive Maintenance Procedures for Town Vehicles
Fred gave each member of the Committee a copy of a draft policy for
vehicle maintenance. John asked why the Town needed such a policy.
David felt that it was important to have a policy so that all
vehicles will be uniformly maintained. Ed Conley felt the same.
David asked who tracks all the maintenance and when vehicles needed
services, inspections, etc . Fred indicated that the Town mechanic
does.
Ed asked if the Town should think about becoming its own inspection
station. John asked to have Fred look into it .
David indicated that he would like to have the Committee review the
draft policy and discuss it at the next meeting.
Christopher Circle/Christopher Lane Prolect
David asked why so many trees have been taken down at the water
tank site. Fred indicated that the fence will be replaced. He
explained that we will move the fence closer to the tank and start
mowing the area around the outside of the fence . He also indicated
that we will be regrading the tank site so there will be better
' drainage in the area. Fred explained that the right-of-way (ROW)
has become very overgrown and the sight distance obscured. He told
the Committee that the ROW is 60 feet but that we only cleared 50
feet of it .
David asked if we would be replacing the fence with galvanized or
green fencing and if it would be 6 feet with the barb wire on the
top. Dan indicated that there would be barb wire on top, but that
we could look into the type of fencing to be used and asked the
residents which they prefer. Dan will obtain pricing for
galvanized and coated fencing.
Fred indicated that the people of the area call the tank their
"park" . Fred also informed the Committee that he told the
residents that the project is slated to be finished by June 1 .
David asked if there would be any paving done there, and Fred
indicated there would not .
Public Works Committee Meeting Minutes page 4
r"
Rich Schoch indicated that we would be planting trees to "screen"
in the tank area. He indicated that we will be using spruce and
other screening trees.
The meeting was adjourned at 8 : 50 a.m.
ghk