Town of Ithaca Public Works Committee Meeting
Town of Ithaca Highway Facility
January 26 , 1995 , 8 : 00 a. m.
1 . Approval of Minutes David
2 . Leaf Bags for Fall Collection Rich/Fred
3 . Update on Judd Falls Road Dan/Fred
4 . Update on Maple Avenue Dan/Fred
5 . Discussion of Priority Work Plan
a. Highway/Parks Fred/Rich
b. Engineering Dan
6 . Discussion of Sewer Billing Procedures Dan
7 . Discussion of SJS--Joint Sewer Improvement
Program/Agreement Dan
8 . Discussion of extending sewer to Grippi
parcel (corner of Hayts & Route 96 )
ghk
pc : Mary Bryant, Administrative Secretary
Jon Kanter, Town Planner
Andrew Frost, Code Enforcement Officer
FINAL
TOWN OF ITHACA
Public Works Committee Meeting Minutes
January 26, 1995
Present : David Klein, Chairperson; Dan Walker; John Whitcomb; Rich
Schoch, and Fred Noteboom
The meeting began at 8 : 15 a.m.
Although it was not on the agenda, Fred Noteboom started a
discussion about the recent ditch work on Christopher Circle, since
there has been some negative correspondents regarding it . The
question raised was if the ditch work will help the drainage
problems or not . Fred indicated that it would.
Fred also discussed with the Committee the problems of working in
the rights-of-way and having the residents complain because they
were not contacted. Fred explained that it will take many more
hours to contact each resident of an area before starting a
project .
John Whitcomb felt that if the area is densely populated, that
maybe we should contact the neighborhood association' s president in
writing.
David Klein felt that the Highway and Parks Department should write
an article for the Town newsletter regarding the large project that
are upcoming.
Fred informed the Committee that in the past year, the Highway and
Parks Department has started to reseed ditches after clearing them
out . This helps with erosion control and it looks better.
David asked if the Town had a hydro-seeder. Dan Walker indicated
that we did not, and it is expensive to hydro-seed.
Fred asked if the answer to the negative feedback from residents,
is to tell them each time a project is to be started. John
indicated that a plan in writing for residents to view of the
project would be helpful .
Approval of Minutes
John Whitcomb moved the approval of the minutes, and David Klein
seconded it . The minutes were approved.
Leaf Bag for Collection
Rich Schoch started by informing the Committee that if the Town
were to ask the residents to put their yard waste in bags, the Town
1^� Public Works Committee Meeting Minutes Page 2
would need approximately 8, 000 bags. If the bags were bought in
balk, they would cost 40 cents per bag.
Rich indicated that Cayuga Heights would allow the Town to use
their compactor machine to aid in pick up of the bags . This would
allow more bags to be picked up at one time.
Rich also indicated that the Highway and Parks Department feels it
would be less costly to collect bags than to continue using the
leaf vacuums . They feel that the program would have to be "phased
in" .
Fred suggested that the bags could be bought from the Highway and
Parks Department at cost . David asked if we couldn' t give the bags
away, and Fred indicated that then the people would use them for
other things and not necessarily for yard waste.
John asked if we would allot so many bags per household, and Fred
indicated that it would be hard because rural residents might not
have as much yard waste as the more urban residents.
David asked if collecting the bags would be faster than leaf
vacuums, and it was felt it would be .
Dan suggested that the bags could be distributed when people pay
their water bills. He also suggested that the Neighborhood
Associations could help distribute the bags.
Is enough money saved to warrant the added inconvenience to the
home owner?
Fred informed the Committee that the Highway and Parks Department
picked up twice as many Holiday trees this year than last .
Judd Falls Road Update
Dan indicated that Cornell University is proceeding with their
construction project on Judd Falls Road. The Town will be
extending that project for the "Jug Handle" up to Tower Road. Fred
indicated that Cornell will pay for their work.
David asked who was engineering this work, and Dan indicated that
Cornell was and they would be performing any special testing.
David than asked if there was any written agreement between Cornell
University and the Town of Ithaca. Dan said we where working on
it, and it should be ready by the next Public Works Committee
meeting.
At this point, Dan added an agenda item: Forest Home Drive Bridge.
Dan and Fred had received a memorandum from Tompkins County
1 Public Works Committee Meeting Minutes Page 3
regarding the construction schedule for the Forest Home Drive
Bridge . Dan has concerns that at the rate of the schedule, the
Bridge would not be open until after the college students come back
to school in the fall.
John felt that the Forest Home Drive bridge project and the Judd
Falls reconstruction project should have been at the same time. He
is going to discuss this schedule with the County representatives .
It was discussed that the Town has not received any correspondence
from the County on this matter since July. It was also discussed
that there were staff changes within the County, and that the
County government did some reconstruction of its Committees .
The Public Works Committee asked that the Supervisor write a letter
to the County indicating our concerns .
Maple Avenue Update
Dan indicated that this project would, ideally, be done at the same
time as the Judd Falls/Forest Home Bridge projects . We are in the
process of negotiating with the City of Ithaca and Cornell
University to coordinate this project .
David asked if the trail on Maple Avenue would be reconstructed.
Dan indicated that the trail would be. David also asked if this
project was included in the 1995 budget, and Dan indicated that it
was.
Priority Work Plan
Fred reviewed the Highway and Parks Department' s priority work plan
with the Committee, as did Rich. It was noted that the space needs
for the Highway and Parks Department would be discussed at the next
Public Works Committee Meeting.
At this point, Fred asked to find out what plans the Town Board has
for future parks and trail . David indicated that there was a
Committee working on a recommendation and that it would be in place
by the end of the year.
Fred also discussed with the Committee the addition of a staff
member to the Highway and Parks Department. He indicated that this
person could be an assistant mechanic. This will be discussed more
as he is looking towards 1996 for this new position.
Dan reviewed the Engineering Department' s priority work plan with
the Committee . Dan indicated that the major water projects for
this year are at the Octopus and on west hill behind the hospital .
Public Woxks Committee Meeting Minutes Page 4
John indicated that the Route 366 agreements should be put on the
Engineering' s priority work plan. John also felt that the Capital
Improvement Plan Implementation needs to be enhanced to include the
budgeting of them.
Sewer Billing Procedures
Dan explained that the current system of billing for sewer is based
on the water consumption, not the usage. Cornell University and
Ithaca College feel that it should be changed, since they use a lot
of water strictly for irrigation proposes . John felt that it would
cost the Town a lot of money to make the billing changes that
Cornell and Ithaca College avant. Dan feels that the Town needs to
treat every use the same.
SJS--Joint Sewer Improvement Program/Agreement
Dan said that a draft should be ready around March. John informed
the Committee that the Town is trying to write out the part of the
draft whereas the City of Ithaca has the authority over all the
Town of Ithaca' s land use plans . The City is not happy with this .
Dan indicted we were in agreement that the Town will discuss with
the City any projects that would have sewer projects that effect
the City' s sewer system. The Town would like to have the
Engineering Department in the City involved with our planning, not
City Council.
Sewer for Grippi Property
David indicated that Mr. Grippi would like to have sewer lines
installed to his property. At present, there is sewer up to the
West Hill Fire Station; on Hayts Road, and at the Professional
Building, but four parcels of land on Route 96 do not have sewer
lines . David indicated that a formal request needs to be put forth
by Mr. Grippi so the Town can look into extending the sewer lines
to his property.
Miscellaneous
Dan discussed the alternative sites for a new Town Hall, which he
has put together. The sheet handed out indicates the site, cost of
land, cost of building, and total cost .
Dan also discussed a letter he received from a Mr. Ward, who lives
in the Town of Ulysses . He would like to have water services
extended to him.
The meeting was adjourned at 10 : 00 a.m.