HomeMy WebLinkAboutPWC Minutes 2000-05-23 67:4\-_\,,9-1±„i� i DISPOSITION DAZE �i
*4/
Kj1OWN OF ITHACA
, HIGHWAY DEPARTMENT
106 SEVEN MILE DRIVE. ITHACA. N.Y. 14850
PHONE(607)273-1656 Roads,Parks,Trails,Sewer,and Water FAX (607) 272-6076
Town of Ithaca Public Works Committee Meeting
May 23, 2000, at 8:00 a.m.
Town of Ithaca Highway Facility
1. Minutes David
December 7, 1999
February 3, 2000
March 28, 2000
April 25, 2000
2. Discussion on East King Road Fred
3. Update New Town Hall Dan
4. Wycoff Road Water Line Follow-up Dan
5. Renwick Drive Bridge Update Fred
6. Review Culvert Pipe Policy Fred
7. Review Repair of Paved Driveway Policy Fred
ghk
pc: Mary Bryant, Sr. Typist
Joan Lent Noteboom,Town Clerk
Andrew Frost, Director of Zoning/Building
Jonathan Kanter, Director of Planning
DISPOSITION DATE
TOWN OF ITHACA
Public Works Committee
May 23, 2000
Highway Facility
Present: David Klein; Chairperson, Cathy Valentino, Fred Noteboom, Dan Walker,
and Rich Schoch
Guests: Ward Hungerford and Jonathan Kanter
The meeting began at 8:09 a.m.
The minutes from December 1999 and February 2000 were approved.
East King Road
Ward Hungerford, Tompkins County Highway Manager, informed the Committee that
the State had turned over a portion of E. King Road to the County, and the County
would like to turn that section over to the Town of Ithaca. Ward said that the Tompkins
County Board of Representatives needs to pass a resolution to turn the road over to the
Town. Before this can happen, the Town of Ithaca's Town Board needs to pass a
resolution accepting the road.
There was a discussion regarding the truck pull off(to check brakes, etc.). The state
does not want that pull off taken out. Fred Noteboom said he has been in contact with
the State about helping fix that area. The state said that they would "participate" in
helping. The Committee agreed that before the Town takes over the road, we need to
make sure that the State builds that section of road (for the pull off) to the States
specifications.
Ward said that Tompkins County would be willing to contribute to the cleaning up at
the end of the road. We would make it a dead end road (it would not connect with the
current E. King Road). There may be a need to have a public hearing for this.
There was a discussion regarding the Montessori School's use of the section of road that
we are considering closing. Their buses use that as a staging area. Fred was concerned
for the condition of the road, as sometimes the buses damage the shoulders and
pavement while using Town roads as staging areas.
Public Works Committee Minutes,May 23,2000 Page 2
Fred would like the Town to look into putting a park and ride in that area. This may be
used for the Montessori School's staging area. The Planning and Engineering
Departments will work on the details of this project. Jonathan explained that this may
need to be presented to the Planning Board. It would be a good idea to talk to Fernando
at the MPO.
Fred will talk to Gordan Reimels (NYS DOT) about the State fixing their area. Fred will
talk to John Barney also.
There was a discussion regarding the land around the section of road that will be
turned over to the Town. The County may want to consider turning over the land also.
Route 366 Bridge Construction
On May 17, 2000, New York State had a public information meeting regarding the
construction of the bridge on Route 366 and the relocation of the Judd Falls Road.
Jonathan showed the Committee the State's plans for the reconstruction. The
Committee voiced their concerns with the plan. Cathy felt that the plan was dangerous
and there was nothing in the plan for pedestrian and bike traffic. David Klein was
concerned with the site distances (with the proposed move of Judd Falls road up the
hill). There was a discussion that the Town would like to see them straighten out the
intersections Judd Falls Road/Pine Tree Road. At the State's meeting, we were told that
it was out of the scope of the project.
There was a discussion regarding closing Judd Falls Road between Route 366 and
Campus Road. This would reroute traffic either up to Caldwell Road or through
Cornell University campus to Hanshaw Road. Cathy would like to see if Fernando
could model the closing of Judd Falls Road.
The Committee was informed that the State would be accepting comments/concerns
until June 18, 2000. The Town needs to use strong language to convey our concerns.
This will be discussed at the Town Board meeting in June. Items to be included in the
comments to the State are:
• No consideration for bike or pedestrian's safety.
• No sidewalk shown in design.
• 12-foot lanes are too much.
• Would like to have State consider straight alignment of Judd Falls and Pine Tree
Road.
• This plan has not corrected the problem.
• Too much money estimated to do the job.
•
' - ' Public Works Committee Minutes,May 23,2000 Page 3
The possibility of having Judd Falls road be made a one-way road with no left turn was
discussed.
Penny Lane/Penny Drive
Fred informed the Committee that the Town has not accepted a portion of Penny Lane
(which in the records show it as Penny Drive). The Easements have never been
approved either. Dan will check for an abstract on this. It needs to be discussed at the
next Town Board Meeting.
Update on New Town Hall
We are anticipating completion of the work by July 1, 2000.
We have been held up on some of our finishing work because the Post Office has not
completed their work in the basement. We need to push the Post Office and their
contractors along. Dan said that he has been in contact with them and that if they do
not get moving in two days the Town will have to have the work done and charge the
Post Office.
The following is a list of things that are in the process of being done:
■ The basement is being painting this week.
• Sheet rock is 90 percent up.
• Ceiling track and window is in.
■ Rooftops are on.
• 90 percent of the ductwork is done.
• The Board Room ceiling is done. -
• Elevator is ready to go in.
• Boiler is in.
At the next"job meeting" Dan will talk to the contractors about using 100 percent air at
first to help clean out the smells before moving in.
Talked about the Town Highway Department doing the landscaping. Rich Schoch will
design it and show Cathy the plan. We will get rid of the planter boxes. Dan said that
they might need the Highway Department's assistance in putting up the records
management shelves.
Cathy said that she needs to have an accounting of the money spent and left.
' Public Works Committee Minutes,May 23,2000 Page 4
Cathy asked if the general contractor would be cleaning up so that we will be able to
just move in. Dan said yes. Dan said that the mailboxes might not be in on the day we
move in.
Update on Wycoff Road Water Line and Renwick Drive Bridge
This project is completed. There was a minor problem in the PRV and that is fixed now.
It was up and running on Thursday. The committee felt that the Village of Cayuga
Heights should be responsible for plantings at the PRV building. The contractor will
put down grass seed.
The bridge construction is slated to start on June 12, 2000. There will be a public
meeting for the residents at the Bridge.
Culvert Pipe Policy and Driveway Policy
Culvert Pipe Policy. Fred explained that it has been observed (during the recent rainy
season) that because the Town has taken the time to replace culvert pipes and redo
drainage ways, we have experienced less flooding problems. This is saving the Town
money in the long run.
Talked about the headwalls and that the Town Highway Superintendent would rather
not have them put in. We will add something that the Town will not be responsible for
snow plow or roadwork damage.
Cathy said it was not clear who has to perform the work., The town will do the work
and charge the landowner for materials and an administrative fee. The landowner will
pay for the pipe.
This policy is not really for addressing sub-division work. The final sub-division plan
should indicate the correct culvert pipe size to use.
There was a discussion regarding the inspection process and how it will work.
This policy will be ready to go to the Town Board after the changes to the headwall
statement are made.
The Committee felt that a statement regarding putting in underground drainage needs
to be added to the policy. This will be treated the same way as individual culvert pipe
replacement. We need to add a statement that indicates that the Town may not be able
to do the work right away, or they can get a contractor who will need to use the Town s
specifications.
Public Works Committee Minutes,May 23,2000 Page 5
The.Committee talked about the problems on Texas Lane and Lisa Lane. This needs to
be looked at.
David asked if we would be seeding Christopher Lane and Circle again—it looks like a
lot has not taken. We will need to look at this.
The meeting was adorned at 10:30 a.m.
ghk