HomeMy WebLinkAboutPWC Minutes 2001-09-25 DISPOSITION DATE . Pit
*41
TOWN OF ITHACA
Public Works Committee,September 25, 2001
Highway Facility
Present: David Klein,Chairperson; Fred Noteboom, Rich Schoch, Dan
Walker, Ed Conley
Guests: Wayne Sincebaugh,Gene Redman, and Mike Smith
The meeting began at 8:15.
There were no minutes to approve.
There was a discussion regarding the Tutelo Park development.
Interview for Highway Facility Designer
The Committee discussed some of the references called after the Committee
conducted interviews of the three top firms for designing the Highway Facility.
The firm that we are most interested in will most likely be the best on aesthetics
and will also be practical.
The Committee discussed the Engineering firm we are interested in and that firm
is very "big" on in-ground heating in the garage area. We will want to get more `
information on utility costs on types of in-ground heating systems.
Fred Noteboom asked the Committee if they would like Fred to proceed to
"firm" up the proposal and go from there. Would we like to go to the October
meeting with this? Fred will talk to Cathy about this.
The Committee is leaning towards Hascup/Lorenzini.
Maple Avenue Update
Fred informed the Committee that we have scheduled the construction to begin
on September 26,2001. The road will be closed from Pine Tree Road to the first
drive (at Maplewood apartments).
Public Works Committee Minutes,September 25,2001 Page 2
David asked if we had posted the closing in the newspaper. This has not been
done. We will also look into putting it on the Towri s web site (NOTE: This was
done using a scroll bar on the main page on September 26, 2001.)
The pavement will be milled out and ground down past the sub-grade—
approximately 5 inches down.
There have been some problems with the utilities being in the way of the
construction. This has all been taken care of-Verizon will have to move one
more pole.
There have already been some changes on the details on the plans.
West Hill Water Tank Update
Adhan Piping is the contractor. They are out of the Cortland area.
Dan Walker informed the Committee that the City's Forester has had some
concerns about the trees on the work site. Dan has talked to Bill Gray,
Commissioner of Public Works for the City of Ithaca,regarding this. Bill has said
to go ahead because he knows the Town is going to re-landscape the area.
The foundations have been dug. They should start laying the pipe today. This
new piping will be tied into the 12" pipe already there.
David Klein asked what the time line was for this project. Dan said that the
project should be done by the end of October. Rich Schoch indicated that the
Town would re-landscape the area in the spring. He says that it is better to plant
trees and shrubs in the spring.
Hanshaw Road Back Lot Sewer
•
The contractor is done with their part. The Town has received the videos also.
The site has been seeded and wood chips have been put down along the grassy
area. Rich Schoch and Wayne Sincebaugh have been talking to the residents for
their input on the restoration in their area. We put in a gate that will close off the
area. Wayne said that the trees will be planted, alternating them so as to make
the space look smaller but vehicles will still be able to get through,
The lining of the sewer pipe went well.
We will continue to monitor the infiltration.
Public Works Committee Minutes,September 25,2001 Page 3
Forest Home Drive Sewer Pump
During the weekend the pump at the sewer pump station on Forest Home Drive
broke down. This was a real problem because we were waiting for a pump (that
went down earlier) to be rebuilt. We had to get help from the City—using their
dry pump. We also found out that a transformer was burnt out so NYSEG had
to come fix that.
The Committee discussed storing a pump for problems like this. Wayne said
that it is not a good idea to keep pumps sitting around. The Town may want to
consider getting a dry pump though.
The Forest Home Drive pump station will be equipped with an auto-dialer. This
will automatically call certain phone numbers if there is a problem in the pump
station.
Iacovelli Park Update
The basketball court has been paved. The hoop needs to be put up and the court
needs to be striped.
Most of the seeding and plantings have been done in the park. We have adjusted
some of the plantings.
To get to the park, one needs to go to the end of Juniper Drive (off of Coddington
Road).
Rich Schoch said that some benches need to be put up and the pavilion is done.
There was a discussion on the type of,wood chips we used. We used a new kind
called fibar. The initial chips were donated, although the Town has purchased
some to add to the ones there. We have used the fibar chips at other play
structures within the Town.
We have surface treated a section of the South Hill Trail that leads to Iacovelli
Park.
Miscellaneous
We have paved the Sandra Place walkway. David said that there are a couple of
manholes or valves on Sandra Place that need to be raised. Gene will check into
this.
Public Works Committee Minutes,September 25,2001 Page 4
Fred informed the Committee that we would start working on putting in
underground drainage on West Haven Road on Wednesday.
David asked if the Slaterville Road erosion control project would be done this
year. Dan said that he is working with NYSEG and the Ewings regarding some
easements. We have to go further up the creek. Dan is hoping we can start it this
year.
David asked what storm water capital projects are planned for 2002. Fred said
that Simsbury Road would receive an underground drainage system. Renwick
Drive is also scheduled for 2002. We may want to look at the Lisa Lane/Texas
Lane area.
Fred informed the Committee that because of the accident at Cargill Salt,we
might have a delay in getting salt. We would like to fill the shed before the end
of October.
The Committee discussed the current system of inspecting valves and hydrants
throughout the Town. Currently Bolton Point is doing them.
Fred said that King's Way has been black topped. We will be putting up the sign
as soon as we receive it.
The meeting was adjourned at 9:30 a.m.
ghk