HomeMy WebLinkAboutPWC Minutes 2001-07-24 DISPOSITION DATE
oi' i
11*
< OWN OF ITHACA
HIGHWAY DEPARTMENT
106 SEVEN MILE DRIVE. ITHACA. N.Y. 14850
PHONE (607) 273-1656 Roads,Parks,Trails,Sewer,and Water FAX (607) 272-6076
PUBLIC WORKS COMMITTEE
July 24, 2001, 8:00 a.m.
Highway Facility
1. Approve Minutes David
April 24, 2001
May 22, 2001
June 25, 2001
2. Discussion on RFP's for Highway Facility Fred
3. Update on Highway Projects Fred
4. Discussion on William and Hannah Pew Trail Fred
5. Update on Hanshaw Road Back Lot Sewer Dan
ghk
pc: Mary Bryant, Sr. Typist
Tee-Ann Hunter, Town Clerk
Andrew Frost, Director of Zoning/Building
Jonathan Kanter, Director of Planning
tilliADISPOSITION DATE (
TOWN OF ITHACA
Public Works Committee Minutes
July 24, 2001, Highway Facility
Present: David Klein, Chairperson; Fred Noteboom; Dan Walker; Rich Schoch;
Cathy Valentino, and Ed Conley
Guests: Mike Smith
The meeting began at 8:10 a.m.
The minutes from April and May minutes were approved.
RFP
The Committee discussed the possible candidates for designing the Highway Facility.
David Klein, Dan Walker, and Fred Noteboom have visited some previously designed
buildings by three of the candidates. All the buildings were designed well. Fred has
also looked at other buildings that where built in the area by the candidates. He and
Rich Schoch will go look at one more. Dan has reviewed the plans for a design by
another candidate, and they appear to be complete.
We need to set up interviews with the candidates. These interviews will be conducted
in September. Fred will contact references for the three.
Two of the candidates have been eliminated as possible choices and one would be an
alternative. (There were six all together.)
There was a discussion on the financing and that some money has been set aside. We
will continue to review with the Town's Budget Officer. Cathy Valentino would like to
meet with Fred and Al on this.
Highway Projects
Park Lane: The shoulders need to be put down, one tree needs to be removed,and top
soiling and seeding needs to be done to complete the project. A contractor will repair
the driveways and this should be done this week.
Cayuga Street: We will be paving the street tomorrow. We have already realigned the
ditch from E. Shore Drive to the second driveway of the Boynton Middle School.
Public Work Committee Meeting,July 24,2001 Page 2
Elm Street Ext.: The storm water underground piping has been done.
West Haven Road: We will start work on this next week. We will by putting in storm
water underground piping on the west side.
Coy Glen Road: We will be hooking up the water to the resident's houses soon.
Kay Street: We replaced a water main that has been leaking.
Water Breaks: We helped Cayuga Heights repair a water main break in front Kendal of
Ithaca that they were unable to repair. We have also helped the Town of Lansing repair
a water break.
lacovelli Park: The play structure is done except the cargo netting,which pulled apart
and we will replace it with chain and rubber around the chain. We are now starting
work on the landscaping. The gazebo site has been prepared and we have scheduled to
start work on it soon. The basketball court needs to be paved and the posts for the
basketball hoops have been ordered.
East Shore Park: We took over the maintenance of the park this spring. The gazebo will
be constructed soon. We had to put a trashcan at the site because of all the litter.
We will be surface treating some of the trails.
The Committee has a brief discussion regarding the Post Office and some of the
problems that have surfaced.
William and Hannah Pew Trail
Mike Smith informed the Committee that the survey work has been finished (on the
trail part),has been reviewed by the Baldwins and Colles, and they are OK with this.
The next section to be surveyed is for the large parcel. Title searches still need to be
done. This project also needs to go through the sub-division process at the Planning
Board.
We have not started a plan for the design and construction yet.
Cathy asked where the (Shirley Raffensburger) pavilion would go. It is understood that
the people would like it within walking distance, in a scenic spot, and small.
We would like to start this project in 2002. We need to set aside money for this. We
will take the money from the A7110.401 (Construction) account to start with.
Public Work Committee Meeting,July 24,2001 Page 3
Maple Avenue
Fred informed the Committee that we are set to start and we are waiting until fall to
accommodate Suit-Kote's schedule.
We will have to set aside money into the account line item.
Hanshaw Road
The tree house has been taken down.
The Contractor seems to be very competent.
Dan estimates that they are on schedule although the rain has hindered some.
The staging area is at the Christopher Circle water tank and the Church parking lot.
They will rough grade for topsoil and we will complete the restorations.
We need to talk to Cornell University about the $50,000 they promised to this project.
Sapsucker Woods Road
Brown Road will be closed for the first part of the project. DEC will be monitoring this
project closely.
Cornell University will do all the work. We will be involved in the review if it though.
Bagged Leaves
The Committee decided that the Highway Crews should continue the collection of
leaves the way we have been. We will budget for a new leaf vacuum in 2002.
Texas LaneāArt Rueoff
Dan informed the Committee that Mr. Rueoff has been in contact with him about the
Dewitt Pond and the drainage on Texas Lane.
We need to reduce the flow out of the Dewitt Pond. Dan suggests we reduce the flow
down to a 6" outlet. We need to set a plan and review it with Mr. Rueoff. We also need
to discuss this plan with the Village of Cayuga Heights as it will impact them also.
Public Work Committee Meeting,July 24,2001 Page 4
Fred indicated that we have not had any other problems since we have put in the
underground piping.
The August meeting will be cancelled.
Meeting was adjourned at 9:30 a.m.
gh