TOWN OF ITHACA
PUBLIC WORKS COMMITTEE
May 27, 2003,8:00 a.m.
Public Works Facility
1. Approval of Minutes David
a. March 25, 2003—not available yet
b. April 29, 2003—not available yet
2. Review West Hill Water System Dan/Creig
3. Update on Pubic Works Facility Project Fred/Wayne
4. Update on Reconstruction of Caldwell Road Fred
5. Discussion on Local Delivery Laws Fred/Cathy
6. Discussion on the PEW Trail Progress Fred/Rich S.
ghk
DISPOSITION DATE •
TOWN OF ITHACA
Public Works Committee
May 27, 2003,8:00 a.m.
Public Works Facility
Present: David Klein,Chair Person;Cathy Valentino;Fred Noteboom; Rich
Schoch; Gene Redman;Jonathan Kanter;Creig Hebdon; Mike Smith;
Wayne Sincebaugh; and Will Burbank.
The meeting began at 8:10 a.m.
Minutes will be reviewed at next meeting.
West Hill Water System
Creig Hebdon said that the Town has met with Emerson Power Trans regarding
obtaining an easement. This is moving ahead and has been sent to John Barney,
Town Attorney, to review.
Bostwick Road Tank: Creig showed the Committee what site has been proposed
for a water tank on Bostwick Road. The tree line would be over the top of the
tank. The property will have to be subdivided and this has been sent to the
appropriate boards for approval. This should be before the Planning Board at
their June 17, 2003, meeting.
The owner asked that better screening be put in place,thus the design shows the
fence closer to the tank itself. This would provide more area for
landscaping/screening.
The Town would purchase the land, that the tank would be on,but we would
have to have an easement for the driveway.
This is all moving along and should be ready for presentation to the Planning
Board at their next meeting.
The Committee reviewed what was needed for the SEQR and the site plan.
Creig said that he was putting together a summary of the site, costs, and tank
that would be proposed. Basically, the tank would be a 200,000-gallon tank like
the tank at Troy Road. The color can be what we would like it to be, and it was
felt that a forest green would be a good color.
Public Works Committee Minutes,May 27, 2003 Page 2 •
The Committee discussed the plantings for this site. This would be separate
from the contract,so Creig showed it on a different design. The trees on the
backside of the tank would remain and they are higher than the tank. In the
front,we would propose a double row of pine trees and filled in with some hard
wood trees.
The Committee asked if there would be any height restrictions there. This will
be reviewed with the Zoning Officer for the Town.
Mecklenburg Road Tank: The Engineering Department has been in contact with
Eco-Village and they have been working with the Town on a site on their
property. The tank that is proposed is a concrete tank and the company chosen
to put it in will have to be able to cast the tank on site. This will be worked on
more after Dan Walker comes back from vacation. The road will have to be
worked on also.
Coy Glen Road Pump Station: There are eight possible sites for a pump station
in the Coy Glen Road area.
The Committee reviewed them and felt that the Town needs to come up with no
more than three sites to review with the community.
Wayne Sincebaugh said that the best site would be the closest to a road. This
would be most cost effective in that fewer pipes would be needed,maintenance
would be lower in the winter,and getting materials to it would be easier.
There was a discussion regarding moving the one station site up the road
towards (off the Cole's property) the Young's property. We will have to talk to
the landowners regarding this.
The time frame on this part of the project was discussed. The transmission line
(from South Hill) and the water tank on Bostwick Road are needed to stabilize
the Town's water on West Hill. The pump station is a separate section of this
project and can be done later.
We will have three separate public hearings, so that that Mecklenburg Road
water tank,the transmission line, and Bostwick Road water tank can move
ahead.
Public Works Committee Minutes,May 27, 2003 Page 3
Public Works Facility
Wayne said that Streeter and Kimble have been sent letters outlining the Town's
position on finishing the work at the Public Works Facility. Streeter has most of
their work done—still problems with the overhead doors. Wayne said that he
talked to Dick Paul, Streeter, and told him that he wants them to get someone or
another Wayne Dawson dealer here as soon as possible.
The air handlers are in—we now need training on them.
The electric and plumbing parts of the contract are complete and final payments
have been made.
Caldwell Road Reconstruction
Fred Noteboom said that the Transportation Committee has been informed of
this upcoming project.
There was a discussion on using 5' shoulders.
The Highway Department has been meeting with Cornell Plantations and they
are willing to work with us. They do not have a problem with us taking down
two frees (that would be in the way) out. Cornell Plantations will be putting in a
stone wall.
We will work on a plan so that we can have a public meeting soon.
Local Delivery Laws
Cathy feels that the "local delivery" signs in Forest Home Drive need to be larger
or bolder. There are signs on Warren Road and Pleasant Grove Road. Fred said
the signs may be at the States requirement size,but he will look into this.
PEW Trail
Mike Smith said that the Baldwins and Colles have reviewed the appraisals and
are in agreement with them. The purchase offer has been signed, and the
donation offers have been signed. The Town's attorney has the offers for his
review. We will continue to monitor this through the SAC meetings.
We will probably start construction in the fall.
Public Works Committee Minutes,May 27, 2003 Page 4
p
Ewing Project: The members of the Committee were not sure where this project
is in the progression. This will be contracted out so drawings will be needed for
bidding. This will also be monitored through SAC.
The drawings for the PEW trail have been reviewed and approved by New York
State.
Town Emblems and Miscellaneous
Cathy said that she would like to see all Town vehicles have Town emblems and
numbers on them. The Committee agreed and the Highway Department will
make sure this is done.
The Committee reviewed the Town's vehicle replacement schedule. They talked
about keeping the station wagon for use. Fred will have the Town's mechanic
look at the car to make sure it is in OK condition to keep.
The meeting was adjourned at 9:35 a.m. The next meeting is June 24, 2003.
Woolf Lane: The Highway Department received a call from a resident on Woolf
Lane who was unhappy with a pump station being built there. The residents
there signed a petition to keep it from being built in the right-of-way. They
lacked a few signatures so it was staked out to be built in the right-of-way.
Cathy will talk to Doug Austic (Town of Ulysses Supervisor) regarding this.
ghk