1. Approval of Minutes
a. May 3, 2005 Minutes
2. [)iSCLIssion on Storin Water Management Regulations
a. Salt Managenient Plan,
3. Update
Projects
a.
Coddington Road Community Center
b.
Slaterville Road Erosion Control
c.
J"utelo Park
d.
William and Hannah Pew Trail.
e.
t.,awn Repairs
f.
Seven Mile I.Drive
ghk
2XIMBEREM
TOW N OFIT1 IC. A.
Public Works Corrimittee
May 24,2005, Minutes
Public Worksl.-',acility, 8:00 am.
Present: Cathy Valentino, Dan Walker, Fred Noteboom, Rich Schoch, Mike Smith.; and
Peter Stein
The meeting began at 8:05 am.
The minutes from the May 3, 2005 meeting were approved.
Storm Water Management
a. Salt Management Plan: Fred Noteboom said that the Town will need to have a
plan regarding the Town"s usage and applications of salt. This may be a part of the
Storm Water Management Plan. Fred handed out a draft of such a plan. This plan will
go to the Town Board and will include the level of services we provide for snow and ice
removal. It was decided that this plan should have something regarding the storage of
salt and that we mix our salt with Majic 4) (we may want to reference other brands of
deicers that we have tried and do not use).
b. There was a discussion regarding putting storm water managernent projects in
the 2006 budget. This will have to be discussed more as the time for the 2006 budget
submission comes near.
Coddington Road Community Center: We have finished our part of this work for now.
The hydro -axing has been done, along with a working road to get to the project site.
Rich Schoch believes that the construction of the pavilion may start as soon as this
week. After the pavilion has been built, we will have to do some landscape restoration.
We need to get an easement for this pavilion. The Committee discussed. the long-
standing, good relationship the Town has with the Coddington Road Community
Center.
Eastern Heights Erosion Control (Ewings): The bids have been received for this work to
be done. The lowest bid was from Silverline ConstrUCtion., at $65,000. The rest were
significantly higher, so Dan Walker will be doing some checking to see that nothing was
left Out of this bid. 'This will be before the Town Board at their June meeting. We have
the easements for this work, but Mike Smitti will contact the Ewings to get their
,Ai )RCN 'o
.0orksCommittee Minutes, May 24,2005 Page 2
00
c asement to work on the Williani and 1--3annah Pexv'frafl, which Nvas hinging on the
erosion control project getting done at the Bving's property.
TLIteto Park: Rich said that AAre have fertilized the ball field again and seeded were it did
not take. Tlw footers for the comfort station should be worked on this week. We have
started the grading for the bike path, and Cascadilla "I'ree ' Service prLmed Out the dead
material oil the large Black Oak and Flickory trees on, the site.
We talked about as company who flas asked to design a more elaborate pavilion for this
site. They will be applying for as grant to pay for the design. The Town has expressed
that if ttie grant is denied, we will accept a design fton'i then'l, but we will not pay for as
more elaborate design than we air(-,!ady have.
William and I lannah Pew Trail: We graded more of the area that will be the pal -king
lot, We also had the centerline staked out so that we can do some tree clearing soon.
We are hoping to start in mid.-SUrnmer with graveling the bed for the trail and some
seeding. Next year we will be ready to) oi.1 and stone the trail.
Cathy Valentino asked about a possible pavilion (gazebo) being placed along the trail
that will honor Shirley RathensbUrger, former Town Supervisor. There is
approximately $4,000 in donations for this. The site and design will. not be worked on
until next year.
Fawn Repairs: Fred wanted to inform the Committee of a] I the time and expense the
Public Works crews Put into repairing lawn.s that have been dttg up by snowplows.
"Ehe Connn.ittee felt that we should write up a policy (guidelines) on when. we will
repair lawns and bring it to the next meeting to review. The Committee does not feel
we should be doing lawn repairs in the'rown's right-of-way, unless there is a
compelling reason to do so, as in water main breaks,
Seven Mile Drive Paving Project: We have started this project by taking Out as tree that
was impeding , the drainage way (so that the drainage way can be moved to come
straighter into the culvert pipe that goes across the road), now we are lining the
drainage way with ri,pra,p (large stones) to reinforce the stream banks. After that, Nve
will be cleaning the ditches and getting ready to pave it, then shoulders will be
installed.
Salem I.Xive Paving Project: 'This project will be started after the Seven Mile Drive
project is done. We are going tc> try a new Paving fabric, so this may take more timoto
do. This Fabric is put down in between the binder material and the topcoat. Binder
material is more Course (larger stones) than a top. We will be installing a catch basin
that will help direct the flow of water towards Hanshaw Road during high flows.
an
Public Works Committee Minutes, May 24,2005 Page 3
I
Summer Youth Projects
This year we have hired two people to be leaders for a couple of summer youth worker
projects. One project will be working in the parks repairing, sealing, and cleaning up
the play structures. The other project will have the youth painting fire hydrants,
plantings at Town Hall, and other odd jobs.
Miscellaneous
Fred said that there are new residents at 1408 Hanshaw Road. They have been in
contact with the Town and would like to start filling in the area that floods. We will
dump fill in that area when working in the northeast.
Cathy said that there would be no money in the 2006 budget for Capital Projects —only
the basics like paving projects.
Cathy said that at the last Intermunicipal meeting it seemed as though the County did
not want to contract with the Towns to have pot holes fixed, etc. We are not sure if all
the Towns were contacted about this or not.
Dan said that after some research we have found that the Village of Cayuga Heights
owns a strip of land in the Lexington Drive area and is part of the drainage problems
there. The driveway to the buildings is in the Town of Ithaca, the buildings are in the
Town of Lansing, and parts of the parking lots are in the Village of Cayuga Heights.
We will continue to survey this area this summer.
Mike Smith said that he would like to apply for a grant for parks development. This
would be a way to get some money to replace some of the Town's play structures that
are outdated and not in compliance with ADA. This, grant would be for a 50/50 grant —
we will have to come up with 50 percent of the money or in -kind services.
The Town is trying out a data collector system.