Loading...
HomeMy WebLinkAboutPWSF StructuresTown of Ithaca Personal Wireless Facility Service (PWFS) Flow Charts – How-To 9/14/18 PWFS STRUCTURES – What Are you Proposing To Construct/Install? Tower (taller than 50ft, not a “small cell” facility) Pole (Up to 50ft tall) Co-Location onto Existing Tower, Building, Pole, Silo, etc. Base Station, Equipment, Cabling, Shelters, etc. Town of Ithaca Personal Wireless Facility Service (PWFS) Flow Charts – How-To 9/14/18 Is Proposed Facility Collocated Onto An Existing Structure? NO Is it a New Small Wireless Facility? •New Tower (#1*) •Requires PB site plan approval & special permit, building permit. •Town law contains aesthetic, location, dimensional, etc. requirements, per §332(c)(7). •150 day shot clock for approvals. NO •System (e.g. DAS, #4*) •Requires PB site plan approval & special permit, building permit (exception: internal Planning staff review, building permit only for systems at least 500 feet from public ROW & adjoining owner lot line). •Town law contains aesthetic, location, dimensional, etc. requirements. •90 day shot clock for approvals. NO •Requires internal Planning staff review ᶺ, building permit (#5*) •Town law contains aesthetic, location, dimensional, etc. requirements. •90 day shot clock for approvals. YES Is it a New Individual Small Wireless Facility? YES