YORKDEPARTMENTOFPLANNING215N.TiogaSt14850607.273.1747www.town.ithaca.ny.usMEMORANDUMTO:PlanningBoardMembersFROM:ChristineBalestra,PlannrDATE:February14,2023RE:ProposedSketchPlan—MirabitoRedevelopmentProjectatEastHillPlazaEnclosedpleasefindmaterialsrelatedtoasketchplanproposalfortheredevelopmentoftheMirabitogasstationandconveniencestoreinEastHillPlaza,301PineTreeRoad/CR120.TheprojectinvolvesdemolishingtheexistingMirabitobuildingandredevelopingthesitewithanew6,600+/-squarefootMirabitoconveniencestorewithfuelcanopyandcarwash,alongwithanattachedfast-foodrestaurantanddrive-thru.Tofacilitatetheredevelopment,theapplicantsplantoconsolidatetheparcelthatcontainstheexistingMirabitogasstationwiththeadjacentparcelthatcontainsthebuildingformerlyhousingBurgerKingandre-subdividethepropertytoobtainanadditional0.8÷!-acresforthenewdevelopment.Theresultwillbea1.6+/-acreparcelthatwillcontaintheredevelopedMirabitoandassociateduses,anda1.0+!-acreparcelthatwillcontaintheformerBurgerKingparkinglot.TheapplicanthasnotindicatedafutureintentfortheformerBurgerKingparkinglot.ThisprojectisscheduledforasketchplanreviewattheFebruary21,2023,PlanningBoardmeeting.ThereisnoofficialPlanningBoardactionfortheproject,asasketchplanreviewisintendedfortheBoardtocommunicatesuggestionsand/orconcernstotheapplicantregardingtheproject.Informationabouttheproperty’ssitecharacteristics,approvalprocess,andenvironmentalreviewelementsarenotedbelow.PropertySiteCharacteristicsThepropertyisboundonthenorthbytheEastHillPlazaparkinglot,ontheeastbytheTompkinsTrustCompanybankandaplazaentranceoffEllisHollowRoad/CR110,onthesouthbyEllisHollowRoad,andonthewestbyPineTreeRoad/CR120.TheprojectislocatedwithinthelargestcommercialareaintheTownofIthaca,withaportionintheVehicleFuelandRepairZoneandaportionintheCommunityCommercialZone.AcrossthePineTreeRoadisanopenparcelandtheexistingDunkin’Donuts;andacrossEllisHollowRoadareCornellUniversityhorsepastures.1
Thisareaofthetownhasbeenhighlydisturbedbycommercialdevelopment.Therearenosteepslopes,wetlands,orwaterbodies,historicorarchaeologicallysensitiveresources,endangeredorthreatenedspecies,forestedareas,orotherenvironmentallysensitivecharacteristicsontheprojectsite(theenvironmentalreviewprocessisdescribedbelow).TheTownofIthaca’s2014ComprehensivePlanhasidentifiedthisareaas“TNDHighDensity”(TraditionalNeighborhoodDesign),whichenvisionsaredevelopedLastHillPlazaintoadense,pedestrianfriendlyarea,withhumanscaledesign,aninterconnectedstreetnetwork,andotherfeaturesthatfosterasenseofcommunity.TheproposedsketchdesignembodiessomeofthespiritofapotentialfutureTNDfortheEastHillarea.However,theproposedsidewalksabuttheroad,withnotreelawntoseparatetheroadfromthewalks.ThereisalsoapatioseatingarearightnexttoEllisHollowRoad,whichisnotanappropriate(orenjoyable)placeforseating,andthefuelcanopyisquitelarge.TheBoardshoulddiscussthese,andanyotherlayoutanddesignconcerns,withtheapplicantatthemeeting.ApprovalProcess&EnvironmentalReview(SEQR)ThisprojectwillrequirepreliminaryandfinalsiteplanandsubdivisionapprovalsfromthePlanningBoard.Specialpermitapprovalmaynotbeneeded,asthePlanningBoardpreviouslyissuedspecialpermitsforthegasstation,conveniencestore,andfast-foodrestaurantwhenthoseprojectswereoriginallyapproved.Theenvironmentalreviewforthisprojectwilloccuratthenextstageofprojectreview(preliminarysiteplan,preliminarysubdivision).TheprojectisclassifiedasanUnlistedAction,pursuanttotheStateEnvironmentalQualityReviewActandtheTownofIthacaEnvironmentalReviewLaw.Assuch,theprojectwillrequirethecompletionofaShortEnvironmentalAssessmentForm.Theenvironmentalreviewwillevaluatepotentialimpactsonstormwatermanagementanddrainage,erosionandsedimentationcontrol,infrastructureandutilitycapacity/availability,traffic,noise,lighting,parkingandcirculation,energyusage,communitycharacter,aesthetics,andotheritems.TheapplicantshouldbepreparedtoprovideenoughdetailedplansandstudiesfortheBoardtomakeadeterminationofenvironmentalsignificanceatthenextstageofprojectreview.Theapplicantshouldsubmitelevationdrawings,plansthatshowbuildingmaterials,colors,andothersitedetails,moredetailedlandscapingandlightingplans,gradingplans,anyproposedsignage,erosionandsedimentationcontrolplans,andtripgeneration/trafficcountinformation.Additionally,theapplicantshouldconsultwiththeTownEngineeringDepartmentbeforesubmittingmaterials,astheremaybewaterandsewerissuesthatneedtoberesolved(perattachedmemofromtheTownEngineeringDepartment,datedJanuary23,2023).Pleasefeelfreetocontactmebyphoneat273-1721orbyemailatcbalestra@town.ithaca.ny.usifyouhaveanyquestions.Cc:BrettHughes,MirabitoEnergyProductsMatthewNapierala,NapieralaConsultingJeremyThomas,DirectorofRealEstate,CornellUniversityKristenGutenburger,AssociateDirectorofRealEstate,CornellUniversity2
DEPARTMENT OF ENGINEERING
Stormwater, Sanitary Sewer, Potable Water, Roads, Parks, and Trails
114 Seven Mile Drive, Ithaca, N.Y. 14850
ENGINEERING@TOWN.ITHACA.NY.US
PHONE: 607.273.1656
FAX: 607.272.6076
www.town.ithaca.ny.us
ENGINEERING MEMORANDUM
FROM: Daniel Thaete P.E., Director of Engineering
David O’Shea P.E., Senior Civil Engineer
TO: Matthew R. Napierala, P.E., Napierala Consulting Professional Engineer, P.C
James Ballantyne, Napierala Consulting Professional Engineer, P.C
Brett Hughes, Mirabito Energy Products
CC: Town of Ithaca Planning Board
DATE: January 23, 2023
RE: 301 Pine Tree Rd, Mirabito Energy Products Re-Development
We have reviewed the provided sketch plan materials, plan sheet SK-19(dated
November 3, 2022), sheet SD-1 (dated November 23, 2022) and the project narrative
associated with the project. We offer the following comments:
General
• Please consult with the Tompkins County Highway Department on the planned
improvements near, and within, the County right of way.
• It is anticipated that the applicant will be required to meet the NYS DEC SPDES
General Permit for Stormwater Discharges from Construction Activities. The
stormwater plans and materials will need to be approved prior to final project
approval. As identified within the General Permit, Fueling Stations are considered
“hotspots” requiring specific measures as identified within the regulations.
• A phasing plan must be included in the SWPPP if construction and/or demolition
is going to be completed in a phased manner.
Water and Sewer
• Please provide pre and post development water and sewer flows for review.
There are numerous downstream sections with the sanitary sewer collection
system that are at and/or near capacity (see attached sewer map entitled
“Mitchell St. Sewer Shed Existing Conditions). Increases in flow will need to be
approved by the Town of Ithaca Engineering Department and the Ithaca Area
Wastewater Treatment Facility. An External Plumbing Permit will be required.
• The Town of Ithaca has a 10’ sewer easement centered on the main. Cover shall
not be reduced to less than 4.5’ over the sanitary sewer main. Grading,
vegetation, and other obstructions that would impede access and maintenance to
the main shall not be placed within our easement (refer to attached, “Town of
Ithaca Utilities” map).
• A storm water basin can not be installed within our easement. This would impede
access and maintenance capabilities (refer to attached, “Town of Ithaca Utilities”
map).
• A portion of the water main is located within an easement that is referenced in
the parcels deed. We are unable to locate the easement. This will need to be
rectified. Cover shall not be reduced to less than 5’. An additional easement may
be required if modification to the water services is required.
COMMISSIONER
Katherine Borgella
DEPUTY COMMISSIONER
M. Megan McDonald
121 E. Court St, Ithaca, N.Y. 14850 | Phone: (607) 274-5560 | tompkinscountyny.gov/planning
Creating and implementing plans that position Tompkins County communities to thrive.
February 10, 2023
Christine Balestra, Planner
Town of Ithaca
215 North Tioga St.
Ithaca, NY 14850
Re: Review Pursuant to §239 -l, -m and -n of New York State General Municipal Law
Proposed Action: Sketch plan for proposed Mirabito Redevelopment located at 301 Pine Tree Road,
Tax Parcel #62.-2-1.13, Cornell University, Owner; Brett Hughes, Applicant.
Dear Ms. Balestra:
This letter acknowledges your referral of the proposed action identified above for review by the Tompkins County
Department of Planning and Sustainability pursuant to §239 -l, -m and -n of the New York State General Municipal
Law.
Thank you for the opportunity to review the plan early in the review process. If the proposal goes forward, we look
forward to reviewing the preliminary and/or final site plans.
In our review of the sketch plan we consulted the Tompkins County Highway Division and identified the following
concerns:
• The driveway on Pine Tree Road (County Road 120) is too close to the intersection and should be
eliminated. The American Association of State Highway and Transportation Officials specifically states
that “Driveways should not be situated within the functional boundary of at-grade intersections. This
boundary would include the longitudinal limits of auxiliary lanes.” Drivers exiting and entering the gas
station using the Pine Tree Road driveway may interfere with through traffic.
• The two driveways on Ellis Hollow Road (County Road 110) lie within each other’s influence area. One
should be removed.
• The driveway proposed on Ellis Hollow Road should be relocated to align with the existing cross culvert.
• The stormwater management area in the Northwest corner of the sketch plan is in close proximity to the
fuel tanks and should be relocated. Possible contamination of the stormwater management area from an
event associated with the fuel tanks could have broader water quality impacts downstream.
• The sidewalk and accompanying crosswalk crossing the driveway on Ellis Hollow Road should be
realigned to meet the existing pathway.
• The sidewalk curb cut from the patio on to Ellis Hollow Road should be removed as there is not a
crosswalk at this intersection.
Sincerely,
Katherine Borgella, AICP
Commissioner of Planning and Sustainability
110 FAYETTE S TREET
M ANLIUS, NEW Y ORK 13104
PH 315-682-5580 • FAX 315-682-5544 • EMAIL:MNAP@NAPCON.COM
Project Narrative –Mirabito Energy Products Re-Development
Location: 301 Pine Tree Road
Ithaca, NY 14850
Parcel Size ±1.6 acres (Proposed, contingent on subdivision approval)
Owner: Mirabito Energy Products
PO Box 5306
The Metro Center – 49 Court Street
Binghamton, NY 13902
Attn: Brett Hughes
Contacts: Project Site Engineer
Napierala Consulting, (315) 682-5580
Project Narrative:
Mirabito Energy Products (Mirabito) is proposing to demolish their existing building and re-develop
the site. This site will include a +/- 6,600 square foot building for a new Mirabito convenience store
with fuel canopy and carwash, along with an adjoining fast-food restaurant with drive-thru.
The existing site is within the Town of Ithaca’s Vehicle Fuel and Repair (VFR) zone and Community
Commercial (CC) zone. Additionally, Mirabito is proposing a subdivision/consolidation into Parcel
1 and Parcel 2. The proposed Parcel 1 will be split-zoned with the western portion remaining VFR
and the eastern portion retained as Community Commercial (CC). All aspects of the proposed
convenience store, fueling station, and fuel storage area will be entirely kept within the VFR zoned
portion of the parcel. Similarly, all aspects of the proposed fast-food restaurant with drive-thru will
be entirely kept within the CC zoned portion of the parcel. The convenience store with gasoline sales
will require a Special Permit. The fast-food restaurant with drive-thru will require a Special Permit.
Parcel 2 will be owned by Cornell and be left undeveloped at this time.
Along with the building construction, the site changes include additional parking and circulation
patterns while retaining the existing full access driveways on Pine Tree Road and Ellis Hollow Road
and cross access to the shopping plaza to the north. Additional improvements include a new sidewalk
along the property frontage, a patio seating area, improved landscaping, and site lighting. Given that
Mirabito and a fast-food restaurant are currently operating on this site, the proposed project will have
negligible impact on traffic and trip generation.
Stormwater management will be designed to meet the current standards by NYSDEC and discharge
from the site similar to existing conditions. Public utilities including sewer, water, electric, natural
gas currently serve the parcel and no new services are being proposed. The chart on the following
page outlines the preliminary construction schedule.
Mirabito Energy Products Re-Development 301 Pine Tree Road, Ithaca, NY 14850
Preliminary Project Schedule
ID Task Name Duration Start Finish
1 Town Approvals 180 days 01/2023 06/2023
2 Construction Documents 90 days 06/2023 09/2023
3 Bid/Contract Award 20 days 09/2023 10/2023
4 Mobilization 1 day 10/2023 10/2023
5 Site Work 30 days 10/2023 11/2023
6 Foundation/Utilities 30 days 11/2023 12/2023
7 Bldg Shell/Exterior Finishes 90 days 01/2024 04/2024
8 Fine Grading/Paving 5 days 05/2024 05/2024
9 Landscaping/Site Amenities 5 days 05/2024 05/2024
10 Substantial Completion 1 day 05/2024 05/2024
11 Certificate of Occupancy/Inspection 1 day 05/2024 05/2024
12 Final Completion 1 day 06/2024 06/2024
EVEVEVEVPROJECT NO.
DATE
SCALE
SHEET
MATTHEW R. NAPIERALA, P.E.
NYS REGISTRATION # 068733
PLAN SEAL BY:
PREPARED BY:
COPYRIGHT C 2022
NO.REVISION/ISSUE
SHEET TITLE:
DATE
PREPARED FOR:
PROJECT TITLE:
110 FAYETTE STREET
MANLIUS, NEW YORK 13104
email: MNAP@NAPCON.COM
PH: (315) 682-5580 FAX: (315) 682-5544
N A P I E R A L A
C O N S U L T I N G
PROFESSIONAL ENGINEER, P.C.
SITE DESIGN ENGINEERING
IT IS A VIOLATION OF LAW FOR ANY
PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT,
PROFESSIONAL ENGINEER, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR TO
ALTER ANY ITEM ON THIS DOCUMENT IN
ANY WAY.
ANY LICENSEE WHO ALTERS THIS
DOCUMENT IS REQUIRED BY LAW TO AFFIX
HIS OR HER SEAL AND THE NOTATION
"ALTERED BY" FOLLOWED BY HIS OR HER
SIGNATURE AND SPECIFIC DESCRIPTION
OF THE ALTERATIONS.
NAPIERALA CONSULTING
PROFESSIONAL ENGINEER, PC
MIRABITO ENERGY
TOWN OF ITHACA TOMPKINS COUNTY, NY
MIRABITO ENERGY PRODUCTS
THE METRO CENTER - 49 COURT STREET
P.O. BOX 5306
BINGHAMTON, NY 13902
CONCEPTUAL
LAYOUT PLAN
20-1890
3 NOV 2022
1" = 30'
SK-19 PRELIM
INARYFOR CONCEPT
REV
IEW
ONLY
PROJECT NO.
DATE
SCALE
SHEET
MATTHEW R. NAPIERALA, P.E.
NYS REGISTRATION # 068733
PLAN SEAL BY:
PREPARED BY:
COPYRIGHT C 2022
NO.REVISION/ISSUE
SHEET TITLE:
DATE
PREPARED FOR:
PROJECT TITLE:
110 FAYETTE STREET
MANLIUS, NEW YORK 13104
email: MNAP@NAPCON.COM
PH: (315) 682-5580 FAX: (315) 682-5544
N A P I E R A L A
C O N S U L T I N G
PROFESSIONAL ENGINEER, P.C.
SITE DESIGN ENGINEERING
IT IS A VIOLATION OF LAW FOR ANY
PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT,
PROFESSIONAL ENGINEER, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR TO
ALTER ANY ITEM ON THIS DOCUMENT IN
ANY WAY.
ANY LICENSEE WHO ALTERS THIS
DOCUMENT IS REQUIRED BY LAW TO AFFIX
HIS OR HER SEAL AND THE NOTATION
"ALTERED BY" FOLLOWED BY HIS OR HER
SIGNATURE AND SPECIFIC DESCRIPTION
OF THE ALTERATIONS.
NAPIERALA CONSULTING
PROFESSIONAL ENGINEER, PC
MIRABITO ENERGY
TOWN OF ITHACA TOMPKINS COUNTY, NY
MIRABITO ENERGY PRODUCTS
THE METRO CENTER - 49 COURT STREET
P.O. BOX 5306
BINGHAMTON, NY 13902
SUBDIVISION
SKETCH PLAN
20-1890
23 NOV 2022
1" = 30'
SD-1 PRELIM
INARYFOR CONCEPT
REV
IEW
ONLY