Loading...
HomeMy WebLinkAboutBudget Committee Minutes 7-11-22 1 BUDGET COMMITTEE Minutes - July 11, 2022 Committee present: Eric Levine - Chairman, Rod Howe, Pam Bleiwas Staff present: Donna Shaw, Judy Drake, Joe Slater, Dan Thaete, Marty Mosely Meeting was called to order at: 12:00 p.m. AGENDA ITEMS: • Review and approve meeting minutes from June 13, 2022 Moved: Rod Howe Second: Pam Bleiwas Motion Passed. • Review and approve 2023 Staffing Plans. The 2023-2026 Staffing Plan was shared with Committee. The 2023 Staffing Plan includes the following changes at Town Hall: - 1 FT Computer Support Aide added in 2022 will continue. - 1 FT Deputy Finance Officer will not be funded in 2023. - 1 FT Code Safety Inspector added in 2023. - .25 FT Director of Planning added as overlap for an expected retirement in 2023. Public Works Facility included the following changes: - 1 FT Civil Engineer - .25 FT Administrative Assistant added as overlap for an expected retirement in 2023. • Review and approve 2023 CIP. The Committee reviewed the schedule for capital projects scheduled for 2023: - WATER TANKS - No projects are scheduled for 2023. - WATER MAINS - Water Main Improvements for 2023 total $1,346,365 and consists of two projects carried over from 2022 due to supply chain related backlogs. The Troy/Coddington Backup Generators, estimated at $250,000 was funded with Benefit Assessment Fees in 2022 so will you use the fund balance created in 2023; Ridgecrest Booster Pump and 12” Bypass, estimated at $1,096,365 will utilize ARPA funding. - SANITARY SEWERS - The amount of $300,000 will be budgeted for Sewer Manhole Rehab in 2023, which will be funded from current year revenues in the Sewer Fund. The Forest Home Pump Station & Forcemain Project is carried over from 2022 and expanded to $1,250,000. In 2022, the $450,000 estimated cost was budgeted to use fund balance. This year we are anticipating using the $550,707 balance of ARPA funding and issuing BANS for the remainder of $699,293. - STORM DRAINAGE – No projects are scheduled for 2023. - ROAD IMPROVEMENTS – The 2023 Road Improvement Program is budgeted at $1,481,000 and includes the following projects: 2 - Harris B. Dates Drive – Entrance/Exit $ 77,000 - Conifer 122,000 - Judd Falls – Route 366 to Tower Road 300,000 - Burleigh Drive 152,000 - Lexington Drive 163,000 - Concord Place 51,000 - Birchwood Drive 99,000 - Pinewood Drive 74,000 - Briarwood Drive 78,000 - Maplewood Drive 63,000 - Christopher Lane 182,000 - Christopher Circle 120,000 These projects will be financed with current year property tax, CHIPS revenue, and approximately $781,000 in DB fund balance. - SIDEWALKS – No projects are scheduled for 2023. - TOWN FACILITIES – The PWF Fuel Station is budgeted in 2023 at $750,000 and PWF MEP Study is budgeted at $20,000, both will use available fund balance. - GREEN ENERGY UPGRADES – This is a new category for 2023 and includes $25,000 for Town Hall and PWF green energy upgrades, which will be funded by available fund balance. - PARKS & TRAILS – Improvements to Town Parks & Trails for 2023 is budgeted at $331,700 and includes a $66,000 local share contribution (from Open Space Plan Reserve) to the new Babcock Ridge Trail design, pending grant approval, as well as $50,000 for trail overlay from General fund balance. Review and discuss Vehicle/Equipment Replacement Schedule for 2023. The Committee reviewed the spreadsheet for the preliminary 2023 Vehicle/Equipment Replacement. The total of new equipment is budgeted at $620,000. This includes a new electric mower to replace a diesel-powered mower. The Ventrac Tractor will be auctioned and replaced with leased equipment on a trial basis while we determine what equipment best meets the Town’s needs. The total amount estimated to be received from auctioning five pieces of equipment is $165,600. • Update on status of investments. We currently have $3,000,000 invested with NYCLASS earning 1.12%. Their rates continue to climb from .63% when we first enrolled in June. First National Bank of Groton quoted .8% for a 12-month CD and Tompkins Community quoted 1.5% for a 12-month CD. We transferred $8,000,000 from FNBG to Tompkins Community for the 12- month CD on July 2nd. On June 15th we opened a 6-month CD for $4,500,000 with Tompkins Community with an initial rate of .65%. On June 21st they voluntarily raised that rate to 1.15% after the federal rate hike. 3 Tompkins Community also raised the interest rate on our Super Savings account from .11% to .85% following the federal rate hike. • Update on Sales Tax collections for 2023. For the first five months of 2023, sales tax collections of $1,763,773 are 24.2% higher than the $1,420,624 received for the same period in 2022. • Other Items. The Commission approved a 4.5% increase to the Bolton Point water rate on 7/7/2022. The new rate will be $6.03/1,000 gallons with a minimum bill amount of $30.15 for 5,000 gallons. The meeting was adjourned at 12:46 p.m. Next Meeting: Monday, August 8, 2022 at 12:00 pm, Town Hall - Aurora Room