Loading...
HomeMy WebLinkAboutPC Minutes 2022-07-21 Town of Ithaca Planning Committee Thursday, July 21, 2022 (3:00 PM via Zoom) Minutes Committee members: Rich DePaolo, Chair; Rod Howe & Margaret Johnson Board/Staff members: Director of Planning, Susan Ritter; Planners Chris Balestra& Dan Tasman, Director of Code Enforcement Marty Mosely. Guests: Representing the seasonal luxury campground proposal on Danby Road- Justin McGuire & Natalie. Representing RaNic Golf Club-Noah Demarest-STREAM Collaborative, Jason Demarest, Adam Fishel-Marathon Engineering and Richie Lou-Hotel Hospitality consultant. Bruce Brittain, Carl Franck, Clover Drinkwater, general comments for RaNic proposal. 1. Persons to be heard: Bruce Brittain commented he would like to see the RaNic golf club kept as open space and that the proposed PDZ, if approved, does not allow more housing units then the current zoning allows. Carl Franck commented he appreciated the (RaNic)proposal for the concession for public use opportunities. He also expressed appreciation for the Town Planning Committee, the governing documents and measures that protect the future interests of the Town, for example, such as if the current owner changes, what uses would be allowed. Clover Drinkwater asked for clarification as to what step in the process the RaNic re-zoning proposal currently is in and encouraged the Town to continue the plan for as much open space as possible for the community. Rich replied that no formal applications have been made, the proposal is in design phase and a draft local law proposal to change the zoning is being discussed at the committee level. The general timeline for the committee is to review the draft local law in detail over the next couple months before making its formal recommendation to the Town Board. Rich followed up by stating there is time and opportunity for public input on design modifications. Rich thanked the public for weighing in and sharing their comments with the Committee. 2. Committee announcements and concerns: None. 3. Approval of June meeting minutes: Rich moved; Rod seconded. June 16, 2022, minutes were approved as presented. 4. Seasonal luxury campground proposal (tax parcel 36.-1-6.2/Danby Road): Justin McGuire shared a concept proposal for the 55-acre parcel on Danby Road next to the current La Tourelle & Firelight camps. The concept includes a 29-unit luxury seasonal campground including accommodation options such as small cabins and yurts on raised wooden platforms. Nineteen of the proposed 29 sites would have indoor plumbing and private bathrooms and the remaining 10 sites would utilize a shared central bath house. All units would have electricity. ADA compliance for accessibility is proposed as well as an 850' two-way roadway and a camp loop broken into two half-moons with a one-way driveway. An add- on feature for a seasonal ice cream shop with a camp office at the campground entrance was also noted. Typical camping actives are proposed for guests including hiking trails connecting to the abutting State 1 Park and a Saturday yoga class open to the public. Clearing and disturbing as little of the property to retain the current land character and wildlife was also noted as the intent. Planning Committee members general questions/comments included: some of the A-frame cabins seem large and permanent in nature, may need traditional building standards rather than the platform proposal (applicant replied that the detailed design is not complete, possible concrete pillars will be recommended by the engineers). The proposal is a seasonal business, however, the buildings would remain during off season (applicant stated they would be winterized, and the internal roads would be maintained). Electricity access or hard wired? (Underground wiring). Connection to the trail system at the State Park will need to be granted. Staff comments/questions: Marry mentioned the NYS Energy Code would not apply to the buildings if not being heated or cooled, however, the Town of Ithaca Energy Code would apply, and the certificate would note the building is not a conditioned area. Fire Access would need to be maintained and fire hydrant flow established as well as overall road standards and capabilities. It was noted that ADA enforcement is federal not local, however, the ICC sister codes would be part of the local code inspection process that includes a percentage of accessible units. Sue stated the proposal would not conform to existing Low Density Residential Zoning regulations. Options, if the committee is open to the use and overall proposal, are to somehow merge the new uses into the existing adjacent La Tourelle PDZ or create an all new PDZ. Rich was open to amending the neighboring PDZ with the limits of the uses that are proposed. Rod was favorable to the proposal with the acknowledgement of details needing to be worked out. No objections were raised for the overall concept of the seasonal luxury campground proposal. The applicant was encouraged to proceed with the process of submitting a formal sketch plan and other subsequent steps of the review process. 5. RaNic Golf Club site development proposal/draft proposed PDZ update: Noah Demarest of STREAM Collaborative presented a revised development plan and draft PDZ language that would be applicable to both the Village of Cayuga Heights and Town. The language was based on the Maplewood PDZ and Noah acknowledged that some of the provisions may not be relevant to the RaNic proposal and it is still a working draft. Comments received from Town planners will be incorporated into a revised version for consideration. Some of the comments pertained to proposed uses that may not be applicable or appropriate for the site as a whole, but instead ancillary to the clubhouse (i.e. daycare, office, etc.). Noah stated that this presentation will be provided to the Village at their upcoming meeting and he hopes for the project to remain on a similar track for both municipalities. Highlights from the discussion included that the large subarea PD-16-G represents the open golf course space. The plan was to include three single family home lots in the PDZ, but these will likely be moved to outside the PDZ given that the use is allowed in the existing LDR zone, although the proposed lot sizes may not comply. The two PD-16-M subareas are proposed for the higher intensity hospitality/townhome uses, with one subarea fronting along Warren Road to include proposed "stay and play"units. The Village PD-1 would encompass the proposed hotel and several townhouses with the remaining zoning in the Village not changing from the existing residential zone. The existing clubhouse that is divided by the municipal line will be renovated and two new outlets are proposed on Hanshaw 2 Road for ingress/egress to serve a sixteen-unit townhome area. Another twelve-unit townhome cluster area is proposed using a new internal driveway. Adam Fishel noted the process with the County for the proposed new curb cuts is in early discussion. Staff comments/questions: Sue Ritter noted that a sketch plan review with the Planning Board would be the initial step before any consideration of SEQR and preliminary site plan. The full preliminary submission requires a 30-day review by the County and for other interested and involved agency referrals before any board action. Committee comments/questions: Rich asked if the roadways would be private (yes) and then asked about short term rentals (STR)noted in the use table and whether this would fall under the same criteria as the town's existing STR law. Noah responded that the intent for short term rentals is different from lodging and is expected to follow the town's regulations. In addition, the short-term rentals would/could be managed by the hotel rather than the typical Airbnb situation. It was also noted that accessory dwelling unit and accessory home occupation were listed as permitted uses in PD-16-G, but there are no dwelling units allowed and this was noted as a mistake to be removed. The 14'-170' width at front (sidewalk or ROW edge) for Site and Building Design configuration was questioned as not applicable to the PD-16-G and Noah indicated more applicable revised numbers would be proposed for the Hanshaw Road fronting buildings. The proposed townhouse height of 2-3 stories was commented on by both staff and Rich, Noah mentioned that 2.5 story may be closer to the intent. The Sign section and applicable standards were questioned and will need location clarifications as well, most likely relevant to the Hanshaw and Warren Road driveway fronting sections. The tentative approval schedule was reviewed and discussed; Sketch Plan submission anticipated for the second August Planning Board meeting and another refined clean version of the PDZ from Noah back to the Planning Committee in August as well, with redlined edits showing any changes. Town Planning staff commented on the need for more screening, with some sort of buffer or landscaping, between the existing homes and the proposed townhome clusters. Architectural elements for the townhomes were raised as concerns too. Chris B clarified that the house next to one of the proposed townhouse driveways is owned by the applicant and proposed to be removed. Noah mentioned that the site plan review will likely identify a buildout process and schedule for the improvements as they won't likely all happen at the same time. Noah asked for clarification on the SEQR process with the two municipalities, and whether one would be the Lead Agency and the other an Involved Agency. Planning staff recommended the Town conduct the SEQR review as Lead Agency due to quantity of the project in the Town. This was supported by the developer with support anticipated by the Village too. Chris B stated that once the Full SEQR and preliminary site plan is submitted letters declaring the Town as Lead Agency will be sent out to all interested and involved agencies giving them the opportunity to concur or otherwise respond to the Town's intent. 6. Discussion of draft Inlet Valley Overlay Zone proposal: Rich stated that committee comments and suggestions had been incorporated and he did not flag anything in the most recent revision. This version did incorporate initial Attorney comments as well as Code Enforcement Director comments. A final attorney review may not be able to occur before the next Planning Committee meeting. It is anticipated that all current edits will be accepted and that only new attorney changes will show up in any subsequent version. If there are no major changes, the committee was agreeable to the minor ones being 3 summarized to the committee and the document moving forward to the Town Board without an additional discussion due to all the time at the committee level to date. 7. Staff updates and reports: Sue reported that the Limited Historic Commercial Overlay draft amendments are anticipated to be back before the Committee in August. A submission for a self-storage facility in Inlet Valley is still anticipated per a recent staff inquiry with the developer's consultants. Noted as a use allowed in the current zoning but not in the overlay proposal. Rod and Marry briefly noted a meeting with Cornell that focused on utilities and areas that may need improvements to accommodate future development. Rod noted that information has been supplied to Cayuga Heights as requested for sewer capacity concerns. An error in calculation from the airport flow has alleviated some immediate capacity concerns but surrounding development is still being monitored closely. 8. Next meeting date and upcoming agenda items: next meeting Aug. 18, 2022. Topics: RaNic PDZ, LHC draft amendments. The Planning Committee meeting concluded at 4:12 pm. 4