HomeMy WebLinkAboutPB Minutes 2021-10-05 TOWN OF ITHACA PLANNING BOARD
215 North Tioga Street
Ithaca,New York 14850
Tuesday, October 5,2021
Due to COVID-19 and the NYS Legislation allowing virtual meetings,the meeting will be held via the Zoom
audio/visual application with no in-person attendance permitted. Members of the public may listen to(call in on cell
or landline: (929)436-2866 and enter the Meeting ID: 836 4376 4382) or view(by computer
https://us06web.zoom.us/i/83643764382)the Board meeting through Zoom.
AGENDA
7:00 P.M. PUBLIC HEARING: Consideration of Final Subdivision approval for the proposed 3-lot subdivision
located at 519 Elm Street Extension,Town of Ithaca Tax Parcel No. 29.-7-12.42,Medium Density
Residential Zone. The project involves subdividing the 8.2-acre parcel into three lots (Parcel A-1 is 2.51
acres,Parcel A-2 is 3.58 acres,and Parcel A-3 is 2.11 acres). The project will also involve a private shared
access road to serve the new parcels and an existing parcel, stormwater facilities, and connections to public
water and sewer facilities. David and Sarah Locke Mountin, Owners/Applicants.
7:15 P.M. SEQR Determination: Alden-Baer Subdivision, 235 &239 Dubois Road.
7:15 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Subdivision Approval for the proposed
subdivision located at 235 and 239 Dubois Road, Town of Ithaca Tax Parcel No.'s 22.-2-1.313 and 22.-2-
1.312, Low Density Residential Zone. The proposal involves subdividing 0.186+/-acres from the east side
of 235 Dubois Road,which will then be consolidated with 239 Dubois Road. Barbara Alden and Ellen Baer,
Owners/Applicants.
7:30 P.M. SEQR Determination: Cornell University New Experimental Hall at Wilson Laboratory, Synchrotron Drive.
7:30 P.M. PUBLIC HEARING: Consideration of Preliminary Site Plan Approval and Special Permit for the proposed
Cornell University New Experimental Hall at Wilson Laboratory,located on Synchrotron Drive,Town of
Ithaca Tax Parcel No. 63.-1-8.1,Low Density Residential Zone. The proposal involves the construction of a
2-story,+/- 15,869 square foot building on the west side of Wilson Laboratory. The project will also include
a new 20' wide paved access path and turnaround, seating areas along Cascadilla Creek,bicycle racks,
bioretention facilities, slope drainage improvements, and native plantings. Cornell University,
Owner/Applicant; Kimberly Michaels,Trowbridge Wolf Michaels Landscape Architects,Agent.
6. Persons to be heard.
7. Approval of Minutes: July 20, 2021,August 3,2021, and August 17, 2021
8. Other Business
9. Adjournment
Susan Ritter
Director of Planning
273-1747
NOTE:IF ANY MEMBER OF THE PLANNING BOARD IS UNABLE TO ATTEND,PLEASE NOTIFY
CHRIS BALESTRA AT 273-1747 or CBALESTRA(a),TOWN.ITHACA.NY.US.
(A quorum of four(4)members is necessary to conduct Planning Board business.)
Accessing Meeting Materials Online
Site Plan and Subdivision applications and associated project materials are accessible electronically on the Town's website under"Planning
Board"on the"Meeting Agendas"page(http://www.town.ithaca.nv.us/meeting-agendas).
TOWN OF ITHACA
aJ
(-1 > 215 N. Tioga Strut, Ithaca, N.Y. 14850 ❑' ❑
www.town.ithamny.us E
YO ■
AFFIDAVIT OF SERVICE BY MAIL. AND POSTING & PUBLICATION
STATE OF NEW YORK ) SS.:
COUNTY OF TOMPKINS )
I, Abby Homer, Administrative Assistant for the Town of Ithaca being; duly sworn, depose and
say, that deponent is not a party to the actions, is over 21 years of age with a professional address of
215 North Tioga Street, Ithaca, New York.
That on the 28" day of September 2021, deponent served the within Notice upon the property
owners within 500 ft. of the properties identified below:
Tax Parcel 29.-7-12.42 Final Subdivision Approval for the proposed 3-lot subdivision located at 519
Elm Street Extension.
Tax Parcel #22.-2-1.313 & 22.-2-1.312 Preliminary and Final Subdivision Approval for the proposed
subdivision located at 235 and 239 Dubois Road.
"Tax Parcel #. 63.4-&1 Preliminary Site Plan Approval and Special Permit for the proposed Cornell
University New Experimental Hall at Wilson Laboratory, located on Synchrotron Drive.
By depositing same enclosed in a postpaid addressed wrapper, in a post office under the exclusive care
and custody of the United States Post Office Department within the State of New York, and that the
attached notice has been duly posted on the sign board of the Town Clerk of the Town of Ithaca on
September 281", 2021, and the notice has been duly published in the official newspaper,Ithaca Journal
on September 291h 2021..
Abby l- , Administrative Assistant
Sworn to before me on 112.1 , 2021.
Notary Pu i
E . JORDAN
NOTARY PUBLIC-STATE OF NEW YORK
No, OI J0 1 b 81
OuWffl d In Tompkins County
Ithacajournal.com I WE NE DA`f,SEPTEMBER 29,,2021
calPublic Notices
# ; Y MA
TO'VVN QF ITHACA PLANNING BOARD
_F`LJB1.1CHICAFCIIWI NrIC NI
The Planning Board will hold public heairings on Tcnesday,
October 5, 2�i21, at the following times and on the fol
lowing matters..
7a10 P.M Consideration of Final Subdivision ap-
proval for the proposed 3-lot subdivision located at 519
Elm Street Extension, Town of Ithaca Tax Parcel No. 29. 7,,
12.42, Medlurn Density Residential Zone. The project In-
volves subdividing the B.2-acre Is
Into three lots (Par-
cel A-1 is 2.51 acres, Parcel A-2 is 3.58 acres, and Parcel A
d is 2.11 acres). The project will also involve a private
shared access road to serve the new parcels and an exist-
ing parcel, stormwaater facilities, and connections to p ub.. I
lic water and suer facilities. David .and Sarah Locke
Mountln,Owners/Apapalicants,.
7.15 P. , Consideration of Preliminary and Final
Subdivision Approval for the paropzoseed .subdivision locat-
ed at 235 and 239 Dubois Road, Town of Ithaca Tax Parcel
No.'s 22.-2-1.B1B and 22.-2-1.812, Low Density Residential
Zone. The proposal Involves subcdividlng o.1Bis +iw acres
from the east side of 235 Dubois Road, whroich will then be
consolidated with 239 Dubois Road. Barbara Alden and r
Ellen Baer, Owners/Applicants.
I
17:30 P.M. Consideration of Preliminary Site Plan
Apra .oval and Special Permit for the proposed Cornell
Lin verslty New Experimental Hall at Wilson Laboratory,
€ located on Synchrotron Drive, Town of Ithaca Tax Parcel
No.63.-1-&1, Low Density Residential Zone. The proposal
involves the construction of a 2-story, +/- 15,865 square
foot building on the west side of Wilson Laboratory. The
a prreaiect will also include a new 20'wide paved access path
an turnaround, seating areas along Cascadilla Creek, bi-
cycle racks, bioretention facilities, slope drainage im-
provements, and native plantings. Cornell University,
Owner/Applicant; Kimberly Michaels, Trowbridge 'wolf
Michaels Landscape Architects;Agent.
Due to Ct VID-1+9 and the NYS legislation allowing virtual
rnea tin s, the meeting will be held via the Zoom
auediopvsual application with no In-person attendance
permitted. Zoom Meeting ID 836 4376 4,382. Call in (929)
436-286E. Any person wishing to address the board will
be heard. In addition, comments can be sent:via email to
townclerketown.1thacamy.us up to the end of business
the cda of than meeting and all comments will be 'for-
? warde to the board. Additional Information is availa-
ble at vPArw.tovwn.ithaca.ny.us.
Susan Ritter, Director of Planning
g®29/202 I
TOWN OF ITHACA PLANNING BOARD
October 5, 2021
MINUTES
Board Member Present: Liebe Meier Swain, Chair; Members Cindy Kaufman, Greg
Lindquist, Ariel Casper, Margaret Johnson and Yvonne Fogarty. Absent: Fred Wilcox
Town Staff: Paulette Rosa, Town Clerk; Susan Brock, Attorney for the Town; Lorraine
Moynihan Schmidt, Attorney for the Town; Chris Balestra, Planner; Sue Ritter, Director of
Planning; Marty Mosely, Director of Code Enforcement; David O'Shea, Engineering; Becky
Jordan, Deputy Town Clerk
Ms. Meier Swain opened the meeting at 7:00 p.m.
Agenda Item 1 Consideration of Final Subdivision approval for the proposed 3-lot subdivision
located at 519 Elm Street Extension, Town of Ithaca Tax Parcel No. 29.-7-12.42, Medium
Density Residential Zone. The project involves subdividing the 8.2-acre parcel into three lots
(Parcel A-1 is 2.51 acres, Parcel A-2 is 3.58 acres, and Parcel A-3 is 2.11 acres). The project
will also involve a private shared access road to serve the new parcels and an existing parcel,
stormwater facilities, and connections to public water and sewer facilities. David and Sarah
Locke Mountin, Owners/Applicants.
Mr. Mountin stated that since the preliminary approval from this Board, the project has gone
through the Zoning Board process and received the variances needed and the SWPPP approvals
have been received and the Ithaca Fire Department has approved the road access for emergency
vehicles.
Public Hearing
Ms. Meier Swain open the public hearing at 7:03 p.m. There were no members of the public
wishing to address the board and the public hearing was closed at 7:04 p.m.
PB RESOLUTION 2021-024: Final Subdivision Approval
Mountin Subdivision
519 Elm Street Ext
Tax Parcel No. 29.-7-12.42
Town of Ithaca Planning Board, October 5, 2021
WHEREAS:
1. This is consideration of Final Subdivision approval for the proposed 3-lot subdivision located
at 519 Elm Street Extension, Town of Ithaca Tax Parcel No. 29.-7-12.42, Medium Density
Residential Zone. The project involves subdividing the 8.2-acre parcel into three lots (Parcel
A-1 is 2.51 acres, Parcel A-2 is 3.58 acres, and Parcel A-3 is 2.11 acres). The project will
also involve a private shared access road to serve the new parcels and an existing parcel,
PB 2021-10-05(Filed 10/25) Pg. 1
stormwater facilities, and connections to public water and sewer facilities. David and Sarah
Locke Mountin, Owners/Applicants;
2. This is an Unlisted Action for which the Town of Ithaca Planning Board, acting in an
uncoordinated environmental review with respect to the project on March 16, 2021, made a
negative determination of environmental significance, after having reviewed and accepted as
adequate a Short Environmental Assessment Form Part 1, submitted by the applicant, and
Parts 2 and 3 prepared by the Town Planning staff;
3. The Planning Board, following a public hearing on March 16, 2021, granted preliminary
subdivision approval, after reviewing and accepting as adequate a subdivision plat titled
"Preliminary Subdivision Map Showing Part of Lands of David Mountin & Sarah Locke
Mountin, Located on Elm Street Extension, Town of Ithaca, Tompkins County,New York,"
prepared by T. G. Miller P.C., dated 1/12/2018 and most recently amended 3/4/2021, along
with a set of plans titled"519 Elm Street Subdivision,"prepared by Stephen John Arthur
Maybee, LPE, dated March 2, 2021, including Sheet S-1 titled"Preliminary Site Plan Plat
Subdivision," Sheet S-2 titled"Site Plan Utility Layout," Sheet S-3 titled "Water& Sewer
Details 1," Sheet S-4 titled"Sanitary Sewer Details," Sheet SW-1 titled "Grading and
Stormwater Utility Plan," Sheet SW-2 titled "Erosion& Sedimentation Control Plan," Sheet
SW-3 titled"Erosion& Sedimentation Control Details," Sheet SW-4 titled"Road Profile,"
and Sheet SW-5 titled"Culvert and Swale Capacity Worksheet," and other application
materials; and
4. The Planning Board, on October 5, 2021, has reviewed and accepted as adequate a revised
subdivision map titled"Final Subdivision Map, Showing Part of Lands of David Mountin &
Sarah Locke Mountin, Located on Elm Street Extension, Town of Ithaca, Tompkins County,
New York,"prepared by T. G. Miller P.C., dated 1/12/2018 and most recently amended
8/12/2021, along with set of revised plans titled"519 Elm Street Subdivision,"prepared by
Stephen John Arthur Maybee, LPE, including Sheets S-1 through S-4, dated August 17, 2021
(Sheets S-2 and S-3 most recently revised on 9/01/2021), and Sheets SW-1 through SW-5,
dated August 17, 2021, and other application materials:
NOW THEREFORE BE IT RESOLVED:
That the Planning Board hereby grants Final Subdivision Approval for the proposed Mountin 3-
Lot Subdivision, as shown on the plans noted in Whereas #4 above, subject to the following
conditions:
a. Before the issuance of any building permits, filing of this Planning Board resolution in
the Tompkins County Clerk's Office, indexed to all relevant lots, and submission to the
Planning Department of proof of such filing,
b. Before the issuance of any building permits, acceptance by the Town Board, and
completion and dedication to the Town, of the sanitary sewer line and related
infrastructure to be conveyed to the Town,
PB 2021-10-05(Filed 10/25) Pg. 2
c. Before the issuance of any building permits, approval by the Town Board, full execution
and filing of a 20' wide sanitary sewer easement(s) granted by the applicant and the
relevant property owner on the northern half of Elm Street Extension to the Town of
Ithaca for the maintenance and access to the sewer infrastructure; such easement shall be
satisfactory to the Attorney for the Town and the Town of Ithaca Public Works
Department,
d. Before the issuance of any building permits, approval by the Town Board, full execution
and filing of a water easement granted by the applicant to the Town of Ithaca for the
maintenance and access to the water infrastructure; such easement shall be satisfactory to
the Attorney for the Town and the Town of Ithaca Public Works Department,
e. Before the issuance of any building permits, submission of proof that a fire flow test has
been conducted to verify that there is a water supply capable of supplying the required
fire flow for fire protection purposes, pursuant to Section 507.1 of the NYS Fire Code,
f. Before the issuance of any building permits, receipt of a Town Highway Work Permit for
all work within the Town right-of-way,
g. Before the issuance of any building permits, submission for signing by the Chairperson of
the Planning Board of an original and three dark lined prints of the approved final
subdivision plat, prior to filing with the Tompkins County Clerk Office, and submission
of a copy of the receipt of filing to the Town of Ithaca Planning Department,
h. Prior to the conveyance of any lot in this subdivision or the lot shown as Tax Map No.
29-7-12.43, filing of restrictive covenants (reviewed and approved by the Attorney for the
Town) for these four lots that run with the land and that specify the four lot owners'
maintenance and repair/replacement responsibilities for the shared private drive and for
the stormwater facilities that serve more than one lot, and
i. As deemed necessary by the Attorney for the Town to assure that each of the relevant lots
has access to (i) every part of the shared driveway, and (ii) all stormwater, water, and
sewer infrastructure serving the relevant lot, upon the initial conveyance of each lot,
filing in the Tompkins County Clerk's Office of the necessary access and/or utility
easements that have been approved by the Attorney for the Town; such filing shall be
made at the time of the recording of the deed for the conveyed lot, and proof of such
filing shall be submitted to the Planning Department within 5 days of the filing.
Moved: Ariel Casper Seconded: Greg Lindquist
Vote: ayes—Meier Swain, Kaufman, Lindquist, Casper, Johnson, Fogarty
Agenda Item 2 Consideration of Preliminary and Final Subdivision Approval for the proposed
subdivision located at 235 and 239 Dubois Road, Town of Ithaca Tax Parcel No.'s 22.-2-1.313
and 22.-2-1.312, Low Density Residential Zone. The proposal involves subdividing 0.186 +/-
acres from the east side of 235 Dubois Road, which will then be consolidated with 239 Dubois
Road. Barbara Alden and Ellen Baer, Owners/Applicants.
PB 2021-10-05(Filed 10/25) Pg. 3
Ms. Fogarty and Mr. Casper stated that they are acquaintances with the applicant but do not feel
that will influence their determination here.
Ms. Alden was present to answer any questions and stated that she had nothing to add to her
cover letter to the Board.
SEQR Determination
Ms. Fogarty had a comment about stormwater discharge and Ms. Balestra noted that this is
subdivision with no development being proposed so the answer of no is appropriate.
Ms. Fogarty suggested adding clarity in the "brief description of proposed action"making the
sentence, move property lines that would result in 235 Dubois Road to be decreased to
approximately 24, 925 sq ft (1/2 acre) from 30,056 sq ft.
Ms. Brock stated Area Variance needs to be added as approval needed on SEQR form page 1
number 2.
PB RESOLUTION 2021- 025: SEQR
Preliminary and Final Subdivision Approval
Alden-Baer Subdivision/Consolidation
235 & 239 Dubois Road
Tax Parcel No.'s 22.-2-1.313 and 22.-2-1.312
Town of Ithaca Planning Board, October 5, 2021
WHEREAS:
1. This is consideration of Preliminary and Final Subdivision Approval for the proposed
subdivision located at 235 and 239 Dubois Road, Town of Ithaca Tax Parcel No.'s 22.-2-
1.313 and 22.-2-1.312, Low Density Residential Zone. The proposal involves subdividing
0.186 +/- acres from the east side of 235 Dubois Road, which will then be consolidated
with 239 Dubois Road. Barbara Alden and Ellen Baer, Owners/Applicants;
2. This is an Unlisted Action for which the Town of Ithaca Planning Board is acting in an
uncoordinated environmental review with respect to the project;
3. The Planning Board on October 5,2021,has reviewed and accepted as adequate a narrative,
a subdivision plat entitled "Lands of Barbara Alden Guttridge & Ellen Baer, 235 & 239
Dubois Road, Town of Ithaca, Tompkins County, New York State,"prepared by R. James
Stockwin, PLS, dated August 28, 2021, and other application materials; and
4. Town planning staff has recommended a negative determination of environmental
significance with respect to the proposed Subdivision Approval;
PB 2021-10-05(Filed 10/25) Pg. 4
NOW THEREFORE BE IT RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination of environmental
significance in accordance with Article 8 of the Environmental Conservation Law and 6 NYCRR
Part 617 New York State Environmental Quality Review for the above referenced action as
proposed,based on the information in the EAF Part 1 and for the reasons set forth in the EAF Parts
2 and 3, and, therefore, an Environmental Impact Statement will not be required.
Moved: Yvonne Fogarty Seconded: Ariel Casper
Vote: ayes—Meier Swain, Kaufman, Lindquist, Casper, Johnson, Fogarty
Public Hearing
Ms. Meier Swain open the public hearing at 7:14 p.m. There were no members of the public
wishing to address the board and the public hearing was closed at 7:15 p.m.
Determination
The Board had no questions or comments on the action.
PB RESOLUTION 2021-026: Preliminary and Final Subdivision Approval
Alden-Baer Subdivision/Consolidation
235 & 239 Dubois Road
Tax Parcel No.'s 22.-2-1.313 and 22.-2-1.312
Town of Ithaca Planning Board, October 5, 2021
WHEREAS:
5. This is consideration of Preliminary and Final Subdivision Approval for the proposed
subdivision located at 235 and 239 Dubois Road, Town of Ithaca Tax Parcel No.'s 22.-2-
1.313 and 22.-2-1.312, Low Density Residential Zone. The proposal involves subdividing
0.186+/- acres from the east side of 235 Dubois Road, which will then be consolidated with
239 Dubois Road. Barbara Alden and Ellen Baer, Owners/Applicants,
6. This is an Unlisted Action for which the Town of Ithaca Planning Board, acting in an
uncoordinated environmental review with respect to the project, has on October 5, 2021,
made a negative determination of environmental significance, after having reviewed and
accepted as adequate a Short Environmental Assessment Form Part 1, submitted by the
applicant, and Parts 2 and 3 prepared by the Town Planning staff, and
7. The Planning Board on October 5, 2021,has reviewed and accepted as adequate a narrative,
subdivision plat entitled"Lands of Barbara Alden Guttridge & Ellen Baer, 235 & 239 Dubois
Road, Town of Ithaca, Tompkins County, New York State,"prepared by R. James Stockwin,
PLS, dated August 28, 2021, and other application materials;
NOW THEREFORE BE IT RESOLVED:
PB 2021-10-05(Filed 10/25) Pg. 5
1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary
and Final Subdivision Approval, as shown on the Preliminary and Final Subdivision
Checklists, having determined from the materials presented that such waiver will result in a
significant alteration of neither the purpose of subdivision control nor the policies enunciated
or implied by the Town Board; and
2. That the Planning Board hereby grants Preliminary and Final Subdivision Approval for the
proposed Alden-Baer Subdivision, as shown on the plat noted in Whereas #3 above, subject
to the following conditions:
j. Receipt of any necessary variances from the Zoning Board of Appeals,
k. Submission for signing by the Chairperson of the Planning Board of an original and three
dark lined prints of the approved final subdivision plat, prior to filing with the Tompkins
County Clerk Office, and submission of a copy of the receipt of filing to the Town of
Ithaca Planning Department,
1. If deemed necessary by the Attorney for the Town, submission of a revised "Declaration
of Shared Easement and Maintenance Agreement" for the shared driveway that is
associated with the three lots, and
in. Within six months of this approval, consolidation of the 0.186+/- acres from 235 Dubois
Road (Tax Parcel No. 22.-2-1.313)with 239 Dubois Road(Tax Parcel No. 22.-2-1.312),
and submission to the Planning Department of a copy of the completed Tompkins County
Assessment Department Consolidation Request Form.
Motion: Greg Lindquist Seconded: Cindy Kaufman
Vote: ayes—Meier Swain, Kaufman, Lindquist, Casper, Johnson, Fogarty
Agenda Item 3 Consideration of Preliminary Site Plan Approval and Special Permit for the
proposed Cornell University New Experimental Hall at Wilson Laboratory, located on
Synchrotron Drive, Town of Ithaca Tax Parcel No. 63.-1-8.1, Low Density Residential Zone.
The proposal involves the construction of a 2-story, +/- 15,869 square foot building on the west
side of Wilson Laboratory. The project will also include a new 20' wide paved access path and
turnaround, seating areas along Cascadilla Creek,bicycle racks,bioretention facilities, slope
drainage improvements, and native plantings. Cornell University, Owner/Applicant; Kimberly
Michaels, Trowbridge Wolf Michaels Landscape Architects, Agent.
Ms. Brock recused herself from the meeting due to her spouse's involvement with this project.
Ms. Balestra introduced Lorraine Moynihan Schmitt, Attorney for the Town for this project.
Ms. Michaels shared a presentation. She showed the basic location and layout with the primary
entrance at the Pine Tree Rd and Dryden Rd intersection on Synchrotron Drive. The building
PB 2021-10-05(Filed 10/25) Pg. 6
can't go anywhere else due to the need to be adjacent to the underground synchrotron ring and
how the science has to happen. The xrays come from the ring into the experimental spaces and
that is what is driving the location,height and other factors of the development.
Ms. Carney, University Architect, introduced researchers Dr. Joel Brock and Dr. Ernest Fontes
and gave a history of the project. This project is under a$33M grant from the National Science
Foundation with the goal is to increase the impact of Wilson lab and the work that can be done
there and create the strongest magnetic in the world and the number one leading x-ray facility for
studying materials in the world for studies of materials under extreme magnetic fields.
Ms. Carney went through detailed views and specifications of the buildings which were in the
packet.
Ms. Michaels went through the variances and permits from the various levels of government that
are going to be needed, noting that the hope is to begin construction in the Spring of 2022, and it
will take 2 years to complete.
SEAR Determination
Ms. Fogarty pointed out that the Town of Ithaca should be added on page 2, as an identified
Agency.
Ms. Fogarty noted that page 4, under project operations, there seems a phenomenal amount of
truckloads of soil to be taken from the site and she asked if some of that is going to be used to fill
in the wetland.
Ms. Michaels replied that they will use on site materials wherever they may be needed. The
project can commit to at least 50%waste usage eliminating some of the landfill use. The
truckload calculation is based on the balance of the cut, including understanding what needs to
be kept on site. It will be about 4,500 truck round trips over a 2-year period and those truck trips
are not all for soil removal but include delivery of materials, including concrete for pouring the
foundation, which will be the most intense period of the truck trips. About 300 round trips will
be the soil removal.
Ms. Fogarty inquired about the maximum depth of the excavation or dredging of 30' feet.
Ms. Carney replied that that is into the hillside at the Campus Road elevation as opposed to the
below grade where the building will be at grade.
Ms. Fogarty inquired about the impervious surface area and whether that was all due to roadway
construction and whether there was a way to make any of that impervious surface.
Ms. Michaels responded that they tried to make the roadway as small as possible with minimal
pavement, however, the requirement for emergency vehicle access is 20' feet in width and the
pavement is exactly what is needed for that traffic, no more. She stated that they have been
taking into consideration comments and concerns from the Board regarding impacts to the
PB 2021-10-05(Filed 10/25) Pg. 7
stream and there and they changed the seating area along the stream to stone dust to decrease
potential impact as well as openness to any further suggestions.
Ms. Fogarty stated that she was thankful they were committing to 50% of reuse on site.
Ms. Fogarty referred to page 11, E.2. d where it states the project the average depth to the water
table is 9' feet and how far they are excavating in that area.
Ms. Michaels responded that that is measured from the lower elevation of the site and Mr.
Fernaays added that it will be a deep concrete caissons so we are not excavating, but drilling into
the bedrock and putting concrete piles,beams and then the slab.
Ms. Fogarty asked how or if that will affect the creek.
Ms. Michaels responded that they do not expect it to have an impact as it is channelized in this
area.
Ms. Fogarty stated that about 80% of the site is poorly drained and asked how that will be dealt
with.
Ms. Michaels responded that there's typically intensive clay soils in our area so a fair amount of
soil here is not well drained. There is a stormwater system and bio retention. Runoff from the
roof of the new building and a majority of the roadway will be directed into the bio retention
basins engineered with better soil and percolation capacities set up to meet DEC's expectations
for stormwater.
Ms. Fogarty stated that the Planning Board deals with stormwater runoff regularly and because
of climate change we are getting bigger storms. DEC's regulations haven't caught up with the
climate change reality yet. Is Cornell going by DEC regulations or by the kind of storms we're
getting now?
Ms. Michaels replied that their SWPPP is in compliance with DEC regulations and the projects
increase in impervious surface will have no effect on the peak runoff for Cascadilla Creek. The
engineers calculated that for both the 10-year and 100-year storm projections.
Mr. O'Shea stated that the engineers at TJ Miller have modeled the project and this site is so far
down in the water shed for the creek that actually impounding the water on this project could
potentially create a negative effect on the creek. They are trying to let water out from the site as
quickly as possible so as not to impact downstream structures. Potentially impounding the water
could raise the level of the water in the creek. This is an approved method by DEC so there are
no variances required.
Ms. Fogarty asked about the wetlands stated size on pg 11 and the difference in what has been
talked about and is stated.
PB 2021-10-05(Filed 10/25) Pg. 8
Ms. Michaels responded that there are wetlands that we are not impacting; she looked in the
appendices but it was determined that it was a typo and it will be fixed.
Ms. Kaufman asked about the drive where it opens up to the creek midway along the road and
she asked what that was for.
Ms. Michaels responded that that is in case an emergency vehicle needs to get by another
emergency vehicle and it is not required, but was to make it easier on first responders.
Ms. Kaufman wondered if that extra section could be stone dust also, only if that would make a
difference in the impervious and still serve the function or need.
Ms. Michaels responded they could look into that, but the construction level needed to hold a
truck would not be as impervious as grass and such.
Ms. Balestra added that at the staff level, we flagged that because on the site visit it was termed
as a grander entrance to the building, not as an emergency access.
Ms. Michaels responded that it serves dual purposes of accenting the entrance, provides a view
to the creek and also emergency access if needed. It is not required and could be removed.
Ms. Kaufman responded that she liked the architectural mood there and it would depend if that
contributed to runoff in a significant way whether that should be removed.
Ms. Balestra added that the Board would be looking at the stream setback mitigations for a
recommendation to the Zoning Board.
Ms. Meier Swain said she is confused because the Environmental Committee is saying store as
much as you can and Mr. O'Shea is saying move it along as much as possible and what is the
effect of removing that extra bump out.
Ms. Balestra shared her screen to allow the Board to review the Environmental Review
Committee comments submitted and distributed late in the day. She also reminded the Board, in
relation to the section of widened pavement, that during their consideration for site plan approval
and special permit they are looking at all elements of the project not just architecture and
emergency egress and ingress but also stream setback mitigation.
Mr. O'Shea stated there are two parts to a SWPP; water quality and quantitative parts. In the
water quality piece, they are going to meet DEC regulations. The Environmental Committee has
asked for a 50-year storm detainment which is going to create a greater impact, and the opposite
of what we are looking at achieving. This a greater impact and disturbance on the site with a
larger pond to store water. DEC regulation requires treatment of 90% of the impervious area for
the 1-year storm; a jump from 1 year to a 50-year storm is a pretty big jump. For the Quantity
piece, that is based on previous vs post conditions. There is a slight increase in the post,but
holding it would potentially flood people downstream. The stone dust area being discussed as a
possible removal piece of the project is such a small area it wouldn't have much impact either
PB 2021-10-05(Filed 10/25) Pg. 9
way to the stormwater practices being proposed as well as the passing area being proposed, it is
probably less than 5% of the area and it would be less impactful on the stream but would not
change the stormwater aspect.
Mr. Santelli agreed, saying that they have looked at the that 10-year and 100-year storms and
from a quantity standpoint, we will not be increasing the rate of runoff to the stream, so detaining
the 50-year storm event could exacerbate flooding and increase the possibility of flooding. They
are trying to get larger storm event runoff into the creek quickly as opposed to detaining it. The
stone dust area is not a big factor overall.
Mr. Lindquist stated that that makes sense, and if it is not going to make a big impact, the safety,
aesthetics and use of the pull off and seating area, it doesn't make sense to remove them.
Ms. Kaufman agreed.
Mr. Lindquist asked if there was a way to get the Environmental Committee's comments earlier
in the process and Ms. Balestra said she would convey the comment.
Ms. Fogarty referred to the Full Environmental Assessment Form -Part 3 attachment, middle of
page where it discusses impact to surface water, and it talks about the parking lot and the existing
biofiltration devices under the grassed areas of the parking lot. How is not covering,blocking, or
destroying these devices going to play out during construction and it would be a good idea to add
how that will be done.
Ms. Balestra stated this was added as condition f on the draft resolution.
Ms. Fogarty asked how that was going to happen in practice; it is one way to say we want it to
happen, but how are they going to make it happen.
Mr. Mosely noted that the construction hours need to be listed as between 7:00 a.m. —9:00 p.m.
in accordance with Town Code Chapter 184.
Ms. Balestra noted a change on the EAF Part 1; after Brief Description of Proposed Action insert
"is the consideration of preliminary site plan approval and special permit for the Cornell New
Experimental Hall".
PB RESOLUTION 2021-027: SEQR
Preliminary Site Plan Approval & Special Permit
Cornell New Experimental Hall (Wilson Laboratory)
Tax Parcel No. 61-1-8.1
Synchrotron Drive
WHEREAS:
1. This action involves consideration of Preliminary Site Plan Approval and Special Permit for
the proposed Cornell University New Experimental Hall at Wilson Laboratory, located on
PB 2021-10-05(Filed 10/25) Pg. 10
Synchrotron Drive, Town of Ithaca Tax Parcel No. 63.-1-8.1, Low Density Residential Zone.
The proposal involves the construction of a 2-story, +/- 15,869 square foot building on the
west side of Wilson Laboratory. The project will also include a new 20' wide paved access
path and turnaround, seating areas along Cascadilla Creek,bicycle racks,bioretention
facilities, slope drainage improvements, and native plantings. Cornell University,
Owner/Applicant; Kimberly Michaels, Trowbridge Wolf Michaels Landscape Architects,
Agent;
2. This is a Type I Action pursuant to the Town of Ithaca Code, Chapter 148- Environmental
Quality Review;
3. At its meeting on July 20, 2021, the Planning Board proposed to establish itself as Lead
Agency to coordinate the environmental review of the above-referenced proposal, and on
August 2, 2021, notified potential Involved and Interested Agencies of its intent to serve as
Lead Agency;
4. The Planning Board, on October 5, 2021, has reviewed and accepted as adequate a Full
Environmental Assessment Form Part 1, submitted by the applicant, Parts 2 and 3,prepared
by Town Planning staff, a binder titled"New Experimental Hall At Wilson Laboratory,
Review Application Report," dated September 17, 2021, a set of drawings titled "New
Experimental Hall For CHESS,"prepared by SWBR and T.G. Miller PC, including the
following sheets dated 08/31/2021: C000, C002, C100-C103, C201, C301-C302, C401,
C501-0503, L-101, L201, A111-A112, A201, A301, and E001, a Site Lighting Photometric
Sheet (SL-001), prepared by Leotek, dated 7/28/2021, and other application materials; and
5. The Town Planning staff has recommended a negative determination of environmental
significance with respect to the proposal;
NOW THEREFORE BE IT RESOLVED:
That the Town of Ithaca Planning Board, having received no objections from other Involved
Agencies, establishes itself as Lead Agency to coordinate the environmental review of the above-
described proposal;
AND BE IT FURTHER RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination of
environmental significance in accordance with Article 8 of the Environmental Conservation Law
and 6 NYCRR Part 617 New York State Environmental Quality Review for the above referenced
proposal, based on the information in the EAF Part 1 and for the reasons set forth in the EAF
Parts 2 and 3, and, therefore, a Draft Environmental Impact Statement will not be required.
Motion: Liebe Meier Swain Seconded: Greg Lindquist
Vote: ayes - Meier Swain, Kaufman, Lindquist, Casper, Johnson, Fogarty
PB 2021-10-05(Filed 10/25) Pg. 11
Public Hearin
Ms. Meier Swain opened the public hearing at 8:42 p.m. There was no one wishing to address
the Board and Ms. Jordan stated that she had not received any emails or calls and saw no one
online wishing to speak and the public hearing was closed.
Action Determination
Ms. Balestra noted the recommendation from staff that the Board make a recommendation to the
Zoning Board about the provisions for stream setback that needs to be discussed.
Ms. Fogarty said she wants the unnecessary impervious pavement areas removed.
Mr. Lindquist said he would rather leave them in there, especially given the added explanations
tonight and the very limited impact removing them would have on the runoff.
Ms. Balestra added that this was drafted before the information on the emergency use and we
were looking at what could be done to the riparian buffer and areas where you could add
additional plantings to help repair the bank.
Mr. O'Shea asked about impervious pavers,but if the goal is to limit the footprint for vegetative
buffer, that would not accomplish that.
Mr. Lindquist stated that if that is the goal, then he is ok with removing them,knowing that the
impact on the stormwater is negligible.
Ms. Meier Swain asked which is the greater concern.
Ms. Balestra responded that the Stream Setback law is very specific about the riparian buffer,
and protecting that is the ultimate goal and anything that can be done to do that is our goal.
Ms. Moynihan Schmitt noted that this would be a recommendation to the ZBA, not a condition
they are enforcing.
The Board decided to leave the recommendation as drafted.
Mr. Casper asked about the statement regarding bringing in newer magnets as they become
available and whether the weight would increase.
Mr. Fontes responded that in general they become smaller and lighter, and nothing compares
with emergency fire trucks.
Ms. Fogarty suggested adding fencing around biofiltration devices to identify and protect them"
to condition f and Mr. O'Shea added that the condition f and its staging plan needs to be
incorporated into the SWPP prior to final approval. The Board agreed.
PB 2021-10-05(Filed 10/25) Pg. 12
The Board discussed the lighting and 3500 is being used on new projects as they come through.
Ms. Michaels stated that Cornell typically uses 4000K on streetlights and 3000K elsewhere and
the project team is comfortable using 3500K if the Board wants.
The Board was comfortable saying "not to exceed 3500"to be consistent with other development
approvals.
Mr. Casper asked about the Project Narrative statement that says natural gas will be abandoned
and not used.
Ms. Michaels responded that abandoning is less intrusive to the site than removing it.
PB Resolution 2021-028: Preliminary Site Plan Approval & Special Permit
Cornell New Experimental Hall (Wilson Laboratory)
Tax Parcel No. 61-1-8.1
Synchrotron Drive
WHEREAS:
1. This action involves consideration of Preliminary Site Plan Approval and Special Permit for
the proposed Cornell University New Experimental Hall at Wilson Laboratory, located on
Synchrotron Drive, Town of Ithaca Tax Parcel No. 63.-1-8.1, Low Density Residential Zone.
The proposal involves the construction of a 2-story, +/- 15,869 square foot building on the
west side of Wilson Laboratory. The project will also include a new 20' wide paved access
path and turnaround, seating areas along Cascadilla Creek,bicycle racks,bioretention
facilities, slope drainage improvements, and native plantings. Cornell University,
Owner/Applicant; Kimberly Michaels, Trowbridge Wolf Michaels Landscape Architects,
Agent;
2. This is a Type I Action for which the Town of Ithaca Planning Board, acting as lead agency
in coordinating the environmental review with respect to this project, has on October 5, 2021,
made a negative determination of environmental significance, after having reviewed and
accepted as adequate a Full Environmental Assessment Form Part 1, submitted by the
applicant, Parts 2 and 3, prepared by Town Planning staff, and other application materials;
and
3. The Planning Board, at a public hearing held on October 5, 2021, has reviewed and accepted
as adequate a binder titled"New Experimental Hall At Wilson Laboratory, Review
Application Report," dated September 17, 2021, a set of drawings titled "New Experimental
Hall For CHESS,"prepared by SWBR and T.G. Miller PC, including the following sheets
dated 08/31/2021: C000, C002, C100-C103, C201, C301-C302, C401, C501-0503, L-101,
L201, A111-A112, A201, A301, and E001, a Site Lighting Photometric Sheet(Sheet SL-
001), prepared by Leotek, dated 7/28/2021, and other application materials;
PB 2021-10-05(Filed 10/25) Pg. 13
NOW THEREFORE BE IT RESOLVED:
That the Planning Board hereby finds that the Special Permit standards of Article XXIV Section
270-200, Subsections A—H, of the Town of Ithaca Code, have been met, specifically that:
A.The project will be suitable for the property on which it is proposed, considering the
property's size, location, and physical site characteristics.
• The project has been designed and the proposed building is shaped to fit the space in
which it will occupy on the property. Although the physical site characteristics are
constrained, the proposed building will be constructed in the only suitable location for the
high magnetic beam to connect to the Wilson Laboratory Synchrotron ring.
B. The proposed structure design and site layout are compatible with the surrounding area.
• The proposed structure is an industrial/educational building that fits in with type of
structures that exist on the property. The proposed site layout largely follows the existing
layout, with expanded access to the new building and new landscaping elements. Overall,
the proposal is compatible with the surrounding area.
C. Operations in connection with the proposed use do not create any more noise, fumes,
vibration, illumination, or other potential nuisances than the operation of any permitted use
in the zone.
• The noise, illumination and other nuisances that will occur on the site will be temporary
and associated with construction of the building, which would be the case with any
construction in the zone. These nuisances will cease upon completion of the building.
D.Community infrastructure and services, such as police, fire and other protective services,
roadways, schools, and water and sewer facilities are currently, or will be, of adequate
capacity to accommodate the proposed use.
Cornell will be utilizing their own infrastructure and services, all of which are of
adequate capacity to accommodate the proposed use.
E. The proposed use, structure design, and site layout will comply with all the provisions of the
Town Code and with the Town of Ithaca Comprehensive Plan, provided that the proposed
building will receive the requested variances from the Zoning Board of Appeals.
F. The site layout, with proposed vehicular, bicycle and pedestrian access, traffic circulation,
and parking and loading facilities, is sufficient for the proposed use and is safely designed
for emergency vehicles.
• There are no changes to the existing parking lot that serves the site. All accessways have
been safely designed for emergency vehicles and either have been or will be approved by
the Codes Department and the Ithaca Fire Department before final site plan approval.
G.The project includes sufficient landscaping and/or other forms of buffering to protect
surrounding land uses. Existing vegetation is preserved to the extent possible.
• There will be some tree and vegetation loss associated with the project. The project will
include tree preservation where possible. All lost trees will be replaced with additional
trees and other vegetation. The surrounding land uses are other Cornell campus
structures and uses, which will not be affected by the building.
PB 2021-10-05(Filed 10/25) Pg. 14
H.To the extent deemed relevant by the Planning Board, the proposed use or structure
complies with all the criteria applicable to site plan review set forth in Chapter 270, Zoning.
AND BE IT FURTHER RESOLVED:
1. That, pursuant to Town Code Section 270-219.5.I, the Town of Ithaca Planning Board hereby
recommends that the Zoning Board of Appeals approve the proposed Stream Setback
mitigation plan associated with the project, with the following conditions:
a. That the applicant consider removing unnecessary impervious pavement that abuts
the stream edge of Cascadilla Creek, and
b. That the applicant, where possible, consider adding more plantings and trees along
the creek to further offset the effects of the encroachment into the stream setback.
2. That the Town of Ithaca Planning Board hereby grants Preliminary Site Plan Approval for
the proposed Cornell University New Experimental Hall project, located on Synchrotron
Drive, as described in the materials listed in Whereas #3 above, subject to the following
conditions:
a. Before final site plan approval, granting of any necessary variances from the Town of
Ithaca Zoning Board of Appeals,
b. Before final site plan approval, submission to the Town of Ithaca Engineering
Department of the additional details related to the Stormwater Pollution Prevention
Plan (SWPPP) noted in the memo written to Cornell University by David O'Shea and
Daniel Thaete, dated 7/13/2021, revised 8/17/2021 and 9/22/2021; and approval of
the SWPPP by the Town Engineer,
c. Before final site plan approval, submission of calculations and other information,
satisfactory to the Town Engineer, outlining any associated impacts and/or changes at
the Town of Ithaca Pleasant Grove water interconnect,
d. Before final site plan approval, submission of documentation to the Town Engineer,
from the Ithaca Area Wastewater Treatment Facility (IAWWTF), stating that the
plant has adequate capacity to treat the anticipate wastewater flows,
e. Before issuance of a building permit, submission of calculations, satisfactory to the
Town Engineer, demonstrating how the existing and proposed lift stations meet the
Plumbing Code of NYS and NYS Design Standards for Intermediate Size Wastewater
Treatment Systems,
f. Before issuance of final site plan approval, submission of a construction staging plan
for review and approval by the Town Engineer that includes a note to confirm that the
project staging area will not be placed over, on, or in an existing stormwater
biofiltration device in the Wilson Laboratory east parking lot. This condition shall be
included on the building permit that is issued and said staging area shall be
maintained as approved for the entire duration of the building permit for the project,
PB 2021-10-05(Filed 10/25) Pg. 15
g. Before the issuance of a building permit, inclusion of the New Experimental Hall
project into the campus-wide Stormwater Operations, Maintenance, and Reporting
agreement between Cornell University and the Town of Ithaca,
h. Before issuance of a building permit, submission to the Planning Department of proof
of receipt of the required Nationwide Permit from the Army Corps of Engineers to fill
the 0.03-acre wetland on the project site, and
i. All outdoor lighting shall conform to the requirements of the Town of Ithaca Outdoor
Lighting Law and, if constructed, the proposed alternative light poles to be replaced
on Campus Road above the new NEH building shall not exceed 3 5 OOK color
temperature.
Motion: Ariel Casper Seconded: Cindy Kaufman
Vote: ayes -Meier Swain, Kaufman,Lindquist, Casper, Johnson, and Fogarty
Agenda Item 4 Approval of Minutes
Minutes July 20, August 3 d,August 17'h -Motion by Cindy Kaufman seconded by Yvonne
Fogarty; unanimous.
Motion to adjourn by Ariel Casper seconded by Yvonne Fogarty; unanimous.
Submitted by
da^,
Becky Jo Deputy Town Clerk
PB 2021-10-05(Filed 10/25) Pg. 16