Loading...
HomeMy WebLinkAboutDo I need a design Professional DEPARTMENT OF CODE ENFORCEMENT 215 N. Tioga St 14850 607.273.1783 codes@town.ithaca.ny.us When do I need a design professional? New York State requires that building permit applications submitted, to the Town of Ithaca Code Enforcement Department, include plans stamped by a Design Professional (either a licensed Architect or a licensed Engineer) when NYS Education Law requires that plans be stamped by a design professional. What makes it complicated is that the requirements are slightly different for Architects and Engineers. a. All construction and alterations to a structure require plans stamped by an NYS-licensed Engineer. Except: 1) Stamped plans are not required for agricultural structures when the project costs less than $ 10,000 UNLESS the work affects the structural safety of the structure; 2) Stamped plans are not required for residential structures with a gross habitable floor area of 1,500 square feet or less if the project costs less than $ 10,000 UNLESS the work affects the structural safety of the structure or public safety. See Chapter 16 of the Consolidated Laws; Title VIII: The Professions; Article 145 Engineering and Land Surveying, Section 7209. b. All construction and alterations to a structure require plans stamped by an NYS-licensed Architect. Except: 1) Agricultural structures; 2) Residential buildings with a gross habitable floor area of 1,500 square feet or less; 3) Alterations costing $20,000 or less, UNLESS the work affects the structural safety of the structure or public safety. See Chapter 16 of the Consolidated Laws; Title VIII: The Professions; Article 147 Architecture, Section 7307