TOWN OF ITHACA
126 EAST SENECA STREET '
ITHACA, NEW YORK
14850
August 16, 1979
Mr. Willis Hilk.er
275 Burns Road
Ithaca, New York 14850
RE: Acceptance of Noxthview Road West
Highway and Utilities.
Dear Mr. Hilker: .
The present condition of your development at the end of
Northview Road is disgraceful, unlawful, and of.inadequate
construction quality as follows:
(1) Sewer - The Town will not accept th.e public sewer
line constructed in the fall of 1978 until the
proper tests are-conducted'to the satisfaction of
the Town and the City Sewer Division. Because of
the poor quality control during construction in
maintaining bedding, line, and.grade, minimum in
spection and test shall include a visual inspection '
by tamping to verify that.there are no sags, curves,
bulges, etc; infiltration and exfiltration water
tests and air tests. Minimum standards and..methods
of the Town, City and ASTM shall be met and fol-
lowed.
(2) Water.- The Town will not accept the public water
fine constructed in fall of 1978 until. the proper
tests are conducted to the satisfaction of the Town
and the Southern Cayuga Lake Intermunicipal Water
Commission. Because of the poor quality control
during construction and existing field condition of.
the end blow -off minimum inspection and'texts shall
include a 24 hour pressure test and further disin-
fection if necessary and be satisfactory to the
Town and SCLIWC and follow.AWWA recommendations.
(3) Sewer - The end manhole cover is not secured to the
manhole structure. This is both hazardous and un-
lawful. Surface run-off is illegally entering the
sewer at this point due solely to your negligence..
{
R
t
t.I LN 24 fhcE 74
-2 August 16, 1979
(4) Hi �hhway - The back fill used in trenches- in the
portion of Northview Road West already a Town
Highway is unacceptable. All trenches shall be
straight saw cut on each edge with twenty one
inches of material removed and replaced with twelve
inches of crushed bank run gravel compacted in six
inch lifts, with six inches of crusher run lime-
stone, and with three inches of asphalt concrete.
(5) HHihway - The road material in place for the sec-
.t of n of Northview Road West not yet accepted as a
Town Highway is unacceptable. As a part of con-
structing the water and sewer mains back fill mate-
rial of.shale and clay has been intermixed with
what'crushed back run was hauled in. The present
lack of roadside drainage.has trapped water in the
base and sub. -base allowing heavy construction ve-
hicles to pump fines into the gravel around the
entire perimeter of the circle and thus ruining the
gradation of the crushed bank run gravel.. The road
specifications requiring twelve inches of crushed
bank run gravel, six inches of crusher run lime -
.stone, and double oil and limestone treatment should
be developed treating the existing.material as a
sub -base or removing it.
(6) Drainage Ditches -The drainage.ditch in the rear
of areas shoulU be shaped to a trapedozoidal cross-
section -with minimum 1.on.2 side slopes from lot
level to ditch bottom. While I have observed the
ditch to be deep enough and at a sufficient slope
it is little'more than a trench in spots which with-
out shaping and stabilization of ground cover will
slough off and silt up creating pools and.blockages
and unpleasant breeding areas for mosquitoes. .
(7) Subdivision -.At the.time you had obtained.your
building permit for 215 Northv.iew Road West and had
sold a lot to Mr. Louis Munch, 214 Northview Road,
a portion of which.bordered the existing Town High-
way you had gone as far as you could in obtaining
.permits or selling lots without completing the above
items and having.the Town accept same or posting a
bond of acceptable type.and amount for their comple-
tion. At the time you sold 215 and subdivided that
lot from your remaining land.you sold a lot with no
.legal access to an accepted Town Highway.. This is
a clear violation of Town Law. A certificate of
compliance.cannot be issued for 215 Northview.Road
West until you complete the -improvements as described
•
1
•
-3 August'16, 1979
above. The owners of 215 Northview Road West now
own .a landlocked.parcel of land and by virtue of
your illegal action are also in violation of Town
Law. Air. Munch ,is more fortunate in that h.is
property in part borders on the older•portion.of
Northview Road Lest, a.Town Highway. Under no
circumstances can any land .be sold of or a permit:
to build be issued on the remaining three lots.
Further, the above violation of.Town Law should be
resolved within sixty days or the Town will pursue
appropriate legal action.
(8) Surve� In the'process of surveying the area given
to.e Town as park land as part of this subdivision
we were unable to locate any property markers even
for the lot at 215 Northview West which you had.
sold. Subsequent to our finding the owner at
215. Northview West requested a survey from'you.
This practice of riot surveying lands sold will not.
be tolerated. in the Town of Ithaca.
The above points are all very serious acts of neglect.. All
are clearly violations of permit requirements, $ubdivision
Law, and Town Law. Having asked you over a month ago to visit
the Town office to go over problems with Northview West this
letter is the next step in a legal process that will hopefully
avoid court action with your cooperation. While some items
require immediate attention like'the manhole cover, the re-
maining paving and construction season makes the sixty day
dealine firm, realistic, and sufficient..
I will expect your full cooperation in resolving these matters
_.and a letter within 10 business days detailing your timetable
for completion.
Sincerely,
P.
Lawrence P. Fabbroni, P.E.
Town Engineer
LPF/js
eel &4(o'el Desch, Supervisor Town
V. Pat Hannan, Asst. Superintendent city
Don Terrell, SCLIWC
Robert Parkin, Town Highway Superintendent