TOWN OF ITHACA PLANNING BOARD MEETING
Tuesday, June 21, 2011
215 N. Tioga Street, Ithaca, NY 14850
Board Members Present: Chair: Fred Wilcox; Members: Hollis Erb, George Conneman, John
Beach, Ellen Baer, Jon Bosak, David Slottje, Linda Collins
Staff Present: Bruce Bates, Director of Code Enforcement; Creig Hebdon, Engineer; Deb
DeAugistine, Deputy Town Clerk; Susan Ritter, Director of Planning; Christine Balestra, Planner;
Mike Smith, Planner; Susan Brock, Attorney for the Town
Call to Order
Mr. Wilcox called the meeting to order at 7:03 p.m. and accepted the secretary's posting of the
public hearing notices. He also noted that he would have to leave the meeting at 9:00, probably
before the meeting ends.
AGENDA ITEM
Persons to be heard
No one came forward to address the Board.
AGENDA ITEM
SEOR Determination: Third Residential EcoVillage Experience Modifications, Rachel
Carson Way
Liz Walker, applicant, and David Herrick and Michele Palmer from TG Miller were present. Ms.
Walker explained that they changed the project to accommodate the rise in prices. They decided
to add ten small units to the project to accommodate affordability. They added seven units to the
common house and changed some single - family units to duplexes, which are more affordable to
build. Duplexes are not as accessible because they are not as wide, but they are more affordable.
Mr. Herrick spoke about the site modifications:
• Parking: They created additional parking because of the addition of the ten units.
• Utilities: They've also gone back to a more conventional utility extension program, instead of a
common heat distribution system because bundling the utilities in a single duct bank or
corridor would cost more.
• Impervious surface: By combining the current FROG emergency access with the access to
the new carport and some of the new parking spaces they didn't need to increase impervious
surfaces. Tom Parsons has reviewed and okayed the plan.
• Stormwater: They built the original TREE neighborhood stormwater wetland facility large
enough to accommodate more than is draining to it, so it won't be necessary to make
modifications for the changes in either the building footprints or the expanded parking spaces.
This is a stormwater management neutral modification to the site plan.
Mr. Bosak was surprised that the district heating turned out to be more expensive than the
conventional alternative. Ms. Walker and Mr. Herrick explained that with the district heating
system, they would have had to build special foundations with special channels in the slabs under
each house. The pathway or chase that could have been used for multiple utilities had to go
outside (underground) because they lost the space under the buildings.
PB Minutes 06 -21 -2011
Page 2 of 16
Ms. Palmer showed the Board samples of building materials. The only sample they did not have
was a natural wood that will appear on the facade, which will be a locally provided wood such as
hemlock or cedar. They will choose from what the local mills have at the time of construction.
Ms. Erb noted that some places in the plans specifically call for cedar. She cautioned that
specifying a particular wood might lock them into using it. Ms. Palmer will change these to say
natural wood.
Windows were discussed. It was explained that there are fewer windows in passive solar
construction. Concentrating windows on the south - facing side is very important so they will work
as intended. Some rooms might be a bit gloomy. The architect and energy engineers are trying to
get as much natural light in every room as possible while still adhering to passive solar's very
stringent regulations. Some of the houses have higher ceilings to bring in a bit more light. The
residents are purposely working to make energy efficiency their most important goal.
Ms. Erb pointed out that on the first floor of the common building, the plans call for an apartment
with a bedroom that shares a wall with the play area.
Ms. Walker responded that the concept of having an apartment on the ground floor is to make it
accessible, and that an elderly couple will be moving into that apartment. The architect thinks it's
a logical place for the play area, and is planning very good sound insulation, especially in that
wall.
There was discussion regarding snow and rain dripping from the solar panels. It was agreed that
it appears to be shedding toward the entrance of the building. Ms. Walker said that it is her
experience from living in the first neighborhood that the snow will be broken up by the central
trellis on the front porch.
PB Resolution No. 2011 -051: SEAR, Preliminary and Final Site Plan Approval, EcoVillage
TREE Neighborhood Modifications, Tax Parcel No.'s 28. -1- 26.22, 28. -1- 26.82, 28. -1- 26.84,
Rachel Carson Way
Moved by Hollis Erb; seconded by Linda Collins
WHEREAS:
This action involves consideration of Preliminary and Final Site Plan Approval and a
Recommendation to the Town of Ithaca Town Board regarding amendments to Planned
Development Zone No. 8, for the proposed modifications to the Third Residential
Neighborhood Experience (TREE) project, located off Rachel Carson Way, Town of Ithaca
Tax Parcel No.'s 28. -1- 26.22, 28. -1- 26.82, and 28. -1- 26.84, Planned Development Zone No.
8. The modifications include adding 10 new dwelling units (total of 40 units), increasing the
overall parking by 23 +/- spaces (including 16 additional spaces for TREE), and showing a
new layout for the water and sewer infrastructure. The proposal also involves amendments to
the Planned Development Zone No. 8 language to allow 15 (rather than 12) residential units
in the Sustainable Living Center, increasing from 6 to 8, the number of dwelling units allowed
per acre, and allowing ground mounted and freestanding solar collectors as principal uses in
the Planned Development Zone. EcoVillage at Ithaca, Inc. Owner /Applicant; Liz Walker,
Organization Manager, Agent; and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board is acting in an
uncoordinated environmental review with respect to Site Plan Approval; and
PB Minutes 06 -21 -2011
Page 3 of 16
3. The Planning Board, on June 21, 2011, has reviewed and accepted as adequate a Short
Environmental Assessment Form Part I, submitted by the applicant, a Part II prepared by
Town Planning staff, an application package entitled "TREE, Third Residential EcoVillage
Experience," dated May 20, 2011, including floor and elevation plan sheets SLC Al -SLC A4,
& SLC 10 -SCL 14, titled "SLC- Sustainable Living Center," prepared by Coterre Architects and
Development Managers, dated 5/12/11 (not plot date); floor and elevation plan sheets BA 1,
BA 2, BA 4 -BA 7, and BA 11, titled "Blue Houses -Units 5, 6, 19, 20, 21," prepared by Coterre
Architects and Development Managers, dated 2/26/11 (not plot date); floor and elevation plan
sheets MA 1, MA 2, MA 4 -MA 7, and MA 11, titled "Magenta Houses -Units M7, M8, M15-
M20," prepared by Coterre Architects and Development Managers, dated 4/20/11 (not plot
date); floor and elevation plan sheets PA 1, PA 2, PA 4 -PA 7, and PA 11, titled "Purple
Houses -Units P11 -P16," prepared by Coterre Architects and Development Managers, dated
3/3/11 (not plot date); floor and elevation plan sheets TA 1, TA 2, TA 4 -TA 7, and TA 11, titled
"Turquoise Houses -Units T7 -T10," prepared by Coterre Architects and Development
Managers, dated 2/16/11 (not plot date); sheet C100, titled "Existing Conditions Plan,"
prepared by T.G. Miller, P.C., dated 5/20/11; revised sheet C101, titled "Layout Plan,"
prepared by T.G. Miller, P.C., date stamped 6/2/11, sheets C102 -C105, containing grading,
drainage, erosion and sedimentation, and utility plans, prepared by T.G. Miller, P.C., dated
5/20/11; detail sheets C201 -C202, prepared by T.G. Miller, P.C., dated 5/20/11; sanitary
profiles sheet C301, prepared by T.G. Miller, P.C., dated 5/20/11; a lighting, landscaping, and
sign plan sheet L101, prepared by T.G. Miller, P.C., dated 5/20/10; and site details sheet
L102, prepared by T.G. Miller, P.C., dated 8/20/10; and other application materials; and
4. The Town Planning staff has recommended a negative determination of environmental
significance with respect to the proposed Site Plan Approval,
NOW, THEREFORE, BE IT RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination of environmental
significance in accordance with Article 8 of the Environmental Conservation Law and 6 NYCRR
Part 617 New York State Environmental Quality Review for the above referenced actions as
proposed, based on the information in the EAF Part I and for the reasons set forth in the EAF Part
II, and, therefore, a Draft Environmental Impact Statement will not be required.
Vote:
Ayes: Wilcox, Erb, Conneman, Beach, Baer, Bosak, Collins
AGENDA ITEM
Public Hearing: Consideration of Preliminary and Final Site Plan Approval and a
Recommendation to the Town of Ithaca Town Board regarding changes to Planned Development
Zone No. 8 for the proposed modifications to the Third Residential EcoVillage Experience (TREE)
project located off Rachel Carson Way, Town of Ithaca Tax Parcel No.'s 28 -1- 26.22, 28 -1 -26.82
and 28 -1- 26.84, Planned Development Zone No. 8. The modifications include adding ten new
dwelling units (total of 40 units), increasing the overall parking by +/- 23 spaces (including 16
additional spaces for TREE), and showing a new layout for the water and sanitary sewer
infrastructure. The proposal also involves amendments to the Planned Development Zone No. 8
language to allow 15 (rather than 8) residential units in the Sustainable Living Center and
increasing from 6 to 8 the number of dwelling units allowed per acre. EcoVillage at Ithaca, Inc.,
Owner /Applicant; Liz Walker, Organization Manager, Agent.
Mr. Wilcox opened the public hearing at 7:31 p.m. There being no one, Mr. Wilcox closed the
public hearing at 7:34 p.m.
PB Minutes 06 -21 -2011
Page 4 of 16
PB Resolution No. 2011 -052: Preliminary and Final Site Plan Approval, EcoVillage TREE
Neighborhood Modifications, Tax Parcel No.'s 28. -1- 26.22, 28. -1- 26.82, 28. -1- 26.84, Rachel
Carson Way
Moved by Ellen Baer, seconded by Hollis Erb
WHEREAS:
1. This action involves consideration of Preliminary and Final Site Plan Approval and a
Recommendation to the Town of Ithaca Town Board regarding amendments to Planned
Development Zone No. 8, for the proposed modifications to the Third Residential
Neighborhood Experience (TREE) project, located off Rachel Carson Way, Town of Ithaca
Tax Parcel No.'s 28. -1- 26.22, 28. -1- 26.82, and 28. -1= 26.84, Planned Development Zone No.
8. The modifications include adding 10 new dwelling units (total of 40 units), increasing the
overall parking by 23 +/- spaces (including 16 additional spaces for TREE), and showing a
new layout for the water and sewer infrastructure. The proposal also involves amendments to
the Planned Development Zone No. 8 language to allow 15 (rather than 12) residential units in
the Sustainable Living Center, increasing from 6 to 8, the number of dwelling units allowed
per acre, and allowing ground mounted and freestanding solar collectors as principal uses in
the Planned Development Zone. EcoVillage at Ithaca, Inc. Owner /Applicant; Liz Walker,
Organization Manager, Agent; and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board, acting in an
uncoordinated environmental review with respect to the project has, on June 21,
2011, made a negative determination of environmental significance, after having
reviewed and accepted as adequate a Short Environmental Assessment Form Part I,
submitted by the applicant, and a Part II prepared by Town Planning staff; and
3. The Planning Board, at a Public Hearing held on June 21, 2011, has reviewed and accepted
as adequate a Short Environmental Assessment Form Part I, submitted by the applicant, a
Part II prepared by Town Planning staff, an application package entitled "TREE, Third
Residential EcoVillage Experience," dated May 20, 2011, including floor and elevation plan
sheets SLC Al -SLC A4, & SLC 10 -SCL 14, titled "SLC- Sustainable Living Center," prepared
by Coterre Architects and Development Managers, dated 5/12/11 (not plot date); floor and
elevation plan sheets BA 1, BA 2, BA 4 -BA 7, and BA 11, titled "Blue Houses -Units 5, 6, 19,
20, 21," prepared by Coterre Architects and Development Managers, dated 2/26/11 (not plot
date); floor and elevation plan sheets MA 1, MA 2, MA 4 -MA 7, and MA 11, titled "Magenta
Houses -Units M7, M8, M15 -M20," prepared by Coterre Architects and Development
Managers, dated 4/20/11 (not plot date); floor and elevation plan sheets PA 1, PA 2, PA 4 -PA
7, and PA 11, titled "Purple Houses -Units P11 -P16," prepared by Coterre Architects and
Development Managers, dated 3/3/11 (not plot date); floor and elevation plan sheets TA 1, TA
2, TA 4 -TA 7, and TA 11, titled "Turquoise Houses -Units T7 -T10," prepared by Coterre
Architects and Development Managers, dated 2/16/11 (not plot date); sheet C100, titled
"Existing Conditions Plan," prepared by T.G. Miller, P.C., dated 5/20/11; revised sheet C101,
titled "Layout Plan," prepared by T.G. Miller, P.C., date stamped 6/2/11, sheets C102 -C105,
containing grading, drainage, erosion and sedimentation, and utility plans, prepared by T.G.
Miller, P.C., dated 5/20/11; detail sheets C201 -C202, prepared by T.G. Miller, P.C., dated
5/20/11; sanitary profiles sheet C301, prepared by T.G. Miller, P.C., dated 5/20/11; a lighting,
landscaping, and sign plan sheet L101, prepared by T.G. Miller, P.C., dated 5/20/10; and site
details sheet L102, prepared by T.G. Miller, P.C., dated 8/20/10; and other application
materials;
PB Minutes 06 -21 -2011
Page 5 of 16
NOW, THEREFORE, BE IT RESOLVED:
1. That the Town of Ithaca Planning Board, pursuant to Chapter 270 "Zoning ", Section 270 -
236.H of the Town of Ithaca Code, hereby finds that:
a. There is a need for the proposed use in the proposed location; and
b. The existing and probable future character of the neighborhood in which the use is to be
located will not be adversely affected by the proposed zoning amendment and project
development; and
c. The proposed amendment to Planned Development Zone No. 8 is in accordance with a
comprehensive plan of development of the Town; and
2. That the Town of Ithaca Planning Board hereby recommends that the Town of Ithaca Town
Board enact the proposed Local Law Amending Chapter 271 of the Town of Ithaca Code,
Titled Zoning: Special Land Use Districts, to Change EcoVillage Planned Development Zone
Provisions Relating to Dwelling Units in a Community Center, Acreage Per Neighborhood,
and Solar Collectors;
AND BE IT FURTHER RESOLVED:
1. That the Town of Ithaca Planning Board hereby grants Preliminary and Final Site Plan
Approval for the proposed modifications to the Third Residential Neighborhood Experience
(TREE) project, Town of Ithaca Tax Parcel No.'s 28. -1- 26.22, 28. -1- 26.84, and 28. -1- 26.82,
Planned Development Zone No. 8 (EcoVillage), as described in the plans and application
materials listed in Whereas Number 3 above, subject to the following conditions:
a. Submission of final construction documents of all proposed structures, roads, revised
water /sewage facilities, stormwater management, and other improvements (including, but
not limited to, revised drawing SLC -11, denoting type of wood siding to be used and
revised drawing PA2 to show interior door into study), for review and approval of the Town
of Ithaca Department of Public Works prior to issuance of any building permits; and
b. The appearance of all buildings and structures in the Third Residential EcoVillage
Experience, including roofs, shall be consistent with the architectural drawings, as
referenced above; and
c. Submission of record of approval for the water and sewer connections by the County
Health Department and by the Town of Ithaca Public Works Department prior to
construction of said facilities; and
d. Conveyance to the Town of Ithaca of the sewer line extension and permanent sanitary
sewer easements centered along the proposed sanitary sewer main extension into TREE
as shown on the revised Utility Plan (Sheet C105, revised 5/20/11), as well as an access
easement around the stormwater facility, and acceptance by the Town of Ithaca Town
Board of such conveyances, subject to review and approval of the Town of Ithaca Public
Works Department, prior to issuance of any Certificates of Occupancy for the Third
Residential EcoVillage Experience; and
e. Submission of a stormwater "Operation, Maintenance, and Reporting Agreement"
between the property owner and the Town of Ithaca, satisfactory to the Attorney for the
PB Minutes 06 -21 -2011
Page 6 of 16
Town and the Town of Ithaca Public Works Department, prior to issuance of any building
permits; and
f. Adoption by the Town Board of the proposed Local Law Amending Chapter 271 of the
Town of Ithaca Code, Titled "Zoning: Special Land Use Districts," to Change EcoVillage
Planned Development Zone Provisions Relating to Dwelling Units in a Community Center,
Acreage Per Neighborhood, and Solar Collectors; and
g. All other outstanding conditions of the November 16, 2010 Final Site Plan & Final
Subdivision Approval Resolution No. 2010 -093, shall remain applicable;
AND BE IT FURTHER RESOLVED:
1. That the Planning Board hereby authorizes an increase in the maximum number of allowable
dwelling units in the Third Residential EcoVillage Experience (TREE) neighborhood, from 30
dwelling units to 40 dwelling units, pursuant to Section 271 -9.G, finding that:
a. The increase in density will not adversely affect the general welfare of the community, and
b. The increase in density will result in a more efficient use of the land, as a majority of the
additional units will be located in one structure (the Sustainable Living Center), and the
remaining units will be duplexes, and
c. The increase in density will result in a total of 100 dwelling units among three
neighborhoods within the Planned Development Zone (PDZ), which will not exceed the
150 dwelling unit maximum allowed for the PDZ.
Vote:
Ayes: Wilcox, Erb, Conneman, Beach, Baer, Bosak, Collins
AGENDA ITEM
SEQR Determination: Ithaca Beer Company Development, Mancini Road
Dan and Mari Mitchell, owners, David Herrick and Michele Palmer, TG Miller, and Ernie Bayles,
architect, were present.
Mr. Mitchell ran through the project for the people present. Ithaca Beer has been around for 13
years. They put an addition on four or five years ago, and have maxed out that space. They
chose this area because it's close to the brewery, it's on the Town water system, and is on a plot
of land he and his wife bought that was farmed in the past and on which they want to create a
farm brewery. The craft beer industry has been growing. In the new 15,000 sq ft facility, they will
continue with their manufacture and.wholesale business. Ithaca Beer is sold in 7 states now, and
this extra space will allow them to grow three to four times. They have added a small pub in the
front to act as welcome center. Lots of people come in from out of town who like their products
and want to see where they are manufactured. People from all over the world have tried Ithaca
Beer. They plan to grow hops and barley and have a beer garden. At some point they want to
create an estate beer, where everything is grown in Ithaca.
The Planning Board talked about and made modifications to the Full EAS.
Mr. Mitchell.went over the PDZ plan and provided samples of building materials they plan to use.
PB Minutes 06 -21 -2011
Page 7 of 16
PB Resolution No. 2011 -053: SEOR, Ithaca Beer Company Development, Mancini Road
(off Elmira Road), Tax Parcel No.'s 33- 3 -2.2, 31 -3 -3.12 and 33 -3 -2.9
Moved by George Conneman; seconded by Jon Bosak
WHEREAS:
This action is consideration of Preliminary Site Plan Approval, Preliminary Subdivision
Approval, and a Recommendation to the Town of Ithaca Town Board regarding the creation of
a new Planned Development Zone for the proposed Ithaca Beer Company Development
located on Mancini Drive off Elmira Road (NYS Route 13) on Town of Ithaca Tax Parcel No.'s
33- 3 -2.2, 31 -3 -3.12 and 33- 3 -2.9, Low Density Residential and Light Industrial Zones. The
proposal involves developing approximately 12.52 acres of the property for a new brewery
facility which includes 11,000 +/- square feet for production, shipping /receiving, and storage,
1,500 +/- square feet for offices, and 2,500 +/- square feet for the retail and pub space. The
project will also include a beer garden, two silos, agricultural fields, approximately 78 parking
spaces, signage, stormwater facilities, outdoor lighting, and landscaping. As part of this
proposal, a 9.56 +/- acre parcel is being subdivided from Tax Parcel 33 -3 -2.2 for the brewery
development (Parcel D). The subdivision proposal also involves subdividing off a 0.75 +/-
acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be consolidated with 33- 3 -2.9, and
subdividing off a 0.75 +/- acre parcel (Parcel C) from Tax Parcel No. 33- 3 -2.9, to be
consolidated with the new 9.56 acre brewery parcel (Parcel D). The project also involves a
request to rezone approximately 12.52 acres from Low Density Residential and Light
Industrial Zones to a new Planned Development Zone (PDZ). The Planning Board will also
consider modifying a condition from the "Mancini Realty Five - Parcel Subdivision" (Planning
Board Meeting, September 21, 1993) regarding bringing the private roads (Mancini Drive and
Mancini Road) up to Town specifications and deeding them to the Town. Mitchell Ventures,
LLC, Owner /Applicant; Dan Mitchell, President, Ithaca Beer Company, Inc., Agent; and
2. This is a Type I Action for which the Town of Ithaca Planning Board has indicated its intent to
act as Lead Agency in a coordinated environmental review with respect to this project; and
3. The Planning Board, on June 21, 2011, has reviewed and accepted as adequate a Full
Environmental Assessment Form Part I, submitted by the applicant, and Part 11 prepared by
Town Planning staff, the following drawings: "Subdivision Plat" dated 4/5/2011 and prepared
by T.G. Miller P.C.; "Plans" (Sheets A101 and A102) and "Elevations" (Sheets A201 and
A202), dated 5/19/2011 and prepared by Ernie Bayles, Architect; "Existing Conditions Plan"
(Sheet C100), "Site Plan" (Sheet C101), "Layout Plan" (Sheet C102), "Grading and Drainage
Plan" (Sheet C103), "Erosion & Sediment Control Plan — Construction Phase" (C104),
"Erosion & Sediment Control Plan — Stabilization Phase" (C105), "Utility Plan" (C106),
"Details" (Sheets C201, C202, C203), "Planting Plan" (L102), dated 05/20/2011 and prepared
by T.G. Miller P.C.; "Signage Locations" (Sheet L -103) and "Sign Details" (Sheets L -104 and
L -105), dated May 19, 2011 and prepared by Ithaca Beer Co., and other application materials;
and
4. The Town Planning staff has recommended a negative determination of environmental
significance with respect to the proposed project;
NOW THEREFORE BE IT RESOLVED:
PB Minutes 06 -21 -2011
Page 8 of 16
That the Town of Ithaca Planning Board, having received no objections from other Involved
Agencies, hereby establishes itself as Lead Agency to coordinate the environmental review of the
above described actions;
AND BE IT FURTHER RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination of environmental
significance in accordance with Article 8 of the Environmental Conservation Law and 6 NYCRR
Part 617 New York State Environmental Quality Review for the above referenced actions as
proposed, based on the information in the EAF Part I and for the reasons set forth in the EAF Part
II, and, therefore, a Draft Environmental Impact Statement will not be required.
Vote:
Ayes: Wilcox, Erb, Conneman, Beach, Baer, Bosak, Collins
AGENDA ITEM
Public Hearing: Consideration of Preliminary Site Plan Approval, Preliminary Subdivision Approval,
and a Recommendation to the Town of Ithaca Town Board regarding the creation of a new Planned
Development Zone for the proposed Ithaca Beer Company Development located on Mancini Drive
off Elmira Road (NYS Route 13) on Town of Ithaca Tax Parcel No.'s 33- 3 -2.2, 31 -3 -3.12 and 33 -3-
2.9, Low Density Residential and Light Industrial Zones. The proposal involves developing
approximately 12.52 acres of the property for a new brewery facility which includes 11,000 +/-
square feet for production, shipping /receiving, and storage, 1,500 +/- square feet for offices, and
2,500 +/- square feet for the retail and pub space. The project will also include a beer garden, two
silos, agricultural fields, approximately 78 parking spaces, signage, stormwater facilities, outdoor
lighting, and landscaping. As part of this proposal, a 9.56 +/- acre parcel is being subdivided from
Tax Parcel 33 -3 -2.2 for the brewery development (Parcel D). The subdivision proposal also
involves subdividing off a 0.75 +/- acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be
consolidated with 33- 3 -2.9, and subdividing off a 0.75 +/- acre parcel (Parcel C) from Tax Parcel
No. 33- 3 -2.9, to be consolidated with the new 9.56 acre brewery parcel (Parcel D). The project also
involves a request to rezone approximately 12.52 acres from Low Density Residential and Light
Industrial Zones to a new Planned Development Zone (PDZ). The Planning Board will also
consider modifying a condition from the "Mancini Realty Five - Parcel Subdivision" (Planning Board
Meeting, September 21, 1993) regarding bringing the private roads (Mancini Drive and Mancini
Road) up to Town specifications and deeding them to the Town. Mitchell Ventures, LLC,
Owner /Applicant; Dan Mitchell, President, Ithaca Beer Company, Inc., Agent.
Mr. Wilcox opened the public hearing at 8:49 p.m.
Mr. Bosak stated that he is delighted to see an expansion of manufacturing in the Town. Ms.
Collins agreed, saying it will be a wonderful addition to the community. Ms. Erb added that she's
pleased with the emphasis on local agriculture.
Mr. Mitchell noted that there will be a zone change requested with the land swap. Parcel B is
currently zoned low density residential, but the new owner will want it changed to light industrial.
Ms. Brock responded that the new owner will have to ask the Town Board for a zoning change for
that parcel.
Mr. Wilcox left the meeting at 8:55 p.m., and Vice Chair Ms. Erb took over the meeting.
Michael Vitucci, 191 Seven Mile Drive, addressed questions to the Board as a representative of
several residents from the neighborhood who were present in the audience. Regarding the land
PB Minutes 06 -21 -2011
Page 9 of 16
outside the PDZ, which Mr. Mitchell intends to farm, Mr. Smith explained that the property is
zoned low density residential. Agriculture is permitted in that zone, so there will be no change in
zoning. The only property being rezoned is the PDZ. There will be space outside for patrons to
eat at a picnic table. As for music, the applicants are allowed (under the new law) to hold special
events, such as festivals and music series, subject to noise permits. Ms. Brock pointed out that
'the Town has a noise ordinance, so if the noise was expected to exceed the threshold, they
would need to apply to the Town Board for a permit for each of these events, subject to public
hearing and conditions. The permitted accessory building is the stage, which is not to exceed
2500 square feet. Ms. Erb suggested that concerned residents attend the public hearing of the
Town Board with neighborhood concerns. Mr. Vitucci stated that all in all, they have no bones to
pick regarding Mr. Mitchell's proposal, that they appreciate how he is taking care of the property,
and that they are just trying to be prepared for what they might not like. He said there are already
lighting issues from one of the motels that have an impact on the neighborhood and wondered if
there would be protection factors so light from the project isn't bleeding onto their property. Ms.
Brock responded that the applicant has to comply with the lighting law. She suggested they
contact Bruce Bates with concerns about existing lighting fixtures. Light trespass onto other
properties is not allowed. They have to use dark sky fixtures, which direct the light straight down.
Ms. Erb closed the public hearing at 9:06 p.m.
Board discussion:
Ms. Brock stated that signs in the application are listed in the PDZ law and specifically allowed
Ms. Erb is pleased with the arrow telling directing traffic to exit onto 13A, saying that it's crucial to
public safety.
Mr. Hebdon pointed out that the private road does not have to follow NYS law regarding
roadways; this gives the applicant a lot of leeway for signage.
Ms. Brock stated that the Town Board will have to revise the law to show that some of the
facilities will not be on the PDZ property. Since the pond and other facilities will be on property
owned by other parties, access easements will be needed to permit people to cross property
lines. The Town will need to be party to those agreements for maintenance purposes just in case
Ithaca Beer or a future owner fails to provide maintenance.
The Board discussed diverting traffic away from Route 13. Third -party trucks will form their own
patterns; they'll try their own methods to find the fastest way in.
Regarding the letter from Ed Marx, the Board agreed that his concerns probably arise from a
misconception regarding the larger farmland's intended use; the PDZ does not cover the entire
property. Ms. Ritter will send a letter acknowledging receipt of the letter.
PB Resolution No. 2011 -054: Preliminary Site Plan Approval, Preliminary Subdivision,
Approval, Recommendation to the Town Board Regarding the Creation of a new Planned
Development Zone, and Modification of 1993 Planning Board Condition, Ithaca Beer
Company Development, Mancini Road (off Elmira Road), Tax Parcel. No.'s 33- 3 -2.2, 31 -3-
3.12 and 33 -3 -2.9
Moved by John Beach; seconded by George Conneman
WHEREAS:
PB Minutes 06 -21 -2011
Page 10 of 16
This action is consideration of Preliminary Site Plan Approval, Preliminary Subdivision
Approval, and a Recommendation to the Town of Ithaca Town Board regarding the creation of
a new Planned Development Zone for the proposed Ithaca Beer Company Development
located on Mancini Drive off Elmira Road (NYS Route 13) on Town of Ithaca Tax Parcel No.'s
33- 3 -2.2, 31 -3 -3.12 and 33- 3 -2.9, Low Density Residential and Light Industrial Zones. The
proposal involves developing approximately 12.52 acres of the property for a new brewery
facility which includes 11,000 +/- square feet for production, shipping /receiving, and storage,
1,500 +/- square feet for offices, and 2,500 +/- square feet for the retail and pub space. The
project will also include a beer garden, two silos, agricultural fields, approximately 78 parking
spaces, signage, stormwater facilities, outdoor lighting, and landscaping. As part of this
proposal, a 9.56 +/- acre parcel is being subdivided from Tax Parcel 33 -3 -2.2 for the brewery
development (Parcel D). The subdivision proposal also involves subdividing off a 0.75 +/-
acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be consolidated with 33- 3 -2.9, and
subdividing off a 0.75 +/- acre parcel (Parcel C) from Tax Parcel No. 33- 3 -2.9, to be
consolidated with the new 9.56 acre brewery parcel (Parcel D). The project also involves a
request to rezone approximately 12.52 acres from Low Density Residential and Light
Industrial Zones to a new Planned Development Zone (PDZ). This action also includes
consideration of a modification of a condition from the "Mancini Realty Five - Parcel
Subdivision" (Planning Board Meeting, September 21, 1993) regarding bringing the private
roads (Mancini Drive and Mancini Road) up to Town specifications and deeding them to the
Town. Mitchell Ventures, LLC, Owner /Applicant; Dan Mitchell, President, Ithaca Beer
Company, Inc., Agent; and
2. This is a Type I Action for which the Town of Ithaca Planning Board, acting as lead agency in
a coordinated environmental review, has, on June 21, 2011, made a negative determination
of environmental significance, after having reviewed and accepted as adequate a Full
Environmental Assessment Form Part I, submitted by the applicant, and a Part II prepared by
Town Planning staff; and
3. The Planning Board, at a Public Hearing held on June 21, 2011, has reviewed and accepted
as adequate, the following drawings: "Subdivision Plat" dated 4/5/2011 and prepared by T.G.
Miller P.C.; "Plans" (Sheets A101 and A102) and "Elevations" (Sheets A201 and A202), dated
5/19/2011 and prepared by Ernie Bayles, Architect; "Existing Conditions Plan" (Sheet C100),
"Site Plan" (Sheet C101), "Layout Plan" (Sheet C102), "Grading and Drainage Plan" (Sheet
C103), "Erosion & Sediment Control Plan — Construction Phase" (C104), "Erosion & Sediment
Control Plan — Stabilization Phase" (C105), "Utility Plan" (C106), "Details" (Sheets C201,
C202, C203), "Planting Plan" (L102), dated 05/20/2011 and prepared by T.G. Miller P.C.;
"Signage Locations" (Sheet L -103) and "Sign Details" (Sheets L -104 and L -105), dated May
19, 2011 and prepared by Ithaca Beer Co., and other application materials; and
NOW THEREFORE BE IT RESOLVED:
1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary
Subdivision Approval, as shown on the Preliminary Subdivision Checklist, having determined
from the materials presented that such waiver will result in neither a significant alteration of
the purpose of subdivision control nor the policies enunciated or implied by the Town Board,
and
2. That the Town of Ithaca Planning Board hereby grants Preliminary Subdivision Approval for
the proposed Ithaca Beer Company Development project located on Mancini Road, as
described in the drawings listed above, subject to the following conditions:
PB Minutes 06 -21 -2011
Page 11 of 16
a. submission of the final subdivision plat, including all requirements on the Final Subdivision
Checklist, prior to Final Subdivision Approval, and
b. upon issuance of Final Subdivision Approval, submission for signing of one original or
mylar copy and three dark -line prints of the final plat by the Planning Board Chair, said
plat to be filed in the Tompkins County Clerk's Office, and a copy of the receipt of filing
provided to the Town of Ithaca Planning Department, prior to the issuance of any building
permits, and
c. consolidation of the 0.75 +/- acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be
consolidated with 33- 3 -2.9, and the 0.75 +/- acre parcel (Parcel C) from Tax Parcel No.
33- 3 -2.9, to be consolidated with the new 9.56 acre brewery parcel (Parcel D), and
submission of a copy of the consolidation request to the Town of Ithaca Planning
Department within six months of the date of the final subdivision resolution; and
BE IT FURTHER RESOLVED:
1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary
Site Plan Approval, as shown on the Preliminary Site Plan Checklists, having determined from
the materials presented that such waiver will result in neither a significant alteration of the
purpose of site plan control nor the policies enunciated or implied by the Town Board, and
2. That the Town of Ithaca Planning Board hereby grants Preliminary Site Plan Approval for the
Ithaca Beer Company Development project located on Mancini Road, as described in the
drawings listed above, subject to the following conditions:
a. approval by the Town of Ithaca Town Board of the new Planned Development Zone for
this project, prior to Final Site Plan Approval, and
b. submission of the final Stormwater Pollution Prevention Plan and associated drawings, for
review and approval by the Town of Ithaca Public Works Department, prior to Final Site
Plan Approval, and
c. submission of details showing the addition of a stop sign at the end of the new driveway
where it meets Mancini Road, prior to Final Site Plan Approval, .and
d. submission of construction details of all proposed structures, driveways,. water /sewer
facilities, stormwater management, and other improvements (including, but not limited to,
revised drawings showing two silos, plus a pad for a third silo to be added in a .future
phase), prior to Final Site Plan Approval, and
e. submission of proof that the Ithaca Fire Department has reviewed the designs and
determined they provide satisfactory access for firefighting vehicles and equipment, prior
to Final Site Plan Approval, and
f. submission of colors and design details for the two silos, prior to Final Site Plan Approval,
and
g. submission of elevations, designs, colors and details on the use of the two storage sheds
shown on the "Layout. Plan ", prior to Final Site Plan Approval, and
h. submission of details showing the proposed bicycle racks, prior to Final Site Plan
Approval, and
PB Minutes 06 -21 -2011
Page 12 of 16
submission of one set of the final site plan drawings on mylar, vellum, or paper, signed
and sealed by the registered land surveyor, engineer, architect, or landscape architect
who prepared the site plan material, prior to the issuance of a building permit, and
j. submission of a stormwater "Operation, Maintenance, and Reporting Agreement' between
the property owner and the Town of Ithaca, satisfactory to the Attorney for the Town and
the Town of Ithaca Public Works Department, prior to issuance of any certificates of
occupancy, and
k. submission of record of application for and proof of receipt of all necessary permits from
county, state, and /or federal agencies, prior to the issuance of any certificates of
occupancy,and
submission of an easement agreements among the Ithaca Beer Company, property
owner, Mitchell Ventures LLC, and the Town of Ithaca, and among the Ithaca Beer
Company property owner, Ferrara Realty Inc., and the Town of Ithaca for the stormwater
facilities that extend onto those adjacent properties, for review and approval of the
Attorney for the Town and the Town of Ithaca Public Works Department, prior to the
installation of those stormwater elements; and
m. submission of an easement satisfactory to the Attorney for the Town to ensure ingress
and egress for the 10.21 -acre parcel onto Mancini Drive and Mancini Road, prior to
issuance of building permits, and
n. construction of the private stormwater facilities in a manner satisfactory to the Town of
Ithaca Public Works Department, prior to issuance of certificates of occupancy; and
BE IT FURTHER RESOLVED:
That the Town of Ithaca Planning Board hereby recommends that the Town of Ithaca Town Board
enact the proposed Local Law Amending Chapters 270 and 271 of the Town of Ithaca Code to
Provide a new Planned Development Zone for the Ithaca Beer Company project; and
BE IT FURTHER RESOLVED:
That the Town of Ithaca Planning Board hereby deletes condition "b" ( "Before the earlier of (a) the
sale of either Lot 2 or Lot 3, or (b) the issuance of a building permit for construction on either Lot
2 or Lot 3, the entire roadway from NYS Rte. 13A westerly to the end of the cul -de -sac at Lot 2
and Lot 3 be constructed in accordance with Town specifications and deeded to the Town, and
further, the existing road in from NYS Rte. 13 shall be brought up to Town specifications, deeded
to the Town, and made into a one -way road for ingress only, or security (cash, bond, or letter of
credit) for said construction above in an amount determined by the Town Board, after
recommendation of the Town Engineer, and in a form approved by the Attorney for the Town, be
provided to the Town') from the "Mancini Realty Five - Parcel Subdivision" (Planning Board
Meeting, September 21, 1993), so that it is not required that the roadways mentioned above
(Mancini Road and Mancini Drive) be constructed to Town specifications, be deeded to the Town,
or changed to only one -way.
Vote:
Ayes: Erb, Conneman, Beach, Baer, Bosak, Collins, Slottje
PB Minutes 06 -21 -2011
Page 13 of 16
AGENDA ITEM
SEAR Determination: The Gym at East Hill Plaza, 323 Pine Tree Road.
Maria Maynard, agent, Cornell University, and Lara Dunn and Brent Handy, owners, The Gym,
were present. Mr. Handy said he and Ms. Dunn combined have 25 years of design and
management experience in the fitness industry. Their Town of Lansing club was established three
years ago. Members have access to the facility 24 hours per day, 365 days per year.
To questions, the applicants explained that the facility will offer equipment only — there will be no
classes. Sundays and holidays are when people utilize the outside - normal- boundary hours. It's a
cost - efficient model, because they don't have employees. They can monitor the facility with
cameras and door security 24 hours per day, even from a Blackberry. It's the highest level
security available. When someone uses their key fob, the applicants see their name and visually
from a camera. They can talk through the camera, if need be.
There are four levels of security:
1. Fob: The key is automatically removed from the system when someone is no longer a
member.
2. Tailgater system: This notifies the applicants through email that the door is ajar. When a
member fobs in, the door locks after five seconds. It allows only one person to come
through the door at a time, so if a second person tries to come through, it feels the second
person. It will then send an email notification. It tracks both entering and exiting. Members
don't have to fob to get out, but the system tracks when someone goes out; if someone
tries to get back in, it sends an email notification.
3. Remote access live -feed security cameras. If the system senses that a door is left ajar,
the applicants can look at it live.
4. Emergency phone system.
They can also provide lanyards for people to wear and use as a panic button.
Ms. Maynard addressed light spillage. There will be tinted film on the windows. People will be
able to see out, but not in very well. It's doubtful that the inside light will be brighter than the
parking lot light, since the parking lot lights will be brighter than anything else.
PB Resolution No. 2011 -055: SEQR, Preliminary and Final Site Plan, East Hill Plaza -
Conversion of Space, Tax Parcel No. 62 -2 -1.121
Moved by John Beach; seconded by Ellen Baer
WHEREAS:
1. This action is consideration of Preliminary and Final Site Plan Approval for the proposed "The
Gym" project, located in the East Hill Plaza at 323 Pine Tree Road, Town of Ithaca Tax Parcel
No. 62. -2- 1.121, Community Commercial Zone. The proposal involves converting the former
4,425 + /- square foot Cayuga X -Press space into a 24 -hour access fitness center ( "The Gym ")
within the existing East Hill Plaza. The only exterior change proposed is to add a new sign for
the fitness center. Cornell University Real Estate Department, Owner /Applicant; Maria B.
Maynard, Property Manager, Agent, and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board is acting as lead
agency in the environmental review with respect to Site Plan Approval, and
PB Minutes 06 -21 -2011
Page 14 of 16
3. The Planning Board, on June 21, 2011, has reviewed and accepted as adequate a Short
Environmental Assessment Form (EAF) Part I, submitted by the applicant, and Part II
prepared by Town Planning staff, an application package date stamped June 10, 2011,
containing a narrative, a general location map of East Hill Plaza, the specific location of the
proposed space within the Plaza, a photo showing the proposed signage, and interior floor
plans of the proposal, and other application materials, and
4. The Town Planning staff has recommended a negative determination of environmental
significance with respect to the proposed Site Plan Approval;
NOW THEREFORE BE IT RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination of environmental
significance in accordance with Article 8 of the Environmental Conservation Law and 6 NYCRR
Part 617 New York State Environmental Quality Review for the above referenced actions as
proposed, based on the information in the EAF Part I and for the reasons set forth in the EAF Part
II, and, therefore, a Draft Environmental Impact Statement will not be required.
Vote:
Ayes: Erb, Conneman, Beach, Baer, Bosak, Collins, Slottje
AGENDA ITEM
Public Hearing: Consideration of Preliminary and Final Site Plan Approval for the proposed The
Gym project located in the East Hill Plaza at 323 Pine Tree Road, Town of Ithaca Tax Parcel No.
62- 2- 1.121, Community Commercial Zone. The proposal involves converting the former 4,425 +/-
square foot Cayuga X -Press space into a 24 -hour access fitness center (The Gym) within the
existing East Hill Plaza. The only exterior change proposed is to add a new sign for the fitness
center. Cornell University Real Estate Department, Owner /Applicant; Maria B. Maynard, Property
Manager, Agent.
Ms. Erb opened the public hearing at 9:53 p.m.
Joel Harlan, Newfield, spoke in favor about the project.
Ms. Erb closed the public hearing at 9:56 p.m.
The building was formerly the Rite Aid. There are currently two ADA- compliant bathrooms; one
restroom will be altered to include a shower, thereby incorporating it into the other restroom. This
will create one ADA - compliant unisex bathroom.
Mr. Bates said that the bathroom needs to be designed for the maximum occupancy for that type
of structure, which he thinks is an assembly -type gymnasium classification. The bathrooms also
have to be divided 50/50, male /female.
Ms. Maynard stated that the architect agreed with the assembly - gymnasium designation, which
would allow 60 people maximum based on the square footage. She said that the shower does not
need to be there. The architect will look into the plumbing code further. The two employees of the
other business in the building share the bathroom. They would need to provide the same type of
key access to the bathrooms to accommodate these employees.
The building sign was discussed. It must be consistent with the others in the plaza and be within
the square footage allowed by the sign law.
PB Minutes 06 -21 -2011
Page 15 of 16
PB Resolution No. 2011 -056: Preliminary and Final Site Plan, East Hill Plaza - Conversion
of Space, Tax Parcel No. 62 -2 -1.121
Moved by Ellen Baer; seconded by John Beach
WHEREAS:
This action is consideration of Preliminary and Final Site Plan Approval for the proposed "The
Gym" project, located in the East Hill Plaza at 323 Pine Tree Road, Town of Ithaca Tax Parcel
No. 62. -2- 1.121, Community Commercial Zone. The proposal involves converting the former
4,425 + /- square foot Cayuga X -Press space into a 24 -hour access fitness center ( "The Gym ")
within the existing East Hill Plaza. The only exterior change proposed is to add a new sign for
the fitness center. Cornell University Real Estate Department, Owner /Applicant; Maria B.
Maynard, Property Manager, Agent, and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board, acting as lead agency
in the environmental review with respect to the project has, on June 21, 2011, made a
negative determination of environmental significance, after having reviewed and accepted as
adequate a Short Environmental Assessment Form Part I, submitted by the applicant, and a
Part 11 prepared by Town Planning staff, and
3. The Planning Board, at a Public Hearing held on June 21, 2011, has reviewed and accepted
as adequate an application package date stamped June 10, 2011, containing a narrative, a
general location map of East Hill Plaza, the specific location of the proposed space within the
Plaza, a photo showing the proposed signage, and interior floor plans of the proposal, and
other application materials,
NOW THEREFORE BE IT RESOLVED:
1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary
and Final Site Plan Approval, as shown on the Final Site Plan Checklist, having determined
from the materials presented that such waiver will result in neither a significant alteration of
the purpose of site plan control nor the policies enunciated or implied by the Town Board, and
2. That the Town of Ithaca Planning Board hereby grants Preliminary and Final Site Plan
Approval for the proposed conversion of the former Cayuga X -Press space to "The Gym"
fitness center, as shown in the application package date stamped June 10, 2011, subject to
the following condition:
• That the applicant obtains a sign permit for the proposed sign and a building permit for the
proposed conversion of space.
Vote:
Ayes: Erb, Conneman, Beach, Baer, Bosak, Collins, Slottje
AGENDA ITEM
Approval of minutes, June 7, 2011
PB Resolution No. 2011 -057: Minutes of June 7, 2011
PB Minutes 06 -21 -2011
Page 16 of 16
Moved by Linda Collins; seconded by John Beach
WHEREAS, the Town of Ithaca Planning Board has reviewed the draft minutes from the meeting
on June 7, 2011; now, therefore, be it
RESOLVED, that the Town of Ithaca Planning Board approves the minutes, with corrections, to
be the final minutes of the meeting of June 7.
Vote
Ayes: Erb, Conneman, Beach, Baer, Bosak, Collins Abstentions: Slottje
AGENDA ITEM
Other Business
Generic Transportation Questions
Ms. Erb and Mr. Bosak made a first stab at a traffic analysis presentation format that the Board
could require all developers to use. They requested that the other board members look at it and
come up with questions to add to the list of questions the answers to which should help the Board
understand traffic analysis better. The questions will be discussed at the first meeting in July.
Adjournment
Upon motion by John Beach, the meeting adjourned at 10:20 p.m.
Respectfully submitted,
Debra DeAugis ' ,_ Deputy To n Jerk
TOWN OF ITHACA PLANNING BOARD
215 North Tioga Street
Ithaca, New York 14850
Tuesday, June 21, 2011
AGENDA
7:00 P.M. Persons to be heard (no more than five minutes).
7:05 P.M. SEQR Determination: Third Residential EcoVillage Experience Modifications, Rachel
Carson Way.
7:05 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Site Plan Approval and a
Recommendation to the Town of Ithaca Town Board regarding changes to Planned
Development Zone No. 8 for the proposed modifications to the Third Residential
EcoVillage Experience (TREE) project located off Rachel Carson Way, Town of Ithaca
Tax Parcel No.'s 28 -1- 26.22, 28 -1 -26.82 and 28 -1- 26.84, Planned Development Zone
No. 8. The modifications include adding ten new dwelling units (total of 40 units),
increasing the overall parking by +/- 23 spaces (including 16 additional spaces for
TREE), and showing a new layout for the water and sanitary sewer infrastructure. The
proposal also involves amendments to the Planned Development Zone No. 8 language to
allow 15 (rather than 8) residential units in the Sustainable Living Center and increasing
from 6 to 8 the number of dwelling units allowed per acre. EcoVillage at Ithaca, Inc.,
Owner /Applicant; Liz Walker, Organization Manager, Agent.
7:30 P.M. SEQR Determination: Ithaca Beer Company Development, Mancini Road.
7:30 P.M. PUBLIC HEARING: Consideration of Preliminary Site Plan Approval, Preliminary
Subdivision Approval, and a Recommendation to the Town of Ithaca Town Board
regarding the creation of a new Planned Development Zone for the proposed Ithaca Beer
Company Development located on Mancini Drive off Elmira Road (NYS Route 13) on
Town of Ithaca Tax Parcel No.'s 33- 3 -2.2, 31 -3 -3.12 and 33- 3 -2.9, Low Density
Residential and Light Industrial Zones. The proposal involves developing approximately
12.52 acres of the property for a new brewery facility which includes 11,000 +/- square
feet for production, shipping/receiving, and storage, 1,500 +/- square feet for offices, and
2,500 +/- square feet for the retail and pub space. The project will also include a beer
garden, two silos, agricultural fields, approximately 78 parking spaces, signage,
stormwater facilities, outdoor lighting, and landscaping. As part of this proposal, a 9.56
+/- acre parcel is being subdivided from Tax Parcel 33 -3 -2.2 for the brewery
development (Parcel D). The subdivision proposal also involves subdividing off a 0.75
+/- acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be consolidated with 33- 3 -2.9, and
subdividing off a 0.75 +/- acre parcel (Parcel C) from Tax Parcel No. 33- 3 -2.9, to be
consolidated with the new 9.56 acre brewery parcel (Parcel D). The project also involves
a request to rezone approximately 12.52 acres from Low Density Residential and Light
Industrial Zones to a new Planned Development Zone (PDZ). The Planning Board will
also consider modifying a condition from the "Mancini Realty Five - Parcel Subdivision"
(Planning Board Meeting, September 21, 1993) regarding bringing the private roads
(Mancini Drive and Mancini Road) up to Town specifications and deeding them to the
Town. Mitchell Ventures, LLC, Owner /Applicant; Dan Mitchell, President, Ithaca Beer
Company, Inc., Agent.
TOWN OF ITHACA PLANNING BOARD
NOTICE OF PUBLIC HEARINGS
Tuesday, June 21, 2011
By direction of the Chairperson of the Planning Board, NOTICE IS HEREBY GIVEN that Public Hearings will be held by
the Planning Board of the Town of Ithaca on Tuesday, June 21, 2011, at 215 North Tioga Street, Ithaca, N.Y., at the following
times and on the following matters:
7:05 P.M. Consideration of Preliminary and Final Site Plan Approval and a Recommendation to the Town of Ithaca
Town Board regarding changes to Planned Development Zone No. 8 for the proposed modifications to the
Third Residential EcoVillage Experience (TREE) project located off Rachel Carson Way, Town of Ithaca
Tax Parcel No.'s 28 -1- 26.22, 28 -1 -26.82 and 28 -1- 26.84, Planned Development Zone No. 8. The
modifications include adding ten new dwelling units (total of 40 units), increasing the overall parking by
+/- 23 spaces (including 16 additional spaces for TREE), and showing a new layout for the water and
sanitary sewer infrastructure. The proposal also involves amendments to the Planned Development Zone
No. 8 language to allow 15 (rather than 8) residential units in the Sustainable Living Center and
increasing from 6 to 8 the number of dwelling units allowed per acre. EcoVillage at Ithaca, Inc.,
Owner /Applicant; Liz Walker, Organization Manager, Agent.
7:30 P.M. Consideration of Preliminary Site Plan Approval, Preliminary Subdivision Approval, and a
Recommendation to the Town of Ithaca Town Board regarding the creation of a new Planned
Development Zone for the proposed Ithaca Beer Company Development located on Mancini Drive off
Elmira Road (NYS Route 13) on Town of Ithaca Tax Parcel No.'s 33- 3 -2.2, 31 -3 -3.12 and 33- 3 -2.9, Low
Density Residential and Light Industrial Zones. The proposal involves developing approximately 12.52
acres of the property for a new brewery facility which includes 11,000 +/- square feet for production,
shipping/receiving, and storage, 1,500 +/- square feet for offices, and 2,500 +/- square feet for the retail
and pub space. The project will also include a beer garden, two silos, agricultural fields, approximately
78 parking spaces, signage, stormwater facilities, outdoor lighting, and landscaping. As part of this
proposal, a 9.56 +/- acre parcel is being subdivided from Tax Parcel 33 -3 -2.2 for the brewery
development (Parcel D). The subdivision proposal also involves subdividing off a 0.75 +/- acre parcel
(Parcel B) from Tax Parcel 33- 3 -2.2, to be consolidated with 33- 3 -2.9, and subdividing off a 0.75 +/- acre
parcel (Parcel C) from Tax Parcel No. 33- 3 -2.9, to be consolidated with the new 9.56 acre brewery parcel
(Parcel D). The project also involves a request to rezone approximately 12.52 acres from Low Density
Residential and Light Industrial Zones to a new Planned Development Zone (PDZ). The Planning Board
will also consider modifying a condition from the "Mancini Realty Five - Parcel Subdivision" (Planning
Board Meeting, September 21, 1993) regarding bringing the private roads (Mancini Drive and Mancini
Road) up to Town specifications and deeding them to the Town. Mitchell Ventures, LLC,
Owner /Applicant; Dan Mitchell, President, Ithaca Beer Company, Inc., Agent.
8:00 P.M. Consideration of Preliminary and Final Site Plan Approval for the proposed The Gym project located in
the East Hill Plaza at 323 Pine Tree Road, Town of Ithaca Tax Parcel No. 62- 2- 1.121, Community
Commercial Zone. The proposal involves converting the former 4,425 +/- square foot Cayuga X -Press
space into a 24 hour access fitness center (The Gym) within the existing East Hill Plaza. The only
exterior change proposed is to add a new sign for the fitness center. Cornell University Real Estate
Department, Owner /Applicant; Maria B. Maynard, Property Manager, Agent.
Said Planning Board will at said times and said place hear all persons in support of such matters or objections thereto. Persons
may appear by agent or in person. Individuals with visual impairments, hearing impairments or other special needs, will be
provided with assistance as necessary, upon request. Persons desiring assistance must make such a request not less than 48
hours prior to the time of the public hearing.
Susan Ritter
Director of Planning
273 -1747
Dated: Monday, June 13, 2011
Publish: Wednesday, June 15, 2011
��f X-11.. - o
Wednesday, June 15, 2011 THE ITHACA JOURNAL
Town of Ithaca
Planning Board
215 North Tioga Street
June 21, 20117:00 p.m.
PLEASE SIGN -IN
Please Print Clearly, Thank You
Name Address
—4-U _C_� Se
L Sa l P---
qA�- 6n7t'a",' C
TOWN OF ITHA
AFFIDAVIT OF POSTING AND PUBLICATION
I, Sandra Polce, being duly sworn, depose and say that I am a Senior Typist for the Town of
Ithaca, Tompkins County, New York; that the following Notice has been duly posted on the sign
board of the Town of Ithaca and that said Notice has been duly published in the local newspaper,
The Ithaca Journal.
Notice of Public Hearings to be held by the Town of Ithaca Planning Board in the Town of Ithaca
Town Hall 215 North Tioga Street, Ithaca, New York, on Tuesday, June 21, 2011 commencing
at 7:00 P.M., as per attached.
Location of Sign Board used for Posting: Town Clerk Sign Board — 215 North Tio ag Street.
Date of Posting: June 13, 2011
Date of Publication: June 15, 2011
a Qo-P�
Sandra Polce, Senior Typist
Town of Ithaca
STATE OF NEW YORK) SS:
COUNTY OF TOMPKINS)
Sworn to and subscribed before me this 15`h day of June 2011.
4w, "e,
Notary Public
CARRIE WHITMORE
Notary Public, State of New York
No. 01 WH6052877
Tioga County
Commission Expires December 20�'Ko�/
TOWN OF ITHACA PLANNING BOARD
215 North Tioga Street
Ithaca, New York 14850
Tuesday, June 21, 2011
AGENDA
7:00 P.M. Persons to be heard (no more than five minutes).
7:05 P.M. SEQR Determination: Third Residential EcoVillage Experience Modifications, Rachel
Carson Way.
7:05 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Site Plan Approval and a
Recommendation to the Town of Ithaca Town Board regarding changes to Planned
Development Zone No. 8 for the proposed modifications to the Third Residential
EcoVillage Experience (TREE) project located off Rachel Carson Way, Town of Ithaca
Tax Parcel No.'s 28 -1- 26.22, 28 -1 -26.82 and 28 -1- 26.84, Planned Development Zone
No. 8. The modifications include adding ten new dwelling units (total of 40 units),
increasing the overall parking by +/- 23 spaces (including 16 additional spaces for
TREE), and showing a new layout for the water and sanitary sewer infrastructure. The
proposal also involves amendments to the Planned Development Zone No. 8 language to
allow 15 (rather than 8) residential units in the Sustainable Living Center and increasing
from 6 to 8 the number of dwelling units allowed per acre. EcoVillage at Ithaca, Inc.,
Owner /Applicant; Liz Walker, Organization Manager, Agent.
7:30 P.M. SEQR Determination: Ithaca Beer Company Development, Mancini Road.
7:30 P.M. PUBLIC HEARING: Consideration of Preliminary Site Plan Approval, Preliminary
Subdivision Approval, and a Recommendation to the Town of Ithaca Town Board
regarding the creation of a new Planned Development Zone for the proposed Ithaca Beer
Company Development located on Mancini Drive off Elmira Road (NYS Route 13) on
Town of Ithaca Tax Parcel No.'s 33- 3 -2.2, 31 -3 -3.12 and 33- 3 -2.9, Low Density
Residential and Light Industrial Zones. The proposal involves developing approximately
12.52 acres of the property for a new brewery facility which includes 11,000 +/- square
feet for production, shipping/receiving, and storage, 1,500 +/- square feet for offices, and
2,500-+/- square feet for the retail and pub space. The project will also include a beer
garden, two silos, agricultural fields, approximately 78 parking spaces, signage,
stormwater facilities, outdoor lighting, and landscaping. As part of this proposal, a 9.56
+/- acre parcel is being subdivided from Tax Parcel 33 -3 -2.2 for the brewery
development (Parcel D). The subdivision proposal also involves subdividing off a 0.75
+/- acre parcel (Parcel B) from Tax Parcel 33- 3 -2.2, to be consolidated with 33- 3 -2.9, and
subdividing off a 0.75 +/- acre parcel (Parcel C) from Tax Parcel No. 33- 3 -2.9, to be
consolidated with the new 9.56 acre brewery parcel (Parcel D). The project also involves
a request to rezone approximately 12.52 acres from Low Density Residential and Light
Industrial Zones to a new Planned Development Zone (PDZ). The Planning Board will
also consider modifying a condition from the "Mancini Realty Five - Parcel Subdivision"
(Planning Board Meeting, September 21, 1993) regarding bringing the private roads
(Mancini Drive and Mancini Road) up to Town specifications and deeding them to the
Town. Mitchell Ventures, LLC, Owner /Applicant; Dan Mitchell, President, Ithaca Beer
Company, Inc., Agent.
8:00 P.M. SEQR Determination: The Gym at East Hill Plaza, 323 Pine Tree Road.
8:00 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Site Plan Approval for the
proposed The Gym project located in the East Hill Plaza at 323 Pine Tree Road, Town of
Ithaca Tax Parcel No. 62 -2- 1.121, Community Commercial Zone. The proposal involves
converting the former 4,425 +/- square foot Cayuga X -Press space into a 24 hour access
fitness center (The Gym) within the existing East Hill Plaza. The only exterior change
proposed is to add a new sign for the fitness center. Cornell University Real Estate
Department, Owner /Applicant; Maria B. Maynard, Property Manager, Agent.
8. Approval of Minutes: June 7, 2011
9. Other Business:
10. Adjournment
Susan Ritter
Director of Planning
273 -1747