HomeMy WebLinkAboutPB Minutes 2006-12-19FILE
DATE \ -F-
REGULAR MEETING
TOWN OF ITHACA PLANNING BOARD
TUESDAY, DECEMBER 19, 2006 at 7:00 p.m.
215 NORTH TIOGA STREET, ITHACA NY 14850
The Town of Ithaca Planning Board met in regular session on Tuesday,
December 19, 2006, at the Town Hall, 215 North Tioga Street, Ithaca, New York,
at 7:00 p.m.
PRESENT
Fred Wilcox, Chairperson;
Board Member; Rod Howe,
Talty, Board Member.
ABSENT
Tracey Mitrano,
Eva Hoffmann, Board Member; George Conneman,
Board Member; Larry Thayer, Board Member; Kevin
Board Member
STAFF
Jonathan Kanter, Director of Planning; Daniel Walker, Director of Engineering;
Christine Balestra, Planner; Mike Smith, Planner; Susan Brock, Attorney for the
Town; Paulette Neilsen, Deputy Town Clerk,
OTHERS PRESENT
Herb Engman, Warren Road; Kim Michaels, Trowbridge and Wolf; Grace Chiang,
Holt architects; Bill Paladino, Buffalo, NY; Joanne Tredco, Vivien Lorenzo and
Alfonse Pieper, from the Belle Sherman /Byrant Park neighborhood(s)
CALL TO ORDER .
Chairperson Wilcox declares the meeting duly opened at 7:05 p.m., and accepts
for the record Secretary's Affidavit of Posting and Publication of the Notice of
Public Hearings in Town Hall and the Ithaca Journal on December 11, 2006 and
December 13, 2006, together with the properties under discussion, as
appropriate, upon the Clerks of the City of Ithaca and the Town of Danby, upon
the Tompkins County Commissioner of Planning, upon the Tompkins County
Commissioner of Public Works, and upon the applicants and /or, agents, as
appropriate, on December 11, 2006.
Chairperson Wilcox states the Fire Exit Regulations to those assembled, as
required by the New York State Department of State, Office of Fire Prevention
and Control.
PERSONS TO BE HEARD
Chairperson Wilcox. invites the public to address a topic that is not on this
evenings agenda and stating that if there were people present for the sketch plan
review for the proposed hotel and retail at East Hill Plaza, although that is not a
PB Minutes Dec. 19, 2006
Pg. 2
Public Hearing, the Board we will give them an opportunity to speak at that time.
There being no one, the next item was announced.
SEAR Determination: Engman / Westmont 2 -Lot Subdivision, 206 Forest
Home Drive and 120 Warren Road.
Herb Engman, 120 Warren Road
I am proposing to buy 1000 square feet from my downhill neighbor. I am on the
up side on Warren Road and the Westmont's are on the downside of Forest
Home Drive. It's mainly' to straighten out a lot -line and 1000 square feet is
maybe '/ or less of this room, so it's not a huge amount of territory. I am aware
that it is a Type I action, I have never been a Type I action before, I am very
proud of that and the reason is that I am not in the Historic District but the 1000
square feet will move from a. lot that is in the Historic District to my lot and so we
will lose 1000 square feet of a Historic District to me.
Chairperson Wilcox — We should point out that Herb is a member of the Town of
Ithaca Town Board, just for the record.
Ms. Brock — actually I am not sure that that would be lost from the Historic
District ... The lines are already set, it just detaches from the current house that is
in the Historic District to your house, which is not.
Chairperson Wilcox — Environmental concerns? Herb, you have no plans to build
on this 100 - square foot lot?
Mr. Engman — No, it's a very steep slope and it would be virtually impossible to
build on. So it will remain in its natural state.
Board Member Hoffmann — So what is the reason that this is happening?
Mr. Engman — My lot is a very weirdly shaped lot, It comes out from Warren
Road and then juts suddenly one direction and by buying 1000 feet from my
neighbor, I can straighten out the lot line a little bit and it gives me a little
breathing room from the back of my lot line. It's a little longer lot .line from the
back of the house. The majority of my lot just goes straight, at an angle down the
hill and doesn't give me a lot of backyard area and this will help me with that.
Board Member Hoffmann - So even though this is very steep, it will give you a
little space.
Mr. Engman — Right, right.
Chairperson Wilcox — Any further discussion?
PB Minutes Dec. 19, 2006
. Pg.3
ADOPTED RESOLUTION: PB RESOLUTION NO. 2006 -120: SEQR
Preliminary & Final Subdivision Approval Engman/Westmont 2 -Lot
Subdivision, 206 Forest Home Drive & 120 Warren Road, Tax Parcel No.'s
66 -2 -2 & 66 -2 -4
MOTION made by Board Member George Conneman, seconded by Board
Member Rod Howe.
WHEREAS:
1. This is consideration. of Preliminary and Final Subdivision Approval for the
proposed 2 -lot subdivision located at 206 Forest Home Drive and 120
Warren Road, Town of Ithaca Tax Parcel No.'s 66-2 -2 and 66 -24,
Medium Density Residential Zone. The proposal involves subdividing a
+/ -1,000 square foot strip of land from the eastern edge of 206 Forest
Home Drive, which will then be consolidated with 120 Warren Road.
Roger & Lois Westmont and Herbert Engman, Owners /Applicants, and
2. This is a Type I Action for which the Town of Ithaca Planning Board is
acting as Lead Agency in this environmental review with respect to
Subdivision Approval, and
3. The Planning Board on December 19, 2006, has reviewed and accepted
as adequate a Full Environmental Assessment Form Part I, submitted by
the applicant, and Part II prepared by the Town Planning staff, survey
maps entitled "Survey Map of 1.20 Warren Road, Town of Ithaca,
Tompkins County, New York," prepared by Kenneth A. Baker, amended
10/3/06 to show 1000 s.f, parcel, and survey map of "Forest Home Drive
lot 92, Town of Ithaca, Tompkins County, New York" prepared by Kenneth
A. Baker, amended 7/30/97 which references the proposed subdivision
Parcel A, and other application materials, and
4. The Town planning staff has recommended a negative determination of
environmental significance with respect to the proposed Subdivision
Approval;
NOW THEREFORE BE IT RESOLVED.
That the Town of Ithaca Planning Board hereby
of environmental significance for the reasons
Assessment Form Part II referenced above, in
State Environmental Quality Review Act for t
proposed, and, therefore, an Environmental
required,
A vote on the motion resulted as follows:
makes a negative determination
set forth in the Environmental
accordance with the New York
he above referenced action as
Impact Statement will not be
PB Minutes Dec. 19, 2006
Pg. 4
AYES: Wilcox, Hoffmann, Conneman, Thayer, Howe, and Talty.
NAYS: None.
The Motion was carried unanimously.
Chairperson Wilcox announces the next Agenda item.
PUBLIC HEARING. Consideration of Preliminary and Final Subdivision
approval for the proposed 2 -lot subdivision (lot line modification) located at
206 Forest Home Drive and 120 Warren Road, Town of Ithaca Tax Parcel
No.'s 66 -2 =2 and 66 =2 -4, Medium Density Residential Zone. The proposal
involves subdividing a +/= 1,000 square foot strip of land from the eastern
edge of 206 Forest Home Drive, which will then be consolidated with 120
Warren Road. Westmont Family Trust and Herbert J. Engman,
Owners /Applicants.
Board Member Talty — I have a question. I understand the breathing room part,
but this makes it an even more odd .looking parcel to me, am I alone on that? If
you look at the current parcel the way it is, I understand it's a little odd shaped,
but now if you include that 1000 square foot,.it's even more odd..
Chairperson Wilcox — it is odd. It kind of violates my sense of ... But it's a legal lot.
It looks odd, but it's a legal lot. _
Board Member Talty — I could see a larger parcel being purchased...
Chairperson Wilcox — I can see another thousand then another thousand until
eventually you fill up the backyard.
Mr. Engman - I can explain that a little bit. I had actually offered to buy the entire
section that runs from my property down to the...there's a sharp curve in the
Town of Ithaca's trail that runs down there but the Westmont's wanted to
preserve, the potential at least, for two lots on their property. They have enough
property where it could be potentially two lots. So they wanted to sell only the
minimum 1000 square feet, otherwise I would have bought considerable more
down the hill, but they did not want to go in that direction.
Board Member Hoffmann — The one thing that I think I see on the aerial map, is
that it looks like by purchasing this 1000 square feet you will be able to have
access to that walkway, which you don't have now. Except by going out on
Warren Road.
Mr. Engman — That is correct. When the
left a gap in the guardrail that goes down
be school children that used to walk thrc
the trail and catch the bus on Forest Hor
Warren Road, so they don't need to use
Town of Ithaca built that walkway, they
and the reason for that is there used to
ugh the backyards and go out through
ie Drive. Well, today the bus stops on
it but both I and my neighbors use the
PB Minutes Dec. 19, 2006
Pg. 5
connection to get there and now I'll have a connection on my own land, rather
than through my neighbor's property, which will still be the Westmont's property.
They've graciously allowed us to do that.
Board Member Hoffmann — But is it possible to walk there? It's not too steep to
walk?
Mr. Engman — It is a challenge and it's not something I do in winter when it is
frozen.
Chairperson invites the Public to speak. There being no one, he closes the
Public Hearing at 7:15 p.m.
ADOPTED RESOLUTION: PB RESOLUTION NO. 2006 -121 Preliminary
and Final Subdivision Approval -- Engman/Westmont 2 -Lot Subdivision
206 Forest Home Drive & 120 Warren Road Tax Parcel No.'s 66=2=2.& 66 -2 -4
MOTION made by Board Member Larry Thayer, seconded by Chairperson Fred
Wilcox.
WHEREAS:
1. This is consideration of Preliminary and Final Subdivision Approval for the
proposed 2 -lot subdivision located at 206 Forest Home Drive and 120
Warren Road, Town of Ithaca Tax Parcel No.'s 66 -2 -2 and 66-24,
Medium Density Residential Zone. The proposal involves subdividing a
+/ -1,000 square foot strip of 'land from the eastern edge of 206 Forest
Home Drive, which will then be consolidated with 120 Warren Road.. `
Roger & Lois Westmont and Herbert Engman, Owners /Applicants, and
2. This is Type I Action for which the Town of Ithaca Planning Board, acting
as lead agency in environmental review with respect to Subdivision
Approval, has on December 19, 2006, made a negative determination of
environmental significance, after having reviewed and accepted as
adequate a Full Environmental Assessment Form Part I, submitted by the
applicant, and Part II prepared by the Town Planning staff, and
3. The Planning Board on December 19, 2006, has reviewed and accepted
as adequate a Full Environmental Assessment Form Part I, submitted by
the applicant, and Part II prepared by the Town Planning staff, survey
maps entitled "Survey, Map of 120 Warren Road, Town of Ithaca,
Tompkins County, New York," prepared by Kenneth A. Baker, amended
10/3/06 to show the 1,000 s.f, parcel and survey map of "Forest Home
Drive lot 92, Town of Ithaca, Tompkins County, New York" prepared by
Kenneth A. Baker, amended 7/30/97 which references the proposed
subdivision Parcel A and other application materials;
PB Minutes Dec. 19, 2006
. Pg.6
NOW THEREFORE BE IT RESOLVED:
1. That the Town of Ithaca Planning Board hereby waives certain
requirements for Preliminary and Final Subdivision Approval, as shown on
the Preliminary and Final Subdivision Checklists, having determined from
the materials presented that such waiver will result in neither a significant
alteration of the purpose of subdivision control nor the policies enunciated
or implied by the Town Board, and
2. That the Planning Board hereby grants Preliminary and Final Subdivision
Approval for the proposed 2 -lot subdivision located at 206 Forest Home
Drive and 120 Warren Road, Town of Ithaca Tax Parcel No.'s 66 -2 -2 and
66-2 -4, as shown on the survey map entitled "Survey Map of 120 Warren
Road, Town of Ithaca, Tompkins County, New York," prepared by Kenneth
A. Baker, amended 10/3/06 to show the 1,000 s.f. parcel and survey map
of "Forest Home Drive lot 92, Town of Ithaca, Tompkins County, New
York" prepared by Kenneth A. Baker, amended 7/30/97 which references
the proposed subdivision Parcel A, subject to the following conditions:
a, submission for signing by the Chairman of the Planning Board of a
mylar and three dark - lined prints of the final subdivision plat, prior
to filing with the Tompkins County Clerk's Office, and submission of
a receipt of filing to the Town of Ithaca Planning Department, and
b, within six months of this approval, consolidation of the 1,000 +/=
square foot parcel with Tax Parcel No. 66-2 -4, and submission of
evidence of such consolidation to the Town of Ithaca Planning
Department.
A vote on the motion resulted as follows:
AYES: Wilcox, Hoffmann, Conneman, Thayer, Howe, and Talty.
NAYS: None.
The Motion was carried unanimously.
Chairperson Wilcox announces the next Agenda item at 7:19 p.m.
SEQR Determination: Ithaca Community Childcare Center Additions &
Renovation, 579 Warren Road. .
Grace Chiang, Holt Architects and Kim Michaels, Trowbridge and Wolf
Ms. Michaels — As you know from our sketch plan review submission, the
proposal in front of you includes putting two additions on the Ithaca Community
PB Minutes Dec. 19, 2006
Pg. 7
Child Care building and also doing some interior renovations and some exterior
work.
The phasing for this work will include:. The first phase will be approximately 5360
gross square feet of the after school area for the children and that is an additional
new space and new programming on -site. Right now that after - school program
happens remotely, they rent space for it and they would like to consolidate it at
their current location.
The second phase is approximately 550 gross square feet on the infant wing.
This will allow reconfiguration of the infant rooms to enlarge all of those spaces.
The third phase will be interior renovations and the fourth phase will be providing
a canopy from the front door to the parking lot.
The landscape improvements and site work mostly deal with accommodating the
building addition, putting the site back together, doing site grading, putting back
lawn and tree. Mostly in the configuration that existed before. There are no
changes to the parking lot. There is an additional sidewalk being added and a
crosswalk to facilitate circulation through the site.. This is really the only change
that's been, that's happened in the plan since we came to you for sketch plan
review.
We had originally thought that the busses might be able to stop on Warren Road
and come across the site, and the County was not interested in that possibility
and so conversations with the neighbor at BOCES have indicated that the school
busses that will drop the after - school children off can enter the BOCES site,
which is south, and there's a diagram in your packet of information, it's on the
third or fourth page, that shows how the busses will travel to the site. It's entitled
"Pedestrian Circulation" it's a color diagram that shows how the busses will loop
through the BOCES site. They will come in to the south of IC3 through the
BOCES driveway, loop through the BOCES campus and actually end up tight
here. The bus will end up here, facing this direction so children will leave the bus
and immediately be picked up . by a sidewalk that runs all the way to the front
door without crossing any vehicular traffic at all. That is the major change, the
only change really, since we came to you for sketch plan and in direct response
to your comments at that time.
Children will be met by teachers when they get off the bus and escorted into the
classroom. BOCES is in agreement with this arrangement and there has been a
letter included in your packet from BOCES which shows that they're interested in
working out this kind of circulation between the two properties and we do not
have the formal legal easements and agreements yet between the two parties.
but we ask that we be granted approval this evening contingent on providing
those before building permit.
PB Minutes Dec. 19, 2006
Pg. 8
The only other site improvements really are providing site lighting along the main
walk in front of the main building and these will be dark =sky, full. cut off fixtures to
adequately light the site, especially in the winter months when pick -up time
coincides with darkness.
Grace Chiang — I guess the only thing I would add is that there are elevations .in
the packet, which are behind Kim here, so you can probably see in your
packet ... It indicates where the after - school addition is and where the infant
addition is and this is all from the east looking west. And also the new canopy.
As Kim had mentioned, there will be, in Phase 1, we will also be residing the
building because the siding is in poor condition right now and needs to be
resided, so the entire building will be resided as well as a roof replacement, it's a
flat roof, for the most part, there is a little bit of shingle although I think it is only
the flat roof that needs to be replaced., As you can see, these are the new pieces
here sitting in front of the existing building, so there are obviously new
(inaudible), new windows, all of those materials will match the existing windows,
are aluminum clad wood window.
I think, unless you have any questions....That's probably what we've got.
Board Member Hoffmann I thought I saw something in the papers about some
additional landscaping to the north of the existing building, where the site plan
shows some playgrounds or something like.that.
Ms. Michaels — There is nothing in. the plan that will make_ changes to the
playgrounds. The infant addition will impact where the playground fence is, and
can show you that on the drawing, and that's the only change. It will relocate that
fence.
The existing fence, right now the playground area is here and wraps around the
building ... the existing fence runs along here and comes in to the front and
because of this infant addition, we are going to just move... relocate that fence to
come all the way across and then hit the addition. corner. Actually we will be
losing a little space for the addition but capturing space in front. But there won't
be any...
Board Member Hoffmann — So that's the only place where there may be a little
different landscaping, then, because it gets disturbed.
Ms. Michaels — correct.
Chairperson Wilcox - Dan, do you want to talk about drainage.
Mr. Walker — It's downhill most of the time.
Chairperson Wilcox — I noticed just slight increases in the ...
PB Minutes Dec. 19, 2006
Pg. 9
Mr. Walker — Right, it's a very slight ... this small watershed is a small part of the
overall big watershed that includes the health care campus that is all owned by
Cornell. This is a very small disturbance, there is some paved area and sidewalk
and some lawn area that's going to be replaced with roof and impervious
surfaces but the increase in run off is very small ... it's less than an acre of
disturbed area so it doesn't fall under the State Stormwater Pollution
Requirements and there's plenty of capacity in the existing storm drainage
system. There are no problems in that area apparently and their analysis shows
that it is a very minor change and it won't be a big impact.
Chairperson Wilcox = You agree with their analysis?
Mr. Walker — Yes
Chairperson Wilcox Michael, any comments from you?
Mr. Smith — No, all set.
Board Member Talty — I just want to say I appreciate the improvement on the site
plan with regards to safety for the children. That was an issue that I had last time
when they were crossing the parking lot, so kudos for working that out.
Chairperson Wilcox — I am getting a little bit ahead of myself, but, you have every
expectation that a fully executed agreement with BOCES will be possible? To
allow busses to enter and to exit and for the children to be dropped off? We
have the letter from them indicating that they are receptive to the ... to this use but
you're right, it's one thing for the Administrator to say, it's another thing for the
lawyers to get to it and begin worrying about things like liability.
Board Member Thayer — On the lighting and landscaping page, there is a picture
of a fixture there that sort of bothers .me...I don't see the bulb in it and if you're
going to use that, I wonder where the bulb would be in that.
Ms. Michaels — The bulb is in the housing at the top and it shines down. It's not a
globe fixture. The globe fixtures don't ...
Board Member Thayer — So the bulb wouldn't be visible?
Ms. Michaels — No, absolutely. not. What is fun about it is it looks like those old
fashion globe fixtures but it doesn't have the drawback of that ... so it's up inside
that housing shining down.
Chairperson Wilcox — Any other questions with regard to the environmental
review?
PB Minutes Dec. 19, 2006
Pg, 10
ADOPTED RESOLUTION PB RESOLUTION NO. 2006 -122: SEQR
PRELIMINARY & FINAL SITE PLAN APPROVAL & SPECIAL PERMIT
ITHACA COMMUNITY CHILDCARE CENTER — ADDITIONS &
RENOVATIONS, 579 WARREN ROAD, TAX PARCEL NO. 73 =1 -1.4
MOTION made by Board Member Rod Howe, seconded by Board Member Kevin
Talty.
WHEREAS:
1. This action is consideration of Preliminary and Final Site Plan Approval
and Special Permit for the proposed additions and renovations at the
Ithaca Community Childcare Center located at 579 Warren Road, Town of
Ithaca Tax Parcel No. 73- 1 -1.4, Medium Density Residential Zone, The
proposal includes the construction of two additions totaling +/- 5,910 gross
square feet, interior renovations to the existing building, a new canopy
leading to the main entrance, .and new landscaping, sidewalks, and
lighting. Ithaca Community Childcare Center, Owner /Applicant; Peter J.
Trowbridge, Trowbridge & Wolf,. LLP, Agent, and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board is
acting as Lead Agency in environmental review with respect to Site Plan
Approval and Special Permit, and
3. The Planning Board, on December 19, 2006, has reviewed and accepted
as adequate a Short Environmental Assessment Form (EAF) Part I,
submitted by the applicant, and Part II prepared by Town Planning staff,
plans titled "Erosion and Sediment Control Plan" (C101), dated November
14, 2006, "Site Demolition Plan" : (L101), "Site Layout Plan" (L201),
"Phasing Plan" (L202), "Site Grading Plan" (L301), "Landscape & Lighting
Plan", (L401), "Floor Plan" (A101), and "Building Elevations" (A102), dated
November 17, 2006, prepared by HOLT Architects, Trowbridge & Wolf,
LLP, and T.G. Miller, P.C., and other application materials, and
4. The Town Planning staff has recommended a negative determination of
environmental significance with respect to the proposed Site Plan
Approval and Special Permit;
NOW THEREFORE BE IT RESOLVED:
That the Town of Ithaca Planning Board hereby makes a negative determination
of environmental significance based on the information in the EAF Part I and for
the reasons set forth in the EAF Part II in accordance with the New York State
Environmental Quality Review Act and Chapter 148 Environmental Quality
Review of the Town of Ithaca Code for the above referenced action as proposed,
PB Minutes Dec. 19, 2006
Pg. 11
and, therefore, neither a Full Environmental Assessment Form nor an
Environmental Impact Statement will be required.
A vote on the motion resulted as follows:
AYES: Wilcox, Hoffmann, Conneman, Thayer, Howe, and Talty.
NAYS: None.
The Motion was carried unanimously.
Chairperson Wilcox announces the next Agenda item at 7:29 p.m.
PUBLIC HEARING: Consideration of Preliminary and Final Site Plan
Approval and Special Permit for the proposed additions and renovations at
the Ithaca Community Childcare Center located at 579 Warren Road, Town
of Ithaca Tax Parcel No. 73 =1 -1.4, Medium Density Residential Zone. The
proposal includes the construction of two additions totaling +/- 5,910 gross
square feet, interior renovations to the existing building, a new canopy
leading to the main entrance, and new landscaping, sidewalks, and.
lighting. Ithaca Community Childcare Center, Owner /Applicant, Peter J.
Trowbridge, Trowbridge & Wolf, LLP, Agent.
There being no one wishing to address the Board, Chairperson Wilcox closes the
Public Hearing at 7:30 p.m.
Chairperson Wilcox — Grace and Kim, why don't you come back here just in
case.
We talk about staging here a little bit. Construction, if approved and the
appropriate legal matters are worked out with BOCES would begin in '07?
Ms. Chiang — No, actually probably '08 which is different than what we told you
about last time. IC3 is feeling that they can't move quite as quickly as they
original felt. So Phase 1 would be '08, summer of '08.
Chairperson Wilcolx - And completion would be ? ??
Ms. Chiang — Well, there are several Phases, completion of the first phase...
Ms. Michaels — completion of the first phase would be before the beginning of the
school year.
Chairperson Wilcox — Well, what I am saying is if right now you push back Phase
1 start from '07 to '08, have both schedules been pushed back? Alright, alright.
Board Member Howe — Is there a time limit on ... any time frame on when we
approve this....
PB Minutes Dec. 19, 2006
Pg. 12
Mr. Kanter — There actually is a limit on the special permit of 18. months, I think,..
Chairperson Wilcox — There is a sunset provision on...but that is...you have to
start construction within...
Mr. Kanter — That's 3 months I mean three. years ... for site plan approval.. but I
think it is 18 months for a special permit....
Ms. Brock — The Code has a requirement for when work has to materially
commence and I am looking to see if there is a similar requirement for the
duration of the work and when it has to be completed by ... I'm not seeing it on
early review...
Chairperson Wilcox — I am not aware that the zoning ordinances had a must
complete by but we do have had a must start within.
Ms. Brock — I don't see anything ... I will let you know if I find something, during
your discussion.
Chairperson Wilcox — Any other questions?
ADOPTED RESOLUTION: P13 RESOLUTION NO. 2006 -123: Preliminary &
Final Site Plan Approval & Special Permit Ithaca Community Childcare
Center — Additions & Renovations, 579 Warren Rd, Tax Parcel No. 73 -1 -1.4
MOTION made by George Conneman, seconded by Larry Thayer
WHEREAS.
1. This action is consideration of Preliminary and Final Site Plan Approval
and Special Permit for the proposed. additions and renovations at the
Ithaca Community Childcare Center located at 579 Warren Road, Town of
Ithaca Tax Parcel No. 73- 1 71.4, Medium Density Residential Zone. The
proposal includes the construction of two additions totaling +/- 51910 gross
square feet, interior renovations to the existing building, a new canopy
leading to the main entrance, and new landscaping, sidewalks, and
lighting. Ithaca Community Childcare Center, Owner /Applicant; Peter J.
Trowbridge, Trowbridge & Wolf, LLP, Agent, and
2. This is an Unlisted Action for which the Town of Ithaca Planning Board,
acting as lead agency in environmental review with respect to Site Plan
Approval and Special Permit has, on December 19, 2006, made a
negative determination of environmental significance, after having
reviewed and accepted as adequate a Short Environmental Assessment
PB Minutes Dec. 19, 2006
Pg. 13
Form Part I, submitted by the applicant, and a Part II prepared by Town
Planning staff, and
3. The Planning Board, at a Public Hearing held on December 19, 2006, has
reviewed and accepted as adequate, plans titled "Erosion and Sediment
Control Plan" (C101), dated November 14, 2006, "Site Demolition Plan"
(L101), "Site Layout Plan" (L201), "Phasing Plan" (L202), "Site Grading
Plan" (L301), "Landscape & Lighting Plan" (L401), "Floor Plan" (A101),
and "Building Elevations" (A102), dated November 17, 2006, prepared by
HOLT Architects, Trowbridge & Wolf, LLP, and T.G. Miller, P.C., and other
application materials,
NOW THEREFORE BE IT RESOLVED:
That the Planning Board hereby grants Special Permit for the proposed Ithaca
Community Childcare Center finding that the standards of Article XXIV Section
270 -200, Subsections A -L, of the Town of Ithaca Code, have been met,
AND BE IT FURTHER RESOLVED:
1. That the Town of Ithaca Planning Board hereby waives certain requirements
for Preliminary and Final Site Plan Approval, as shown on the Preliminary and
Final Site Plan Checklists, having determined from the materials presented
that such waiver will result in neither a significant alteration of the purpose of
site plan control nor the policies enunciated or implied by the Town Board,
and
21 That the Town of Ithaca Planning Board hereby grants Preliminary and Final.
Site Plan Approval for the proposed additions and renovations at the Ithaca
Community Childcare Center located at 579 Warren Road, Town of Ithaca
Tax Parcel No. 73- 1 -1.4, Medium Density Residential Zone, as shown on
plans titled plans titled "Erosion and Sediment Control Plan" (C101), dated
November 14, 2006, "Site Demolition Plan" (001), "Site Layout Plan" (L201),
"Phasing Plan" (L202), "Site Grading Plan" (L301), "Landscape & Lighting
Plan" (L401), "Floor Plan" (A101), and "Building Elevations" (A102), dated
November 17, 2006, prepared by HOLT Architects, Trowbridge & Wolf, LLP,
and T.G. Miller, P.C., subject to the following conditions:
a. submission of one original set of the final site plan drawings on
mylar, vellum, or paper, signed and sealed by the registered land
surveyor, engineer, architect, or landscape architect who prepared
the site plan material, prior to the issuance of a building permit, and
PB Minutes Dec. 19, 2006
Pg. 14
b, submission of record of application for and approval of all
necessary permits from county, state, and /or federal agencies, and
C, submission of an agreement between BOCES and IC3 for the use
of a portion of the adjacent BOCES property for overflow parking
and as the site for school bus drop -offs, for review and approval of
the Town Attorney, prior to issuance of a building permit.
A vote on the motion resulted as follows:
AYES: Wilcox, Hoffmann, Conneman, Thayer, Howe, and Talty.
NAYS: None.
The Motion was carried unanimously.
Chairperson Wilcox announces the next Agenda item at 7:38p.m.
SEQR Determination: Rite Aid Pharmacy Fence, Pine Tree Road & Mitchell
Street.
Bill Paladino, 295 Main Street, Suite 210, Buffalo, New York
With regard to this fence that does currently exist around the drainage pond, on
our site, we have evaluated, listened to the concerns, through Jon Kanter,
listened to the concerns of the Board and various people in the area..
.we will be
removing the fence from the site.
The fence, initially, was put up by our contractor, pretty much telling us he
thought we had a liability concern out there that we. did look at. We feel there is.
one, whether it's a perceived one or a real one, I guess we'll wait in the future to
see what happens with it but at this point in time we are going to remove the
fence.
Board Member Hoffmann — I have trouble hearing you. Could you speak a little
bit more slowly, please. And could you say, what was the final....
Mr. Paladino — We will be removing the fence.
Board Member Hoffmann — Okay. And not replace it with anything else?
Mr. Paladino — There will be nothing there, no.
Board Member Hoffmann except
original...
more plantings ... as according to the
Mr. Paladino — That's correct... whatever was on the original drawing.
PB Minutes Dec. 19, 2006
Pg. 15
Mr. Kanter — So in other words, it sounds like you are withdrawing your
application?
Mr. Paladino — Correct. ...off mic joking ...I don't like it either. I liked it...the
reason the chain -link was put up was that you can see through it, its not
readily... because its silver, you can't readily see it, we thought, we were planning
on doing additional landscaping all around it to make it more visually appealing
over there. We did put landscaping on the inside of it, we felt why hide that with
a fence you can't see through.
Board Member Hoffmann — I still have trouble hearing you. Is there something
wrong with the microphone today?
Can I just say ... Its in your interest to speak in such a way that I and everybody
can hear what you are saying because otherwise I'm going to have to ask you to
repeat what you said, it will take much longer, everybody will get impatient, so,
please.
Mr. Paladino — Understood.
Chairperson Wilcox - So for the record, the applicant has withdrawn the
application this evening. The applicant has agreed to remove the fence, which
was not on the original site plan and therefore, we're done.
Ms. Brock — The Planning Board does not need to take any action on this matter
tonight. .
Mr. Kanter — And again, in terms of the final certificate of occupancy, the fence
will have to be removed prior to issuance of that final CO.
Board Member Conneman — And the landscaping?
Mr. Kanter — We will review the landscaping and make sure it is consistent with
what was shown on the plan.
Chairperson Wilcox states the next agenda item at 7:42p.m.
Consideration of a Sketch Plan review for a proposed hotel and two
restaurant / retail buildings as part of the Phase II Development of the
former Judd Falls Plaza located off Pine Tree Road and Mitchell Street,
Town of Ithaca Tax Parcel No.'s 62- 1 -3.2, 62- 1 -2.2, and 62 -1 -1, Community
Commercial Zone. The proposal includes a three - story, +/- 60,507 square
foot hotel containing approximately 84 rooms and two restaurant / retail
buildings totaling +/- 7,900 square feet. The proposal will also include
improvements to the parking area along with new walkways and
PB Minutes Dec. 19, 2006
. Pg. 16
landscaping. 1093 Group, LLC, Owner /Applicant; William A. Paladino,
Agent.
Board Member Talty -- I will be recusing myself due to my past relationship with
the applicant in my past life in Buffalo, New York.
Chairperson Wilcox — Once again Ladies and Gentlemen, though this is not a
public hearing this evening, we will give you the opportunity, to address the
Planning Board once the applicant has made his presentation and we have had a.
chance to question him, we will give you a chance to voice your concerns and to
possibly to raise some questions as well.
Bill Paladino, Buffalo, New York
As discussed, we are here to propose our Phase II development hereon the site
of Pine Tree Plaza. We've gone through Phase I and in Phase I, due to the
Board's request we proposed retail on the back, not really knowing what we were
doing but wanting to show something just so you can gauge the size and density
of the property.
After much review and with different tenancies, different options, different people,
we came to conclusion that maybe retail, all retail, maybe isn't the best use for
the property. Maybe we would look at some of the other things we get ourselves
into development wise, being hotels, residential and in doing so. we found that
maybe a hotel was a fit for this property along with some additional
retail /restaurants.
We're proposing, currently, to construct an 84 -room, limited service hotel on the
site. Three stories. In the rear of the property, as defined now. Currently, as
most of you are aware already, the front of the property around Pine Tree has
been redeveloped. Curb cuts are all in place as they will be in final form. The
Rite Aid building itself and to the rear of the Rite Aid building has all been
developed and put into final form. But the rear of the property still needs to be
developed into something and put in final form.
The hotel in the rear is the best place for the hotel given the awkward layout of
the property itself. We realize there is a grade difference there that is being
explored by our engineer and will continue to be explored. We are here tonight
to just preliminarily show this to you and to get your thoughts and comments on
the plan.
Also being explored further, which will be, is the size of the current drainage
pond. We designed it very conservatively in the beginning, we don't know if it
can possibly be smaller, in the end it will possibly have to be a little bigger but our
engineers are telling us we may be able to minimize the size of that somewhat
based upon what we show here and the future of what we show along Pine Tree.
PB Minutes Dec. 19, 2006
Pg. 17
Along. Pine Tree Road, or along Mitchell Road, development wise, we're showing
retail building here, we don't really have a tenant in mind. For the other retail
building, we do have Dunkin Donuts would like to locate to the site. It's been
mentioned, fast food restaurants, this and that. We're really not interested, we
don't consider Dunkin Donuts a fast food restaurant, we're not looking at Burger
Kings, Wendy's, other things such as that. When we say restaurant/retail for our
other retail building here, we're thinking more along the lines of an Applebee's,
Chilli's or a nicer dining restaurant... You sit down, maybe with a small bar in it,
something along those lines, not a fast food restaurant for that size. But over
here it could end up being some other type of retail whether it be a store of some
type or something similar to Rite Aid or some other retail you see across the
street at Pine Tree, we're not sure. We are trying to find some things that go in
this neighborhood that differentiate from other things that are currently there.
Things that would compliment the neighborhood rather than compete directly
with other things. in the neighborhood'.
As I said, with regard to the site, the majority of the infrastructure for the site is in
at this time. Being the curb cuts are final formed as they are; our drainage.
should be able to handle, with some additional piping in different areas, based on
what we finish our drainage as the nuts and bolts of it are all in place to handle
what we are going to do in the future.
Utility wise, most utilities are to the site already and put in form, they just have to
be extended to handle any ancillary development. Water has been an issue out
there, which you all probably know at this point, and we are waiting on the Town
to currently update their water plant there. Dan Walker has assured me that it'll
be done in the next few months and that any ... the. update of that water plant will
allow any development, be it hotel or whatever else we decide to put on this
property, it will be able to adequately supply that use. Out of my discussion with
him last week.
Parking wise, we have, calling out right now, this plan for 256 spaces, 66 being
allocated to the Rite Aid as in our initial plans, 84 to the hotel, being one per
room and 106 to the two remaining buildings. We feel, once the final plan. is
determined, and we would like to come to a final plan as far as the hotel and
Dunkin Donuts is and then leave some additional area for a retail spec building
or some other tenant coming along in the future, being maybe a third phase
down the line, that does get finalized. Under this. process here in Phase II,
identify the location of that area so that will just sit in maybe a grassy state,
currently, until something is defined in the future for its final use.
Board Member Hoffmann — Excuse me
parking spaces for different businesses.
Can I ask you to repeat the 'number of
Mr. Paladino — Ah, 256 spaces total, 66 was under the Rite Aid development, 84
to the hotel and then 106 for the other two buildings, which are currently not
PB Minutes Dec. 19, 2006
Pg. 18
finalized in size nor in location. But we are proposing them in certain sizes and
location right here.
With regard to the hotel where it's situated, we would be looking for two
variances with regard to the cemetery. Its laid out in a way, being what we felt
was the most attractive views from the hotel, being east -west. Looking out the
shopping center and /or looking out the cemetery as opposed to looking out into
south being a few homes and just a lot of grass area and the north being the
courtyard sports., .the Courtyard Sports Center.
We have given you reports, market study that does show there is a need for a
hotel. They feel the market is under served. In analyzing the hotel itself, we look
for unique markets. We do usually one a year, is what we've been looking to do.
We have done four over the four to five years. We look for markets where there
is not a lot of competition, they're unique areas ... We think the design of our
buildings is a unique product and we try and put them in areas where we feel
there's a lot of growth and upside to it. You might not see it there now, you might
say, "Well there's a lot being built right now, there's not a lot of ... there is a lot of
competition already, there's a market that's not growing", well, we sort of
disagree with some of those comments. We feel the market is growing, based
on our studies. We feel five years from now there's going to be a lot of demand
for new hotel rooms. We feel right now there is a demand for hotel rooms, which
is referenced in our market report. We've taken into account the market report
was done by a person from this area. He went to school here, he's from the
area, he comes back to area a lot, he knows the area, and he'd be happy to sit
and talk with you too if anyone had any questions specific to those reports.
1.
Also, where we look at these markets, we look at 20 -25 sites each year and we
pick one, based on what we feel is its uniqueness and Ithaca is what we would
like to do next year as our hotel project. We feel there's three areas, census sort
of showed that there are three areas north of New York that are growing, north of
Albany in the Saratoga area, which we are looking ... we built a hotel last year in
Ellicottville New York which is south of Buffalo which is a new area that is a
growing area... finished that hotel up earlier this year and then Ithaca and Finger
Lakes market, which is a growing area. One of the advantages of working with
Wingate, who we work with is that it is Cendant Corporation and Cendant
Corporation has Howard Johnson, Days Inn, Ramada, Super 8, Travel Lodge,
Amerihost and then Wingate which is their high -end brand which, they feel is
comparable to,, higher than a Hampton Inn but a little less than a Hilton Garden
that you may see downtown. Part of the reason for this area too, is there isn't
much, besides the Ramada, up in Triphammer and that area, there's not really
any Cendant products here. Cendant has a great reach over a number of people
that do use their products and that's another reason we feel this market would be
a good place for them. Cendant has many avenues out there as part of their
corporation that drives business to them, They own Orbitz, Century 21, Avis,
Budget and a few other travel agencies that all drive the people who use these
PB Minutes Dec. 19, 2006
Pg. 19
sites, they like to drive their business to Cendant brands and that's why they feel
this would be a good market for them. They do not have a lot of product in the.
Finger Lakes region itself and they feel that having one here, its unique location,
its look, would drive a lot of traffic from areas far from just the Ithaca market. And
that's what we are going after.
Board Member Hoffmann— Can I ask you to repeat the name of this corporation.
Mr. Paladino — Cendant. (spelled out by him)
As far as the size of the hotel, we've done many studies on this, our hotels range
anywhere from 110 rooms to 84 rooms. We feel 84 rooms is the minimum room
number we need to operate efficiently under our program. We don't just build the
hotels and have someone else run them for us. We do operate them ourselves.
We run them ourselves with our own people internally. They run every hotel we
have except for one which (inaudible) ... Benderson Corporation and they run it
through their organization.
That's pretty much it as far as what we.are looking to do here.
Chairperson Wilcox — Questions, comments. .'who wants to go first.
Board Member Connemann — My concern, Bill, is that this is a neighborhood.
This is not the Elmira Road, this is a neighborhood. And to me, this hotel is just
out of size itself for that kind of neighborhood as would be, if we go back to
having a. drive through restaurant. In a neighborhood we don't need ... we need
facilities... We need a supermarket, we need one.fast food restaurant, we need
some sort of a hotel, accommodations and so forth and so on...We don't need
more than one. And this is in my opinion, intruding into a neighborhood and I'm
not the only one that thinks that. In addition, asking for all of these variances, it
seems to me that that's, as far as I'm concerned, that's off the wall. Because the
reason we have zoning is so we know what. kinds of things should be developed
there.
I went on the internet to look at Wingate, I found one in Albany, one in Garden
City Long Island and in regard to the Long Island one, the size, the rest of them,
the ones in Tennessee and so forth, don't tell us what the size are. You make
the broad statement that 84 is . the only way you can do it economically and
before I would approve anything that big, which would take a variance, I would
like to see the size of the hotels, all the Wingates across the country. We went.
through this once before with a developer and.we.found out that there are lots of
hotels smaller than whatever they pointed us to.
Mr. Paladino — No, I am sure there are many smaller Wingates but they're
not ... there are many conditions that dictate how big you can have a hotel. It's
PB Minutes Dec. 19, 2006
Pg. 20
based on the market report, it's based on the financial feasibility of that market
report and it's based on the operations of the operating company.
Board Member Conneman — The market report doesn't even list the Ramada,
unless I missed it. So, _ I feel in general you're asking for special permits in a
neighborhood which is a neighborhood and doesn't need two of everything.. In
my opinion, and that's why we have zoning. I don't know what you do in Buffalo,
but that's another world, this is the Town of Ithaca, not the Elmira Road, not
Buffalo.
I have lots of small questions, but that's the big one I think we better lead off with
and cut to the chase.
Board Member Hoffmann — Yes, I have some additional comments having to do
with the market report or the market. study, which I find has a lot of mistakes in it.
would like to know what you think about it, Fred, since this is what you do for a
living. But, some of the major problems... incidentally, this happened already
when you were here .about the Rite Aid project and I know you are from out of
town and I know street names can be confusing, but I've gotten to the point
where I would like to mention to you that it's not Mitchell Road, it's Mitchell
Street ... and I think it would be good if you corrected that in all your papers.
Mr. Paladino — No problem.
Board Member Hoffmann — But, the more major problem is that on page 10 in the
market study, it talks about the market area overview and it says "the subject site
is located in the City of Ithaca, New York"...
Chairperson Wilcox — Makes you wonder about the quality of the market study,
doesn't it...
Board Member Hoffmann — That's right. And then it mentions figures for City of
Ithaca, population figures and not the Town of Ithaca which is where we are and
what we are dealing with...
Mr. Paladino — Well, you're right on the crest of the City there but I can
have ... any comments you have on the market study I can have addressed. I
mean, I depend on those to make my recommendations on where we do these
hotels so if there are significant problems or issues with them, I also would like to
know.
Board Member Hoffmann — Yes, I think but, as a responsible developer, you
should have. checked this out before and you should have known that, especially
since you have already developed Rite Aid, that this is the Town of Ithaca.
PB Minutes Dec. 19, 2006
Pg, 21
Mr. Paladino — I understand that and that's just a minor oversight on their part, it
doesn't really dispute a lot of the facts in there.
Board Member Hoffmann — That's not minor... there's a big difference in the
population in the City of Ithaca and the Town of Ithaca and they also mention
other things in this report, which really makes it clear that they are looking at the
City of Ithaca, not the Town of Ithaca ... So this market study is just not worth very
much, the way I see it anyway. So I don't think it's reliable and I wouldn't want to
take it into account.
There are other mistakes too. For instance, on page 13 they list various projects
that are happening around this area and on Cornell campus and they are not
numbered but ... let's see...on the middle of the page, a little below the middle...it
says "Physical Sciences project — East Campus Research facilities.:. this is a
building that is going to go up on Clark Plaza, and there was something about it
in the newspaper, I think it was either just today or ....
Chairperson Wilcox — the City Planning Board is considering it tonight.
Board Member Hoffmann — That's right ... Well,
be connected to the Vet research tower and
research lab facilities." Well, I think we all kno%
personally... This is for the physical sciences,
engineering and as far as I know, it had nothing
Veterinary School so whoever put this together
carefully.
here it says "the new facility will
will consolidate existing animal
v that that is wrong and I know it
chemical biology, physics and
to do with the Ag School and the
just didn't check into things very
I have a number of things marked in here, but those are just two pretty glaring
examples. I also don't understand why some of the hotels are not listed. I went
to a website too,.to find out where one of the hotels mentioned called Courtyard
by Marriott is located because I wasn't familiar with it and I found that that is the
one which is at the intersection of Route 13 and Warren Road on the Cornell' ..by
the airport ... and I found it on a list of hotels ... It has 11 hotels listed and they give
ratings and the only 2 that have 3 stars are the Statler, the Economy Inn Ithaca
on Elmira Road and the Best Western University Inn which is talked down in the
report ... it's being called dated and not very good quality compared to what this
proposed one is going to be and some of the other ones which are listed have
fewer stars, like 2 stars. I just find that there are so many inconsistencies
that ... just mentioning those, I will give that market report a pretty low grade. So
that is just one of my comments, I'll get to more but I will give someone else a
chance.
Board Member Conneman — I think you are starting to get the point that there's.
some opposition here.. .A lot of public opposition. We got a letter tonight signed
by 20, 25 people probably that's opposed to. such a massive project in such a
small confined lot. Just basically, there's not room for it and it's really out of
PB Minutes Dec. 19, 2006
Pg. 22
character with the neighborhood, as we've mentioned before. And of course,
when we've talked about the fast food, I think Dunkin Donuts is a fast food type
operation and it is too close to the Burger King., As per our codes.
Board Member Howe Different, slightly different tangent, well two comments,
...I don't like developments where there's a big parking lot in the middle...) just
think we are at a different phase, that it doesn't encourage pedestrian flow and all
sorts of things. So, I'd like to see more ingenuity in design but I hope developers
also realize they don't have to always go after chain retail or restaurants. I hope
you have ways of connecting with the local businesses to see if there might be a
local business that wants to have some sort of shop or retail presence at a place
like this like Gimme Coffee or other local businesses ... I don't think it always has
to be a chain.
Mr. Paladino — We are currently talking to a few local businesses too.
Board Member Conneman — What kind of local.... businesses?
Chairperson Wilcox — He said he ... they were talking to some local businesses.
Board Member Conneman — Who?
Mr. Paladino — That's confidential.
Chairperson Wilcox — No ... no ... I accept that. If I'm a restaurateur or local one
I'm sure I wouldn't want my competitors to know l was negotiating for a site.
Bill, if I could make some general comments.
Dealing with you on the Rite Aid pharmacy, I think the exchange between you
and the company you represent on the Board was you pushed and we pushed
back. That was the experience. And that's the game we play. I thing this Board
made it very clear that we weren't willing" to, for example, grant or even
recommend variances for signage and I don't think this Board, myself included is
prepared to seriously consider variances whether they be side yard variances for
the hotel or recommending variances for having a second drive through
restaurant within 1500 feet of the Burger King. I think the ... this Board has
worked hard to keep the signage down, both on your site and sites in this
neighborhood, whether it's the Burger King across the street or the CFCU credit
union building, the East Hill plaza itself and the restaurant and Courtside and the
new Cornell office building. You would have to put up a pretty good case, at
least to me, to have this board recommend variances. Even side yard variances
for the hotel. I mean my feeling is that you have tried to stuff the biggest hotel
you could into there and my response is ... no, I'm not inclined. Somebody
commented, I think it was the letter we got, that this would be the tallest structure
in the area. I don't think it is as tall as the new Cornell office building, which did
exceed but your pushing the limits and I think
the other members of the Board saying we're
abide by the zoning and you can push to go
I'm no sure that this board would be willing to
variances be granted because we don't grant
the Zoning Board.
PB Minutes Dec. 19, 2006
Pg. 23
I am responding, and I think I hear
going to push back and make you
beyond what the zoning allows but
grant the recommendation that the
variances, we only recommend to
Issues. We can get into the site plan... specifically to the site plan, we still have
the issue of pedestrian circulation from the residents who live west of this facility
on Mitchell Street, walking .up and needing access either to the Rite Aid or to
East Hill Plaza. Unless there is some sort of sidewalk system along Mitchell
Street and Pine Tree Road, we have them, at least for now, walking through the
parking lot. Behind or in front of the proposed Dunkin Donuts and then...l'm
concerned about pedestrian safety. The recommendation has been made that
having a sidewalk run up Mitchell Street and a Pine Tree Road might be the
ultimate solution. I know you looked into potential sidewalk locations with the
bank and you kind of struck out but maybe this time you...
Mr. Paladino — I won't talk to her again ever ... she was absolutely miserable ... I
will never talk to them again. Just impossible to deal with or even speak with.
Chairperson Wilcox — But safety is a concern Just. as it has been in crossing
Pine Tree Road,
Mr. Paladino — I think ... In my mind tl
come down to the right -of -way to the
HSBC lot and the corner house it kind
way and they'd like to get back to the
this property line between us and the
the best of the worst alternatives,
riere are two options to it. Either it does
corner which I know with the size of the
of brings people a little bit more out of the
retail or possibly cutting up between along
HSBC and back into our lot which may be
Chairperson Wilcox — That probably... well...
Mr. Paladino — But still, from that point, you're left out here and you don't have
anywhere to go unless you go to the Rite Aid and cut back across.
Chairperson Wilcox — But it does minimize the amount of distance that would be
traversed across the parking lot. :
This Board will look at landscaping, we will
lighting, you mentioned drainage, of course.
nod of a head over here ... one of the things
traffic tends to occur at times other than wt
roads. So, they tend not to be generators
Which mitigates the traffic impact of hotels.
look at circulation, we will look at
Traffic study will be required but,
we know about hotels is their peak
ien peak traffic is occurring on the
of additional traffic at peak times.
PB Minutes Dec. 19, 2006
Pg. 24
Now, restaurants are another story.
Mr. Paladino - I guess traffic wise, restaurant wise, while we are looking at
particular uses, we're just not looking for ... like I said, I know your feelings on fast
food and being Dunkin Donuts falling into that category. They are primarily 75%
of their business is morning between the hours of 6:30 and 8:30 and that being
said, that is at a peak hour but the drive throughs' are important to them simply
because people do not, as you do with other restaurants, go to work, sit there,
then go out for lunch again and go to a restaurant. People get Dunkin Donuts on
their way to work. Typically that is what they do.
Chairperson Wilcox — I agree with that position of Dunkin Donuts but I don't
agree that that is what we necessarily want here.
Board Member Conneman - I love Dunkin Donuts and my wife would be amazed
that I would say don't put a Dunkin Donuts here. That's not the place for it.
There is already a place for people to pick up things that people want to take to
work and it's not a competition. To me it's an issue that we don't want this to be
a big commercial center. It's a neighborhood commercial and that should be
small.
Mr. Paladino — It's a neighborhood commercial but there's six acres left in your
neighborhood commercial area...
Chairperson Wilcox — You bought the land, you bought the land'..
Board Member Conneman — You said it was going to be small retail.
Mr. Paladino — It is small retail...
Board Member Conneman — You said the first time you came that ...
Mr. Paladino — I agree totally that 4I said that and I agree that that is exactly what
am sticking with right here, too.
Board Member Conneman — And the other thing is this would go up, as Eva said,
this is ridiculous. You leave out...
Mr. Paladino — I gotta go back through the report and talk to the person who did it
and talk to him.
Board Member Conneman — ...and if this fellow who wrote it just happens to be
someone who lived there for a long time or came back, he sure didn't know
anything before he left or when he came back.
PB Minutes Dec. 19, 2006
Pg. 25
Chairperson Wilcox — I'm going to finish up a couple of comments and then let
Eva speak.
For the record, I voted against the Burger King. Circulation, traffic, were my
issues. Specifically the traffic along Pine Tree Road from Route 79 .heading
towards this location. My concern was the narrowness of that part of Pine Tree
Road once you come up the hill from over Route 79, very narrow through there
and there is already a lot of traffic on that section of the road. Especially at peak
hours and my concern. was that the Burger King would add to an already
potentially dangerous situation.
Market study, real briefly. That is an important part of your application. Because
this Board needs to make a determination collectively that there is a need for this
hotel and of this size and in this location. Especially because you have the right
to a 30 room hotel by owning the land, that comes with the land, but .you need a
special permit, special approval ... I'm sorry ... which one ?...special permit in order
to go beyond 30 and .therefore the market study is crucial. It's problematic..: you
know what they are. going to do with the City/Town of Ithaca issue... They're .
going to add the City and the Town together and call that the market area. .1
mean, frankly, that's what they're going to do and your going to have a 50,000
population market that they are going to talk about. That would be the
reasonable thing to do. But you better have...
Board Member Hoffmann — It's not just the numbers, its other things too.
Chairperson Wilcox — I know, I know. But, I can avoid the small technical errors
that really...for example, the ratings. I mean, ratings are subjective whether they
are 1 star, 2 star, 3....1 don't know whether people who have stayed there have
given the ratings. I don't know whether it's AAA, so I don't care about that.
That's just subjective, but this thing better be clean and tightened up and
convince this Board that you need ... that there is a need for an 84 room hotel.
Mr. Paladino — Well, we're going to back to him also...
Chairperson Wilcox - I'm not convinced, and even if I am convinced there's a
need, is there a need to wedge it into this small area.
Board Member Conneman — All I'm saying is that if you come back before this
Board, I expect to have some information on Wingate, the smaller hotels that
Wingate builds and where they are so we can look at some of these if we happen
to be traveling because I think... they're not on the website...they apparently
avoid telling how big they are....
PB Minutes Dec. 19, 2006
Pg. 26
Mr. Paladino — No, I don't think they avoid telling how big they are. I think that
each different market requires ... has different nuances to them. .
Board Member Conneman — Well, if you go to a lot of other hotel websites, they
will tell you exactly how big each hotel is. I can go across the country and tell
you how big they are.
Mr. Paladino — You most likely could. I understand.
Board Member Hoffmann — My general comments about development on this
piece of land is, and I think most people who live in the neighborhoods around
there will say the same thing, some of them did in a letter we got, is that, we
would like to see this land developed and the East Hill Plaza on the other side to
continue to develop and businesses leave like Rite Aid so that there is a variety
of services available. We.have a hotel already in that area, do we need another
one, really, right there? We have a fast food restaurant, do we need another
drive through fast food restaurant? To me, from a planning point of view and
from a neighborhood point of view, there should be a variety of services
available. Maybe that's not good for the businesses because it doesn't create a
competitive situation between them. I know that businesses often gather in one
area and they compete with each other but that's not what's wanted and needed
in this commercial area here.
There was some comments made about pedestrian safety and I wanted to tell
you all about something I saw the other day when I was driving. into that area by
the Rite Aid. A car that was stopped to leave East Hill Plaza at Pine Tree Road
went straight across Pine Tree Road, into the Rite Aid parking lot, drove through
it and went out the second driveway by Mitchell Street. So it essentially used this
as a cut through instead of going out to the corner of Pine Tree and Mitchell
where there's a street light and then going on Mitchell Street. So I was stunned
to see this happening but I am getting concerned that maybe there are drivers
who are going to choose to do this and that of course creates additional
problems for pedestrian safety on this land. But drivers do, sometimes,
unexpected things.
The other thing I wanted to say was that the tree cutting that was done on this
parcel as part of the development so far, went too far. We had. asked, and I.
thought you understood that we wanted to have as many trees and shrubs as
possible saved. When the two houses were taken down.
Mr. Paladino — Which I think ... I feel we did do that. We eliminated a lot of the
brush and cleaned up the whole area. I mean, I couldn't, obviously, sit out there
every day but we did mark a number of trees that we felt were going to stay and I
don't think they went beyond that, as far as I know.
PB Minutes Dec. 19, 2006
Pg. 27
Board. Member Hoffmann — Well, I can tell you, since I live in that area that I saw
some of the trees going down as part of the houses being demolished and taken
away but after that there were additional trees and shrubs taken down and that,
to me, is where it went too far and I can assure you that I'm going to do what I
can; in further applications for this land, to make sure that the language in our
resolutions are as tight as possible so that nothing more can happen like that and
when we agree to approve a plan for you and we see that it is not followed, that
doesn't make us...it doesn't make me look very favorably on the next application
because I've lost a little bit of faith and that's going to make me be very careful
about how we approve, if we approve, of whatever you are proposing. Do you
understand what I am trying to say?
Mr. Paladino — I understand. I don't think though, I mean this is the first I am
hearing about the tree issue. I don't know of any other issues...
Board Member Hoffmann — Well, I haven't had an opportunity to speak to you
before now.
Mr. Paladino — But, I think, you know, in being in construction, I think what's left
out there, our guys did a pretty good job in maintaining as much as they could
out there, given the circumstances out there.
Board Member Hoffmann — There is a stretch along Mitchell Street which is
probably in the middle of that stretch where all the trees where, between the
western most driveway into the parcel and the most easterly driveway that goes
into the bank and your parcel ... In the middle of that, all the shrubbery is gone
and almost all the trees are gone and you have a clear view into the Rite Aid,
which is, I imagine, the reason they were taken down.
Mr. Paladino — No, I don't agree with that...
Board Member Hoffmann — That's what it looks like to me and that's why I am
feeling upset. And the other thing, you know, that happened, we talked about
this the last time we met you weren't here, when this was on the agenda, is that,
at night, when one drives from downtown towards East Hill Plaza on Mitchell
Street, there are lights on the canopy of the HSBC bank which is south of your
Rite Aid parcel, and they are probably there because they are required because
there is an ATM machine there, but they are spotlights that are directed to that
when you drive along Mitchell Street they come right in your eye and they are
very bright and I suspect they've been there all along but because the trees and
shrubbery were cut down, they are now visible and they blind you as you drive
along there. So things like that can happen and I would like to see, very much,
some plantings put back again to prevent that as well as some discussion,
perhaps, between you and the bank, to try to get that light situation straightened
out so the lights don't blind people. They shine enough for the ATM safety but
not in people's eyes.
PB Minutes Dec. 19, 2006
Pg. 28
Mr. Paladino — I don't think I can convince them to do anything over there. Like
said, they are unresponsive to anything we ask them to do. I know with regard to
the Rite Aid there was some concerns with the lighting, with the final lighting that
we had that we have corrected with Jon or that is being corrected if they're not
corrected totally yet.
With regard to some. of the shrubbery, as we talked at our initial meeting, we
were going to remove the majority of the shrubbery on the site and keep the
good trees that we felt were good and I think our guys did a pretty good job of
doing that. Some of the stuff right along where our property line and the right -of-
way, the DOT asked us to remove all of that because of the sight visions. They
wanted to clean up the visions coming out of our driveway looking up towards the
intersection there. So the DOT did require we remove a lot of those trees.
Board Member Hoffmann — Which driveway are you talking about?
Mr. Paladino — Mitchell, as you come up along...
Board Member Hoffman — Which one on Mitchell Street? There are two?
Mr. Paladino — We only have one driveway on Mitchell Street. Oh, the HSBC
driveway you're talking about...
Board Member Hoffmann — The western most one, the one closest to the
cemetery?
Mr. Paladino — The one closest to the cemetery, correct. But that whole length
along there, all the way up to the corner, as far as our property line, they asked
us to remove as much of the shrubbery and trees as possible.
Board Member Conneman — But Bill you could have come back to us and told us
that's what they said. You could have come back to us about the fence and you
didn't do it.
Mr. Paladino — I agree, that's my fault. I am back to you right now about the
fence and we are removing the fence.
Board Member Conneman — but you built the fence and you took down the
shrubbery. We told you what to do and you didn't listen.
Mr. Paladino — Well, it isn't that we didn't listen, I did listen, we did listen. I can't
go out there and count every tree just like you couldn't in the beginning neither,
think my guys did a very good job of maintaining as many trees as they could on
that side. And cleaning up the site.*. I'm hearing here like the site isn't a dramatic
improvement which I feel it is over what it was and we are continually trying to
PB Minutes Dec. 19, 2006
Pg. 29
improve that to put it in a state that compliments the neighborhood, that's good
for the neighborhood but that's also is a nice development on our behalf also.
Chairperson Wilcox - Because I want to move on from this point, it's sufficient to
say that should site plan approval be granted, this Board will require significant
landscaping in that area to replace what was there. I think we can say that.
Board Member Hoffmann — And if you have some letters from DOT about what
they require, please bring it in and show us so we know what they said.
Mr. Paladino — In future things, we will do that, we will bring everything in.
Board Member Hoffmann — For the one they already required
Mr. Paladino — We'll talk to our subcontractor and look for that for you.
Board Member Hoffmann -- because if it is something near the driveway, does
that mean there can be no planting toward Mitchell Street, between Mitchell
Street and the retention pond?
Mr. Paladino — They like low lying plantings, they said, if anything is going to be
replaced there ... low lying plantings or grass is what they like to see closest to the
street.
Board Member Hoffmann — Yes, but did they expressly forbid you to put anything
else in?
Mr. Paladino — No. I said low lying plantings, something that doesn't obstruct the
view.
Chairperson Wilcox — We can move on, we're not going to get anywhere with this
discussion. The floor is still yours if you want to bring up some other items.
Board Member Hoffmann — Those were the items that were the most important
right now.
Board Member Howe — I think I should stress that this is a community
commercial zone so maybe a market study could be done on neighbors to see
what kind of businesses they would like to see in the neighborhood.
Chairperson Wilcox — Yeah, as a positive, he mentioned Applebee's and Chillis
which are two of which we already have in this area but an Applebee ... there is
sort of that Applebee, Ruby Tuesdays, Chillis, TGI Friday's, Olive Garden, ...if
somebody local is unwilling to invest in a 5000ish square foot restaurant, it's a
significant size building, maybe something smaller, on the surface, I would not
have a problem with a restaurant such as that. We have one other fine dining
PB Minutes Dec. 19, 2006
Pg. 30
restaurant in the area, that's not meant to be subjective but simple that we have
Olivia's there and I remember in the mall, back 10, 15 years, we had a steak
house in there for many years...) can't think of its name...What's Your
Beef ... thank you... something like that. So, I'm not opposed to, I'm not sure you
want to call them an upscale chain, but, it's a sit down restaurant, not a drive
through. But again, the devil's in the details as far as parking, drainage, yada
yada ...
Mr. Paladino — That's probably the biggest ... we have talked to people as we
were developing the site and that's the biggest thing was we need a restaurant
up here. Not a fast food but a place that w can bring our families to and sit at
night and bring our families to eat and that was the biggest thing people kept
mentioning to our construction workers. And me just in the. store earlier, the
store manager said it to me.
Board Member Thayer — Olive Garden would be good.
(asides about various. "chain restaurants")
Board Member Hoffmann — My suggestion would be, when you are trying to find
a restaurant, to recognize that there are pretty sophisticated people living in
Ithaca, cosmopolitan people and if we already have, in this area, a restaurant of
a certain kind, its probably not a good idea to get another one.
Mr. Paladino — Well we don't feel that what we are proposing. here is similar to
any other restaurant up there. I mean, I don't see how you can put Dunkin
Donuts in the same classification as Burger King, I don't see that, nor would they,
nor would, probably Burger King.
Mr. Kanter — Can I ask a question about Dunkin Donuts. Are there any Dunkin
Donuts in this country that do not have drive throughs? I think I know the answer
to that but I want to hear your answer.
Mr. Paladino — I have not seen any nor done any myself.
Mr. Kanter — Well, I know there are some and I know that they do locate in places
like downtowns, those types of locations, I think if we told them that Dunkin
Donuts is okay but the drive through isn't okay, they might consider adjusting it to
accommodate a more neighborhood, pedestrian oriented environment.
Mr. Paladino — At this point, they're telling me that without a drive through they
won't do it. So, if it came down to it and it definitely was denied, a drive through,
then it'd be their decision whether they want to at that point or not.
Mr. Kanter — I think, we've always talked about this, but a lot of these corporate
chains have the plan they want to do, they have other plans that they are sort of
PB Minutes Dec. 19, 2006
1. Pg. 31
willing to. consider and then in their back pocket they've got plans that they'll go
to if they can't do anything else.
Board Member Conneman — That goes with signs also. Big signs, medium
signs, little sign ... that's what Burger King ... The reason Burger King was
approved, was that they had front lawn, Eva insisted upon trees, they ... we
promised them there would be no other drive through restaurants in there and
they had a little sign. They went to corporate and got a little sign. They
conceded .on a lot of things.
Mr. Kanter — And in back of the building instead of the front.
Board Member Thayer -Let's see if the public has anything different.
Chairperson Wilcox — I want to make one more comment about, Bill, as you
know, there is a lot of correspondence between you and Jon over the past couple
of months and you are certainly aware of the fact that I was copied on much of
that...So I am aware of the issues that went back and forth, whether it's the
crossing over Pine Tree Road, which I. believe is still not resolved yet, it was the
installation of lighting which was not consistent... again, from dealing with you
before ... were you pushing the issue or was it a mistake that was just made...)
don't know. Someone brought up to me that one of the delays that you
experienced was a problem with the sprinkler system in the Rite Aid building.
Now I don't know how you . resolved the problem, but that makes me wonder if
there might have been pressure problems in the Rite Aid, might we have
pressure problems in the hotel.
Mr. Paladino — No. Dan Walker, as I said earlier, has assured me once this
problem is corrected, that they are working on right now, that the problem will go
away. We will have no problems with any development we should elect to do on
the site.
Mr. Walker — The problem is the pipe between Pine Tree Road tank and East Hill
Plaza area is too small. It's a 6" water main for about 3000 feet. To correct that
problem, and that was a problem when the Cornell Office Building at East Hill
recognized because that is a taller building, they knew there was not adequate
water pressure for fire flow and we have had inadequate pressure for fire flow in
the East hill Plaza for years. What we have done ... weIve installed :a new valve
or a new control on the valve that connects the transmission main from Bolton
Point to the distribution area. Currently that valve is controlled by the tank level
at Pine Tree Road. We have installed a controller on that valve that will sense
the pressure and flow in that distribution zone and when there is a demand, a
high demand, it will open that valve up to allow additional flow to come in from
the transmission main. That bell's in place. What we are waiting for is the new
East Hill tank, which we built this past year, to come on -line, it isn't on-line yet
because Bolton Point's in the process of installing new pumps.:.it's above
PB Minutes Dec. 19, 2006
Pg. 32
Hungerford Hill-Road, on the Snyder Hill Road side.. not Snyder Hill, Ellis Hollow
Road side of the Bakerhill complex. So, once that tank is full and in operation,
which should happen in the next 2 -3 months depending on how everything
works, we will have adequate pressure to satisfy the demands, currently, for the
East Hill Plaza, for the Cornell office building and for the Rite Aida After
everything is in place, we will do flow tests for the actual conditions and we'll
provide that information in to any individual who wants to build a building in that
area.
The problem with the Rite Aid was the pressure wasn't ready when they were
ready for a building permit, or for a Certificate of Occupancy and there was no
guarantee on our part when that was going to happen. They could've designed
the system to work with the existing pressures but they didn't. They used a
better performance and we worked out those issues at this point. I am assuming
that within 3 months we will be fully on -line and have everything automatic. Right
now, 75% of the time there will be adequate pressure in that area for fire flow but
we will not be opening or giving a certificate of occupancy to the Cornell office
building until everything is in place. In fact, they're paying the costs for the
upgrades to the valve which is not very much, but they are paying that. To us.
So, will I guarantee that we will have adequate pressure for a three story hotel,
not at this point, till I see the calculations, but will the water pressure probably be
adequate for a design they can do? ... probably.
Chairperson Wilcox — So that's something we'll have to...
Mr.
Walker
— Right.
By
the time this thing
gets ... comes back to you, we should
be
in place
and we'll
do
flow tests and have
that done.
Chairperson Wilcox — Should we give the patient public a chance to ... Bill, is
there anything you would like to say? We'll give you a chance later to talk if you
want.
Ladies and Gentlemen, thank you for being patient. In no particular order, if you
will raise your hand, you know the drill ... We'll ask you to come, give us your
name and address and we'll hear what you have to say.
JoAnne Tredco, 310 Elmwood Avenue .
am a member of the Belle Sherman /Bryant Park Civic Association and actually
Vice President of it. You received a letter from us. We are 100 members strong,
we have 120 plus people on our list -serve and this has been actively talked
about, this project on that. I just want to thank you for your time tonight.
This is a, as you well know, Bryant Park is the closest residential area to the East
Hill Plaza area and its full of families and all sorts. They are key patrons of the
East Hill Plaza strip. Actually, I bank at CFCU, I just went shopping yesterday at
the P &C, I picked up a prescription at Rite Aid, I am a member of Courtside so
PB Minutes. Dec. 19, 2006
Pg. 33
am kind of your ideal patron of that area and I am sure I represent a lot of people
there. But, I think you're ... you know, we are a nice group of neighbors. We are.
beginning to feel a little bit ringed or ensieged by 79 coming down and the
commercial zone that is being proposed as well as College Town and Cornell's
development which is that office park. The neighbors are beginning to be
worried about kind of what is the tipping point. How much stress can we take in
that area? It's a neighborhood strip mall area and it's perceived as a
neighborhood strip mall. I ride my bike sometimes up there, I send my daughter
up by bike and you know, people want to feel like it is a neighborhood accessible
commercial zone not out of scale or character. Anyway, this development was a
concern of many of the members of our group. Each had their own separate
concerns and they.will be likely sending in separate notes regarding that. But,
just wanted to raised a couple of considerations. One, some have voiced a
concern over the increased commercialization of the area that is out of scale with
the neighborhood, a number of members of the Board commented on that.
Some have also said they are concerned about what's behind East Hill Plaza, the
new development by Cornell, that off -site office building and all the feeder roads
that are going to be ... that tie into that development and how much more traffic is
going to be there. So some people may be writing in, concerned about that.
There's a great deal of concern about pedestrian safety. Being a biker, I am
concerned about bike safety in that area. There's no sidewalks right now going
up and down right in front of Rite Aid going down into the Belle Sherman /Bryant
Park area. There's a great deal of children, as you well know, with the Belle
Sherman School that walk and their parent's walk and there' s that at that Dryden
Road and Mitchell Road..,
Chairperson Wilcox — Don't say Mitchell Road ... we just chastised him for saying
Mitchell Road ... (laughter)
Ms. Tredco — Yeah, there's all
chaotic, you know, and I think a
walking there. And I guess there
yet another fast food restaurant.
a number of people said where a
eat there. There's nothing in that
those roads that come in together and that's
lot of parents are concerned with their children
will be some. people writing in concerned about
There is really a need for a proper ... you know,
re the proper family sit down you can afford it to
area up in East Hill Plaza.
So I guess that's about it ... I just hope that the Board will give enough time...lt
sounds like you're debating it ... 1. didn't know how that was going to happen but
this is right around the holidays, a lot of people have gone away for the vacation
time period and I hope you will be able to allow enough time for them to provide
you with their input.
Chairperson Wilcox — Before you leave, ... Is your neighborhood association on
the mailing list? Do you get notice about our agendas?
PB Minutes Dec. 19, 2006
Pg. 34
Ms. Tredco — I asked to be. When we found out about this I contacted... There
was a woman at the Planning Department... Sandy... it was Sandy... I asked to
get those e- mails.
Chairperson Wilcox — I would encourage your members to write but to also show
up at Public Hearings, its fine if they live in the City it doesn't give them rights,
nor more rights. .
A little bit about how we will proceed. The applicant is going to take.. 'We have 3
drawings and a market study. The Applicant has come before us to really get our
feel for this proposal. They will take our feedback and they will come back with
the drawings, the studies and plans necessary for us to consider it formally.
When they come back is up to them. Whether it's in a month or whether its in 2
or 3 months, we don't know but they have some work to do before they have
sufficient materials and they may revise what they are proposing based upon the
feedback tonight. And when they come back .... then they'll come back ... Since
you were here earlier, you know what the procedure is, we'll do the
environmental review and then if we get through that, we will actually get to the
sketch plan. So this is really just the first phase where we hear from the
developer and they hear from us. So no approvals will be done tonight, this is
just a here's what you want to do and here's the feedback back and forth.
Mr. Kanter — If we are talking about process, it would
recommended that since there were so many comments
liking what you saw in this sketch plan, that the applicant pr
back with a revised sketch plan before they spend a whole
going into detail preliminary drawing. So I think the
proceeding, most likely, on an informal basis on that regard.
probably be highly
by the Board at not
'obably want to come
lot of time and effort
process will still be
Chairperson Wilcox - It gets formal if you see on the agenda "Public Hearing ".
Then you know that we have gotten to the formal stage, but while. it says sketch
plan....
Ms. Tredco — One thing ... I'm ... I also was hoping to say and I just
remembered ... I would urge the developer to talk to the neighbors, .our
Neighborhood Association to figure out what are the needs and wants of the
residents. Obviously I use a lot of the stores in that neighborhood, or in that strip
mall, I can see needs and I am sure my neighbors can as well. You know, he
should be checking. in with us and see what we see the need in terms of
development or stores and I hope he does...
Chairperson Wilcox — Well he can do that if he chooses to. He can come here to
this public forum and hear it, yes. The other thing I want to make clear is that as
the owner of the land, he has with it the right to develop consistent with the
zoning. I think I mentioned before that the zoning allows for a 30 -room hotel.
Assuming that he meets all the other zoning requirements, that is a right he owns
PB Minutes Dec. 19, 2006
Pg. 35
with the land and this Board can not simply turn him down because we don't
want a 30 -room hotel there. He has that right and we all need to remember that.
What he doesn't have a right for is a 84 -room hotel and he doesn't have the right
to have side yard setbacks that are less than the zoning requires. So, we have
some discretion but very often people give us ... think we have more discretion
than we really have. We must abide by the zoning ordinances that...
Ms. Brock — Well, Fred, he does have a right to a hotel larger than 30 -rooms if
this Board gives him a special permit and to do that then the Board would have to
make. the findings that all the criteria in section 270 — 200 ....
Chairperson Wilcox — Right, it's not a right that comes with the land.
Ms. Brock — No, no. But it's not a use that's prohibited either. It's a use that's
allowed by special permit and the Board has to follow the special permit approval
process and make findings as required by the code to issue the permit.
Chairperson Wilcox — And that's where the need comes in.
Ms. Brock — Yes, yes. That's part of the considerations for approval of a special
permit. .
Board Member Hoffmann — I would like to add to you also, and to everybody
else, that it's most useful both for us on the Board as well as for the developer,
for everybody really, when people find out what we are talking about and come in
early in the process and tell us what they think about it and the people who live in
the neighborhood have very good things to say. They know what the traffic is
like, they know all kinds of things that maybe some of us on the Board don't know
if we don't live in the neighborhood. So its really important that people come in
and early on. Because later on, when perhaps it's reported in the newspapers,
on the radio that the final approval is going to happen, it's a bit late.
Ms. Tredco — Well, I hope we are in adequate time for our comments tonight.
Vivien Lorenzo, 21.7 Cornell Street
am a member of the zoning committee of the Bryant Park Civic Association. I
feel that this is the wrong location for this type of development and I would feel
very uncomfortable having any variances granted for it. A large hotel and drive
through restaurant are kind of by their nature traffic generating businesses and
I'm concerned that the majority of this traffic would be coming up from downtown
and using Mitchell Street, which would mean it would be passing within a few feet
of the front door of the Belle Sherman Elementary School. This school has
approximately 250 children ages 4 -10 attending it, many of whom walk to school
and it has already been recognized in the recent facilities bond discussions with
the Ithaca City School district that really the location and the entrance are already
very dangerous and the corner at Cornell and Mitchell Streets already has lots
PB Minutes Dec. 19, 2006
Pg. 36
and lots of children walking through it on their way to and from school and to the
playground and that corner also has been recognized as being dangerous and
think this would significantly increase the traffic. The school start time right now
is 8:00 a.m which I think would be prime time that people would be driving up to
the Dunkin Donuts.
I think this neighborhood in general is a pedestrian oriented neighborhood. Many
of the people have chosen to live there so they are able to walk to work. Walk to
College Town, walk to down town and I think that development up in the East Hill
Plaza should be more suited to neighborhood type businesses. Thank you.
Alfonse Pieper, 139 Ithaca Road
Just ... A lot of the things that have been addressed and commented on are ones
that I've had so I am going to try and talk about things that haven't been brought
UPS
First of all, I would like to thank the Board members for seriously considering the
concerns ... I live in the City of Ithaca, not the Town ... Our neighborhood as well
as your own neighborhood on Ellis Hollow and I appreciate that, and seeing that.
In some of the various correspondence, we mentioned the list serve and so forth,
I think the general underlying feeling is that we all understand that if the
development is proposed and is within the current, existing zoning requirements,
we understand that and we really don't have any objections to something that
meets the legal requirements that's set for that piece of property. But we do
have, as. Vivien said, when there's variances being granted and so forth. One
thing that I wanted to know, Chair, you sort of touched about the procedural thing
and I have a question... The next time around, when the applicant comes and
you look at the environmental review, is that when you'll do your scoping for the
SEQR? Or for the environmental of is that done, has that been done with the
first phase of this site?
Chairperson Wilcox — Scoping is a process that you go through should a full
environmental assessment be required... well, impact statement, thank you. ..I am
hard pressed to believe that the size of this development would require such a
detailed environmental review. I'm not precluding it, but I am hard pressed to
think.
Mr. Pieper — I guess, one of the things then, I don't know where you kind of figure
it out. This is just one project. I know that Cornell has just put up a building and
so forth and it really ... I guess I am going to address some other issues sort of
everybody's been talking about the interaction between Mitchell Street coming up
from Bryant Park neighborhood, but I think ... Let's say this hotel development...)
would imagine one of its clients is going to be Cornell and with the new Cornell
buildings that coming down to the intersection, the 4 -way stop intersection there,
there are no sidewalks there and there's a lot of traffic and it's a very...that also
PB Minutes Dec. 19, 2006
Pg. 37
is a highly trafficked area and very dangerous and any traffic generated is going
to have an impact on that intersection and also some other intersections. I know
there's traffic studies going on and so forth but for me, actually driving in and out
of the mall. When I leave P &C, I no longer can turn left.. Like you mentioned the
person going across the street ... You no longer can turn left there at various
times of the day. You have to turn right because you are never going to get out
of there and that's ... you know ... I guess I am going to reiterate, when you talk to
the neighborhood, you find out the nuances of actually how it is there. It's very
easy to develop a plan. based on the criteria ... I have. been a professional
engineer before, I know the guidelines we go under, but sometimes we miss the
nuances of the traffic and how people actually move about the neighborhood.
There has also been talk about scale to the neighborhood and I think we've sort
of been referring to the scale to our neighborhood in Bryant Park but there is also
the scale to the existing commercial neighborhood and that's the strip mall is one
story, the existing hotel is one, pretty much one story, the housing behind that is
two stories ... I actually believe that 3 stories of Cornell's office building there is a
little out of scale of it.. It's a little, it has, to me, a very corporate, silicone valley
type of block to it. So I think that I am going to ask that when you start to look at
these things, that you look at both scales, not just the neighborhood but also the
scale of the commercial.
The other thing that I was going to mention was that.. 'along the same line of
formulas, it's very easy to get a formula. Like right now you see pharmacy
formulas. Right now you'll get one and then across the intersection you're gonna
get another pharmacy. I have a store in Cortland and you can see Walgreen and
then ... it's not Rite Aid but another one and it is becoming very .... It's a
programmatic type of formula and I'd like to say ... this is. more to the
developer... Ithaca is unique, its really working, you see a lot of talk about
sustainability, pedestrian community trying .to do that and I think you can come
with a development that is out of the programmatic box and look at things. It's
been awhile, but I went through Saratoga Springs and driving through there, they
had, I want to say a book seller, like a Barnes & Noble or a Borders into an
existing commercial block. So those things are changed. I know one time I was
traveling and a McDonalds was in a historic building and they actually had a sign
made typical to the other sign. So there are examples you can find where what
you think of your development, large development that will put the same type of
building across the country, they do make changes and I would ask that the
developer, when he is looking at his aesthetic design of it, that maybe he gives a
little consideration to something a little different. Like instead of a three story flat
roof that maybe the third story is in a gable, just a little out of the box. And
would also say that our neighborhood is a big asset because we are a walking
community and could be very consistent participant with the retailers with what
he's developing. And again, I'll say, everybody has mentioned the kind of
restaurant... We would love a family restaurant that is affordable for families
versus a drive through. I think that is more than enough, for me to say.
PB Minutes Dec. 19, 2006
Pg. 38
Hollis Erb, 118 Snyder Hill Road,
First of all, I am very pleased to hear that the applicant will pull the chain -link
fence. I know that that is the previous item of business but I think that the
applicant should be applauded for simply withdrawing that.
I also like to mention that I think that the small retaining barrier that has been built
along the cemetery most side of that. driveway is actually an attractive little
feature and I would like to congratulate the applicant on that feature.
I think that the scale of this hotel is completely out of anything that is appropriate
for this location and. for our neighborhood. I appreciate the Board members who
have spoken in terms of looking for variety to serve the neighborhood rather than
competing sorts of same types of businesses. Everybody has talked about a
family style restaurant and that would certainly be something that would be
attractive to have. I am a little ... I find myself amazed when I look at the parking
spaces allotted right next to the 52,000 square foot location when I think back to
how hard Burger King fought to keep the dozens and dozens of parking spaces
that it had for its.drive through restaurant. But that's besides the point, perhaps,
now. I think that the scale of this hotel is so ludicrous that it has resulted in
putting the storage and garbage across the parking lot next to the Rite Aid. I
mean, that already says something about how badly configured this whole
process is. I would like to see storage buildings and garbage dumpsters behind
the building out of any sight and instead of a massive swath of concrete, if that's
not going to be small retail buildings, I'd like to see some better types of
landscaping than just a little bit, because we have to, at the ends of the long,
couple dozen lines of parking spaces.
When we start discussing more seriously pedestrian traffic, I'd remind everybody
that pedestrians are probably going to take the shortest route unless the other
route is made extraordinarily attractive and I can almost bet that no one is going
to go all the way up the intersection and swing around the existing old house for
a sidewalk. So there is going to have to be a sidewalk put through some place
here. But even trying to separate the sidewalk from this driveway, I think, is
going to risk having a lot of pedestrian traffic still go:up the.driveway or down the
driveway, because its simply the shortest route and its going to be very hard to
avoid that.
I'm confident that you will also think in terms of light and signs and the
composition of the materials on the sidewalls of any of these structures. But I'll
be back and listen to you doing that. The whole ... My best understanding is that
the whole regulation against an additional drive through restaurant within 1,500
feet was explicitly in reaction to the Burger King and assurances to the
neighborhood, and to additional neighborhoods within our town. And to violate
that new assurance on almost the first possible occasion is just breaking faith
with the neighborhood and what I'd like to preserve still as neighborhoods. We
PB Minutes Dec. 19, 2006
Pg. 39
will lose the charm and the character that brought many of us into Ithaca and
kept us in Ithaca.
I also notice that there is nothing built -in in terms of bicycle traffic or bicycle
parking. I just mention that because nobody else has.
I urge you not to grant the kinds of massive, I think, massive variances that are
now being proposed and I look forward to seeing a revised site plan so that we
can work together with those. Thank you very much.
Chairperson Wilcox — Anybody else? I
mention the location of the dumpster
indication of how they have managec
relocated those facilities some ... 100
definitely inappropriate.
want to mention that we had forgotten to
and the storage shed...That's another
to squeeze this building in there and
feet away from the building, which is
Bill Paladino — Response
Just want to get the Boards impression as to the look of the building.
Chairperson Wilcox — This Board generally has worked with developers, whether
it's a large apartment buildings or commercial buildings, to try and make sure that
we don't have these large masses. We want architectural details, whether that's
pitched roofs, whether that colors, whether that's a building face that has different
depths, if you will, away from the viewer ... That sort of thing that breaks up the
mass.
Mr. Paladino — Which we have done on here. The majority of the areas. I mean,
this is a different color. Our plank, our hardy lank is what the majority of the
building is built out of. This area here are butted out from the front. This area
here is brick, around here. A different block around the bottom, there. Gabled
roofs...
Chairperson Wilcox — You know the Country Inn & Suites that's being built up on
South Hill, it's one of the saving graces of their design is the architectural details
that they've put on the outside of their building. You know, unlike the Holiday Inn
Express and the people like that which tend to build very large, blocky looking
structures and we struggled mightily with that particular hotel before eventually
approving a smaller one, but, they do have a lot of gabled roofs and things like
that that provide some attractiveness to a very large building. The more you can
provide, the better.
Mr. Paladino — Understood.
Chairperson Wilcox = And color and variations.. 'whether it's the volor around the
windows or the changes in colors for floors or something that breaks up that
huge mass.
PB Minutes Dec. 19, 2006
Pg. 40
Board Member Howe -. But I am sort of surprised that that is your first question.
because I hope you heard that there is just a lot of concerns about the. whole
what we see here right now so in some ways, the look of the building is really a
? ? ?? issue right now.
Board Member Hoffmann — I was just going to say something similar. It's just
way, way too big the way this drawing is so I simply can not react to the way it
looks because it is so huge.
Chairperson Wilcox — Does anybody not expect that this developer will come
back exactly what he has proposed and ask us to approve it!
Board Member George Conneman — I don't know but I'm not sure he listens. We
said its too big B.I.G.
Chairperson Wilcox — Bill knows how to push, and we'll push back if necessary
but don't be surprised if that's what he comes back with.
Board Member Conneman - If that's what he comes back with, then we'll take
care of it.
Chairperson Wilcox — Then we'll do our job.
Board Member Conneman — I think that several people here indicated that we
should give him no variances. Why bother zoning. This is a neighborhood, Bill.
Do you know how to spell neighborhood? Look at West Chester and Saratoga
Springs, not Buffalo and think.
Mr. Paladino — I look at a lot of different neighborhoods, George.
Board Member Conneman — Okay, well look at those because that's more like
Ithaca. I don't think you listen very well.
Mr. Paladino — I do listen very well.
Board Member Conneman — well, Okay.
Board Member Hoffmann — I have another comment about the number of parking
spaces and I actually wanted to ask Staff about that. Sixty -six spots for Rite Aid,
which is there already, 84 spaces for the hotel and then 106 spaces for the other
two buildings and when I look at the footprints for them on this proposed plan,
they are fairly small and one of them is a drive- through so is there really a need
for 106 spaces for those two?
PB Minutes Dec. 19, 2006
Pg. 41
Mr. Kanter — Well, I don't know. We have not really our usual analysis yet
because I am suspecting that this is going to be a different plan from what we
see here. But, for instance, we did get comments from the Environmental
Review Committee and the Conservation Board that they felt that there is way
too much paved area and probably too much coverage of the site. I mean, that
actually may be something we have to look at. There is what the zoning calls a
"minimum useable open space requirement" of 30% of the site area and we
haven't even begun to look at calculations to see whether this approaches .that.
That's something that we will have to do as well. Parking is part of that issue,
coverage of the site is all involved in that.
Board Member Hoffmann — Well, maybe that's something to remind you, Mr.
Paladino, about, that there is this requirement for a certain percentage of open
space.
Mr. Paladino — I understand there is
Mr. Kanter — And the Environmental Review Committee was very concerned
about the total impervious surfaces on the site and were suggesting using other
types of surfacing if it comes to that.
Board Member Hoffmann — Yeah, I saw that and I think that's an excellent idea. I
think the coverage, in general, is too much.
Board Member Thayer — I think the comment about coming back with a.sketch
plan again would be appropriate.
Chairperson Wilcox — If Bill decides to come back with the same thing, or
essentially the same thing, then he's going to invest the time and the money to
do the engineering drawings, to do the traffic study and I don't know what you'll
do, whether you'll accept it or not, I'm not going to prejudge what the Staff:will do
but, if they accept it and it comes to this Board, we'll make our determination. I
think we've been very clear about what we're going to do but that does not
prevent Mr. Paladino and the company he represents from nonetheless coming
that way.
If you are going to make significant changes, based upon the input you've
received from this Board, then maybe having you make the long drive again and
going through sketch plan review might be a reasonable thing to think
about.. depending upon how much you change in response to what you heard.
tonight.
Board Member Conneman — The traffic study should include the new Cornell
building too.
Mr. Paladino — I think our last traffic study included that, actually.
PB Minutes Dec. 19, 2006
Pg. 42
Mr. Kanter — Remember, there was a :.. there were two traffic studies recently in
the area. One was more of the Cornell project, and the other was for the Rite Aid
site incorporating future development to the extent they could. What would have
to be done now is a fine tuning of those two traffic studies to address what
specifically is being proposed on that site in Phase II.
Mr. Paladino And our engineers :did consult with ... The engineers for both
projects did consult with one another before so I see no reason they couldn't do
that again.
Board Member Conneman — Market study.
Chairperson Wilcox — He heard our comments before and he understands the
importance of the market study.
Board Member Thayer — He also has to convince four out of five instead of four
out of seven.
Chairperson Wilcox — Interesting point. We will ... we have a member whose term
is up at the end of the year who has decided not to serve on this Board next year.
So, until we replace that member we are a six - member Board, you know that we
have one person who has recused himself, so until that position is filled, you
gotta get 4 out of 6. Excuse me, you have to get 4 out of 5. So you understand
the hurdle. Anything else you want besides the feedback on the architect..
Mr. Paladino — All set.
Mr. Kanter — Susan was reminding ... We did talk about things like fire access at
the last meeting but it probably would make sense to repeat that.
Chairperson Wilcox — Yeah, we should just mention that someone brought up, I
think it was two ago when you were unable to make. it ... Fire access to the rear
isn't there and that, when you talk to the Fire Chief here, he may tell you that this
is unacceptable because they can't get to the rear of the building.
Mr. Paladino — He told us that as long as the hose can get within ... the hose can
reach 300 feet from where a truck can be stationed.
Chairperson Wilcox — He puts that in writing, then you'll bring it but...
Mr. Walker — Bill, I think really, you better look at you topography. Because there
is probably a 15foot grade drop from the north end to the south end as I look at it
today and that would put.. .if you put that in so your entrance was at the existing
grade, you'd only have a one story building on the north side ... which may not be
a bad thing. Even if you excavated it and had retaining walls, you would not.
PB Minutes Dec. 19, 2006
Pg. 43
have, even if you could get the variance to be only 30feet away, there would not
be adequate space for the fire department to get around that building. They
would ... unless an access way was built up on the west side of the. retaining
pond.
Board Member Hoffmann — I have a question, actually about that slope, both to
you Dan, and to Mr. Paladino ... Was that slope there before, when it was Ide's
Bowling Lanes property or was that slope created with fill?
Mr. Walker — There was some fill put in there I think, but not too much because
there are still trees above the pond. The old house that sat back up in
there...there was some fill put in there when they tore the house down but
basically that ... I don't think that's changed very much. What has changed is
there's a bigger, higher pile of fill in the parking area. The area that used to be
the parking area, that was excess material that they have spread in there so that
is kind of more level than it used to be looking at it from the Rite Aid side..
Mr. Kanter — Can I just mention that in terms of the grading and the architecture,
putting those two together, an elevation your on like that isn't really very helpful
when it makes it look like a totally flat site when. you are actually dealing with
changes in the topography and how the building is going to fit in the topography
so you really want to show, when we get to that point, if we get to that point, you
want to show something more like a cross section drawing that shows, really,
how the building fits in with the site.
Mr. Paladino — We will.
Chairperson Wilcox — Anything else? Bill do you need anything else.
Mr. Paladino — Appreciate all of your comments.
Chairperson Wilcox — Ladies and Gentlemen, stay tuned. Thank you all very
much.
Consideration of Approval of 2007 Planning Board Meeting Schedule.
Chairperson Wilcox — I move the proposed new schedule for next year as
drafted, seconded by Board Member Thayer... Discussion?
Board Member Thayer — January 2nd all
Chairperson Wilcox — Do you want to meet on January 2"d?
Board Member Hoffmann — I notice that Passover is on the 3rd of April, which is a
meeting day.
PB Minutes Dec. 19, 2006
Pg. 44
Chairperson Wilcox — It doesn't seem to impact this Board.
Ms. Brock — It might affect the public. People who want to come and comment.
Board Member Hoffmann — And the other is Election Day
Mr: Kanter — We always talk about but...
Board Member Talty — All I know is that I juggle a lot of balls everyday and if its
really important, people can show up.
ADOPTED RESOLUTION:
PB RESOLUTION NO. 2006 =124
Town of Ithaca Planning Board
Schedule of Meetings - -- 2007
Planning Board Meeting
December 19, 2006
MOTION made by Chairperson Fred Wilcox, seconded by Board Member Larry
Thayer.
RESOLVED, that the Town of Ithaca Planning . Board adopt and hereby does
adopt the following as its schedule of Regular Meetings for the Year 2007.
Unless otherwise notified, all meetings will be held on the first and third
Tuesday of each month, commencing at 7:00 p.m. and ending by 10:00 p.m.
FIRST MEETING OF THE MONTH SECOND MEETING OF THE MONTH
January 2, 2007 January 16, 2007
February 6, 2007 February 20, 2007
March 6, 2007 March 20, 2007
April 3, 2007
May 1, 2007
June 5, 2007
July 3, 2007
August 7, 2007
September 4, 2007
October 2, 2007
April 17, 2007
May 15, 2007
June 19, 2007
July 17, 2007
August 21, 2007
September 18, 2007
October 16, 2007
November 6, 2007
December 4, 2007
PB Minutes Dec. 19, 2006
Pg. 45
November, 20, 2007
December 18, 2007
A vote on the motion resulted as follows:
AYES: Wilcox, Hoffmann, Conneman, Thayer, Howe, and Talty
NAYS: None.
The Motion was carried unanimously.
Consideration of . Recommendation to the Town Board Regarding-
Chairperson of the Planning Board for 2007.
ADOPTED RESOLUTION
PB RESOLUTION NO. 2006 =125
2007 Planning Board Chair
Recommendation To Town Board
Planning Board, December 19, 2006
MOTION made by Board Member Hoffmann, seconded by Board Member Larry
Thayer.
RESOLVED, that the Town of Ithaca Planning Board recommends to the Town
Board that Fred Wilcox, III, be appointed as Chair of the Planning Board for the
year 2007.
A vote on the motion resulted as follows:
AYES: Hoffmann, Conneman, Thayer, Howe, and Talty.
NAYS: None.
ABSTENTIONS: Wilcox
The Motion was carried unanimously.
Approval of Minutes: December 5,20060
ADOPTED RESOLUTION: PB RESOLUTION NO. 2006 =126
APPROVAL OF MINUTES:
DECEMBER 5, 2006
TOWN OF ITHACA PLANNING BOARD
DECEMBER 19, 2006
MOTION by Chairperson Wilcox, seconded by Board Member Hoffmann.
PB Minutes Dec. 19, 2006
Pg. 46
RESOLVED, that the Planning Board does hereby approve and adopts the
December 5, 2006 minutes as the official minutes of the Town of Ithaca Planning
Board for the said meeting with corrections.
The vote on the motion resulted as follows:
AYES: Wilcox, Conneman, Thayer, Howe and Talty.
NAYS: None.
ABSTENTIONS: Hoffmann
The vote on the motion was carried.
Other Business
Discussion regarding Agendas for January 2nd and 16th meetings.
Discussion regarding the lights up around Triphammer Road,
Meeting Adjourned
Chairperson Wilcox adjourned the meeting at 9:30 p.m.
Res a tful ubmitt ,
Paulette Neilsen
Deputy Town Clerk
TOWN OF ITHACA PLANNING BOARD
215 North Tioga Street
Ithaca, New York 14850
Tuesday, December 19, 2006
AGENDA
:00 P.M.. Persons to be heard (no more than five minutes).
:05 P.M. SEQR Determination: Engman / Westmont 2 -Lot Subdivision, 206 Forest Home Drive and 120 Warren Road.
:05 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Subdivision approval for the proposed 2 -lot
subdivision (lot line modification) located at 206 Forest Home Drive and 120 Warren Road, Town of Ithaca Tax
Parcel No.'s 66 -2 -2 and 66 -2 -4, Medium Density Residential Zone. The proposal involves subdividing a. +/- 1,000
square foot strip of land from the eastern edge of 206 Forest Home Drive, which will then be consolidated with 120
Warren Road. Westmont Family Trust and Herbert J. Engman, Owners /Applicants.
':10 P.M. SEQR Determination: Ithaca Community Childcare Center Additions & Renovation, 579 Warren Road.
U0 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Site Plan Approval and Special Permit for the
proposed additions and renovations at the Ithaca Community Childcare Center located at 579 Warren Road, Town of
Ithaca Tax Parcel No. 73- 1 -1.4, Medium Density Residential Zone. The proposal includes the construction of two
additions totaling +/- 5,910 gross square feet, interior renovations to the existing building, a new canopy leading to
the main entrance, and new landscaping, sidewalks, and lighting. Ithaca Community Childcare Center,
Owner /Applicant; Peter J. Trowbridge, Trowbridge & Wolf, LLP, Agent,
7:25 P.M. SEQR Determination: Rite Aid Pharmacy Fence, Pine Tree Road & Mitchell Street.
7:25 P.M. PUBLIC HEARING: Consideration of Preliminary and Final Site Plan approval for a modification to the Rite Aid
Pharmacy development located at 330 Pine Tree Road, Town of Ithaca Tax Parcel No.'s 62- 1 -3.2, 62- 1 -2.2, and 62-
1-1, Community Commercial Zone. The requested modification includes permitting the installed 6 -foot high chain
link fence around the storm drainage pond to remain. The installed fence does not conform with the site plan
approved by the Planning Board on December 6, 2005, which did not show any fence in this location. 1093 Group,
LLC, Owner /Applicant; William A. Paladino, Agent.
7:40 P.M. Consideration of a Sketch Plan review for a proposed hotel and two restaurant / retail buildings as part of the Phase
II Development of the former Judd Falls Plaza located off Pine Tree Road and Mitchell Street, Town of Ithaca Tax
Parcel No.'s 62- 1 -3.2, 62- 1 -2.2, and 62 -1 -1, Community Commercial Zone. The proposal includes a three -story, +/-
60,507 square foot hotel containing approximately 84 rooms and two restaurant / retail buildings totaling +/- 7,900
square feet. The proposal will also include improvements to the parking area along with new walkways and
landscaping. 1093 Group, LLC, Owner /Applicant; William A. Paladino, Agent.
9. Consideration of Approval of 2007 Planning Board Meeting Schedule,
10. Consideration of Recommendation to the Town Board Regarding Chairperson of the Planning Board for 2007.
11. Persons to be heard (continued from beginning of meeting if necessary).
12. Approval of Minutes: December 5, 2006,
13. Other Business:
14, Adjournment.
Jonathan Kanter, AICP
Director of Planning
273 -1747
NOTE: IF ANY MEMBER OF THE PLANNING BOARD IS UNABLE TO ATTEND, PLEASE NOTIFY
SANDY POLCE AT 273 -17470
(A quorum of four (4) members is necessary to conduct Planning Board business.)
TOWN OF ITHACA PLANNING BOARD
NOTICE OF PUBLIC HEARINGS
Tuesday, December 19, 2006
By direction of the Chairperson of the Planning Board, NOTICE IS HEREBY GIVEN that Public Hearings
will. be held by the Planning Board of the Town of Ithaca on Tuesday, December 19, 2006, at 215 North
Tioga Street, Ithaca, N.Y., at the following times and on the following matters:
7:05 P.M. Consideration of Preliminary and Final Subdivision approval for the proposed 2 -lot
I ubdivision (lot line modification) located at 206 Forest Home Drive and 120 Warren
Road, Town of Ithaca Tax Parcel No.'s 66 -2 -2 and 66 -2 -4, Medium Density Residential
Zone. The proposal involves subdividing a +/- 1,000 square foot strip of land from the
eastern edge of 206 Forest Home .Drive, which will then be consolidated with 120
Warren Road. Westmont Family Trust and Herbert J. Engman, Owners /Applicants.
7:10 P.M. Consideration of Preliminary and Final Site Plan Approval and Special Permit for the
proposed additions and renovations at the Ithaca Community Childcare Center located at
579 Warren Road, Town of Ithaca Tax Parcel No. 73- 1 -1.4, Medium Density Residential
Zone. The proposal includes the construction of two additions totaling +/- 5,910 gross
square feet, interior renovations to the existing building, a new canopy leading to the.
main entrance, and new landscaping, sidewalks, and lighting. Ithaca Community
Childcare Center, Owner /Applicant; Peter J. Trowbridge, Trowbridge & Wolf, LLP,
Agent.
7:25 P.M. .Consideration of Preliminary and Final Site Plan approval for a modification to the Rite
Aid Pharmacy development located at 330 Pine Tree Road, Town of Ithaca Tax Parcel
No.'s 62- 1 -3.2, 62- 1 -2.2, and 62 -1 -1, Community Commercial Zone. The requested
modification includes permitting the installed 6 -foot high chain link fence around the
storm drainage. pond to remain. The installed fence does not conform with the site plan
approved by the Planning Board on December 6, 2005, which did not show any fence in
this location. 1093 Group, LLC, Owner /Applicant; William A. Paladino, Agent.
Said Planning Board will at said times and said place hear all persons in support of such matters or objections
thereto. Persons may appear by agent or in person. Individuals with visual impairments, hearing
impairments or other special needs, will be provided with assistance as necessary, upon request. Persons
desiring assistance must make such a request not less than 48 hours prior to the time of the public hearings.
Jonathan Kanter, AICP
Director of Planning
273 -1747
Dated: Monday, December 11, 2006
Publish: Wednesday, December 13, 2006
VY 1•
�Wed�nesd�ay Decem�ber�13 �2„0506'� THE ITHACAJQIIRNAL
Town of Ithaca
Planning Board
215 North Tioga Street
December 19, 2006
7:00 p.m.
PLEASE SIGMN
Please Print Clearly, Thank You
Name Address
rS Erb
Jov) P tq ock/ 44 1
� 1 a� + , e
TOWN OF ITHACA
AFFIDAVIT OF POSTING AND PUBLICATION
I, Sandra Polce, being duly sworn, depose and say that I am a Senior Typist for the Town of
Ithaca, Tompkins County, New York; that the following Notice has been duly posted on the sign
board of the Town of Ithaca and that said Notice has been duly published in the local newspaper,
The Ithaca Journal.
Notice of Public Hearings to be held by the Town of Ithaca Planning Board in the Town of Ithaca
Town Hall 215 North Tioga Street Ithaca New York on Tuesday, December 19, 2006
commencing at 7:00 P.M., as per attached.
Location of Sign Board used for Posting: Town Clerk Sign Board — 215 North Tioga Street.
Date of Posting:
Date of Publication:
December 11, 2006
December 13, 2006
6 A.(: la-ec
Sandra Polce, Senior Typist
Town of Ithaca
STATE OF NEW YORK) : SS:
COUNTY OF TOMPKINS)
Sworn to and subscribed before me this 13th day of December 2006.
Notary Public
CONNIE F. CLARK
Notary Public, State of New York
No. 01 CL6052878
Qualified in Tompkins County
Commission Expires December 26, 20
Page 1 of 1
Steven Williams
From: Chris Balestra
Sent: Thursday, January 18, 2007 10:22 AM
To: Steven Williams
Subject: FW: Temporary CO for 105 Larisa Lane
Steve,
There's nothing else we need in the Planning Department. The PB conditions needed to be met prior to any CO's -
they've been met. It is now up to you to decide if Boris has met any outstanding Building Department conditions, like
payment of the CO fees, for example. That's a Building Department issue - Dan, Kristie, and you get to decide
whether to hold up the final CO because of the fees or any other building issues.
Chris
- - - -- Original Message---- -
From: Chris Balestra
Sent: Wednesday, December 27, 2006 3:55 PM
To: Steven Williams; 'bsimkin @twcny.rr.com'; 'joa @albaneselawoffice.com'
Cc: Jonathan Kanter; Dan Walker; Kristie Rice; Chris Balestra; Susan Brock (E -mail)
Subject: Temporary CO for 105 Larisa Lane
Steve,
Please see the attached memo to Code Enforcement Staff regarding the issuance of a Temporary Certificate of
Occupancy for 105 Larisa Lane. I will let you know when then conditions in the attachment have been met, so you
know when to issue a Final Certificate of Occupancy.
cc'd Boris and his attorney
as well as town staff and
the Town Attorney. Boris, please keep
in mind that although
you submitted the proposed
deed between Westview
Partners and Huckle, you will also need
to submit a copy of the
final signed deed for our files. Also, be prepared for 101
Larisa Lane-
it has not yet received
a CO and we will likely
have to go through some of
this process for that property as well (not the park dedication, but
the proposed and
signed deed and the signed
stormwater maintenance
agreement).
Please see me with any questions you might have. Thanks!
Chris
Christine Balestra, Planner
Town of Ithaca Planning Department
215 North Tioga Street
Ithaca, NY 14850
1/18/2007