FL ANNING AND ENGINEERING REPORT
Lawrence P . Fabbroni , P . E .
Town Engineer
NOVEMBER 8 , 1985 through DECEMBER 9 , 1985
Water - Contract Administration Watermains Phase II
and - Provide private water service to curb on Renwick Drive
Sewer - Planning for watermain replacement -- Second Bridge Forest Home
- Alternative investigation water and sewer service to West Shore
and Hospital
Parks - Delivery of Sand Bank Road -Buttermilk executed Agreement to County
for signature
Town Hall - Continued design heating alternatives
and
Town Barn
Highways - Burns Road -- Property Closings -- property survey map being
prepared
- - Fill being placed from Park Lane and Crispell at
north 250 feet of project
- - Mulching for erosion control scheduled
-- First stage landscaping of banks complete
- Park Lane -- Rough excavating proceeding weather permitting
-- Coordination with NYSDOT
- Forest Hare Drive -- Design of retaining walls and drainage plans
proceeding
- Hospital Access -- Coordination with Hospital construction
- Blackstone Avenue -- Coordination with County on drainage for
highways at Blackstone Avenue and Hanshaw
Road
Transit - Continued circulation of six-party NET Agreement -- Village of
Lansing and County execution pending
Sewer - Brief SJS Committee and subcommittee on contract progress and
Treatment change orders , progress payments and requests for Contracts 1 ,
Plant 2 , 3 , 41 5 , 6 , 7 , 3A , 4A, 5A, 6A
- Monitor compliance with MBENBE, Labor rates , CPM
Planning & Engineering Report 11 / 8 / 85 thru 12 / 9 / 85 Page 2
- Brief SUS and legal counsel on outline for resolution of changes
with Contracts 1 and 2
- Monitor inspection adequacy , efficiency , and timeliness of Stearns
& Wheler inspection and project management , particularly :
Lake -- project management , change orders , scheduling
Franklin Street - - balance of testing and risk to Owner
Digester Tanks -- leakage
Secondary Digester Tank - - Floating Cover
- Monitor steel placement , concrete placement , etc . ( form, steel ,
and concrete , gallery 2 excavated and poured, portion solid
handling building base slab poured with utilities and duct
banks cast in , thickener tank base slab area poured with
utilities and duct banks cast in , gallery deck east half
between primary settling tanks and aeration tanks poured ,
entrance structure walls formed and poured , primary settling
tank walls 3 / 4 complete , sluice gates grouted in place influent
building , roof membrane in place , temporary heat enclosure for
influent building , electrical conduit and heating ducts 1 / 2
complete influent building , Thoroseal wall finish applied in
wet well room, Garon sealing of secondary digester 90 %
effective , Contract 7 inspection and field orders to
accommodate unexpected site conditions and short manhole
headroom 3 of 12 structures in place : Elm Street , Trumansburg
Road , University Avenue .
Drainage - Gabions assembled
- Culvert extension at start of gabion wall complete
- Gabion placement as water level permits
LPF /nf
12 / 9 / 85
ASSISTANT TOWN ENGINEER ' S MONTHLY REPORT
NOVEMBER 8 , 1985 to DECEMBER 6 , 1985
Robert R . Flumerfelt , P . E .
1 . Burns Road
a . Placement of fill material from Park Lane Extension at
upper end of Phase II section begun .
Earthwork presently approximately 85 % complete .
2 . Park Lane Extension
a . Excavation of earth at lower end near intersection with
Rt . 79 begun .
b . Negotiations with NYSEG regarding relocation ( lowering )
of 10 " gas main continuing .
3 . Fall Creek Gabion Retaining Wall along Forest Home Drive
a . Culvert extended through gabion wall at east end .
b . Placement of gabion baskets begun - - little progress
due to high water .
4 . Forest Home Drive
a . Design of retaining walls and drainage for road
reconstruction begun .
RRF / nf
12 / 9 / 85
TOWN HIGHWAY SUPERINTENDENT ' S MONTHLY REPORT
NOVEMBER 8 , 1985 to DECEMBER 9 , 1985
Robert E . Parkin
- Complete Fall Clean - Up
Bring Voting Machines back to Highway Facility
- Install Resident Culverts on Dove Drive
Take some Gabion Baskets to Forest Home Drive Drainage Site
Haul BR Gravel for Fill behind Gabions
Start Gabion Installation and Drainage Pipe
Wire Gabions together at Shop
- Ditch Cleaning - - Snyder Hill Road
- - Ridgecrest Road
Cut and Repair Shoulders - - Culver Road
- Miscellaneous - - Patching
- - Install Road Name Signs
- - Stop Signs on Private Road where they
Intersect with Town Roads
- - Trees and Brush
- Some Welding Repair of Forest Home Drive North Bridge Deck
Haul and Stock CR Gravel at Burns Road # 2
Haul Fill ; Bulldoze and Roll Fill from Park Lane
Haul Salt for Stock Pile
Some Cindering and Plowing
REP / nf