HomeMy WebLinkAboutTB Minutes 1985-08-13 FLANNING AND ENGINEERING REPORT
Lawrence P . Fabbroni , P . E .
Town Engineer
AUGUST 13 , 1985 through SEPTEMBER 9 , 1985
Water - Coordinate water services extensions -- Snyder Hill
and - Coordinate water service extension -- Hickory Place
Sewer - Coordinate sewer service extension -- Kendall Avenue
- Contract Adninistration Watermains Phase II -- Change Orders,
Schedules, citizen inquiries, applications
- Monitor Wage Compliance Watermains Phase II
- Staff inspection and as - built measurements for subdivision
construction
- Planning future watermain extensions -- incomplete
- Budgeting . for 1986
Parks - Awaiting Town Attorney review of Sand Bank Road -Buttermilk
improvement agreement
- Awaiting Town Attorney review of pe n-nanent easement
- Budgeting 1986
- Dialogue with City and State Parks on Inlet Bikeway
Town Barn - Start developing capital project for heating , fire and security
and systems for 1986
Town Hall - Develop HVAC upgrade proposals for Town Hall -- preliminary
estimates
Highways - Burns Road -- Property Closings -- still pending Town Attorney
action
- Coordinate fill and compaction with NYSDOT and State Contractor
- Complete heavy earthmoving
- Highway Department -- placement of filter fabric , drainage pipe ,
alignment modification, rough grading , gravel placement ,
crusher run placement on south end Phase I , and south end Phase
II
- Contract management for SOS project
Hospital - Hospital escrow agreement
- Discussion with landowner ( eminent domain seems necessary )
Park Lane - Design Park Lane Extension , financial considerations , field review
with developer and excavator, further refinements with NYSDOT ,
rock investigations , and cost implications of relocating gas
main , meetings with landowner
INVENTORY OF HIGHWAY MACHINERY , TOOLS AND EQUIPMENT
Highway Law , Section 142 ( 3 )
( To be prepared by the Town Superintendent and filed with the Town Board on or before September 30 in each year . )
TOWN OF ITHACA I COUNTY OF TOMPKINS
DATE OF INVENTORY - SEPTEMBER 9 , 1985
Year Purchase Estimated Cost
Quantity Description Manufactured Price Condition of Repairs
1 361 Brockway and Plow 1970 $24 , 000 .00 Fair $32000 . 00
1 358 Brockway and Plow 1973 203o835 . 00 Fair 35500 . 00
1 L8000 Ford and Plow 1971 22 , 378 .00 Fair 2 , 500 . 00
1 FWD and Plow 1983 843944 . 00 Good 1 , 000 . 00
1 F600 Ford 1975 9 , 061 .00 Fair 2 , 000 . 00
1 F600 Ford 1972 59800 . 00 Poor - - - - - - - -
1 F100 Ford Pick -Up 1966 29160 .00 Poor 200 . 00
1 Dodge Omni Car 1981 5 , 805600 Fair 700900
1 T500 Gallion Grader 1966 27 , 079 .00 Good 1 , 000 . 00
1 Buffalo Roller 1947 6 , 700 . 00 Fair 600000
1 Callion Roller ( used ) 1968 5 , 050900 Fair 700 . 00
1 Case Backhoe 1974 112945 . 00 Good 700 . 00
3 Air Flow Spreaders ' 79 / 182 / 183 13 , 000 .00 Good /Good /Good 900000
1 Sicar Snow Blower 1966 6 , 795 . 00 Good 300900
1 Badger Excavator 1980 54 , 000 .00 Good 800 . 00
1 MB Power Broom 1976 32000 . 00 Fair 800000
1 Good Roads Stone Box 1958 12550 .00 Good 300 . 00
1 John Deere Mowing Tractor 1985 17 , 000 . 00 New 300 . 00
1 Michigan Rubber Roller (used ) 1972 82000000 Good 500000
Radios 10 Mobile , 2 Portable , Base , Repeater 1978 112659 . 00 Good 600 . 00
1 930 Cat Loader 1978 58 , 136 .00 Good 800 . 00
Tools and Miscellaneous 113500 . 00
1 John Deere 450-C Dozer 1979 23 , 430 .00 Good 600 . 00
1 Centerville 16 Ton Trailer 1979 4 , 750 . 00 Good 500 . 00
1 Custom 150 Dodge Pick -Up ( used ) 1978 4 , 600 .00 Good 500 . 00
1 Emergency Sewer Generator 1978 122500 . 00 Good
1 John Deere Mowing Tractor ( Parks ) 1982 62169 .00 Good 200 . 00
1 D- 150 Dodge Pick - Up Club Cab 1980 6 , 021 . 00 Good 300 . 00
1 Snow Co . Trailer 1982 1 , 432 .00 Good 100000
1 Dodge Aries Car ( used ) 1982 59000 . 00 Good 400 . 00
1 Chevy Citation Car ( used ) 1981 5 , 000 .00 Good 400 . 00
1 Dodge Pick -Up 1985 82626900 New 200000
1 recommend purchase of the following ;
Description Estimated Cost
Superintendent ' s Car to replace 1981 Dodge Omni
$ 7 , 000 . 00
Dump Truck to replace 1973 358 Brockway
$ 48 , 000 . 00
T OTA L $552000 . 00
Ito,
obert E . Parkin , Town of Ithaca Highway Superintendent
REP/nf
ASSISTANT TOWN ENGINEER ' S MONTHLY REPORT
AUGUST 13 , 1985 to SEPTEMBER 9 , 1985
Robert R . Flumerfelt , P . E .
1 . Burns Road
a . Design adjustments and stakeout of horizontal control
and grades for Phase II construction .
b . Stakeout for connection of south end of Phase I
construction to existing Burns Road .
c . Construction progress :
Phase I
- all gravel sub -base placed ,
crushed stone base course 90 % complete .
Phase II
earthwork approximately 50 % complete ,
gravel sub -base and drainage fabric
placement approximately 60 % complete .
2 . Park Lane Extension
a . Test holes dug to determine depths to rock .
b . Investigation begun regarding conflict with existing
gas main . Alternatives are relocation ( lowering )
of gas main versus carrying gas main on a beam in
existing location with roadway to pass underneath .
30 " Hungerford Heights " ( yarn ) Subdivision
a . Field measurements completed for " As Built " location of
water services and sewer laterals .
40 1985 Water Improvements - Phase II
a . Contract administration , construction inspection .
RRF / nf.
9 / 9 / 85
BUILDING INSPECTOR ' S MONTHLY REPORT
AUGUST 1985
Lewis D . Car tee
10 Building Permits Issued , August 1985 , Town of Ithaca - - 15
Construction Cost - - $ 629 , 683000
Fees Collected - - $ 490 . 00
20 Building Permits Issued , August 1985 , Town of Ulysses - - 15
Construction Cost - - $ 403 , 500 . 00
Fees Collected - - $ 490 . 00
3 . Building Permits Issued , August 1985 , Village of Trumansburg
- - 5
Construction Cost - - $ 96 , 660900
Fees Collected $ 187 . 00
4 . Zoning Board of Appeals - - Fees Collected - - $ 50 . 00
5 . Water Permits issued - 30 ; Fees Collected - $ 4 , 365 . 00
Sewer Permits issued - 8
6 . Certificates of Compliance Issued - 13
Fees Collected - - $ 15 . 00
LDC / nf
9 / 4 / 85
t
PARKS AND RECREATION WAYS MONTHLY REPORT , AUGUST , 1985
Park , trail , and municipal site maintenance .
Completion of bench construction and installation .
Eastern Heights Park driveway and parking area completion , play
structure repairs .
Dewitt exercise trail repairs .
Hosted chain saw safety class with participants from other local
parks departments , schools .
Fire hydrant painting .
Prepared budget proposals , Park Use Law proposed amendments .
Susan Beeners
Richard Schoch
Sept . 4 , 1985
t
Planning & Engineering Report 8 / 13 / 85 thru 9 / 9 / 85 Page
Sewer - Brief SJS Committee and subcommittee on contract progress and
Treatment change orders , progress payments and requests for Contracts 1 ,
Plant 2 , 3 , 4 , 51 6 , 3A, 4A, 5A, 6A
- Monitor compliance with MBE/WBE, Labor rates , CPM
- Monitor completion of Cleveland- Pierce Inc . Contract 1 work
- Completion of Route 13 crossing
- Monitor changed site conditions -- Influent Sewer along First
Street
- Monitor progress of water quality study of Cayuga Lake
- Monitor inspection adequacy , efficiency , and timeliness of Stearns
& Wheler inspection and project management , particularly .
Influent Building -- Block and Brick Work and Transformer
Secondary Digester -- Cover warranty meetings
Primary Digester -- Painting
Segment II -- Concrete Quality -- Temp . and psi
Cascadilla Creek - Overflow construction
Lake -- Cofferdam problems and documentation
First Street Sewer -- Dewatering -- Unforeseen Conditions
- Monitor steel placement , concrete placement , etc . ( form, steel ,
and concrete ) final clarifiers complete , aeration tanks
complete, base slab primary tanks 1 / 2 complete , base slab
entrance structure and center gallery complete, gallery roofs
and flow channels and primary tank walls being formed ( steel
submittals slow) , primary trusses and bottom roof plate 9 / 10
painted , secondary trusses and bottom plates tack welded, Route
13 crossing complete , influent sewer to Franklin Street
complete , Cascadilla Creek crossing complete , overflow pipe in
place ( backfill and bank protection to be completed ) , block
work and brick work second floor influent building 3 / 4
complete , stairways influent building complete , endwall at
Cascadilla for plant bypass complete , Contract 2 work resetting
sheetpiling complete , Contract 1 land portion virtually
complete, Contract 2 pipe assembly partially complete ( 400
feet ) , Contract 2 excavation for final pipe grade continuing
- Tour and project Audit with NYSDEC officials
- Tour with City BPW members
- Project management for monitoring station contracts including bid
invitations to interested contractors , public relations with
Cornell , addendum review
- Review of Industrial Pre - treatment materials
- Commission survey for secondary digester
Other - Meet with concerned landowner concerning Eastwood Commons drainage
- Review Eastwood Commons drainage with staff
- Review curb proposals for Judd Falls Road
- Purchase and receipt of gabion materials
- Budgeting 1986
- Citizen inquiries on traffic improvements -- school bus stop sign
-- Stone Quarry Road four-way stop -- Judd Falls Road and Tower
Road truck signs -- Forest Home
LPF/ mmf
9 /9 / 85
it
REPORT OF THE TOWN PLANNER
SEPTEMBER 9 , 1985
Subdivisions
Richard Berggren - Compton Road , 8 - lot subdivision
( Preliminary Approval - adjourned to 9 / 17 )
Ivar Jonson - Honness Lane , 53 lot subdivision
( Sketch Plan reviewed 9 / 3 )
Orlando Iacovelli - Coddington Road 18 - lot subdivision
( Sketch Plat. adjourned to 9 / 17 )
Barbara Schultz - Pennsylvania Ave 2 - lot subdivision
( Sketch Plat reviewed 9 / 3 )
Environmental Assessments
" Family " Amendment ( SEAF prepared and reviewed )
" Duplex " Amendment ( SERF prepared and reviewed )
Schultz Subdivision ( SEAF reviewed )
Jonson Subdivision ( SEAF reviewed )
R30 to R15 rezoning ( SEAF prepared and reviewed )
Citizen Assistance
Herbert Monkemeyer - Questions on South Hill Rezoning
John Vasse - Appraisal of Elmira Road Property
Odyssey Research - Discussion with Ithaca College
concerning purchase of industrially zoned land .
Planning Projects
Census , 1990 - Staff work with City and County staff
Comprehensive Plan - Traffic counts compiled
Zoning Ordinance Amendments
Dishes Antennae - Discussed by Planning Board
Trailer Parks - Discussed by Planning Board
Family - revised ; to be considered by Town Board
Duplexes - revised ; to be considered by Town Board
Street Rights - of -Way - to be considered by the Town Board
R30 to R15 Rezoning - map prepared ; amendment revised ; to be
considered by Town Board
TOWN HIGHWAY SUPERINTENDENT ` S MONTHLY REPORT
AUGUST 13 , 1985 to SEPTEMBER 9 , 1985
Robert E . Parkin
Burns Road - - Cut and Fill Slopes
- - Install Drainage Pipe , Lay Down Mirafi
Stabilization Fabric and Cover with Creek
Gravel
Complete all Roads to be Surface Treated
Install Resident Culvert Pipes -- 1 on Renwick Drive ; 3 on Dove
Drive
- Eastern Heights Park - - Haul in CR and Spread with Dozer for
Parking Lot and Paths
Start 2nd Roadside Mowing
- Cut Shoulders and Clean Ditch on Calkins Roads Shape with CBR
Gravel , and Double Surface Treatment
REP / nf
9 / 9 / 85