HomeMy WebLinkAboutTB Minutes 1984-05-07 TOWN OF ITHACA
RDGULAR BOARD MEETING
May 7 , 1984
At a Regular Meeting of the Town Board of the Town of Ithaca ,
Tompkins County , New York , held at the Town Offices at 126 East
Seneca Street , Ithaca , New York , at 5 : 30 P . M . , on the 7th day of
May , 1984 , there were .
PRESENT : Noel Desch , Supervisor
George Kugler , Councilman
Shirley Raffensperger , Councilwoman
Marc Cramer , Councilman
Henry McPeak , Councilman
Gloria Howell , Councilwoman
Robert Bartholf , Councilman
ALSO PRESENT . Robert Parkin , Highway Superintendent
James V . Buyoucos , Town Attorney
Susan Beeners , Park Analysist
Claude F . Robb , 221 Eastern Heights Drive
Ellen Robb , 221 Eastern Heights Drive
Nick Vandam, 413 Snyder Hill Road
REPRESENTATIVES OF THE MEDIA .
Deborah Gesensway , Ithaca Journal
Mary Earle , WHCU
Mike Clark , WTKO
PLEDGE OF ALLEGIANCE
The Supervisor led the assemblage in the Pledge of Allegiance .
REPORT OF TOWN OFFICIALS
Supervisor ' s Report
Reapportionment
Supervisor Desch reported that the County Reapportionment Committee
is still working with us to properly locate the boundary between
County District 11 and 12 on South Hill . The problem is compounded
by the geographic density of Ithaca College Dormitories . It may
make sense to create a separate district just for the dormitories
in order to avoid a dislocation of the line to the disservice of
the "permanent " residents . This could allow us to put all of South
Hill in District 12 , as far as Six Mile Creek ,
Sewage Treatment Plant
Bids are to be opened on May 8 at 2 : 00 P . M . We expect considerable
bidder interest and a competitive price for the project .
Groundbreaking could come before July 1 . The loss of
Superintendent Don Kinsella will be felt for a long time . Don was
a major part of our grant success and was a team player in forging
a close working relationship amongst all of the parties on the
Project . He went on to say that he knew he spoke for all of the
Town in thanking him for his contribution and in wishing him every
success in his new job .
91T
Town Board 2 May 7 , 1984
The Supervisor noted that he would be going to New York with
Dominick Cafferillo to the bid opening on the $ 12 , 500 , 000 BAN issue
scheduled for May 16 at 10 : 00 A . M . The joint City/Town prospectus
is finished and approved . On Monday , April 30th we made the first
construction borrowing on the project in the amount of $ 1 , 000 , 000
at 6 . 5 % and reinvested it for a short while at 9 . 75 % .
Water and Sewer Improvements
We have verbal confirmation , from Albany , that our application to
Audit and Control for establishment of the Water and Sewer
Improvements have been approved , so we can move forward on the
bidding of the projects scheduled for 1984 . The Town Staff is
• winding up the bid documents and will have all of the necessary
easements shortly . I have also asked the Staff to project our
needs for operating revenues to keep our state of repairs and
reliability to the standard we have come to expect . This may mean
an increase in the water surcharge to enable us to get back on
track in painting one reservoir per year . The last one we did was
Ridgecrest in 1982 . Hungerford Hill and Pine Tree were due this
year but our repair bills for water main breaks have left us with
too little money to do them this year . Once these two are done , it
will complete one cycle and enable us in 1986 to start the second
cycle on a preventive maintenance basis . We also have some major
repairs to PRV ' s , line valves , etc .
Town Engineer ' s Report
Town Clerk Jean Swartwood read the Town Engineer ' s Report .
Grubbing and clearing operations will begin on the Burns Road in
the latter part of May . The Summer Schedule for Northeast Transit
begins May 21 . A five year contract is being discussed . Sewer
plans for Bundy Road are near conpletion . Easements are being
obtained , soil borings , final plan and specifications are prepared .
Bidding will follow in rapid order . On May 24th , the NYSDOT will
hold local meetings for affected owners on Route 79 rehabilitation
project . The project is currently under reexamination to resolve
drainage and safety concerns while minimizing environmental
impacts .
The water line extended under Hanshaw Road to connect to the Warren
Farm to the Town system is underway . This involves a joint effort
Town Highway Department , Bolton Point and City of Ithaca .
Development of the In-house computer survey program , to reduce
field notes and eventually plot features in a form suitable to
trace final base maps from, is being developed . Susan Beeners and
Shirley Raffensperger will have a detailed report on the Parks .
Highway Superintendent ' s Re rt
Highway Superintendent Robert Parkin reported that the "No Parking"
signs in Eastern Heights have been installed . We have completed
50 % of the brooming of roads . We have installed several pipes and
culverts for individuals with more to be done . Insulation in the
® loft area of the Highway Facility has been started . We have a man
with a bulldozer working in the Eastern Heights Park . It took two
men , two days to pick up trash bags after the Boy Scouts pick up of
Sand Bank Road . We started Clean-up today , it looks like a weeks
Project * Mr . Parkin went on to say that Eastern Heights roads will
probably be surfaced this year .
Town Clerk ' s Report
Town Clerk Jean Swartwood reported that she had a request for a
" Going Out Of Business " Permit . She reported that she had
8TT
Town Board 3 May 7 , 1984
contacted Albany and that Peter Grossman of Buyoucos , Barney ,
Grossman and Roth is preparing the permit form .
COMMITI= REPORTS
Codes & Ordinance Committee
Chairman Marc Cramer reported that the Committee had no report at
this time .
Parks and Recreation Committe
• Chairperson Shirley Raffenpperger noted that the Board members had
a written report and that Susan Beeners would explain the report .
( Copy attached to minutes ) .
Susan Beeners explained that the plans were to finish the
landscaping in Eastern Heights Park , regrading of the sled hill ,
finish driveway from Tudor Road and the reconstructing of five
parking spaces . Also , the cross country ski area and upgrading of
the play structures . No hunting signs will be put up . The
one-half basketball court will not be constructed unless we are
requested to do so .
Councilwoman Raffensperger noted that all of the proposals were in
keeping with approved Town Board resolutions .
Ms . Beeners explained that the play structure at Tudor Park will be
expanded , we are working on setting and picnic areas . Also putting
in landscaping for adults .
East Ithaca Bikeway , Honness Lane to Maple Avenue is complete . The
bridge railing has to be installed and oil and cindering done to
Game Farm Road . Work on Tareyton Park was stopped because of rain
last year . We will be installing drainage in the playfields and
also upgrading them as well as expanding the play areas . The pot
holes in the Northeast Bikeway from Warren Road to Winston will be
repaired .
Councilman McPeak remarked that it looked like someone had
deliberately dug holes in the Bikeway .
Ms . Beeners went on to say that the Forest Home Walkway will be
completed and playstructures , trails and landscaping will be
completed at Northview Park ,
Country Representative Beverly Livesay asked if there were any
plans to expand the bikeway on to the Cornell Campus ?
Susan Beeners responded that the Committee was working with Cornell
to expand the bikeway .
Councilwoman Raffensperger stated that next month the Committee
would have a presentation on continuing work on the parks for the
® next ten years .
Public Safety and Youth Ca iittee
Supervisor Desch reported that the Committee was continuing their
work on the Fire Contract ,
REPORT OF COUNTY REPRESENTATIVE
On
TOWN OF ITHACA
1984 WORK PROGRAM
PARKS AND OPEN SPACE
EASTERN HEIGHTS PARK
Play Field lawn and drainage improvements .
Sled Hill seeding - - grasses , wildflowers .
.Driveway and Parking Area from Tudor Road ( five spaces ) .
Expansion of Skyvue Road Parking Area ( five spaces ) .
Play Area expansion :
play structure repairs and additions ;
- swings , . seesaw .
Upgrading of existing benches , steps , and trails .
Posting of " No Hunting " signs at boundaries .
TUDOR PARK
Play Structure installation .
Completion of sitting and picnic area .
Landscape improvements , including wildflowers and perennials .
EAST ITHACA BIKEWAY
-1
Completion of route from Maple Avenue to Game Farm Road :
bridge railing installation ;
surfacing .
TAREYTON PARK
Play Field lawn and drainage improvements :
topdressing of infield , installation of rubber bases .
Play Area expansion :
seesaw ;
- swings ( two additional ) ;
sitting area .
1
1984 Work Program Town of Ithaca
Parks and Open Space
1
NORTHEAST BIKEWAY
Drainage and surfacing improvements :
Warren Road ;
Winston Court .
- " SALEM PARK
Play Area completion .
Trail drainage improvements .
FOREST HOME WALKWAY
Ramped . Walk at Warren Road ,
Path , Drainage Work , at Forest Home Drive ,
Railings ,
Landscaping .
Signage ,
NORTHVIEW PARK
Play Area additions :
- seesaw ;
hopscotch pads
benches .
Trail and Landscape improvements .
Susan C . Beeners
May 7 , 1984
2
■
Town Board 4 May 7 , 1984
County Representative Beverly Livesay reported that the
Reapportionment Committee was busy working on reapportioning the
election districts .
The problem of people on Pennsylvania Avenue having to get into
their cars no matter where they vote was discussed . Also , making
Ithaca College a separate district was considered as a possibility .
Councilwoman Raffensperger asked why the people in the Garden
Apartments at Ithaca College could not vote in District #3 ?
Supervisor Desch responded , that could put too many voters in
District 3 .
tIt was the general consensus that County Planning should move the
boundary between District 2 and District 3 to a place where more of
the voters along the Danby Road could vote at NCR instead of the
Machinist Hall on the Elmira Road ,
FLOATING HOLIDAY
RESOLUTION NO , 73
Motion by Councilwoman Raffensperger ; seconded by Councilman
McPeak ,
WHEREAS , the Town employeees , by a majority vote , have elected to
take their Floating Holiday on Friday , May 25th ,
NOW THEREFORE BE IT RESOLVED , that the Town Board of the Town of
Ithaca hereby approves Friday , May 25 as a Floating Holiday for the
Town of Ithaca employees .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
EAF - WATER/ SEWER IMPROVEMENTS
Councilman Cramer asked if the sewer improvements would create a
traffic problem on Route 96 ?
Supervisor Desch responded no , we will be boring Route 96 ,
RESOLUTION NO , 74
Motion by Councilman Cramer ; seconded by Councilman Kugler ,
RESOLVED , that the Town Board of the Town of Ithaca hereby accepts
the Environmental Assessment Form on the Water/Sewer Improvements .
( Copy attached to the minutes ) .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
AUTHORIZE BIDS FOR 1984 WATER/ SEWER IMpRO
VEMENrS
RESOLUTION NO , 75
Motion by Supervisor Desch ; seconded by Councilman McPeak ,
WHEREAS , the Town Board has approved expenditure of monies for the
extension and improvement of water and sewer systems within the
Town of Ithaca , and
Town Board 5 May 7 , 1984
WHEREAS , the permissive referendum period for said improvements has
passed without petition , and
WHEREAS , Audit and Control approval is expected ,
NOW THEREFORE BE IT RESOLVED , by the Town Board of the Town of
Ithaca to authorize bidding of the Phase I - 1984 Improvements
subject to approval of contract documents by the Town Supervisor ,
Town Attorney and Town Engineer and New York State Audit and
Control approval .
( Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
• SEMINAR FOR TOWN ENGINEEER
RESOLUTION NO . 76
Motion by Councilwoman Howell ; seconded by Councilman Cramer ,
RESOLVED , that the Town Board of the Town of Ithaca hereby
authorizes Town Engineer Lawrence Fabbroni to attend Dun &
Bradstreet Business Education Services one day seminar on
Developing Effective Supervisors , June A , 1984 in Syracuse , New
York , at a cost of $ 150 . 00 .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
APPRECIATION FOR BOY SCOUT TROOP
RESOLUTION NO , 77
Motion by Councilwoman Raffensperger ; seconded by Councilman
Cramer ,
WHEREAS , on April 28 , 1984 , Boy Scout Troop # 99 cleaned up the
trash along Sand Bank Road ,
NOW THEREFORE BE IT RESOLVED , that the Town Board of the Town of
Ithaca does hereby wish to expresss their gratitude for the fine
job performed by Boy Scout Troop # 99 and to thank them for their
greatly appreciated efforts in cleaning up Sand Bank Road .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
RENTAL OF HEAVY MACHINERY FOR BURNS ROAD PRO=
RESOLUTION NO , 78
Motion by Councilman Kugler ; seconded by Councilman McPeak ,
® WHEREAS , in accordance with Town Law it becomes necessary to rent
heavy highway machinery at or below State rental rates , that is not
practical for a Town to own , and
WHEREAS , such heavy earthmovers , HD-16 or D-8 equivalents or 14
yard scraper (pan) , will be necessary to ccimplete grubbing and to
move subbase materials for the Burns Road Project ,
NOW THEREFORE BE IT RESOLVED , by the Town Board of the Town of
Ithaca that such heavy highway machinery , including operators and
� 7 �
Town Board 6 May 7 , 1984
all necessary insurance , be rented to complement Town rollers ,
grader , JD 450B bulldozer , dump truck , etc . , in a timely and
economical way .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
TRANSFER FUNDS . COURT EQUIPMENT
RESOLUTION N0 , 79
Motion by Councilman Desch , seconded by Councilwoman Howell ,
• WHEREAS , there is a need for an additional typewriter for use by
the Court Clerk ,
NOW THEREFORE BE IT RESOLVED , that the Town Board of the Town of
Ithaca hereby authorizes the transfer of $ 300 . 00 from Contingency -
Townwide to Justice - Equipment for the purpose of purchasing an
additional typewriter for the Court Clerks .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
EASEMENT - PEAR.SALL PLACE
Town Attorney James Buyoucos noted that the Town was under no
obligation to grant an easement . He went on to say that the house
would be difficult to sell if the easement weren ' t granted , but
it ' s up to the Town Board ,
Supervisor Desch stated that there was a possibility , in the past ,
that an addition would be put on the building, however , this seems
very remote now. He noted that the Water Commission also agreed to
the easement .
Laura Holmberg , attorney for the property , stated that for many
years this property has used this access .
Town Attorney James Buyoucos asked if it was necessary for the
wooden steps to be on Town property?
Attorney Holmberg responded , they have been there for many years .
She noted that Mr . Mix had said they were used in the winter time .
RESOLUTION NO . 80
Motion by Councilman Bartholf ; seconded by Supervisor Desch ,
RESOLVED , by the Town Board of the Town of Ithaca :
1 . The right-of way shall be 12 ' in width or as shown on the map ,
whichever is the lessee .
® 2 . At no time shall any vehicles of the GRANTEE be parked on the
driveway .
3 . The driveway shall be maintained by the GRANTEE in such
condition as the Town may reasonably require .
4 . If any vehicles are parked in the driveway , the Town may have
them removed at GRANTEE ' S expense .
Town Board 7 May 7 , 1984
5 . If any repairs , additions or other work are required by the
Town with respect to the lands and the building thereon the
driveway shall not be used for ingress or egress so long as such
work is being performed . Such notice shall be given as the Town
deems reasonable . In case of an emergency or circumstances
demanding prompt or immediate action , the notice may be given
orally .
6 . Title is taken subject to the several easements and sewer ,
water , drainage , gas , electric or other lines now in place ,
including the right to repair , relocate , replace , reconstruct
existing lines ; subject to right to temporary suspension of
easement rights while work is being done .
• 7 . Town reserves the right to grant easements or rights provided
that after their installation they will not interfere with the
rights of the GRANTEE to have ingress or egress to and from the
street and the garage for vehicles . Subject to temporary
suspension of easement rights while uork is being done .
8 . Also included are the provisions in the resolution adopted by
the Town Board on June 13 , 1983 . Provisions will be made for
limiting the use to the occupancy and the dwelling as now
constructed for one automobile ; the owners of 163 Pearsall Place
will be liable for any damage caused to the Town premises and to
the facilities thereon resulting from the negligence or any act of
the owners : The buyers agree to save and hold harmless the Town of
Ithaca , its agents , servants , employees , contractors and so forth
from any and all damages or liability which the Town may incur
because of any act or negligence of the GRANTEES of the easement ,
including reasonable attorneys ' fees ; the GRANTEES will provide
such insurance as may be required by the Town indemnifying the Town
against any such liability ; the GRANTEES will pay to the Town all
necessary expenses incurred in connection with the granting of this
easement including cost of publication of notice .
( Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
PUBLIC HEARING - AMENDING 1984 FEDERAL REVENUE SHARING BUDGET
Proof of posting and publication notice of a public hearing to
amend the 1984 Federal Revenue Sharing Budget having been presented
by the Town Clerk, the Supervisor opened the public hearing .
As no one in attendance wished to speak for or against the
amendment , the Supervisor closed the public hearing .
RESOLUTION NO , 81
Motion by Supervisor Desch ; seconded by Councilman Cramer ,
WHEREAS , $ 20 , 000 . 00 was approved as a capital project for 1984
using Federal Revenue Sharing Funds that were approved in previous
years for Town Hall renovations but not spent , and
WHEREAS , $ 18 , 000 . 00 was approved as a capital project for 1984
using Federal Revenue Sharing Funds that were approved in previous
Years for Drainage but not spent ,
NOW TBEREF'ORE BE IT RESOLVED , that the Town Board of the Town of
Ithaca hereby authorizes the amending of the 1984 Federal Revenue
Sharing Budget to include the $ 20 , 000000 for Town Hall renovations
and $ 18 , 000. 00 for Drainage .
8ZT
SEQR _
Notice of Completion of Draft EIS
Lead Agency: Ithaca Towh' Board Project # (ifany) '
Address:
126 East Seneca St - �-
Ithaca , NY 14850
Date. May 4 , 1984 t�
This notice is issued pursuant to Part 617 (and local law # 3 , 1980 if any) of the imple- ..
menting regulations pertaining to Article 8 (State Environmental Quality Review) of the Environ•
mental Conservation Law,
A Draft Environmental Impact Statement has been completed and accepted for the proposed
action described below. Comments on the Draft EIS are requested and will be accepted by the con-
tact person until May 21 , 1984
i . . m . I M . '
Title of Actions , Lake Shore West Development
mm
Description of Action: 1 ) Rerrovat ion . of existing Biggs ;Memorial Hospital M ml:� CM )
, and the construction of 400 life care units .
2 ) Construction of a 120 bid nursing home
Location: (Include the name of the county and town ,) Town of Ithaca
Tompkins County
C- 1 6
Ak
SEQR Notice of Completion of Draft EIS Page 2
Potential Environmental Impacts: Increased site runoff , heavier traffic
to and from the site influx of a particular age group with
particular needs: .
The Draft Environmental Impact Statement specifically answers
8 questions asked : by the Town Board. in its Determination . of
Al
significance. .
Copies of the Draft EIS may be � obtained from: Peter Me Lovi , Town Planner
Town of Ithaca
Contact Person: Peter Me Lovi
Address: 126 E . Seneca . St . Ithaca , NY 14850
Phone No. : . . - ( 607 ) 273 - 1747
Copies of this Notice Sent to
P see list attached , ' . .
*.Commissioner-Department of Environmental Conservation , 50 Wolf Road, Albany, New York
12233-0001
Environmental Notice Bulletin-DEC, 50 Wolf Road, Room 509, Albany, New York 12233-0001
' Appropriate Regional Office of the Department of Environmental Conservation
. * Office of the Chief Executive Officer of the political subdivision in which the action will be ptinci-
pally located
' All Other involved Agencies (if any)
State and Regional Clearinghouses
Persons Requesting Draft EIS
. .
* I copy of the Draft EIS must also be included (see 617. 10(e))
C- 17
ti
dk
L .
DRAFT ENVIRONMENTAL IMPACT STATEMENT
Date : April 30 , 1984
Project Name : Lake Shore West Development
Location : Town of Ithaca
Sponsor : ITD Group , . Inc .
986 Bedford Street
Stamford , '` CT 06905 -=
( 203 ) 325 -9655
Contact : Peter M . Lovi , Town Planner
126 East Seneca Street
Ithaca , NY 14850
( 607 ) 273 - 1747
Lead Agency : Town of Ithaca Town Board
Pursuant to Article 8 of the New York State Environmental Conservation Law
6NYCRR 617 . 10 ( b ) and Local Law # 3 , 1980 , . a copy of this Draft Environ -
mental Impact Statement together with the Notice of Completion and
Environmental Assessment . Form was filed with the following agencies :
Commissioner
Department of Environmental Conservation
50 Wolf Road ,
Albany , NY 12233 - 0001
Bradley L . Griffin
Regional Supervisor
Department of Environmental Conservation
Box 1169
Cortland , NY 13045
Supervisor Noel Desch
Town of Ithaca Town Board
132 Updike Road
Ithaca , NY 14850
Chairman Montgomery May
Town of Ithaca Planning Board
1360 Slaterville Road
Ithaca , NY 14850
t
1
Commissioner Frank Liguori
Tompkins County Planning Department
128 East Buffalo St .
Ithaca , NY 14850
Mr . John Andersson
Tompkins County Health , Department
1278 Trumansburg Rd .
Ithaca , NY 14850 '
Chairman Henry Aron
Town of Ithaca Zoning Board of Appeals
106 Woolf Lane
Ithaca , NY 14850
Joseph . M . Powers
Regional Director
New York State
Department of Transportation
333, East Washington Street
Syracuse , NY 13202
1
t
1 .
TABLE OF CONTENTS
I . Town of Ithaca Environmental Assessment Long Form , Part I 1
II . Town of Ithaca Environmental Assessment Long Form , Part III 19
III . Town Board Determination of Significance 21
IV . Specific Questions to be Addressed 24
a ) Traffic impacts 24
b ) Drainage and runoff 24
c ) Clearing required 24
d ) Blasting required 24
e ) Dumping of hazardous wastes 25
f ) Number of permanent employees 25
g ) Capacity of utility system 25
h ) Open space amenities 25
V . Letters and Supporting Documentation 26
TOWN OF ITHACA
ENVIRONMENTAL ASSESSMENT FORM
APPLICANT : The ITD Group , Inc . DATE : March 8 , 1984
PROJECT : Lake Shore West Retirement Community
LOCATION : Hospital Complex , Route # 96 , Ithaca , New York
To be completed and submitted by the applicant . Comments may be written
next to the questions or on additional paper .
GENERAL INFORMATION
1 . Applicant : The ITD Group , Inc .
Address : 986 Bedford Street , Stamford , CT 06905
9 South Main Street , Hanover , NH 03755
Phone : ( 203 ) 325 - 9655 ( 603) 643 - 6085
Property Owner : Tompkins County Board of Representatives
Address : Tompkins County Court House , Ithaca , NY 14850
Phone : ( 607 ) 564 - 9979
20 Location of Proposed Action . ( Write Address / Tax Lot ; Attach USGS
topographic map with affected lands outlined . ) See attached concept site
plan ,
3 . Proposed Action : Development of a retirement complex , including a
centralized life use complex , nursing facility , retirement apartments for
independent living , and facilities for professional doctor ' s offices
4 . Activities and types of operation resulting from the completion of the
proposed action :
PHASE 1 :
Life Use Units . 150 Life Use retirement units in existing old
hospital with limited in -house commercial activities Existing
wings A , B , C , E , F , G , and pool ) . The use of D wing is being
negotiated with the hospital .
FUTURE PHASES :
( New additions H , I , J ) . 250 additional Life Use retirement
units in additions to the old hospital .
INDEPENDENT DEVELOPMENT :
parcels 1 , 2 , 3 , 4 , 5 as shown on the attached plan ) Parcels
1 , 2 , 3 Professional Doctor ' s offices adjacent to life use
complex . Parcel 4 - Nursing complex adjacent to life use
complex . Parcel 5 Retirement apartments for independent
living .
� 1
IDENTIFICATION OF PROPOSED ACTION - Site Plan and USGS MAP
50 State the time schedules for the proposed action :
PHASE 1 :
Planning : 1 / 84' - 3 / 84 Construction : . 11 / 84 - 8 / 85
Design , Documents : 1 / 84 - 9 / 84 Finished Site Work / Grading : 8 / 85
Preliminary Site Work : Limited site work . Additional back parking
and screening .
FUTURE PHASES :
Planning to begin only after Phase I is complete and a waiting list .
is established .
INDEPENDENT DEVELOPMENT : ( Parcels 1 , 2 , 3 , 4 , 5 )
Planning to begin only if internal marketing establishes a need or if
independent developing entities show an interest in concept .
60 Describe the proposed construction techniques to be used if building or
site development is involved . Show locations and routes to be used on
the site plan .
a ) Grading and excavation including equipment vehicles and explosives
to be used : Phase I - Limited excavation and new construction .
Future phases and independent development areas shown on
attached drawing ; no unusual construction practices anticipated .
b ) Transportation of matenals . to site : Route # 96 through hospital drive
to site .
c ) Disposal of waste materials : Contractor will dispose waste materials
as required under contract and concerning all Town , County ,
State , and Federal agencies .
d ) Proposed chemical treatments , such as herbicides , dust control ,
etc . : None known
e ) Special techniques to overcome unusual conditions : None known
2
1
7 . Describe the type of proposed building and site materials to be used .
Independent
Phase I Future Phases Development
Foundation . concrete concrete concrete
Structure : masonry bearing masonry steel wood framing
wall framing
HVAC : steam radiation steam radiation independent
chilled water A / C chilled water A / C systems
Energy Sources : central boiler central boiler independent
systems
Siding : stucco on masonry stucco on masonry wood siding
Insulation : existing blown -in rigid and batt rigid and batt
new batt
Windows and Glass : single pane aluminum sash double pane
and double-pane
thermally -broken
Roofing : clay shake clay shake / rubber asphalt
Pavement : bituminous bituminous bituminous
concrete concrete concrete
Vegetative Cover : see site concept as required as required
plan
80 Total area directly modified by proposed action :
Phase 1 Life Use Units ( existing building wings A , B , C , E , F , 'G , and D
At present , 8 . 2 % of the total project ' s 50 acres ( 4 . 1 acres ) are modi-
fied . The future phases of the life use development and the indepen -
dent development area will require a total of 14 . 6 $ of the 50 acre total
( 7 . 3 acres ) . The total modified area of the project , if fully built would
be 22 . 80 , or 11 . 4 acres . The area considered modified includes all areas
of construction , and all impervious surfaces .
-� 3
a
90 Total area covered by impervious surfaces .
PHASE l : Existing building wings ( A , B , ( , E , F , G , D , plus pool )
Roofs : 57 , 100 s . f . Parking : 52 , 000 s . f . Roads : None in Phase 1
( Parking surface based upon a waiver of multiple family requirements
and a standard of one space per dwelling unit . )
FUTURE PHASES : Life Use Units ( New additions H , I , J )
Roofs : 48 , 350 s . f . ( 41 , 750 s . f . roofs , 6 , 600 playing courts )
Parking : 89 , 000 s . f . 250 spaces @ 1 / unit . 40 , 000 s . f . existing
second tier parking to be used in this future phase . .
Development of new entrance road will allow for the
addition of extra parking .
Roads : 21 , 500 s . f . ( 1 ) 7 , 500 s . f . service road at H wing ; ( 2 )
149000 s . f . lower service road below I and J wing .
INDEPENDENT DEVELOPMENT : ( Parcels 1 , 2 , 3 , 4 , 5 ) Nursing complex ,
doctor ' s offices , retirement apartments . Possible development
independent of Life Use Units ,
Roofs : 68 , 000 s . f .
Parking : 109 , 200 s . f .
Roads : 53 , 400 s . f . ( 44 , 000 s . f existing road , 9 , 400 entrance road
to parking
TOTALS :
Existing New Total
Roofs : 52 , 600 120 , 850 173 , 450
Parking : 83 , 000 167 , 200 250 200
( 243 spaces ) ( 521 spaces ) ( 764 spaces )
Roads : 44 , 000 30 , 900 74 , 900
Total : 179 , 600 318 , 950 498 , 550
Percent of land coverage : existing 8 . 2
Percent of land coverage : new 1496
Percent of land coverage : total 22 . 8
4
10 . Gross Building sizes :
PHASE 1 : Life Use Units ( Existing Building Wings A , B , C , E , F , G , +D )
Present Total :
185 , 000 ( including D and E attics and 4 , 500 sf .
new pool addition ) , ,
No . of Bldgs : One ( 1
No . of Floors / Bldg : Six ( 6 ) levels total in existing building . Nine
( 9 ) levels including the tower ; 4 and 6 floors at
different sections . Block section profile : 3 �
stories from off grade front entrance road ; 6
stories off grade at back service road .
FUTURE PHASES : Life Use Units ( New additions H , I , 3 )
y
Present Total : new 171 , 625 sf .
No . of Bldgs : Three ( 3 ) additions
No . of Floors / Bldg : 4 and 5 stories consistent with roof line of
existing structure off entrance road . Possibility
of six levels depending on floor to floor design .
INDEPENDENT DEVELOPMENT : ( Parcels 1 , 2 , 3 , 4 , 5 ) Nursing complex ,
Doctor ' s offices , retirement apartments .
Present Total : new 105 , 500 sf .
No . of Bldgs : Four 4 independent structures ; seven ( 7 ) in
apartment complex .
No . of Floors / Bldg : 1 , 2 , and 3 stories .
TOTALS :
Existing New Total
Building square footage : 180 , 500 281 , 625 462 , 125
11 . Number of proposed Dwelling Units :
PHASE I : 150 units
Sizes of Units : Studio : 350 - 450 sf ± 15 units
1BR : 450 - 650 sf . ± 100 units
2BR : 650 - 850 sf . ± 35 units
Number of proposed Commercial Units : Eight ( 8 )
Sizes of Units : 150 - 200 sf .
5
FUTURE PHASES : 250 units ( new additions H , I , J )
Sizes of Units : Studio : Average of 450 sf .
1BR : Average of 600 sf .
2BR : Average of 750 sf .
( Unit breakdown as market dictates )
Number of proposed Commercial Units : None planned at this time .
Sizes of Units : Not Applicable
INDEPENDENT DEVELOPMENT : ( Parcels 1 , 2 , 3 , 4 , 5 )
Number of Units : 120 -bed nursing facility
150 -unit apartment complex
Size of Dwelling Units : ± 200 sf . per double occupancy nursing
room .
± 700 sf . per 2BR unit retirement
apartment ,
Number of proposed Commercial Units : Three ( 3 ) small professional
office buildings .
Sizes of Units : 5000 sf . each ; two stories with 2500 sf . footprint .
12 . Parking : Note : Current parking plan requires a variance of 1 space for
each unit as opposed to the existing Multiple Residence requirement of
1 . 3 spaces per unit .
PHASE I : 150 Life Use Units
Parking required by Z . O . with variance : 150 spaces
Existing Parking available : 120 spaces
New Parking Proposed : 30 spaces
Total : 150 spaces
FUTURE PHASES : 250 units ( new additions H , I , J )
Parking required by Z . O . with variance : 250 spaces
Additional Existing Parking available : 123 spaces
New Parking Proposed : 127 spaces
Total : 250 spaces
NOTE : At this time , additional spaces on the right -of-way second tier
parking will be available . .
TOTAL LIFE USE PARKING REQUIRED AND PROPOSED : 400 spaces
INDEPENDENT DEVELOPMENT : ( Parcels 1 , 2 , 3 , 4 , 5 )
Doctor ' s offices : ( 20 spaces / bldg . ; 3 bldg . ) 60 spaces
( 4 spaces for each doctor required by R -30 zone . )
Nursing complex : ( 1 space for each 3 employees ) 80 spaces
( 1 space for each 2 beds )
Retirement apartments : ( 1 . 3 spaces / unit ) 224 spaces
( including clubhouse )
TOTAL INDEPENDENT DEVELOPMENT PARKING SPACES REQUIRED AND
PROPOSED : 364 spaces
TOTAL PARKING SPACES REQUIRED AND PROPOSED FOR COMPLETE 50
ACRE COMPLEX : 764 parking spaces
( NOTE : Indirect Contamination Source Permit may be required if 1 , 000
spaces provided . )
13 . Show proposed Signs on Site Plan :
Signage will be designed , dimensioned , . constructed , and positioned as
required within guidelines established by the Town of Ithaca , the Plan -
ning Board , and the Zoning Board .
Proposed location of complex identification sign located on site plan on
Parcel # 4 R . O . W . possible only if new entrance road is constructed .
14 . Show proposed Lights and other Poles on Site Plan ,
PHASE 1 : LIFE USE UNITS ( EXISTING BLDG ) WINGS A , B , C , E , F , G+D )
Will use existing lighting pole layout , and lighting sources
FUTURE PHASES LIFE USE UNITS ( NEW ADDITIONS )
Height above ground 20 - 30 feet to match existing exact location to
be determined consistent with Town regulations and existing
lighting layout .
Total lumens ± 15 , 000 per fixture
INDEPENDENT DEVELOPMENT ( PARCELS 1 , 2 , 3 , 4 , 5 )
Exact location to be determined consistent with Town regulations .
Height above ground - 12 ' - 16 ' ( residential scale 7s'.
Total lumens - 7 , 000 per fixture / residential
7
. 15 . Name potentially hazardous materials , such as toxic substances , flam -
mables or explosives to be used or disposed of during or after proposed
action : None known
Purpose of materials : Not Applicable
16 . If the resulting activities are either commercial or industrial use , write
the materials to be transferred to / from the site , their frequency , and
the mode of transportation .
Imported materials : Not Applicable Exported materials : Not Applicable
Frequency : Not Applicable Frequency : Not Not
Mode : Not Applicable Mode : Not Applicable
17 . Describe project history , including controversy perceived by the devel-
oper , litigation , court decisions , etc . : None known
COMMUNITY FACTORS AND IMPACTS
. 18 . Designated Zoning of the Site of the proposed action : R30
19 . Zoning Changes or variances being requested : Zoning change to Multiple
Residence District for Life Use Residence complex requested for parcels
5B , 7A , 9 , + portions of parcels 5A , 10 ; approximately roximately 27 27 acres and
the retirement apartments in the independent development area are
approximately 10 . 15 acres . A height variance is also requested to permit
a six floor maximum and a parking requirement not to exceed 1 parking
space per living unit .
20 . Check if the Site of the proposed action is within or next to the fol-
lowing districts of Areas :
X Agricultural District Historic Preservation District
Floodplain ( HUD designated ) Unique Natural Area
Freshwater Wetland
21 . Check which land uses describe the neighborhood character :
X Single - Unit Residential Recreation
Multi - Unit Residential X Agriculture
Commercial Forestry Woodland
Industrial Wildlife / Conservation
X Institutional Inactive
Transportation Other
� _ 8
22 . Check which public services are being requested or applied for :
X Sanitary Sewage X Gas
X Water X Electricity
X Storm Drainage X Telephone
i
( NOTE : Permits may be required from municipality for hook -up . )
23 . Check which transportation facilities will serve the site of the proposed
action :
X State Highway X Sidewalks On - street Parking
X County Highway One -way Traffic Off- street Parking
X Town Highway X Two-way Traffic Bus Systems
City / Village Street Traffic Lights
24 . Number of existing buildings affected by the proposed action :
Show on the Site Plan : One ( 1 ) existing old hospital structure .
25 . Name important buildings or districts known to be historically or archeo -
logically important or which are listed on the register of Historic
Buildings : None known .
Show on the Site Plan :
NATURAL FACTORS AND IMPACTS
26 . Depth to bedrock at Site of proposed action . ( Check more than one if
necessary . )
Up to four feet depth
X Four feet to ten feet
X Greater than ten feet
27 . If bedrock depth is less than ten feet , check type of bedrock existing at
Site of proposed action :
. Shale
X Thinly bedded shale and siltstone ( upper strata )
X Siltstone or sandstone ( lower strata )
Limestone
Note : Borings done at time of new Hospital construction .
9
28 . Check types of topographic features which describe or are found on the
Site
X Level or gently rolling plains Hilltop
Hummocks with small ponds X Hillside
Glens and gorges Valley bottom
29 . . Name the soils as identified in the Soil Survey of Tompkins County which
are found on the part of the Site proposed to be modified . Initials may
be used : Mc , HuD , LtC , HzE
30 . Briefly describe the nature and extent of proposed modifications of
existing slopes or soils or drainage :
PHASE I : LIFE USE UNITS
- Phase 1 development requires little to no revision or modification
to slopes or on - site drainage .
FUTURE PHASES : LIFE USE UNITS
Addition will negotiate existing slope topography . On site drain -
age system will be expanded to handle additional impervious surface
load .
INDEPENDENT DEVELOPMENT AREAS
Development will complement and harmonize with existing topo -
graphy . With existing slope percentage , drainage can occur in
deversion around structures and follow natural water courses .
Percolation will occur naturally in vast areas of undisturbed lands -
caping .
YES NO
319 X Will any wetlands or adjacent areas be modified by the pro-
posed action ? If so , designate on the Site Plan ' the wetlands
which will be affected :
( NOTE : " Wetlands " permit from administrating agency re -
quired for alteration . )
YES NO
320 X Will any streams be modified by the proposed action ? If so ,
designate on the Site Plan which streams will be modified :
( NOTE : " Dam " or " Disturbance " permit from DEC is required
for modifications . )
11
33 . X Will any waste materials or effluent be discharged into a stream
or groundwaters ? If so , designate on the Site Plan the
streams which will be affected :
( NOTE : SPDES permit from DEC required for discharges . )
34 . Do any of the following types of vegetation exist on the Site of
the proposed action ?
X Stands of mature trees greater than 30 feet tall .
X Young tree species less than 30 feet tall .
X Shrubs .
X Terrestrial plants up to two feet high .
X Ferns , grasses , sedges , rushes .
X Aquatic plants .
X Crops ,
350 X Are any vegetative management techniques currently being
practiced on the Site of the proposed action ? General upkeep
on the Phase 1 area .
36 . X Will any trees or shrubs be removed by the proposed action ?
If so , designate on the Site Plan the area that is to be
affected . First phase and future phase life use units re
little to no tree or shrub removal ; quire
rode endent development
will require removal to be shown on final site plans
37 . X Are there any plans for revegetation ? If so , briefly explain :
Phase I landscaping . around attachment to new Hospital and
pool area Future phases and rode endent development areas 11
Ili be landscaped so as to enhance the new addition , doctor ' s
offices , and nursing complex
380 X To your knowledge are there any rare , endangered or unusual
vegetative species which are located on or near the Site of the
proposed action ? If so , how are they distributed :
39 . X Will activity cause a change in or affect visual character of
natural or cultural landscape features ? Limited amount of
vegetation change in clearing for future phase and independent
development construction .
12
i
40 . X To your knowledge , are there any significant wildlife habitats ,
migration routes , or breeding areas located on or near the Site
that might be affected by the proposed action ?
41 . X To your knowledge are there any rare , endangered , endemic ,
or unusual wildlife species which are located on the Site of the
proposed action ? If so , how are they distributed :
42 , X To your knowledge , are there any known unique natural
features on or near the site of the proposed action ? If so ,-
briefly explain :
43 . Will any of the following emissions be produced by the pro -
posed action or its resulting activities ? If so , describe the
cause .
X Ashes :
X Dust :
X Fumes :
X Odors :
X Smoke
X Other Emissions :
( NOTE : Air Quality Permits from DEC or Tompkins County
Health Department may be required . )
44 . X Will there be changes to existing noise or vibration levels due
to the proposed action or its resulting activities ? If so , .
describe the cause :
SOCIO - ECONOMIC FACTORS AND IMPACTS
45 . Number of Employees during construction : Maximum 100 construction
employees for each phase .
46 . Maximum number of employees present at the Site at one timer Maximum
100 construction employees for each phase .
47 . If resulting activities are for either Industrial or Commercial use , state
the employment shifts and number of employees in each shift :
PHASE 1 : Day Shift 90 % , Employees
Night Shift loo Employees
FUTURE PHASES :
Day Shift 70 % Employees
Night Shift 30o Employees
JL�m13
48 . If the resulting activities are for residential use , state 6-he number of
planned residents :
PHASE 1 : Permanent : 135
Seasonal : 15 ( estimated 10 % of total )
Total : 150
FUTURE PHASES : Permanent : 225
Seasonal : 25 ( estimated 100 of total )
Total : 250
INDEPENDENT DEVELOPMENT : Retirement Apartments
Permanent : 150
Seasonal : 0
Total : 150
49 . Briefly describe the nature and amount of indirect growth anticipated as
a result of the proposed action or resulting activities : See attached
statement section on " Community Benefit " .
50 . Existing community or business or facilities or residential structures
requiring relocation : None
51 . If the focus of resulting activities is for residential use , check if
residence is intended for :
Low Income Segment X High Income Segment Families
X Medium Income Segment Students X Elderly
52 . Will proposed activity substantially change the following socio-economic
population distribution ?
Income Ethnic Background
Race X Age : Obvious increase in elderly
COMMENTS
53 . In your judgment , will the proposed action result in a significant
environmental impact during construction and / or during use after
completion ? No . Phase 1 and future phase construction represents
normal residential construction , with very limited impact to the-
environment ,
14
GOVERNMENTAL AGENCIES
54 . Check the levels of government and name the agencies having juris -
diction over the proposed action . Indicate the :. required permits by
stating " YES " or " NO " if permit has been appro"Ved . ( The following
pages will advise on the types of actions which require particular
permits . ) =
FEDERAL PERMITS : Not applicable
a ) National Pollution Discharge Elimination System : EPA Region
11 , New York City.
b ) Activities in navigable waters . Corps of Engineers , Buffalo .
c ) Other
STATE PERMITS
a ) Certificate of Compatibility and Public Need :
PSC , DEC Albany ( Public Utilities ) ,
b ) Dam / Impoundment Construction or Repair :
DEC , Environmental Quality Unit , Cortland .
c ) Disturbance of Stream Bed / Fill of Navigable Waters :
DEC - EQ Unit , Cortland .
d ) Incinerator Construction or Operation :
DEC - EQ Unit , Syracuse .
e ) Indirect Air Contamination Source :
DEC - EQ Unit , Syracuse .
e ) Mining :
DEC - Mineral Resources Bureau , Albany .
f ) Pesticide Purchase , Use ( 7 Permits ) :
DEC , Pesticides Bureau , Albany .
g ) NO Process , Exhaust , Ventilation System . Construction or
Op eration :
DEC - EQ , Syracuse
h ) NO Public Water Supply :
DEC , Environmental Analysis , Albany
SPDES : ( Tompkins County Health Department review )
i )
DEC , Environmental Quality Unit , Syracuse
( Tompkins County Health Department review )
j ) Stationary Combustion Installation :
DEC - EQ Unit , Syracuse
k ) Wetlands / Adjacent Areas Alteration :
DEC - EQ Unit , Cortland
1 ) Other
15
COUNTY OF TOMPKINS
a ) NO Driveways , Culverts : Highway Department
b ) Hazardous Wastes : Health Department
c ) NO Institutional Use : Health Department
Future Phase Health Care Facility
d ) Mass Gathering : Health Department
e ) Offensive Materials ( Scavenger Wastes ) * Health Department
f ) NO Public Utility Line Extension : Health Department
g ) NO Restaurant Use
Health Department
Possibility in Phase I
oil
h ) Restricted Burning :
Health Department ( DEC- EQ Unit review )
i ) NO Sanitary Facility for Realty Subdivision :
Health Department ( DEC- EQ Unit review )
j ) Septic Tank Cleaner / Industrial Waste Collection :
Health Department ( DEC- EQ Unit review )
k ) NO Sewage Disposal System : Health Department
1 ) Solid Waste Management Facility :
Health Department ( DEC - EQ Unit review )
m ) SPDES ( Pollution Discharge ) $
Health Department ( DEC - EQ review )
n ) NO Swimming Use
Health Department
o ) NO Temporary Residence ( Boarding House , Camp , Day Care ,
Hotel , Motel , Mobile Home Park ) *
Health Department
Guest Rooms
p ) NO Water Supply (Public :
Health Department
q ) Wetlands / Alteration Wetlands Commission / County Clerk
r ) Other
TOWN OF ITHACA
a ) Blasting i ) NO Public Utility Connection
b ) NO Building Permit j ) NO Signs
c ) NO Street Opening k ) NO Subdivision
d ) Extraction of Natural 1 ) NO Streets and Drainage
Materials
e ) NO Land Use Variance m ) - Wetlands Alteration
f ) Mobile Home Park n ) NO Zoning Variance
g ) Multiple Residence o ) Other
h ) Planned Unit Development
16
55 . Sources of Public Funds ( if any ) for proposed action : None known .
56 . If Federal review under NEPA is required , name Agency : None known .
Signature of Applicant
Fleck and . Lewis . Architects
Title
17
REVIEWER ' S RECOMMENDATIONS : See attached Part II form .
Type of Action : Type I
Signatu of Reviewer
Town Planner
Titl e
Town of Ithaca
Agency
March 9 , 1984
Date Reviewed
DETERMINATION BY TOWN OF ITHACA TOWN BOARD :
Negative Declaration - - Determination of Non - Significance .
Positive Declaration - - Action may be of Significant Environmental
Impact . D / EIS required .
;iLg n ture of Chairperson
D ate
18
TOWN OF ITHACA
ENVIRONMENTAL ASSESSMENT FORM
PART III
RE : LAKE SHORE WEST
Question # 1 : Will there be an effect as a result of a physical change to the
project site ?
Analysis : The slope of the . entire site is in the range of 10 - 15 percent .
Phase 1 construction , and the construction of future Life Use
Units , will be on the more moderate slopes immediately sur -
rounding the former hospital . The slopes in the parcels
designated for independent development are in the 10 - 15
percent range . The soil in this area is described by the Soil
Conservation Service as very shallow , perhaps 20 inches to
bedrock . This area is suitable for building , though blasting
might be necessary if bedrock were encountered . Soil erosion
is also a risk in these areas and precautions should be taken
in landscaping .
Mitigation : During site plan review for the independent developments ,
borings may be necessary to determine amount of blasting
required to construct the health care facility . Blasting could
have some short-term effect on the existing neighborhood and
residents . Building design , site control , and landscaping
should work with terrain in order to control erosion ,
Question # 6 : Will project affect drainage flow , patterns , or surface water
runoff ?
Analysis : Poorly sited construction and roadways , particularly in the
parcels designated for independent development , would likely
result in soil erosion and unnecessary impacts on natural
drainageways .
Mitigation : Careful site plan review is required by the Planning Board ,
with particular emphasis on the location and sizing of all
culverts , and drainageways . Road construction and parking
facilities should be carefully evaluated during site plan review
to minimize downhill impacts of increased runoff . Check
damming and riprapping may be necessary , when in the opin -
ion of the Town Engineer , additional measures are needed to
control runoff volume and flow and minimize erosion .
Conclusions : The master site plan , as presented , suggests negligible
19
environmental impacts resulting from the construction of the
Life Use Units . Any possible negative impacts would accom -
pany construction associated with the independent develop -
ments . Careful site plan review , with particular attention to
landscaping and erosion control , should '. be expected at such
time as particular independent developments are proposed .
_ � 20
IN THE MATTER OF : Lake Shore West Development
RESOLUTION : Town of Ithaca Town Board
Adopted April 9 , 1984
MOTION by Councilman Mc Peak , seconded by Councilman Bartolf
RESOLVED , that the Town of Ithaca Town Board , acting as lead agency in the
review of the proposed Lake Shore West development , approve and hereby does
approve the Environmental Assessment Form as submitted March 8 , 1984 ; and
FURTHER RESOLVED , that pursuant to Local Law #3 , 1980 , this action is
classified as Type I ; and
FURTHER RESOLVED , that the Town of Ithaca Town Board , has determined
from the Environmental Assessment Form and all pertinent information that the
the construction of the 400 centralized Life Use Units will not significantly
affect the environment provided that :
.10 The developer contribute to the construction of the new entrance road on
terms to be established by the Planning Board , and
20 the developer will determine the number and location of the parking
spaces required for the 400 life use units and employees to the satis -
faction of the Planning Board and Zoning Board of Appeals , and
39 establish to the satisfaction of the Town Engineer that adequate capacity
exists in the water and sewer on - site utility networks as well as the Town
and City system ; it is
FURTHER RESOLVED , that , given the information provided in the Environ -
mental Assessment Form , the construction of the nursing complex may signif-
icantly impact the environment and , therefore , further information is
requested . The questions to be specifically addressed in an Environmental
Impact Statement are :
1 . What the traffic impacts from the nursing facility would be on circulation
through the project site and the adjoining neighborhood ;
2 . How storm drainage and surface runoff from the proposed nursing facility
will be accommodated within existing stream channels ;
3 . How much clearing of the existing landscape would be necessary in order
to construct that nursing facility , as planned ;
4 . What blasting , if any , would be required in order to develop the nursing
facility and adequate associated parking ;
5 . Has there been any dumping of hazardous wastes or materials on the site
indicated for independant development as a nursing facility ;
21
6 . How many permanent employees will be required by the nursing complex ;.
7 . Will the water and sewer system to have sufficient capacity to handle the
additional capacity required by the nursing . complex *
8 . What open space amenities are to be provided for the nursing home
residents .
CARRIED UNANIMOUSLY .
4 / 23 / 84
22
QUESTION # 1 : What the traffic impacts from the nursing facility would be on -
circulation through the project site and the adjoining
neighborhood ;
ANSWER : The attached report from Lowell Barnes ( Appendix # 3 ) des-
cribes atypical day ' s traffic flow in considerable detail . The
most informed opinion at this time is that ' the majority of
traffic to the nursing complex will pass through the Lake
Shore West internal driveway and will not find any advantage
in traveling Indian Creek Road . As a result , the expected
impact on the adjacent neighborhood is expected to be small .
QUESTION # 2 : How storm drainage and surface runoff from the proposed
nursing facility will be accommodated within existing stream
channels ;
ANSWER : As described in the attached letter from Mr . Franklin Van
Volkinburg of Fred H . Thomas Associates ( Appendix #6 ) , it is
anticipated that retention ponds will be built as needed to
accomodate runoff from the nursing facility . Further inves -
tigation will be accomplished during the actual engineering
design to determine whether surface or subsurface basins
would be more effective . The location of all drainage
structure would be subject to review by the Planning Board
and the Town Engineer .
QUESTION #3 : How much clearing of the existing landscape would be
necessary in order to construct that nursing facility , as
planned ;
ANSWERS : Mr . Van Volkinburg ' s letter ( Appendix # 6 ) describes the
amount of site clearing required for the nursing home , parking
areas , and grading transitions as a total of 2001 acres ;
approximately 23 . 7 % of the nursing home site total .
QUESTION # 4 : What blasting , if any , would be required in order to develop
the nursing facility and adequate associated parking ;
ANSWER : In a telephone conversation with Mr . Van Volkinburg on May
3 , 1984 I was told that , in answer to question - #4 , extensive
blasting on the site would make the nursing home development
cost prohibitive . It was stated that the intent and expectation
of the architects and engineers is to site the building and
associated parking in such a way as to avoid the need for
. blasting on the site . This opinion is reinforced by the
letter from - Kevin Lewis , the principal architect for the
development ( Appendix # 5 ) .
24
_:... N..::.:.!uuaL., w...-rte... 1.... ..�...:�r.....✓..e_.......-....�.. ...........V.....e...�,._.......o.. .4.........,...._......._r...______.._.__.______ . -.._.—_.__ _ _ _ _ . .
QUESTION # 5 : Has there been any dumping of hazardous wastes or materials
on the site indicated for independant development as a nursing
facility ;
ANSWER : The attached letter from Donn Williams ( Appendix # 7 ) simply
states that , neither he , nor the head groundskeeper for the
Hospital , have any knowledge of hazardous waste of materials
having been dumped on the site .
QUESTION # 6 : How many permanent employees will be required by the
nursing complex ;
ANSWER : In a telephone conversation with the offices of Fleck and Lewis
on May 3 , 1984 a figure of 60 - 70 permanent employees was
presented . The report of S . Lowell Barnes ( Appendix #3 )
describes the typical hour-to- hour staffing requirements in
considerable detail .
QUESTION # 7 : Will the water and sewer system to have sufficient capacity to
handle the additional capacity required by the nursing
complex ;
ANSWER : In the letter from Mr . Van Volkinburg ( Appendix # 6 ) ,
information is presented which indicates that the utility lines
to the site , and the capacity of the Townwide water and sewer
system in general , will be adequate to serve the facility ' s
present and expected future needs . Superintendent of Public
Works Kinsella and Town Engineer Fabbroni are both referred
to in support of this information .
QUESTION #8 : What open space amenities are to be provided for the. nursing
home residents .
ANSWER : As described in Lowell Barnes report ( Appendix # 3 ) , the
activities and programs in the nursing home appear to . be
exclusively indoor in nature . For patients in a nursing home,
open space amenities more extensive than pleasant landscaped
surroundings may be underutilized . Kevin Lewis ' cover letter
( Appendix # 2 ) indicates that terraced , landscaped areas are
typically provided in nursing homes and are planned . for this
f acility .
25
APPENDIX : Letters and Supporting Documentation
1 . Cover memorandum from Kevin Lewis to Peter Lovi , _ April 27 , 1984
- listing the questions asked by the Town Board and describing the
responses of the various consultants
2 . Cover letter from Kevin Lewis to Peter Lovi , April 30 , 1984
- describing the report of S . Lowell Barnes
39 Report from S . Lowell Barnes to Kevin Lewis , April 25 , 1984
- describing the projected traffic impacts of the nursing home
development and giving a daily staffing model .
49 Letter from S . Lowell Barnes to Ms . Seline Alexander , March 21 , 1984
- estimated parking requirements for Lake Shore West retirement
community .
5 . Letter from Kevin Lewis to Peter Lovi , April 30 , 1984
- discussion of the depth to bedrock and whether any blasting will
be required .
69 Letter from Franklin Van Volkinburg ( Fred Thomas Assoc . ) , May 2 , 1984
- discussion of drainage requirements , clearing of existing
landscape , adequacy of existing utility system to serve
development .
7 . Letter from Donn Williams , May 2 , 1984
- statement that no hazardous materials are believed to have been
dumped on the project site .
26
w
TO � TCWN (.'XIF" ITHAC.A April 27 , 1984
Attn : Mr . Peter Iovi
Ithaca , New York
Re . lake Shore West - Specific questions raised =. by the
TOWN OF ITHACA
The following comments represent responses to specific questions
raised by the Town of Ithaca Boa�'ds . The questions pertain to the
development of a Nursing Complex on the project site .
These questions have been addressed by Fleck & Lewis , Architects , it ' s
partner in this project - Fred H . Thomas Assoc . , Architects & Engineers ,
The ITD Group , Inc . , owners of the project and by the Tompkins County
Dept . of Public Works .
In responses. to the Town ' s request for this information to be made
available as soon as possible prior to the May 7th board meeting ,
specific questions have been answered in letter form from the above
firms and have been sent directly to the Town Planning Office in
an attempt to save time .
The specific questions responded to , were taken from a draft resolution
prepared by the Town Planner for the Town Board , and are as follows :
1 . "What the traffic impacts from the nursing facility would be on
circulation through the project site and the adjoining neighbor-
hood "
24 " How storm drainage and surface runoff from the proposed nursing
facility will be accommodated within existing stream channels ? "
30 " How much clearing of the existing landscape would be necessary in
order .to construct that nursing facility , as planned? "
40 "What blasting , if any , would be required in order to develop the
nursing facility and adequate associated parking? "
S . " Has there been any dumping of hazardous wast or materials on the
site indicated for independent development as a nursing facility? "
66 " How many permanent employees will be required by the nursing com-
plex?
70 "Will the water and sewer system to have sufficient capacity to handle
the additional capacity required by the nursing complex? "
80 "What open space amentities . are to be provided for the nursing home
residents ? "
27
TOWN OF ITHACA April 27 , 1984
A.Attn : Mr . Peter Iovi Page 2
Due to the limited amount of time to prepare responses and the
fact the Nursing Facility is still in it ' s conceptualstages ,
more specific technical information will be made available to
the Town Boards and agencies as the project proceeds from a
conceptual footprint to maturity . In the meantime , it is im-
portant to evaluate these initial responses and the technical
information , offered in terms commensurate with the conceptual
footprint .
Respectfully submitted ,
FLECK & IDIIS , ARCHITECTS
Kevin E . Lewis
Hanover , New Hampshire
KEL : ma
28
FLECK AND LEWIS ARCHITECTS
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
W. BROOKE FLECK A • 1 • A
EDWARDC . LEWISA • 14A
April 30 , 1984
Town of Ithaca
Attn : Mr . Peter Lovi ,
Town Planner
Ithaca , New York 14850 .
Dear Peter :
The attached report from S . Lowell Barnes & Associates was
received by me today . I am forwarding it to you so it can e
be compiled with the other information sent to you from the
other firms .
Please note Mr . Barnes a well known Gerontologist is an
expert in planning retirement communities which include
nursing complexes . Mr . Barnes ' report . addresses . in part ,
questions 116 , and 8 . His report goes into very detailed
programing for the project .
Question # 1 . " What the traffic impacts from the nursing
facility could be on circulation through the project site
and the adjoining neighborhood ? ".
This question has been addressed on page 3 under the heading
" Traffic Analysis . " ' This is an actual projected workday
routine . The " Traffic Summary " on page 4 locates the great -
est amount of traffic impact in terms of time of day .
The question not addressed was the separation of traffic
load between the complex side or the adjoining neighborhood
side . The major work force populace being centered in the
Ithaca area , and with the construction of the new entrance
road to the complex we believe that the vast majority of
increased traffic will happen along the Lake Shore West
Hospital corridor to Rt . 96 , and not through the adjoining
residential neighborhood .
Nothing . at this time would indicate any appreciable traffic
increase along the Indian Creek Road .
Mr . Barnes traffic analysis did not mention . the estimated
amount of traffic generated by visitors to the complex . He
has indicated to this office that visitors to a nusing home
are few and infrequent . The visitation that does occur gen-
erally happens on the weekends , Sunday in particular and would
not rival the majority of staff traffic or parking requirements
associated with a Monday to Friday work week .
310 BRIDGMAN BUILDING P. O. BOX886 HANOVER , NEW HAMPSHIRE 03755 TEL. (603) 643 - 4226
29
Mr . Peter Lovi
April 30 , 1984
Page 2
As indicated on our Gray Handbook dated March 8th , we plan
on providing the amount of parking as required by the code .
Question # 6 , " How many permanent employees will be required
by the nursing complex ? "
I believe this question has been more than sufficiently ,
answered in Mr . Barnes report pages 2 and 3 .
Question # 8 , " What open space amentities are to be provided
for the nursing home residents ? "
Mr . Barnes has gone into great detail to describe the inter -
nal amentities and programs associated with the nursing
complex on page 1 and 2 of his report . However , I believe
the term " Open Space " in the question refers to external
space as well as internal . As any of us who have designed ,
developed or even visited a nursing complex are aware ,
little outside activity areas are required or necessary for
the patients . The vast majority or activities are to
happen internally and under close scrutiny . We are plan-
ning , as is the norm for nursing complexes an outside
garden terrace area adjacent to the public spaces for
sitting and sunning .
It is important to remember patients in this . complex are in-
firmed and recreational activities are generally confined
to interior facilites .
The attached report of Mr . Barnes goes into greater detail
on these 3 questions .
Very truly yours ,
FLECK & LEWIS , ARCHITECTS
Kevin E . Lewis , Architect
KEL : ma
enclosures
30
-
.�. .�acr�P� -
1 Thompson Hill Road
Milford , CT 06460
(203) 878-5663
April 25 , 1984
Mr . Kevin Lewis
Fleck & Lewis , Architects
Hanover , New Hampshire
Dear Kevin :
You have asked me to describe the program planned regarding commons and service
areas for Lake Shore West ' s 120 bed nursing home to be built in the future and
about the number of employees by shift , traffic implications , etc . The following
information relates to your request .
The nursing facility will consist of both skilled and intermediate nursing programs
60 beds each . The building will be two storys with the 60 bed intermediate care
beds and commons areas located on the first floor and the 60 bed skilled program
located on the second floor . There will also be a basement .
The intermediate nursing program ( called Health Related in New York State ) will
consist of an entrance lobby of about 800 square feet , a reception area of about
100 square feet , administrative , accounting , social service and nursing offices
totalling about 1 , 100 square feet , a conference room/ library to be used by both
residents and staff consisting of about 300 square feet , a room for general
activities of about 700 square feet , a chapel of about 400 square feet , a craft
and game room of about 600 square feet , a dining room able to seat 60 residents
about 1 , 500 square feet (many of these residents will be in wheelchairs which
require extra space for traffic flow , a commerical kitchen of about 1 , 700 square
feet including storage and cooling areas , nurses station with medication room ,
oxygen storage , wheel chair storage , about 300 square feet total , a volunteer
area and gift shop about 500 square feet , an examination room of about 300 square
feet , resident shower room with whirlpool bath and regular bath tub , about 400
square feet including clean and dirty linen storage , and a resident locker area
providing about 16 square foot storage for each resident ( these can be stacked
and accomodated in a room of about 750 square feet including traffic flow) .
The skilled nursing program will require an elevator lobby of about 400 square
feet , an office for the activity director and for nursing , a reality orientation
therapy room for rehabilitating confused patients and an observation room for
training , the two rooms should total about 500 square feet , a reading room of
- about 400 square feet , a room for general activities totaling about 600 square
feet , a prayer room of about 200 square feet , a craft and game room of about
600 square feet , a dining room able to accomodate about 40 patients , all in
wheelchairs , about 1 , 000 square feet , a service pantry of about 340 square feet ,
nurses station with medication room , oxygen storage , wheelchair storage , about
450 square feet , a volunteer area of about 200 square feet , an Examination room
of about 300 square feet , resident shower room with whirlpool bath , about 400
a firm specializing in the planning, development, marketing 8 management of high quality retirement communities
® 31
Mr . Kevin Lewis , Page Two
square feet including clean and dirty linen storage , and a resident locker area
providing about 16 square feet storage for each patient , a room of about 750
square feet , staff areas for both mens and womens lockers , toilets lounge and
dining areas totaling about 800 square feet . There must be a toilctfacility
for nurse use and a small kitchen for snacks near each nurse station and public
toiletfacilities for both sexes on each floor . One regular elevator and a
service elevator will be required .
The basement will be used for mechanical functions , about 800 square feet , house
a commerical laundry , about 800 square feet , for housekeeping storage and office
about 600 square feet and for maintenance shop and storage , about 1 , 000 square
feet . At least 800 square feet will be. need for general storage .
The personnel involved by shift assuming 90% occupancy ( 54 patients on each floor
keeping some beds available for the life care residents ) follows . It is important
to note that the shift hours are flexible and can be scheduled around the hospitals
main shift changes , i . e . , they can be 7 to 3 for the day shift , 3 to 11 for the
evening shift and 11 to 7 for the night shift or these shifts could start and end
an hour later or earlier . These shift hours apply only to nursing personnel as
food service , housekeeping , administration , etc . have relative inflexable shits
and work schedules .
Day Shift
NURSING : Director of Nursing , Asst : Director/ Inservice Coordinator , Medical Records
Clerk/nursing secretary and Physical Therapist ( probably supplied by the Hospital
all work a basic 9 A . M . to 5 P . M . shift , Monday through Friday .
Combining the skilled and intermediate care programs in all cases , the day shift
will require four nurses and about 12 nurse aides probably working a 7 A . M . to 3 P . M .
shift ,
FOOD SERVICE : Manager will work a shift of 8 : 00 A . M . to 5 : 00 P . M . so he or she is
available for purchasing/receiving and available to supervise the two main meals .
An Assist . mgr . /Hostess will. work a similar shift to the manager .
The other personnel will work a morning and afternoon shift . From 6 A . M . until
2 P . M . a cook , cook ' s helper , two tray girls and a Sanatation worker caill be on
duty .
HOUSEKEEPING AND LAUNDRY : Six housekeepers , two laundresses and a supervisor will
work a five day week alternating on weekends on a work schedule of 8 : 30 A . M . to
4 : 30 P . M .
ADMINISTRATION : A Licensed Nursing Home Administrator , a Secretary , a BookKeeper
and a receptionist will work five days a week on a 9 A . M . to 5 P . M . schedule .
The receptionist position would be continued on Saturdays and Sundays .
PLANT OPERATION : Two maintenance personnel would be on duty Monday through Friday
and one on weekends with a schedule of 8 A . M . to 4 : P . M .
SOCIAL SERVICES : Two Activity Directors ( alternating on weekends ) , one Social
Worker and a part- time driver working shifts of 9 A . M . to 5 P . M .
3 2
Mr . Kevin Lewis , Page Three
Evening Shift
NURSING . Three nurses and eight aides working a 3 P . M . to 11 P . M . shift , seven days
per week .
FOOD SERVICE : one cook , one cook ' s helper and two tray girls working 2 P . M . until
7 P . M . seven days per week . One Sanatation worker working from 11 A . M . until 7 P . M .
Night Shift
NURSING . Two nurses and five nurse aides working a 11 P . M . until 7 A . M . shift , seven
days per week .
Traffic Analysis .
6 A . M . Five food service workers come to work .
7 A . M . Sixteen nursing personnel come to work replacing the night shift composed of
seven personnel who leave at this same time ( usually a 15 minute time span ) .
8 A . M . Two maintenance workers come to work .
8 : 30 A . M . Nine Housekeepers and laundry workers come to work .
9 A : M . Four nursing personnel , four administrative personnel and three social
service workers come to work ( 11 people ) .
11 A . M . Three food service workers cane to work .
2 P . M . Five food service workers come to work replacing five who leave .
3 P . M . Eleven nursing personnel come to work replacing sixteen who leave .
4 P . M . Two maintenance personnel leave .
:4 : 30 P . M . Nine housekeepers and laundry workers leave .
. 5 P . M . Four nursing personnel , four administrative personnel and three social service.
personnel ( 11 people ) leave .
7 P . M . Eight food service workers leave .
ll P . M . Seven nursing personnel come to work replacing eleven who leave . .
It is important to point out that car pooling goes on particularly with the nurse
aides , housekeepers and food service personnel who work the same shift ( they average
about two to a car . Also we will be purchasing the time of some existing hospital
personnel for some of the above listed positions . Another variable is absenteeism ,
our experience . tells us that two to three people will be absent daily and this
work up assumes 100% attendence .
33 -
Mr . Kevin Lewis , Page Four
Traffic Summary
The greatest traffic flow impact will be at 7 A . M . and at 3 P . M . when the nursing
shifts change . Given the car pooling reality this means that about 9 or 10 cars
will be arriving between 6 : 40 A . M . and 7 A . M . and about 4 cars will be leaving
between 7 A . M . and 7 : 15 A . M . As indicated previously this schedule can be adjusted
to the hospital ' s shift change hours to reduce the total impact.
The 3 P . M . shift change will involve about 7 cars arriving between 2 : 40 P . M . and
3 P . M . and about 9 or 10 cars leaving between 3 P . M . and 3 : 15 P . M .
The next greatest traffic impact will be between 8 : 15 and 9 A . M . involving the
arrival of housekeeping , laundry , some nursing , administrative and social service
personnel about 12 cars and between 4 : 30 P . M . and 5 : 15 P . M . when they leave .
The other shift changes involve various times and will not have a noticeable impact ,
no more than 4 or 5 cars coming or going at a time interval .
I hope this information is helpful to you . Please let me know if I can be of
further service • to you or I . T . D . reference the Lake Shore West Project .
Since ely : >
cc . Enrique Darer S . Lowell Barnes
Gerontologist
35
i
�. .C�acuel� awcKect. 8i r��aciated, �ac.
1 Thompson Hill Road
Milford , CT 06460
(203) 878-5663
March 21 , .1984
Ms . Seline Alexander
Lake Shore West Retirement Coaraunity
. 1287 TrLmiansburg Road K-Building
Ithaca , N . Y . 14850
Dear Ms . - Alexander :
You have asked me to provide you with an estimate of the amount of parking
that will be required at Lake Shore West Retirement Community during its
various developmental phases . In our approximately thirteen years experience
in developing and operating retirement communities we have never experienced
such a community with more than about- 50% to 60% of residents with cars .
This is the case due to • the age of these residents and also due to the facility
providing a transportation service . In reality , they do not need a car . The
staff of this type facility are shift - type employees and therefore require j
less parking than a typical business .
Lake Shore West plans the development of about 150 apartment units in its
first phase which will require about 50 full and part - time employees . The
maximum number of parkings spaces needed would be about 130 spaces . These
spaces would breakdown as follows : 90 resident cars , 30 staff cars and about
10 .spaces for visitors , -
At total development ( about 400 units ) approximately 240 spaces would be
needed for resident cars , 80 spaces for staff cars and about 25 spaces for
visitors , totaling 345 spaces . I would emphasize that these estimates are
the maximum that could be needed . The actual number of spaces needed will
most probably be less .
I hope this information is helpful to you and will help releave the Town of !
Ithaca ' s concern about your parking needs .
i
incerely • y �'
6 . Lowell rnes
Gerontologist
I
i
36
® a firm specializing in the planning, development, marketing d management of high quality retirement communities
FLECK AND LEWIS ARCHITECTS
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
W. BROOKE FLECK A • I • A
EDWARDC . LEWISA • 1 • A
April 30 , 1984
Tbwn of Ithaca Planning Office
Attn : Mr . Peter lovi
Ithaca , NY 14850
Re : Lake Shore West - Answer to question #4 , raised in a resolution
to the Town Board about future construction of the Nursing Com-
plex .
Question # 4 - "What blasting ,, if any , would be required in order to
develop the nursing facility and adequate associated parking?
Dear Peter .
At this stage of the Nursing Facility development with only a concep-
teal footprint location to go by , it is difficult to make an accurate
determination for any future blasting requirements . While the Soil
Conservation Service describes the soil in this area as being 20 " to
bedrock , test borings done at the time of the new hospital construction
which would be more representative , indicate that there is only thinly
bedded shale and siltstone in the upper strata and siltstone or sand-
stone in the lower strata in this general area . These borings indicated
that bedrock was from 10 feet to 12 feet below surface . This fact
combined with no usual sign of ledge or outcroppings , indicate that
blasting probably would not be required . However , it would be . premature
to rule it out completely .
Due to the large costs implied in blasting our final engineering design
of the footings for the structure will be such to avoid , if all possible ,
any need to blast . At the time of the contract development stage when the
documents required for actual construction will be developed , test borings
at corner positions of the building will be taken to determine actual
sub-surface conditions . This is the only available method for determining
ledge conditions .
Sincerely ,
FLECK & =S , ARCHITECTS
Kevin E . Lewis
KEL : ma
310 BRIDGMAN BUILDING P. O. BOX 886 HANOVER , NEW HAMPSHIRE 03755 TEL. (603) 643 - 4226
37
Fred H . Thomas Associates PC 2560 North Triphammer Road , Ithaca, New York 14850 607 / 257 - 1300
,,�;�chitects Engineers 666 Old Country Road , Garden City , New York 11530 5161222 - 2177
� ��
D May 2 , 1984
MAY 2 - 1984
WN OF ITHACA
Mr . Peter Levi
Town Planner
Town of Ithaca
126 East Seneca Street
Ithaca , New York 14850
Re : Lake Shore West
Questions Raised by Resolution
of the Town Board
Dear Mr . Levi :
This is to respond to certain specific questions raised
by the Ithaca Town Board in its resolution approving the
Environmental Assessment Form for this development ,
These questions deal with storm drainage and landscape
clearing for the proposed nursing facility as well as
with the adequacy of the water and sewer systems to serve
the nursing facility and the Life Use residential units .
Question # 2 on the nursing complex asks how storm drain-
age and surface runoff from the facility will be accom=
modated within the existing stream channels . It is
anticipated that retention basins will be built to handle
the additional runoff from impervious surfaces created by
Fred H . Thomas construction of the nursing facility , Further site
investigation will be required to determine whether
Peter Brellochs surface or subsurface basins can be more easily accom-
Angelo Franco , Jr. modated within the existing topographic constraints .
Retention basins would be designed to allow storm water
James S . Loveall collected during peak runoff periods to be discharged
Robert M . Mueller into the existing stream corridors at a controlled flow
Michael R . Schwartz rate . This controlled flow rate would be established to
Franklin Van Volkinburg nominally equal the calculated current runoff rate from
Charles Dvorak
38
• Mr . Peter Levi
May 2 , 1984
Page 2
this portion of the site and would therefore have no
significant effect on the peak volume of water flow in
the stream channel .
Question # 3 on the nursing complex asks how much clearing
of the existing landscape would be necessary in order to
construct the nursing facility , as planned . The clearing
required to allow for building placement , parking areas ,
entry drive installation and grading transitions would
total approximately 2 . 01 acres or 23 . 7 % of the 8 . 48 acre
Parcel 4 . Of the 2 . 01 cleared acres , approximately . 9
acres would not be covered by the building or by paved
surfaces and these areas would be revegetated .
Two questions in the Resolution ask about adequacy of the
water and sewer systems to serve the new development . In
order to avoid repetition , we will answer them together .
Water is provided to the hospital complex by a 10 " line
connected to the Town ' s water distribution system which
is supplied by the City of Ithaca . The main line then
loops around the old and new hospitals serving domestic
water and fire fighting systems within the buildings as
well as fire hydrants located around the perimeter of the
buildings . The on- site distribution system is more than
adequate to serve the Life Use units in the old hospital
building and , with appropriate extensions , the nursing
facility also . We have discussed the projected water
needs of 55 , 000 gallons per day for both buildings with
your engineer , Mr . Fabroni , and with the City ' s Superin-
tendent of Public Works , Mr . Kinsella , and they have both
. expressed no reservations about their systems ' ability to
supply this amount .
Sewage from the hospital complex is carried by a 10"
gravity sewer line to the City of Ithaca ' s collection and
treatment system . On- site sewer lines from the buildings
are generally 8 " size and these connect to the 10" main
sewer at a point approximately 300 feet east of the old
hospital laundry . The 10 " sewer then runs 7 , 000 feet to
the city limit with a total drop of about 160 feet for an
average slope of 2 . 3 % . A 10" gravity sewer at 2 . 37. slope
and flowing full can handle a little over 3 cubic feet of
flow per second or about 1 , 400 gallons per minute .
According to meter readings taken by Bolton Point
personnel , the area served by this sewer line currently
uses an . average of 151 , 000 gallons of water per day .
Adding the 55 , 000 gallons per day from the new
39
HIGHWAYS TOI�fi"PKINS COUNTY BUILDINGS
PUBLIC WORKS
Bostwick Road
Ithaca , N . Y . 14850
AIRPORT FACILITIES Telephone ( 607 ) 273- 4262 SOLID WASTES
DATE : May 2 , 1984
TO : Mr . Kevin Lewis
FLECK & LEWIS , ARCHITECTS
310 Bridgman Building
P . O . Box 886
Hanover , NH 0375 � ����w�
FROM : Donn Williams d�
General Building Supervisor
In response to your letter dated April 25 , 1984 , asking the question
had there been any dumping of hazardous waste or materials at the old hos -
pital site , I have contacted the head grounds keeper for Tompkins Community
Hospital and questioned him about your request . We both have no knowledge
of hazardous waste being dumped on this property .
As far as turning over the building plans , please contact me and we- will
make arrangements .
cc : Peter Lovi , Town Planner of Town of Ithaca ►.
41
s •
FLECK - AND LEWIS ARCHITECTS
MEMBERS OF -FI-IF AMURICAN INSTITUTE OF ARCHITECTS
W. BROOKE FLECK A • I • A
EDWARDC . LEWISA • I • A
April 25 , 1984 t C
Zbmpkins County Dept . of Public Works,.,
Attn : Donn Williams
Bostwick Road
Ithaca , New York
J
Re : Lake Shore West - ;
Ithaca , New York
Dear Donn .
The Zbwn of Ithaca Town Board has requested from us , more specific
information of our proposed Nursing Facility site to supplement
the completed Environmental Assessment Form . One of the specific
questions raised was " Has there been any dumping of Hazardous
Waste or materials on the site indicated for independent develop-
ment as a Nursing Facility? " Not knowing the specific history of
the site I felt the question could be more easily addressed by the
County , the past and current owner.
I would greatly appreciate any information you shed on this parti- i
cular question . As always . we .. are . under a time crunch and _vp ld
appreciate your inurledicate attention . Due to , the time limitations
I would request you send your comments to Peter Lovi ,. . theZbwn Planner
_
of the Town of Ithaca and a copy to me here in New Hampshire .
Pursuant to our meeting in your office yesterday , I would also like
/ to formally request to the County to turn over copies of all con-
`� tract drawings , site plan specifications or any pertinent informa-
tion on the old hospital . This would be of invaluable help in our
upcoming Construction Document Phase .
Thank you for your time and consideration in these matters , if there
are any questions , please feel free to call me .
Very truly yours ,
FLECK & LEWIS , ARCHITECTS
Kevin E . Lewis � .
KEL : ma
310 BRIDGMAN BUILDING P. O. BOX 886 HANOVER , NEW HAMPSHIRE 03755 TEL. (603) 643 - 4226
42
Town Board 8 May 7 , 1984
REVENUES
Federal Revenue Checks (EP # 15 ) $ 841973 . 00
Appropriated Fund Balance 85 , 027 . 00
TOTAL REVENUE & APPROPRIATED FUND BALANCE $ 1701000 . 00
EXPENDITURES
Highway Barn Insulation 21000 . 00
Highway Equipment 8 , 000 . 00
Records Restoration 21000000
Computer 15 , 000900
Fire Station 65 , 000 . 00
® 92 , 000 . 00
Interfund Transfers to
Capital Projects 78 , 000 . 00
TOTAL EXPENDITURES $ 1701000 . 00
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell , and Bartholf
voting Aye . Nays - none) .
SUM ER HELP
Councilman Cramer asked what age requirement the County was
proposing for Summer Help ?
Beverly Livesay responded , the guidelines changed slightly . 70 % of
the kids will be under 18 and next year 75 % . Older youth can be
used for supervision , at your risk .
Councilwoman Raffensperger remarked that nobody knows what CETA is
going to do until the last minute .
Councilman McPeak asked what a Systems Analyst would be doing?
Supervisor Desch responded , develop programs on the ccuputer for
use
Town Planner Lovi stated that several engineering students from
Cornell had been interviewed and would work inside on rainy days .
RESOLUTION N0 , 82
Motion by Councilwoman Raffensperger ; seconded by Councilman
McPeak ,
WHEREAS , the Town Board wishes to make progress on the following
projects during the 1984 Construction Season : Burns Road
relocation , SOS drainage work on Stone Quarry Road , paving , park
construction and maintenance , contract preparation and construction
of water and sewer improvements 1984 , drainage improvements and
maintenance at Eastern Heights and Fall Creek , preparation of base
map , contract documents , etc . , for 1985 water and sewer
® improvements , engineering administration as partner in joint sewer
project , etc . , and
WHERFAtiS , the Town Board has previously authorized hiring three
Civil and Environmental Aides under the Cornell Tradition Program
now identified as Robbin Harris , Janes McKenney , and Jeffrey Finn
all ccmpleting Junior years at Cornell , and
WHEREAS , to satisfy anticipated peak needs of the above project ,
within budgets established , to be filled by JTPA , County SYEP ,
J � �
Town Board 9 May 7 , 1984
Cornell Tradition , Cornell Work Study , and the local employee pool
as appropriate :
A . Two Landscape crews of 4 full-time workers including one added
foreman (woman ) at $ 3 . 35 per hour ; foreman $ 4 . 50 per hour ; between
May 21 - September 7 for ten weeks .
Be One Survey Crew of 3 full-time workers at $ 3 . 35 per hour ;
between May 21 - September 7 .
C . One System Analyst at $ 5 . 00 per hour ; between May 21 - August
24 .
® D . Three Secretarial Aides at $ 3 . 35 per hour ; between June 12 -
September 7 for ten weeks .
E . Four Highway Department temporaries at $ 3 . 35 - $ 6 . 00 per hour
from May 21 - September 12 ,
F . One brush cutting crew at $3 . 35 per hour from June 12 -
September 12 .
G . One Janitor Aide at $ 3 . 35 per hour from June 12 - September 12 ,
and
FURTHER BE IT RESOLVED , that it may be necessary to hire additional
CETA and SYEP employees to meet full time equivalents , e . g . , 2 SYEP
equals 1 -4 / 5 position .
( Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
INI`ERMUNICIPAL SEWER USE ORDINANCE
Supervisor Desch stated that a joint session with the City of
Ithaca will be held in either June or July to discuss the NEW
Intermunicipal Sewer Use Ordinance .
TOWN OF ITHACA K RRANTS
RESOLUTION NO , 83
Motion by Councilman Cramer ; seconded by Councilwoman
Raffensperger ,
RESOLVED , that the Town Board of the Town of Ithaca hereby approves
the Town of Ithaca Warrants dated May 7 , 1984 , in the following
amounts :
General Fund - Town Wide . . . . . . . . . . . . . . . . . . . . . $ 27 , 984 . 65
General Fund - Outside Village . . . . . . . . . . . . . . . $ 91351967
Highway Fund . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 18 , 716 . 74
Parks Reserve Fund . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 024 . 02
® Water & Sewer Fund . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 589 , 541 . 46
Federal Reserve Fund . . . . . . . . . . . . . . . . . . . . . . . . . $ 31285946
Lighting District Fund 277 . 50
Capital Projects Fund . . . . . . . . . . . . . . . . . . . . . . . . $ 355 . 00
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
BOLTON POINT VURRANTS
ZED
Town Board 10 May 7 , 1984
RESOLUTION N0 , 84
Motion by Supervisor Desch , seconded by Councilman Kugler ,
RESOLVED , that the Bolton Point Warrants , dated May 7 , 1984 , in the
Operating Account are hereby approved , in the amount of $ 41 , 701 . 21
after review and upon the recommendation of the Southern Cayuga
Lake Intermunicipal Water Commission , they are in order for
payment .
(Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
® PUBLIC HEARING - AMEND ZONING ORDINANCE - PROPERTY OF ROCCO LUCENTE
Proof of posting and publication notice of a public hearing to
consider an amendment to the Town of Ithaca Zoning Ordinance to
permit the conversion of existing buildings to four dwelling units ,
Tax Parcel No . 6-70 -10 -3 . 12 through 6-70 -10 -3 . 25 at 108 through 230
Sapsucker Woods Road , owned by Rocco Lucente having been presented
by the Town Clerk , the Supervisor opened the public hearing .
Supervisor Desch noted the following resolution , with conditions ,
passed by the Planning Board .
RESOLVED , that concerning the proposal of Mr . Rocco Lucente to
rezone lands on Sapsucker Woods Road , Town of Ithaca Tax Parcels
No . 6-70 -10 -3 . 12 through 6-70 - 10 -3 . 25 , the Planning Board made and
hereby does make the following determinations , findings , and
recommendations to the Town Board :
1 . There is a need for the proposed use in the proposed location
in order to reduce the number of unrelated persons presently
permitted to live in the 14 properties . At present , there may be
as many as 14 unrelated persons residing in each of the 14
structures . The parking areas , garbage facilities , size of lots ,
and landscaping , are insufficient to properly accommodate such a
number of unrelated persons in a manner harmonious with the general
character of the surrounding neighborhood .
It is the developer ' s plan to partition each level of the building
into a one-bedroom and a two-bedrocm dwelling unit , each with a
full bathroom and kitchen . The Planning Board understands that the
utilities necessary for such a conversion are largely in place .
The present proposal would reduce the number of unrelated persons
permitted in each of the 14 structures . The developer has
indicated his willingness to accept restrictive covenants in each
of the deeds , each convenant to list each of the 13 other
properties and the Town as beneficiaries with full powers of
enforcement . These covenants would restrict the occupancy to one
household for each of the one-bedrocm dwelling units per building
and a household and one unrelated person for each unit with two or
more bedrooms . A household would be defined as "Any number of
® related persons , but no more than two unrelated persons occupying a
single dwelling unit . " As a result of these occupancy
restrictions , a maximum number of 10 unrelated persons would be
Permitted to live in each of the 14 structures .
The Planning Board further recommends that , in the event that a
subsequent owner remodels any of the 14 buildings to have less than
4 dwelling units , such a change shall be irreversible , and such an
owner shall forfeit an y prior , non-conforming right to maintain 4
dwelling units on the property . The sole exception to this
provision should be in case of destruction by fire or act of God ,
Town Board 11 May 7 , 1984
the owner shall have the opportunity to rebuild a structure , of
similar dimensions , and maintain 4 dwelling units . If , however ,
the owner rebuilds with a structure of different dimensions or less
than 4 dwelling units , the owner shall have forfeited the right to
subsequently remodel the building and maintain 4 dwelling units .
2 . The existing and probable future character of the neighborhood
will be improved as a result of this proposal . At present and in
the past , large numbers of automobiles have parked in the front
yards and alongside the street , refuse has been strewn around the
garbage receptacles , and the receptacles themselves are not
appropriately landscaped .
® Following the proposed site plan and landscaping scheme , and in
conjunction with the occupancy restrictions , the aesthetic quality
of Sapsucker Woods Road will be improved . New trees and shrubs
will be planted , parking areas will be improved , graded , defined ,
and paved with oil and stone . The reduction in the number of
unrelated persons will reduce the traffic through the neighborhood ,
and the partition of the building into separate apartments should
have the effect or reducing overall noise in the area .
3 . The proposed change would be in accordance with a conprehensive
plan of development of the Town . A policy of the Ccmprehensive
Plan and Zoning Ordinance is to allow for a variety of land uses
and residential alternatives in the Town . In addition , it is
desirable for non-conforming uses to be gradually brought into
substantial , if not actual , conformance with the accepted zoning
pattern for the Town and the immediate neighborhood character .
The present development scheme would permit the developer to
economically convert and sell these structures to as many as 14
independent owners . It is considered that competitive pressures ,
and the requirements of final site plan approval , will result in a
more attractive and conventionally residential neighborhood than
exists at present . Over the longer run , a provision in the
resolution that any subsequent conversion of these properties to a
structure with less than four dwelling units is irreversible will
result in gradual return of this neighborhood to an R15 residential
character indistinguishable from the remainder of the community ,
and the Town in general .
IT IS FURTHER RESOLVED , that the Planning Board reccmmmend and
hereby does recommend the following resolution for the
consideration
. of the Town Board .
" The Town Board of the Town of Ithaca resolves to amend the Zoning
Ordinance of the Town of Ithaca to permit the 14 buildings located
at 108 through . 230 Sapsucker Woods Road , Town of Ithaca Tax Parcels
Nos . 6-70 -10 -3 . 12 through 6 -70 -10 -3 . 25 to be modified to permit the
conversion of each existing building to 4 dwelling units subject to
the following terms and conditions :
1 . The underlying zoning designation of the land shall remain
Residential District R15 and all yard , lot , and area requirements ,
® except as otherwise modified by this resolution , shall remain in
effect .
2 . The front yard and parking requirements of this district are
hereby modified to permit construction of a parking area as
described in a final site plan to be approved by the Planning
Board ,
3 . Each of the 14 buildings affected by this amendment shall be
permitted to be remodeled as two , two-bedroom dwelling units and
two , one-bedroom dwelling units , as more particularly detailed in a
92T
Town Board 12 May 7 , 1984
final building plan and final site plan to be approved by the
Planning Board .
4 . The occupancy of the one-bedroom dwelling units shall be
limited to one household , where a household is defined as , ' any
number of related persons , but no more than two unrelated persons
occupying a single dwelling unit . '
5 . The occupancy of the two-bedroom dwelling units shall be
limited to one household and one unrelated person .
6 . Covenants completely describing these occupancy restrictions
shall be placed in the deeds to each of the properties , naming each
® of the other 13 properties affected by this amendment as principal
beneficiaries of these covenants and giving the Town of Ithaca the
right , but not the obligation , of enforcement .
7 . An additional covenant shall be placed in all the deeds setting
forth that , in the event a building is subsequently modified so as
to have fewer than four dwelling units , such modification is
irreversible , and such an owner shall forfeit any prior right to
maintain 4 dwelling units on the property .
8 . The sole exception to this provisions shall be in case of
destruction by fire or act of God , the owner shall have the
opportunity to rebuid a similar structure , of similar dimensions ,
and maintain 4 dwelling units . If , however , the owner rebuilds
with a structure of different dimensions or less than 4 dwelling
units , the owner shall have forfeited the right to subsequently
remodel the building and maintain 4 dwelling units .
9 . The present owner and developer accepts , in written form , that
at such time as construction commences on the modification of any
property covered by this amendment , he forever waives and forfeits
any future right to rent that particular building , or any structure
which may be later constructed on that particular site , to more
unrelated persons than permitted by the occupany restrictions
described above .
10 . Each of the 14 buildings is to be owner-occupied .
Supervisor Desch noted that there was a negative declaration on the
Environmental Assessment Form . He then asked if anyone present
wished to speak for or against the proposed rezoning .
Town Attornev James Buvoucos noted _that-in- the Preamble a household
Mr . Peter Levi
May 2 , 1984
Page 3
development brings the total water consumption to 206 , 000
gallons per day which is an average of 143 gallons per
minute . If we assume that peak flow equals three times
average flow , we have a peak flow of 429 gallons per
minute which is about 30 % of the sewer line ' s full
capacity . On this basis we have concluded that the 10"
sewer line will easily be capable of handling the sewage
flow from the new facilities . Mr . Kinsella has also
assured us that this increased flow poses no problem for
the City ' s treatment plant .
It should be pointed out that these conclusions are based
on the capacities of the water and sewer systems as they
currently exist and are not dependent upon the improve-
ments that are planned for increasing the capacities of
both systems in the future .
We trust that these comments will serve the Town ' s needs
in assessing the impact of this development . Please feel
free to contact us if any further information is
required .
Very truly yours ,
FRED H . THOMAS ASSOCIATES PC
�t�.i 4'71
;Franklin D . VanVolkinburg
Professional Engineer
FVV : FMH : ddb
cc : Mr . Kevin Lewis , Fleck & Lewis
40
Town Board 13 May 7 , 1984
Town Planner Peter Lovi remarked that in the one bedroom apartment
you could have three persons living there , however , it would not be
possible in the studio apartments .
Town Attorney Buyoucos asked the Board if they understood the
provisions of the resolution that if any of the buildings were
completely destroyed by an act of God , the owners could build a 4
unit replacement unit or if the building had been remodeled to a
lesser amount of units the owner could only rebuild to this lesser
amount .
Councilman Cramer asked what would happen if the four unit building
was destroyed by fire ?
® Town Attorney Buyoucos responded , the owner could replace with a
four unit building .
Councilman McPeak ' asked , what if the building has been modified to
two units ?
The Town Attorney responded , then only a two unit building can be
constructed .
The Town Attorney then asked were is the proposed application for
the site plan and landscaping ?
Town Planner Lovi responded , the Town has the site plan .
Town Attorney Buyoucos responded that he wanted a copy . He
questioned if it showed parking spaces ?
Town Planner Lovi responded , yes .
Town Attorney Buyoucos stated that he hoped the public understood
that if the 14 buildings were sold to one person , to make money ,
occupancy restrictions then would not be enforced by the other
beneficiaries . If there was a violation of the restrictive
covenance you would need the marines to take action .
Councilman McPeak noted that if a person buys all 14 units , he
could live in one and be in compliance .
Mr . Lovi responded that the Planning Board ' s intent was that each
building be owner occupied .
Town Attorney Buyoucos responded that he did not care what the
intent was , he wanted it clearer . Each building must be sold
separately and then the owner must live in the building .
A man in attendance questioned someone buying a building then he
goes on sabbatic and needs to rent the house .
Town Attorney Buyoucos answered , that would be okay .
The man then added that our only concern is not to prohibit a
® buyer , if he goes on sabbatic , etc .
Supervisor Desch then closed the public hearing . Noting that the
best way is to consider approving the restrictions we are
comforable with and have the Town Attorney clean up the language .
PUBLIC HEARING - AMENDING ZONING ORDINANCE - LAKE SHORE WEST
Proof of posting and publication notice of a public hearing to
consider an amendment to the Zoning Ordinance to permit the
U � �
Town Board 14 May 7 , 1984
development of the lands of Lake Shore West , a portion of Tax
Parcel No . 6 -24-3-2 . 2 having been presented by the Town Clerk , the
Supervisor opened the public hearing .
Peter Lovi , Town Planner reviewed the Draft Environmental Impact
Statement . (Copy attached to minutes ) . He noted that the EIS only
pertained to the parcel that will contain the nursing home .
Councilman Cramer stated that 200 square feet per unit , for the
nursing home , seemed rather small , can we verify this figure with
the State ?
Mr . Barnes responded that New York State required 160 square feet
® for two persons , plus closet space . A minimum of 100 square feet
is required for a private room .
Councilman Cramer noting Part III , Question # 7 , "Will the water and
sewer system have sufficient capacity to handle the additional
capacity required by the nursing complex " , asked if the engineering
staff had looked at this ?
Town Planner Lovi responded that most of Mr . Van Volkinburg ' s
answers came fran the Town Engineer ,
Councilman Bartholf stated that the sewage was his main concern ,
because of the need to purrp the sewage up hill .
Supervisor Desch responded that the ITD Group would have to provide
for this plus emergency power .
RESOLUTION NO , 85
Motion by Councilman Cramer ; seconded by Councilman McPeak ,
RESOLVED , that the Town Board of the Town of Ithaca hereby approves
the Draft Environmental Impact Statement on the Lake Shore West
Development pertaining to the renovation of existing Biggs Memorial
Hospital and the construction of 400 life care units plus the
construction of a 120 bed nursing hone .
( Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none ) .
As no one wished to speak , the Supervisor closed the public
hearing .
Councilwoman Raffensperger questioned the number of parking spaces
the Planning Board had required in the initial phase .
Supervisor Desch responded that the Planning Board believes that
one space per unit is sufficient .
RESOLUTION NO , 86
Motion by Councilwoman Raffensperger ; seconded by Councilman
® Kugler ,
WHEREAS , THE Planning Board has made the following determinations ,
findings , and recommendations to the Town Board and to the Zoning
Board of Appeals :
RESOLVED , that , the proposal of the ITD Group to rezone a portion
of lands formerly operated as the Biggs Memorial Hospital complex ,
a portion of Town of Ithaca Tax Parcel No . 6 -24-3-2 . 2 , from
Residence District R30 to Multiple Residence District , further
Z � �
Town Board 15 May 7 , 1984
subject to the receipt of a metes and bounds description
satisfactory to the Town Attorney ,
IT IS FURTHER RESOLVED , that the Planning Board recommend and
hereby does recommend the following resolution for the
consideration of the Town Board :
" That the Town Board of the Town of Ithaca resolves to amend the
Zoning Ordinance of the Town of Ithaca to permit the development of
The Lands of Lake Shore West (a portion of Town of Ithaca Tax
Parcel No . 6-24-3-2 . 2 ) , being that portion of said Lands of Lake
Shore West which contains approximately 27 . 27 acres and which
includes no more than 400 life-use units , more particularly shown
® on Map , as adapted from Base Map prepared by Tompkins County
Department of Planning , entitled "Lake Shore West Centralized
Complex" , dated February 25 , 1984 , revised March 1 , 1984 , and March
8 , 1984 , prepared by Fleck & Lewis Architects , Hanover , N . H . , Fred
Thomas Associates , PC Ithac , N . Y . , and specifically referring to
Parcel numbers shown thereon as " 7A , 7B , 8A " , and portions of " 9 "
and " 10 " , subject to the following terms and conditions :
1 . That the underlying zoning designation of the land shall be
changed from Residence District R30 to Multiple Residence District
and all yard , lot and area requirements , except as otherwise
modified by this resolution , shall pertain .
2 . That the parking requirements for Phase I will be as required
by the current Zoning Ordinance due to the overlapping demands of
residents , staff , and construction corkers . After the actual use
of staff and resident parking is established , this demand ratio
will be applied to Phases II and III and retroactively to Phase I .
To guide the overall planning of parking lots , one parking space
per dwelling unit should be provided for on a final site plan to be
approved by the Planning Board .
3 . That the developer shall contribute $25 , 000 toward the
construction of the new entrance road to the development . A cash
fund will be established with a local bank for this purpose . The
Town shall have the authority to draw on this fund for appropriate
road construction under terms to be outlined in an agreement
controlling this fund .
4 . That a complete description as to the number , type , and extent
Of open space amenities , recreational facilities , and new
landscaping to be provided for the nursing hone and life use unit
residents , shall be provided in a final site plan . Reasonable
Planning ratios providing size and variety of active and passive
Opportunities recognizing the overall number of residents and lack
of any such supportive facilities on West Hill should be
incorporated .
5 . That limited accessory commercial uses shall be permitted in
the building containing the 400 life-use units , the building plans
for all such units and uses to be more conpletely reviewed in the
Planning Board ' s final site plan review .
® 1 . That there is a need for the proposed use in the proposed
location in order to adaptively reuse the former Biggs Memorial
Hospital complex as a condominium-like dwelling and health care
facililty . Given the high costs of remodeling the existing
structures for other than residential uses , and given the
Property ' s location with respect to the County Hospital , the
Proposed development of a "health campus " could provide for
regional as well as local needs ,
' tT
Town Board 16 May 7 , 1984
2 . That the existing and probable future character of the
neighborhood will not be harmed as a result of this proposal . The
proposed use of the site is for health services and residential
dwelling units , both of which are in keeping with the principal
non-agricultural land uses in the immediate and general vicinity .
The proposed access road should actually improve traffic
circulation around the site and ultimately provide a second access
for the Professional Building on Trumansburg Road .
3 . That the proposed change would be in accordance with a
comprehensive plan of development of the Town . The conprehensive
provision of health services for Tompkins County and the Town would
be well-served by the increased scale of specialized services which
® could be provided as a result of this development . Surgical
procedures , preventive medicine , and advanced therapies which might
otherwise be found only in major cities , such as Rochester and
Buafalo , might be provided locally for the client base of the Lake
Shore West project . The availability of such services Would
benefit all residents of the Town and the County .
IT IS FURTHER RESOLVED , that the Planning Board recamiend and
hereby does recommend to the Zoning Board of Appeals :
A . That Special Approval , pursuant to the requirements of Article
V , Section 18 , paragraph 11 , Residence Districts R30 , of the Town
of Ithaca Zoning Ordinance , and subject to final site plan approval
of the Planning Board , be granted to permit the construction of a
nursing home facility on The Lands of Lake Shore West which are
comprised of approximately 50 acres ( a portion of Town of Ithaca
Tax Parcel No . 6 -24 -3 -2 . 2 ) , more particularly shown on Map , as
adapted from Base Map prepared by Tompkins County Department of
Planning , entitled " Lake Shore West Centralized Complex " , dated
February 25 , 1984 , revised March 1 , 1984 , and March 8 , 1984 ,
prepared by Fleck & Lewis Architects , Hanover , N . H . , Fred Thomas
Associates , PC Ithaca , N . Y . , specifically on an area designed as
" 4 " thereon , shown to contain approximately 8 . 48 acres , with such
facility having no more than 120 beds , the footprint therof shown
on said " 4 " , on "Parcel 5B" , on said Map to be approximately 20 , 000
square feet in size .
B . That the parking requirements set forth in Article VI , Section
29 , Multiple Residence Districts , of the Town of Ithaca Zoning
Ordinance be varied , with respect to the Multiple Residence
District portion of The Lands of Lake Shore West ( approximately
27 . 27 acres ) , from 1 . 3 parking spaces per dwelling unit to one
parking space per dwelling unit .
C . That the height requirements set forth in Article VI , Section
281 paragraph 5 , Multiple Residence Districts , of the Town of
Ithaca Zoning Ordinance be varied , with respect to the Multiple
Residence District portion of The Lands of Lake Shore West
(approximately 27 . 27 acres) , to permit the construction of the 400
life-use units in a structure , the new roof heights of which may
not extend higher than the established ridge line profile of the
existing main buildings at the entrance road grade , or extend
® higher than the horizontal ridge line of the existing wings to be
attached to , exclusive of the tower .
Supervisor Desch called for a roll call vote .
Councilman Bartholf Voting Aye
Councilman Cramer Voting Aye
Councilwoman Howell Voting Aye
Councilman Kugler Voting Aye
Councilman McPeak Voting Aye
Councilwoman Raffensperger Voting Aye
9 � j
Town Board 17 May 7 , 1984
Supervisor Desch Voting Aye
The Resolution was duly adopted .
AGREEMENT WITH 'TOWN OF ULYSSES ON INPSECTION OF NEW CONSTRUCTION
Town Attorney Buyoucos stated that he had received today from
Elizabeth Bixler , Attorney for the Town of Ulysses , a copy of the
proposed contract .
Supervisor Desch questioned number two , under Terms . " Ithaca will
provide a qualified building inspector for Ulysses who will
® maintain regular office hours in Ulysses and who will approve
plans , inspect construction and authorize the issuance of
certificates of compliance . " He stated that if the present
Building Inspector retired , the Town might wish to hire a trainee .
Town Attorney Buyoucos asked if the Town was going to take a set
fee and then absorb the cost for a vehicle , gas , maintenance plus
phone calls , etc . He went on to question what would happen if
something takes a lot time and it cannot be done in two afternoons
along with the Building Inspectors other duties ?
Supervisor Desch remarked that the Town will need an escape clause .
He went on to say that if the Building Inspector feels it is going
to involve more of his time than two afternoons a week , he should
make the Town Board aware of this and the fee can be set
accordingly .
Town Attorney Buyoucos noted that Mr . Cartee had indicated that the
Town of Ulysses was going to hire someone else to enforce the Fire
Code .
Supervisor Desch stated that the Town Attorney , the Building
Inspector and himself should discuss this . Mr . Cartee may not be
able to get involved with repairs that need a building permit .
Town Attorney Buyoucos asked what Mr . Cartee would be doing ?
The Supervisor responded , new construction and new additions to
existing structures , enforcing the Building Code ,
Councilwoman Raffensperger asked if eight hours a week would be
enough time for the Building Inspector to accomplish the work and
can the Town of Ithaca space him that much ?
Supervisor Desch responded that the Town of Ithaca could allow
eight hours a week , but no more .
Town Attorney Buyoucos remarked that the subject of Workers '
Compensation needed to be discussed . He stated that he would check
with Robert Boothroyd to see if our insurance would cover Mr .
Cartee .
® Councilwoman Raffensperger noted that if Mr . Cartee was spending
his time in the Town of Ulysses plus the Town of Ithaca and the
Town of Ithaca was receiving the extra money , then the Town of
Ithaca is being unfair to Mr . Cartee as he is doing extra work and
not receiving extra salary .
Supervisor Desch responded , this agreement is strictly four the two
one-half days per week , if the Town of Ulysses wants Mr . Cartee to
attend meetings , etc . , then the Town of Ulysses must reimburse Mr .
Cartee .
Town Board 18 May 7 , 1984
SET DATE FOR PUBLIC HEARING - REZONING OF WALTER WIGGINS PROPERTY
Town Planner Peter Lovi stated that the architect had today brought
in revised site plans for the Chateau Development at 1152 Danby
Road . Mr . Wiggins forgot that he had sold land to his daughter who
built a log cabin . The Planning Board will look at the revised
plans at their meeting on May 15 . Mr . Lovi went on to say that
both Mr . Downing and Mr . Wiggins wish to impress on the Board , the
urgency in getting the property rezoned .
Supervisor Desch suggested that the Board meet for a irk session
later in the month and could at that time , set the date for a
public hearing for the rezoning of the Chateau Development .
® RESOLUTION NO , 87
Motion by Supervisor Desch ; seconded by Councilman Bartholf ,
RESOLVED , that the Town Board of the Town of Ithaca hereby
schedules a work session for the Town Board at twelve noon on May
21 , 1984 .
( Desch , Kugler , Raffensperger , Cramer , McPeak , Howell and Bartholf
voting Aye . Nays - none) .
ADJOURNMENT
The meeting was duly adjourned .
Town Clerk
M1