HomeMy WebLinkAbout03-24-25 PLANNING BOARD MINUTESTOWN OF LANSING PLANNING BOARD MEETING March 24, 2025 Lansing Town Hall, 29 Auburn Road Board Members Present: Dean Shea, Chair Thomas Butler, Vice -Chair Al Fiorille Christine Hass John Licitra Danielle Hautaniemi John Duthie Fredric Villano Also Present: Kelly Geiger, Planning Clerk Mason Molesso, Planner, Joe Wetmore, TB Liaison Public Present: Gerry Pendell Melissa Melko Mollie Messenger James Armstrong Martin Moriwether Matt Liponis Debbie Loring Roger Loring Jesse Young Andy Sciarabba Claudia Brenner Chair Dean Shea opened the meeting at 6:31 pm. Action Items: Excused: Sandy Dennis -Conlon Proiect: Site Plan Review — 0 & 2675 N. Triphammer Rd — Delaware River Solar Applicant: Mollie Messinger, De1So1 Location: 0 & 2675 N. Triphammer Road Project Description: Site Plan Review of two solar energy facilities SEQR: N/A; completed during Use Variance proceedings Anticipated Action: Review updated planting plan, any additional comments or concerns the Board may have, conditions & approval Summary of Discussion: • Mollie Messenger was present to discuss this project • Landscaping, tree height, solar panel height, berms, trails, wetland, fire dept. turnaround, snow plowing, community host agreement, landscaping bond, decommissioning bond • Board approved Final Site Plans with conditions Page 1 of 9 53 RESOLUTION PB 25-05 54 55 TOWN OF LANSING PLANNING BOARD RESOLUTION 56 DELAWARE RIVER SOLAR — NY LANSING I, LLC — 57 FINAL SITE PLAN APPROVAL WITH CONDITIONS 58 59 WHEREAS, on 20 December 2024 an application was made by Mollie Messinger, on behalf of NY 60 Lansing I, LLC (Delaware River Solar), for Site Plan Approval for a 5 MW photovoltaic array facility 61 located on land at TPN 44.-1-1.2. "NY Lansing 1, LLC" will consist of approximately 10,000 62 photovoltaic panels, an access road, utility connections, inverters, and all other facilities and site 63 modifications shown in the drawing set "NY Lansing I, LLC" dated 2/21/2025. The property parcel 64 consists of approximately 24.9 ± acres in the R2 — Residential Moderate Density zoning district which 65 does not permit Solar Energy Facilities. As such, NY Lansing I, LLC has received a Use Variance 66 (Resolution ZBA 24-16); and 67 68 WHEREAS; during the Use Variance proceedings legal notice was published on 28 June 2024, and 69 adjacent property owners within 600 linear feet were notified by mail on the same date, pursuant to Town 70 Code § 270-27(F); and 71 72 WHEREAS; during the Use Variance proceedings the Town of Lansing Zoning Board of Appeals did 73 on 10 July 2024 classify the project as a Type I Action and declared itself the Lead Agency for the 74 coordinated environmental review with the Town of Lansing Planning Board (Resolution ZBA 24-14); 75 and 76 77 WHEREAS; during the Use Variance proceedings a public hearing was held before the Town of 78 Lansing Zoning Board of Appeals on 10 July 2024, and the public was duly allowed to speak upon and 79 address the proposed project, including the SEQR environmental review portion in addition to 80 comments regarding the site plan's; and 81 82 WHEREAS, during the Use Variance proceedings this project was reviewed by the Tompkins County 83 Planning Department, pursuant to Section 239-m of the New York General Municipal Law, during which 84 all inter -municipal concerns stated in the 18 September 2024 letter were adequately addressed by the 85 applicant; and 86 87 WHEREAS, during the Use Variance proceedings the Town of Lansing Zoning Board of Appeals issued 88 a Declaration of Negative Environmental Impact on 11 December 2024 (Resolution ZBA 24-14); and 89 90 WHEREAS, the Town of Lansing Planning Board has evaluated this project under the applicable 91 standards outlined in Town Code § 270-27 as well as Local Law # 3 of 2020 § 802.18-18.14; and 92 93 WHEREAS, TG Miller has reviewed all necessary application materials including, but not limited to, 94 the drawings titled "NY Lansing I, LLC" dated 2/21/2025, the "Operations & Maintenance Plan" dated 95 4/8/2025, and the projects SWPPP in which they subsequently offered their comments on 22 January 96 2025 & 19 March 2025 in letters to the applicant; and 97 98 WHEREAS, NY Lansing 1, LLC has agreed to work with Cayuga Landscape, or a similarly approved 99 landscaping company, who will handle planting and post planting maintenance of all approved site 100 plantings for the duration specified within the required Landscaping Bond; and 101 102 WHEREAS, this project was reviewed by the Town of Lansing Code Enforcement Officer for concerns 103 regarding fire apparatus access and NYS Fire Code compliance, in which comments were provided to 104 the applicant in a 24 March 2025 email; and 105 106 NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS: Page 2 of 9 That the Planning Board of the Town of Lansing does hereby grant Site Plan approval for NY Lansing I, LLC on land located at TPN 44.-1-1.2, as well as all applications, forms and materials, subject to the following conditions which must be met as specified below: 1) Town of Lansing shall receive a raised — seal Final Plat, to certify and complete the Lot Line Adjustment related to this project, prior to issuance of Building Permits. a. The final Plat shall show Trail Easement lands being dedicated to the Town of Lansing. 2) NY Lansing I & II, LLC shall successfully address any withstanding comments from the 19 March 2025 letter from TG Miller prior to the issuance of Building Permits. 3) Project Site Plans shall be amended to meet fire code compliance and deemed complaint by the Town of Lansing Code Enforcement Officer prior to the issuance of Building Permits. 4) Project Planting Plans shall be revised to include a 2' (foot) raised planting berm along the northern project boundary (NY Lansing I, LLC), prior to the issuance of Building Permits. a. Berm is to be located along the norther property line between Bean Hill Road and Stormy View Drive. b. The applicant shall update the project Details Sheet to include any technical detail(s) of berm construction & associated plantings. 5) An Owner/Operator Agreement form shall be approved by the Town of Lansing Town Board prior to the issuance of Building Permits. a. This agreement shall include terms regarding snow clearance during the applicable months as agreed upon between Lansing FD and NY Lansing I & II, LLC. 6) NY Lansing I & II, LLC shall execute a Host Community Benefit Agreement with the Town of Lansing prior to the issuance of Building Permits. 7) Decommissioning Plan shall be reviewed and approved by the Towns engineering consultant, and Decommissioning Bond shall be set, secured and approved by the Town of Lansing Town Board prior to the issuance of Building Permits. a. Decommissioning Bond terms shall include a 5-year re-evaluation clause. 8) NY Lansing I & II, LLC shall offer, for Town Board consideration and approval, dedication of trail easement between all parties for affected lands on TPN 44.-1-1.2 & 44.-1-1.3 prior to the issuance of Certificate of Compliance. a. Trail easement lands, and the use thereof, shall not interfere or impede with any solar array facility functions or easement agreement may be terminated by NY Lansing I & II, LLC. b. Trail easement shall be 60' wide and shall span the northern portion of 44.-1-1.2 & 44.- 1-1.3 and tie into the existing easement on TPN 44.-1-5.4. 9) The Town of Lansing shall receive a Landscaping Bond in the minimum amount of $90,910 USD to ensure the proper installation and maintenance of project (screening) plantings prior to the issuance of Building Permits. Page 3 of 9 161 a. Bond amount shall increase to include the construction of 2' raised berm pending 162 submittal of quote from installing contractor. 163 164 10) Both northern and southern screening plantings shall be installed prior to the issuance of 165 Certificate of Compliance. 166 167 Dated: 24 March 2025 168 169 Motion by: Tom Butler 170 Seconded by: John Licitra 171 172 VOTE AS FOLLOWS: 173 174 Tom Butler - Aye 175 Sandy Conlon - Absent 176 John Duthie - Aye 177 Al Fiorille - Aye 178 Christine Hass -Aye 179 Danielle Hautaniemi - Aye 180 John Licitra - Aye 181 Fredric Villano — Not Voting 182 Dean Shea - Aye 183 184 RESOLUTION PB 25-06 185 186 TOWN OF LANSING PLANNING BOARD RESOLUTION 187 DELAWARE RIVER SOLAR — NY LANSING II, LLC — 188 FINAL SITE PLAN APPROVAL WITH CONDITIONS 189 190 WHEREAS, on 24 April 2024 an application was made by Mollie Messinger, on behalf of NY Lansing 191 II, LLC (Delaware River Solar), for Site Plan Approval for a 3 MW photovoltaic array facility located 192 on land at TPN 44.4-1.3. "NY Lansing II, LLC" will consist of approximately 6,000 photovoltaic 193 panels, an access road, utility connections, inverters, and all other facilities and site modifications shown 194 in the drawing set "NY Lansing II, LLC" dated 2/21/2025. The property parcel consists of approximately 195 42.78 ± acres in the R2 — Residential Moderate Density zoning district which does not permit Solar 196 Energy Facilities. As such, NY Lansing I, LLC has received a Use Variance (Resolution ZBA 24-17); 197 and 198 199 WHEREAS; during the Use Variance proceedings legal notice was published on 28 June 2024, and 200 adjacent property owners within 600 linear feet were notified by mail on the same date, pursuant to Town 201 Code § 270-27(F); and 202 203 WHEREAS; during the Use Variance proceedings the Town of Lansing Zoning Board of Appeals did 204 on 10 July 2024 classify the project as a Type I Action and declared itself the Lead Agency for the 205 coordinated environmental review with the Town of Lansing Planning Board (Resolution ZBA 24-15); 206 and 207 208 WHEREAS; during the Use Variance proceedings a public hearing was held before the Town of 209 Lansing Zoning Board of Appeals on 10 July 2024, and the public was duly allowed to speak upon and 210 address the proposed project, including the SEQR environmental review portion in addition to comments 211 regarding the site plan's; and 212 Page 4 of 9 213 WHEREAS, during the Use Variance proceedings this project was reviewed by the Tompkins County 214 Planning Department, pursuant to Section 239-m of the New York General Municipal Law, during which 215 all inter -municipal concerns stated in the 18 September 2024 letter were adequately addressed by the 216 applicant; and 217 218 WHEREAS, during the Use Variance proceedings the Town of Lansing Zoning Board of Appeals issued 219 a Declaration of Negative Environmental Impact on 11 December 2024 (Resolution ZBA 24-15); and 220 221 WHEREAS, the Town of Lansing Planning Board has evaluated this project under the applicable 222 standards outlined in Town Code § 270-27 as well as Local Law # 3 of 2020 § 802.18-18.14; and 223 224 WHEREAS, TG Miller has reviewed all necessary application materials including, but not limited to, 225 the drawings titled "NY Lansing II, LLC" dated 2/21/2025, the "Operations & Maintenance Plan" dated 226 4/8/2025, and the projects SWPPP in which they subsequently offered their comments on 22 January 227 2025 & 19 March 2025 in letters to the applicant; and 228 229 WHEREAS, NY Lansing II, LLC has agreed to work with Cayuga Landscape, or a similarly approved 230 landscaping company, who will handle planting and post planting maintenance of all approved site 231 plantings for the duration specified within the required Landscaping Bond; and 232 233 WHEREAS, this project was reviewed by the Town of Lansing Code Enforcement Officer for concerns 234 regarding fire apparatus access and NYS Fire Code compliance, in which comments were provided to 235 the applicant in a 24 March 2025 email; and 236 237 NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS: 238 239 That the Planning Board of the Town of Lansing does hereby grant Site Plan approval for NY Lansing 240 II, LLC on land located at TPN 44.-1-1.3 , as well as all applications, forms and materials, subject to the 241 following conditions which must be met as specified below: 242 243 1) Town of Lansing shall receive a raised — seal Final Plat, to certify and complete the Lot Line 244 Adjustment related to this project, prior to issuance of Building Permits. 245 246 a. The final Plat shall show Trail Easement lands being dedicated to the Town of Lansing. 247 248 2) NY Lansing I & II, LLC shall successfully address any withstanding comments from the 19 249 March 2025 letter from TG Miller prior to the issuance of Building Permits. 250 251 3) Project Site Plans shall be amended to meet fire code compliance and deemed complaint by the 252 Town of Lansing Code Enforcement Officer prior to the issuance of Building Permits. 253 254 4) Project Planting Plans shall be revised to include a 2' (foot) raised planting berm along the 255 northern project boundary (NY Lansing 1, LLC), prior to the issuance of Building Permits. 256 257 a. Berm is to be located along the norther property line between Bean Hill Road and Stormy 258 View Drive. 259 260 b. The applicant shall update the project Details Sheet to include any technical detail(s) of 261 berm construction & associated plantings. 262 5) An Owner/Operator Agreement form shall be approved by the Town of Lansing Town Board 263 prior to the issuance of Building Permits. 264 265 a. This agreement shall include terms regarding snow clearance during the applicable Page 5 of 9 months as agreed upon between Lansing FD and NY Lansing I & II, LLC. 6) NY Lansing I & II, LLC shall execute a Host Community Benefit Agreement with the Town of Lansing prior to the issuance of Building Permits. 7) Decommissioning Plan shall be reviewed and approved by the Towns engineering consultant, and Decommissioning Bond shall be set, secured and approved by the Town of Lansing Town Board prior to the issuance of Building Permits. a. Decommissioning Bond terms shall include a 5-year re-evaluation clause. 8) NY Lansing I & II, LLC shall offer, for Town Board consideration and approval, dedication of trail easement between all parties for affected lands on TPN 44.-1-1.2 & 44.-1-1.3 prior to the issuance of Certificate of Compliance. a. Trail easement lands, and the use thereof, shall not interfere or impede with any solar array facility functions or easement agreement may be terminated by NY Lansing I & II, LLC. b. Trail easement shall be 60' wide and shall span the northern portion of 44.-1-1.2 & 44.- 1-1.3 and tie into the existing easement on TPN 44.-1-5.4. 9) The Town of Lansing shall receive a Landscaping Bond in the minimum amount of $90,910 USD to ensure the proper installation and maintenance of project (screening) plantings prior to the issuance of Building Permits. a. Bond amount shall increase to include the construction of 2' raised berm pending submittal of quote from installing contractor. 10) Both northern and southern screening plantings shall be installed prior to the issuance of Certificate of Compliance. Dated: 24 March 2025 Motion by: John Licitra Seconded by: Christine Hass VOTE AS FOLLOWS: Tom Butler - Aye Sandy Conlon - Absent John Duthie - Aye Al Fiorille - Aye Christine Hass - Aye Danielle Hautaniemi - Aye John Licitra - Aye Fredric Villano — Not Voting Dean Shea - Aye 315 Project: Sketch Plan Site Plan Review for new Zamboni storage facilitv at "The Rink" 316 Applicant: Gerry Pendell 317 Location: 1767 E Shore Drive "The Rink" 318 Project Description: Construction of a 30' x 40' pole barn to be used as storage for new electric 319 Zamboni machine. This project is located in the R2 zoning district Page 6 of 9 320 SEAR: Type II — no action needed 321 Anticipated Action: Review Site Plan and provide comments/ concerns, schedule PH for April (if 322 needed?) 323 324 Summary of Discussion: 325 • Gerry Pendell was present to discuss this project 326 • 30x40 pole barn, heated environment, doesn't require SEQR, under 4,000 sq ft., underground 327 electric, asphalt driveway, fire truck access 328 • Board approved project 329 330 RESOLUTION PB 25-07 331 332 TOWN OF LANSING PLANNING BOARD RESOLUTION 333 ZAMBONI STORAGE FACILITY LOCATED AT "THE RINK" 334 SEQRA NEG DEC & FINAL SITE PLAN APPROVAL 335 336 WHEREAS; an application was made by Gerry Pendell, general contractor, for Site Plan Review of 337 a 30' x 40' pole barn type storage structure (as shown in the drawing set "Community Recreation Center 338 Machine Storage Building Site Plan" dated 1/28/2025) on land owned by the Community Rec Center 339 INC located at TPN 37.1-6-9. The purpose of this storage facility is to house The Rink's new electric 340 Zamboni machine. The project consists of the erecting of a 30' x 40' pole barn structure as well as 341 installation of related underground electrical utility line. This project is located in the R2 — Residential 342 Moderate Density zoning district which does permit the construction of a commercial assessor structure 343 pending site plan approval; and 344 345 WHEREAS, 6 NYCRR § 617 of the State Environmental Quality Review Act ("SEQRA") requires that 346 a Lead Agency be established for conducting environmental review of projects in accordance with state 347 environmental law, and the Lead Agency shall be that local agency which has primary responsibility for 348 approving and funding or carrying out the action; and 349 350 WHEREAS, the Planning Board, being the local agency, which has primary responsibility for 351 approving the action declares itself the Lead Agency for the review of this action under 352 SEQRA; and 353 354 WHEREAS, 6 NYCRR § 617.5 (C)(9) determines "construction or expansion of a primary or 355 accessory/appurtenant, non-residential structure or facility involving less than 4,000 square feet of 356 gross floor area and not involving a change in zoning or a use variance and consistent with local land 357 use controls, but not radio communication or microwave transmission facilities" to be a Type II action, 358 which is not subject to further review under SEQRA; and 359 360 WHEREAS, the action noted above is exempt from NYS General Municipal Law § 239 -1, -m, and -n, 361 and will not require further review from the Tompkins County Planning and Sustainability Department; 362 and 363 364 WHEREAS; the Town of Lansing Planning Board, the agency with authority to approve this action, 365 determined that, due to insignificant size and location, no public hearing was necessary for this project; 366 and 367 368 WHEREAS, the Town of Lansing Planning Board has evaluated this project under the applicable 369 standards outlined in Town Code § 270-27; and 370 Page 7 of 9 371 WHEREAS, the Planning Board has considered and carefully reviewed the requirements of the Town 372 code relative to site plan review, the unique needs of the Town due to the topography, the soil types and 373 distribution, and other natural and man-made features upon and surrounding the area of the proposed 374 site plan, and the Planning Board has also considered the zoning in the area and the project in light of 375 the Town's Comprehensive Plan and compliance therewith, and as the underlying use is a permitted use 376 in the zone in which located; and 377 378 NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS: 379 380 That the Planning Board of the Town of Lansing does hereby grant Site Plan Review approval to 381 construct a 3" x 40' pole barn type storage structure (as shown in the drawing set "Community 382 Recreation Center Machine Storage Building Site Plan" dated 1/28/2025) on land located at TPN 37.1- 383 6-9, as well as all applications, forms and materials. 384 385 Dated: 24 March 2025 386 387 Motion by: Al Fiorille 388 Seconded by: Christine Hass 389 390 VOTE AS FOLLOWS: 391 392 Tom Butler - Aye 393 Sandy Conlon - Absent 394 John Duthie — Aye 395 Al Fiorille - Aye 396 Christine Hass - Aye 397 Danielle Hautaniemi - Aye 398 John Licitra - Aye 399 Fredric Villano — Not Voting 400 Dean Shea - Aye 401 402 403 Proiect: Preliminary Plat Review of Minor Subdivision (2 Lots) of land at 25 Snerry Lane 404 Applicant: Joseph Lovejoy 405 Location: 25 Sperry Lane 406 Project Description: Minor subdivision of lands located at 25 Sperry Lane into two new parcels: 407 Parcel A (.748 ac) and Parcel B (.726 ac). This project is located in the R2 zoning district 408 SEQR: Unlisted Action — part 2 required 409 Anticipated Action: Preliminary Plat review, schedule Public Hearing for April, complete SEQR pt. 2 410 411 Summary of Discussion: 412 • Joseph Lovejoy was present to discuss this project 413 • Divide to build another house 414 • Board scheduled public hearing for April 415 416 Proiect: Preliminary Plat Review of Conlon Corners Minor Subdivision (4 Lots) 417 Applicant: Andy Sciarabba on behalf of Jesse Young (owner) 418 Location: 113 Bower Road 419 Project Description: Minor subdivision of lands located at 113 Bower Road into four new parcels: 420 Lots 1-3 (1.5 ac each) and the remaining 182-acre parent lot. This project will also have a 20' easement 421 with the Town for the installation of a walking trail. This project is located in the RA zoning district Page 8 of 9 SEAR: Unlisted Action — part 2 required Anticipated Action: Preliminary Plat review, schedule Public Hearing for April, complete SEQR pt. 2 Summary of Discussion: • Andy Sciarabba and Jesse Young were present to discuss this project • Downsized to 3 lots, now minor instead of major subdivision, basic SWPPP, lot line adjustment, trails • Board set public hearing for April Proiect: Sketch Plan / Site Plan Review of "Sperling Studio' Applicant: Andy Sciarabba on behalf of Josh Sperling (owner) Location: 2073 E Shore Drive (located in the old IGA building) Project Description: Art / woodworking studio including new site improvements. This project is located in the B 1 zoning district SEQR: Unlisted Action — part 2 required Anticipated Action: Review Site Plan and provide comments/ concerns, schedule PH for April, complete SEQR pt. 2 Summary of Discussion: • Andy Sciarabba and Claudia Brenner were present to discuss this project • Septic, new pump system, ornamental landscaping, repave & reline, parking spaces, private charging station, art and woodworking, fenced in patio, inside totes, no dumpsters, outside fagade/design, interior design, confer with trails committee • Board set public hearing for April Proiect: Sketch Plan / Site Plan Review 89 Goodman Rd Applicant: Kevin Kirby, owner Location: 89 Goodman Road Project Description: Site Plan Review of small, home -based business named the `Barksville Inn". This project is located in the AG zoning district SEQR: Type II — no action needed Anticipated Action: Review Site Plan and provide comments/ concerns, conditions of ZBA approval & approval Summary of Discussion: • Applicant did not show • Board discussed fencing, signs, dogs, and zoning. Project will be tabled until April meeting 461 Other Business: 462 • Joe Wetmore discussed zoning items that passed and Delaware River Solar 463 • Board discussed Capital Improvement Committee meeting, budget for salt, status of Dandy and 464 Planning Board training 465 466 Adiourn Meeting 467 Meeting adjourned at the call of the Planning Board Chair at 8:1 Opm. 468 Minutes Taken and Executed by Kelly Geiger 469 470 Access to public documents available online at: 471 Planning Board Email tolcodes(a)lansingtown.com 472 Town Website httvs://www.lansin2town.com Page 9 of 9