Loading...
HomeMy WebLinkAbout08-14-24 ZBA MinutesTown of Lansing Zoning Board of Appeals Meeting Wednesday, August 14, 2024 6:30 PM Lansing Town Hall, 29 Auburn Rd Present Jack Young, Chair Susan Tabrizi Mary Stoe Rick Hayes Roger VandePoel Other Staff Present Kelly Geiger, Planning Clerk John Zepko, Director of Planning Judy Drake, Liaison Public Present Usman Chaudhry Matt Liponis Melissa Melko Mollie Messenger Sue Ruoff Steve Ruoff Joyce Putnam Jennifer Moore Lillian Babcock Stacy Holstein Cheryl Beach Robert G. Holstein Dave Heck Curtis Lyons Sefan Minott Kathleen Blair Michelle Heck Chair Jack Young opened the meeting at 6:38pm Action Items: Excused Bruce Barber Proiect: Applicant wishes to remove prior conditions allowing for fill to be added to site to create positive drainage Page 1 of 2 Applicant: Jason Demarest, representing Lillian Babcock Location: 30 Ladoga Park W, TPN 33.-1-58 Project Description: The applicant has applied for a rehearing to discuss the removal of prior conditions (from 7/20/2004) which would allow for fill to be added to create positive drainage at 30 & 32 Ladoga. This property is located in L1 zoning with lake frontage SEQR: This project is an Unlisted action and will require further review Anticipated Action: SEQRA part 2 review, final decision/conditions Summary of Discussion: • Jason Demarest and Lillian Babcock were present to discuss this project. • Board Postponed the decision, requesting that the letter from TG Miller regarding the Engineer Report of the Project clarifies that the Ruoff s parcel also will not be impacted as only the Bortz property was named in the letter. Next meeting to be held September 11, 2024 Proiect: Use Variance to construct a Solar Enerev Facilitv off N. Triphammer Road Applicant: Mollie Messenger, representing Delawar River Solar Location: 0 N. Triphammer Road; two neighboring lots: 44.-1-1.2 and 44.-1-3.3 Project Description: The applicant has applied for a Use Variance to construct 2 Solar Energy Facilities off N. Triphammer Road. This project is located in R2 zoning which does not permit the construction of a Solar Energy Facility SEQR: This project is a Type I action (617.4 (B)(2) and 617.4 (6)(i)) and will require review Summary of Discussion: • Jack Young Recused himself as Chair and Susan Tabrizi stepped in as Chair • Mollie Messenger, Melissa Melko, Matt Liponis and Usman Chaudhry were present to discuss this project. Wetlands, County 239, Tracking Noise, Landscaping and Maintenance, Road Access • The Board did not make a decision. Board motioned to refer the revised plan to 239. Discussion will continue on the project at the September 11, 2024 meeting Susan Tabrizi adjourned the meeting at 8:03 PM Minutes taken and executed by Kelly Geiger Page 2 of 2