Loading...
HomeMy WebLinkAbout09-12-22 PLANNING BOARD MINUTES I TOWN OF LANSING PLANNING BOARD 2 MEETING SEPTEMBER 12, 2022 3 Lansing Town Hall, 29 Auburn Road 4 5 Board members Present: Excused: 6 Al Fiorille, Chair 7 Sandy Dennis-Conlon, Vice-Chair 8 Thomas Butler 9 Lin Davidson 10 Larry Sharpsteen 11 Dean Shea 12 Deborah Trumbull 13 Dale Baker, Alternate 14 Erin Worsell, Alternate 15 16 Also Present: 17 John Zepko, Planner Joe Wetmore, Councilmember 18 19 Public Present: 20 Tim Buhl Rocco Lucente 21 22 Chair Al Fiorille opened the meeting at 6:31pm. 23 24 Joe Wetmore gave a Liaison Report for the August 17, 2022 Town Board meeting. 25 26 Action Items: 27 28 Village Solars Phase VII 29 Applicant: Rocco Lucente, owner; Tim Buhl, engineer 30 Location: Village Solar, Tax Parcel numbers 39.-1-38.8, 39.-1-38.11, 39.-1-38.13, 39.-1-38.16 31 Project Description: The applicant proposes the demolition of four (4) existing apartment 32 buildings, #21, #88, #96, & #28. The applicant proposes the construction of 138 multifamily 33 units within six (6) apartment buildings. The project is located in PDA 1—Village Circle//Village 34 Solar. 35 SEQR: This is a Type I action under SEAR 617.4 (b) (9) and is subject to environmental review. 36 Anticipated Action: SEQR EAF Part 2 & Findings, Decision on Site Plan 37 38 Summary of Discussion: 39 • Developer Rocco Lucente and Project Engineer Tim Buhl were present to discuss this project. Page 1 of 6 40 The Planning Board discussed concerns with dumpsters, the dog park, open space, lighting, 41 42 RESOLUTION PB 22-13 43 44 TOWN OF LANSING PLANNING BOARD RESOLUTION 45 STATE ENVIRONMENTAL QUALITY REVIEW (SEAR) NEGATIVE DECLARATION AND SITE PLAN 46 APPROVAL 47 VILLAGE SOLAR PHASE VII 48 49 WHEREAS, an Application was submitted for Site Plan review by Rocco Lucente, for the 50 proposed site plan of Village Solar Phase VII, which proposes the demolition of four (4) existing 51 apartment buildings, #21, #88, #96, & #28, and the construction of 138 multifamily units within 52 six (6) apartment buildings; and 53 54 WHEREAS, the project is located in Planned Development Area No. 1—The Village Circle-Village 55 Solars PDA,Tax Parcel numbers 39.-1-38.8, 39.-1-38.11, 39.-1-38.13, 39.-1-38.16; and 56 57 WHEREAS, 6 NYCRR§ 617 of the State Environmental Quality Review Act("SEQRA") requires that 58 a Lead Agency be established for conducting environmental review of projects in accordance with 59 state environmental law and the Lead Agency shall be that local agency which has primary 60 responsibility for approving and funding or carrying out the action; and 61 62 WHEREAS, the Planning Board, being the local agency which has primary responsibility for 63 approving the action, did on 28 March 2022 classify the project as a Type I Action and declare 64 itself the Lead Agency for the environmental review; and 65 66 WHEREAS, Project plans, and related information, were duly delivered to the Tompkins County 67 Planning and Sustainability Department per General Municipal Law § 239; et seq., and such 68 Department responded in a 21 July 2022 letter from Katherine Borgella, Tompkins County 69 Commissioner of Planning, pursuant to §239 -I, -m, and -n of the New York State General 70 Municipal Law with no recommendations or comments on the proposal; and 71 72 WHEREAS, the Planning Board has considered and carefully reviewed the requirements of the 73 zoning code relative to site plan review, the unique needs of the Town due to the topography, 74 the soil types and distribution, and other natural and man-made features upon and surrounding 75 the area of the proposed site plan, and the Planning Board has also considered the zoning in the 76 area and the project in light of the Town's Comprehensive Plan and compliance therewith, and 77 as the underlying use is a permitted use in the zone in which located; and 78 Page 2 of 6 79 WHEREAS,the project,which proposes to demolish 40 dwelling units and construct 138 dwelling 80 units (98 new dwelling units) falls within the maximum of 572 dwelling units as permitted by the 81 Village Solars—Village Circle PDA; and 82 83 WHEREAS, the project has incorporated a landscaping plan that includes the planting of various 84 tree and shrubs as scheduled upon said plan, and which sufficiently mitigates the concerns of 85 light and noise pollution to neighboring properties; and 86 87 WHEREAS, the project includes a lighting plan which is Dark Sky compliant, containing cut off 88 lighting fixtures and limiting the CCT of external lighting to no more than 3000K CCT to protect 89 the character of the neighborhood from light pollution; and 90 91 WHEREAS, the project has submitted a stormwater pollution prevention plan which complies 92 with the NYS General SPDES Permit for Stormwater Discharges from Construction and sufficiently 93 attenuates any increase in stormwater that project may create; and 94 95 WHEREAS, upon due consideration and deliberation by the Town of Lansing Planning Board, 96 now therefore be it RESOLVED as follows: 97 98 1. That the Planning Board of the Town of Lansing determines the proposed project 99 will result in no significant impact on the environment and that a Negative Declaration 100 for purposes of Article 8 of the Environmental Conservation Law be filed in accordance 101 with the provisions of Part 617 of the State Environmental Quality Review Act for the 102 Site Plan Review for Town of Lansing Tax Parcel Numbers 39.-1-38.8, 39.-1-38.11, 39.- 103 1-38.13, 39.-1-38.16. 104 105 2. That the Planning Board of the Town of Lansing does hereby grant Site Plan 106 Approval for Town of Lansing Tax Parcel Numbers 39.-1-38.8, 39.-1-38.11, 39.-1- 107 38.13, 39.-1-38.16 for Rocco Lucente, which includes all building and parking layouts, 108 screening, dark sky lighting, and other site conditions listed in the plan set titled 109 "Village Circle-Village Solars PDA—Phase 7, Lucente Homes/Village Solars, Lansing(T), 110 Tompkins CO. N.Y." prepared by Timothy C. Buhl, Professional Engineer, respectively, 111 revised Sept 6, 2022, and subject to the following: 112 113 The following conditions must be satisfied before issuance of any Building Permit: 114 115 a. A Final Site Plan, incorporating all recommended changes from the 116 Planning Board and the Town Engineer, shall be submitted for the signature of 117 the Chair of the Planning Board within 180 days of this approval. No building Page 3 of 6 118 permits will be issued prior to the signing of the Final Site Plan. The applicant 119 may extend this deadline by requesting an extension from the Planning Board 120 prior to the expiration of this conditional approval. 121 b. Compliance with all current and future recommendations of the Town's 122 Engineer. 123 c. Bioretention area 1 (Lot 41) and Bioretention area 2 (Lot 39) shall be 124 constructed within 180 days of this approval and inspected by the Town's 125 Engineer. 126 d. Acceptance of the final Stormwater Pollution Prevention Plan (SWPPP) by 127 the Town's Engineer and Town Stormwater Management Officer. 128 e. Building Permits are required to construct the approved building and site 129 facilities. Plans must meet all code requirements, including the sealing of plans 130 by a licensed engineer or architect. All improvements shall be constructed in 131 compliance with all state and local building code requirements. 132 f. The applicant will be required to obtain both: i)a Bolton Point water permit 133 for a new water service and meter to connect to the existing Consolidated 134 Water District Mains in accordance with Lansing Town Board Resolution 15- 135 40; and ii) Town of Lansing Sewer Permit. 136 137 The following conditions must be satisfied within six months of approval or the start of 138 construction, whichever comes first: 139 140 a. Submission to Planning staff for review and approval of placement, design, 141 and photometrics of site lighting fixtures in accordance with the Final Site 142 Plan. 143 b. Submission to Planning staff for review and approval of all site details 144 including but not limited to landscaping details, exterior furnishings, walls, 145 railings, bollards, paving, signage, lighting, etc. in accordance with the Final 146 Site Plan. 147 148 The following conditions must be satisfied before issuance of a Certificate of 149 Occupancy: 150 151 a. Any changes to the approved Final Site Plan must be submitted to 152 Planning staff for review and may require Board approval. 153 b. Proper completion of all stormwater reports, permits, and facilities in a 154 form and manner as approved by the Town and NYSDEC, including execution 155 and filing of Stormwater Operating, Management, and Reporting Agreement 156 ("SOMRA") in the form as set forth pursuant to Town Code § 225-8(D), which Page 4 of 6 157 executed and filed SOMRA (and any supporting easements) is required to be 158 submitted to the SMO. 159 g. The final locations of all crosswalks, signage and stop signs, dumpsters, 160 and mailboxes shall be approved by the Code Enforcement Officer and 161 Highway Superintendent. 162 h. All site plan elements shall be present at the locations represented on the 163 approved site plan prior to the issuance of the last certificate of occupancy. 164 i. The dog park shall be relocated and completed prior to the issuance of 165 the last certificate of occupancy. 166 j. Submission of any required executed easement, licenses or other legal 167 agreements involving Town property. 168 k. Repair, replacement or reconstruction of any Town property damaged or 169 removed during construction including, but not limited to paving, signage, 170 drainage structures, etc. 171 I. All plantings (including as shown on the plans described above) shall be 172 maintained as healthy and natural non-invasive vegetation designed to 173 provide both visual and sound buffering. Existing and any new vegetation 174 shall be properly maintained and any dead, diseased, or dying trees or plants 175 shall be promptly replaced, and any tree or plants that, whether singularly or 176 in combination, due to lack of growth, death, recession, disease or other 177 cause, cease to function as buffers shall be replaced in a manner as promotes 178 the goal of such buffer as stated in this site plan approval. This condition shall 179 be deemed to augment and further define prior site plan approval conditions 180 and site plan features hereby or heretofore approved by the Town. 181 m. All lighting fixtures will be "dark sky compliant" glare-free, downward 182 directed, and shielded lighting as promotes the dark-sky standards of the 183 International Dark-Sky Association (IDA) and lamps will be not higher than 184 3000K CCT to minimize adverse human and ecological impacts. 185 186 3. In accordance with Town Code § 270-27(K), this site plan approval is valid for 187 only 36 months from the date hereof, and the applicant/owner is required to 188 commence and substantially complete the construction or other activities for which 189 the site plan is applicable within said 36 months or this approval shall, unless 190 extended upon application timely made, expire, lapse, and be of no further validity, 191 force or effect. 192 193 194 Dated: 12 September 2022 195 Page 5 of 6 196 Motioned by: Norman 'Lin' Davidson 197 Seconded by: Deborah Trumbull 198 199 VOTE AS FOLLOWS: 200 201 Tom Butler—Aye 202 Norman 'Lin' Davidson —Aye 203 Sandra Dennis Conlon —Aye 204 Al Fiorille—Aye 205 Larry Sharpsteen —Aye 206 Dean Shea—Aye 207 Deborah Trumbull —Aye 208 209 Discussion: 210 • Training will be held at the September 26th meeting. 211 • A representative from SRF Associates will be at the September 26th meeting. 212 • The Planning Board would like information on trainings required by the Town. 213 214 Adiourned Meeting 215 Meeting adjourned at the call of the Planning Board Chair at 7:10pm. 216 217 Minutes Executed by Heather Dries. 218 219 Access to public documents are available online at: 220 Planning Board Email tolcodes@lansingtown.com 221 Town Website https://www.lansingtown.com 222 Planning Board agendas, minutes & submittals https://www.lansingtown.com/town-docs Page 6 of 6