Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout21-27 Waza SEQR NegDec Site Plan Approval SignedRESOLUTION PB 21-27
TOWN OF LANSING PLANNING BOARD RESOLUTION - STATE
ENVIRONMENTAL QUALITY REVIEW (SEQR) NEGATIVE DECLARATION AND SITE PLAN
APPROVAL
WAZA TURF FIELD, 320 PERUVILLE RD;
TAX PARCEL NO. 30. 1-30.1
WHEREAS, an application was made by Steve Ruoff, Applicant on behalf of SKR Land LLC, Owner,
in collaboration with TC Waza Academy and FC LIFA, Ltd. for construction and site improvements
for commercial recreation: outdoors on the existing 37.63-acre parcel, Lansing, New York, TPN 30.4-
30.1, located in the Rural Agricultural (RA) Zoning District; and
WHEREAS, 6 NYCRR § 617 of the State Environmental Quality Review Act ("SEQRA") requires that
a Lead Agency be established for conducting environmental review of projects in accordance with state
environmental law and the Lead Agency shall be that local agency which has primary responsibility
for approving and funding or carrying out the action; and
WHEREAS, the Planning Board, being the agency which has primary responsibility for approving the
action, did on March 22, 2021 declare itself the Lead Agency for the environmental review of this
Unlisted Action (resolution # 21-08); and
WHEREAS, the Tompkins County Department of Planning and Sustainability, Tompkins County
Highway Department, and Town of Lansing Highway Department were given the opportunity to
comment on the proposed action; and
WHEREAS, Project plans, and related information, were duly delivered to the Tompkins County
Planning and Sustainability Department per General Municipal Law § 239; et seq., and such Department
responded in a letter dated 23 June 2021 from Katherine Borgella, Tompkins County Commissioner of
Planning, pursuant to §239 -1, -m, and -n of the New York State General Municipal Law with no
recommendations on the proposal:
WHEREAS, the Planning Board has considered and carefully reviewed the requirements of the Town
code relative to site plan review, the unique needs of the Town due to the topography, the soil types
and distribution, and other natural and man-made features upon and surrounding the area of the
proposed site plan, and the Planning Board has also considered the zoning in the area and the project
in light of the Towns Comprehensive Plan and compliance therewith, and as the underlying use is a
permitted use in the zone in which located; and
WHEREAS, upon due consideration and deliberation by the Town of Lansing Planning Board, now
therefore be it RESOLVED as follows:
1. That the Planning Board of the Town of Lansing determines the proposed project will result in
no significant impact on the environment and that a Negative Declaration for purposes of Article
Page 1 of 3
8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617
of the State Environmental Quality Review Act; and
2. That the Planning Board of the Town of Lansing does hereby grant Site Plan approval for the
construction of a 60' x 100' outdoor turf field, which includes all parking layouts, improvements
to the driveway to include widening to 20' and the installation of a 60'x15' gravel emergency
pullout, landscaping, dark sky lighting, and other site conditions listed here in Site Plan as
shown in and upon the Drawing Sheets titled: "Topographic Map Show Lands of SKR Land
LLC" dated 9/2/2021, Prepared by TG Miller; "C-100 Site Plan" dated 9/30/2021, Prepared by
Sciarabba Engineering; "C-101 Erosion & Sediment Control Plan" dated 9/30/2021, Prepared
by Sciarabba Engineering; and
a. The applicant must obtain a NYS DOT permit to widen and otherwise improve the
driveway entrance.
b. If required by Army Corps of Engineers, the applicant will obtain the appropriate permit
to replace the culvert under the driveway
c. All lighting fixtures will be "dark sky compliant" glare -free, downward directed, and
shielded lighting as promotes the dark -sky standards of the International Dark -Sky
Association (IDA).
d. In accordance with Town Code § 270-27(K), this site plan approval is valid for only 36
months from the date hereof, and the applicant/owner is required to commence and
substantially complete the construction or other activities for which the site plan is
applicable within said 36 months or this approval shall, unless extended upon application
timely made, expire, lapse, and be of no further validity, force or effect.
e. The applicant must provide lighting on the walkway between the field and clubhouse as
well as for the parking lot. The lighting may be in a form such as bollard lighting, pole
mounted lighting, or wall pack lighting, or equivalent. The lighting must be shown on
the final site maps provided to the Town.
Dated: October 25, 2021
Motioned by: Tom Butler
Seconded by: Dale Baker
VOTE AS FOLLOWS:
Sandra Dennis- Conlon - Aye
Tom Butler - Aye
Al Fiorille - Aye
Larry Sharpsteen - Aye
Dean Shea - Aye
Dale Baker - Aye
Jerry Caward - Aye
The Planning Board hereby directs clerk of the Planning Board to promptly, and within 10 days of the date of
adoption of this Resolution, file a copy hereof in the Office of the Town Clerk of the Town of Lansing, who returns a
Page 2 of 3
date -stamped copy as received to clerk of the Planning Board, who files a hard copy and electronic copy and duly
indexes in the Planning & Code Enforcement Department's Building/Property History System.
Received in the Lansing Town Clerk's Office on / c'/'7
Debbie Munson, Town Clerk
Town of Lansing
Tompkins County, New York
Page 3 of 3