Town of Lansing
Monday, January 12, 2015 6:30 PM PLANNING BOARD MEETING
PLANNING BOARD MEMBERS
(*Denotes present)
* Tom Ellis, Chairman
* Norman (Lin) Davidson, Vice-Chairman
* Larry Sharpsteen
Richard Prybyl
* Al Fiorille
* Gerald Caward
* Ray Farkas
Deborah Trumbull (Alternate)
* Guy Krogh, Esq.
Other Staff
Kathy Miller, Town Supervisor
Michael Long, Planning Consultant
Ed LaVigne, Town Board Member
David Herrick, P.E. Town Engineer
Ruth Hopkins, Town Board Member
Public Present
Timothy Buhl, P.E. Ted Laux
Kris & Chris Marshall Martha Laux
Hannes Maddens Mary Sullivan
Connie Wilcox James Sullivan
Dan Veaner Elisabeth Hegarty
Amy Bukowski Robert Bukowski
Larry Beck Roger Hopkins
Dennis Shaw Lynda Skibitsky
Maureen Cowan Norfe Pirro
Richard Yehl Lynne Yehl
Several Other People
Other Business
Thomas Ellis called the Planning Board Meeting to order at 6:32 PM.
Public Comments/Concerns other than Agenda Items
APPROVED
2
Thomas Ellis, Chairman inquired if there were any comments from the Public. There
were none.
Mr. Ellis rearranged the Agenda to allow for Minutes to be reviewed first.
Approval/Denial of December 22, 2014 Minutes
Thomas Ellis states on page 5, 2nd paragraph, last sentence build to built.
3rd paragraph 2nd sentence, purposal to proposal.
Raymond Farkas made a motion to approve as amended. Gerald Caward seconded the
motion and it was carried by the following roll call vote:
Vote of Planning Board . . . (Aye) Gerald Caward, Member
Vote of Planning Board . . . (Aye) Norman (Lin) Davidson, Member
Vote of Planning Board . . . (Aye) Ray Farkas, Member
Vote of Planning Board . . . (Aye) Al Fiorille, Member
Vote of Planning Board . . . (Aye) Larry Sharpsteen, Member
Vote of Planning Board . . . (Aye) Thomas Ellis, Member
Public Hearing (s) SEQR and overall Application- Cayuga Farms Multi-
Family Residential Rental Townhomes, Applicant: WB Asset
Management, LLC, North Triphammer Road, Tax Parcel # 37.1-6-3.362
Mr. Timothy Buhl, P.E. for WB Asset Management, LLC appeared before the Planning
Board with the following presentation;
This project has been on the drawing board for a number of years now and has changed
a couple of different times, due to the economy. The project will consist of high end two
story residential rental units. Approximate rents fees range from $1,800 to $2,200 per
month. There will be units with 3, 2 & 1 bedrooms. The 2 & 3 bedroom units will each
have a two car garage and 1 garage for the 1 bedroom. There will be a total of 102 units,
21 buildings, 4-6 units but nothing smaller. The site will be served by Public Water. The
front portion of the property (eastern side) is in the Town’s Consolidated Water District.
The Developer has submitted the necessary paperwork to the Town Board for a back lot
water extension. The extension will be paid for entirely by the Developer with no cost
to the taxpayers. The project will have an onsite Wastewater Treatment Plant that will
be manned by a NYS Licensed Treatment Operator, and again the Treatment Plant will
be fully financed by the Developer. Interior Pedestrian walkways and driveways will be
installed. The project will be built in Phases with a build out of approximately five
years. With this proposal, it will bring about 50 additional cars at the peak hour of
commuting. The road on the property will be private. Several years ago the Town
Board and the Planning Board requested that the Developer builds the first phase of
APPROVED
3
their access road (600 ft.) south of the property (through Michaleen’s) and dedicates it to
the Town. The Developer agreed to that.
Larry Sharpsteen brought to Mr. Buhl’s attention the Map presented did not show both
construction entrances.
Lynn Day, Zoning Officer states previously it has been the Town policy to have the
road built and dedicated prior to issuance of any Building Permits. Mr. Buhl states they
had planned on building it later.
Mr. Ellis reminded the Public prior to opening up the Public Hearings that this is an
allowed use for the R3 District. Mr. Ellis further stated the Public Hearings will remain
open in order to continue to take comments/concerns and to get items ironed out prior
to the closure of the Hearings.
Public Hearing (s) SEQR and overall Application- Cayuga Farms Multi-
Family Residential Rental Townhomes, Applicant: WB Asset
Management, LLC, North Triphammer Road, Tax Parcel # 37.1-6-3.362
Larry Sharpsteen made a motion to open both Public Hearing(s) at 6:50 PM. Norman
(Lin) Davidson seconded the motion and it was carried by the following roll call vote:
Vote of Planning Board . . . (Aye) Gerald Caward, Member
Vote of Planning Board . . . (Aye) Norman (Lin) Davidson, Member
Vote of Planning Board . . . (Aye) Ray Farkas, Member
Vote of Planning Board . . . (Aye) Al Fiorille, Member
Vote of Planning Board . . . (Aye) Larry Sharpsteen, Member
Vote of Planning Board . . . (Aye) Thomas Ellis, Member
Public Comments/Concerns
Elisabeth Hegarty: Chief Issues: Traffic & Traffic Control
High accident rate on Waterwagon Road & Asbury Road (? Arrow lane for new
development)
Sewer Plant: Are there any Package Plant in Tompkins County & what is their track
record
Taxation
Safe guards by this Company
APPROVED
4
Larry Sharpsteen states there is a Package Plant currently in operations in Lansing at
the Department of Corrections/Youth building on Auburn Road. There have been no
problems that the Town has been made aware of with respect to their system.
Timothy Buhl advised Ms. Hegarty that the Developer is responsible for paying for the
installation of the system, as well as upgrades or if it should fail. The Tompkins County
Health Department monitors it very closely.
Thomas Ellis states the Town is preparing to create a sewer benefit district for this
particular project that will be paper only that would relieve the Town of any obligation
to fix, repair, maintain or replace the plant.
Guy Krogh legal Counsel for the Town stated it’s a Wastewater District. Basically it’s a
catch basin, if for some reason the owner retreated from the obligation to maintain by
virtue of Bankruptcy, the cost would not fall to the Town’s general charge.
Thomas Ellis states the Town is working diligently with the traffic issues within the
town with respect to Subdivisions, however, the state regulates the roads and have the
final say what the Town and County can do with them. The Planning Board will take
into consideration, the possibility of requesting an arrow pull off lane for the main
entrance of the subdivision.
Larry Sharpsteen states the Planning Board many times tried to get pull offs and it’s the
County that keeps denying them. Mr. Sharpsteen referred Ms. Hegarty directly to the
County Highway Department.
Two different Gentlemen had concerns with pedestrians’ safety at the corner of Asbury
and North Triphammer. One suggested putting in a traffic light. Again, several
Members of the Planning Board advised the Public that it is the State’s jurisdiction for
lighting and the Town has tried for 30 years plus to get the State to put a light in.
Timothy Buhl indicated he is going to talk to TCAT about servicing the project
James Sullivan offered the following concerns;
APPROVED
5
Chairman Ellis advised Mr. Sullivan the items he has listed is beyond the purview of
the Planning Board. Mr. Ellis further stated the Town has their own Engineer that will
review the plans as well as the DEC reviewing them.
APPROVED
6
Mr. Sullivan has great concerns with 16,000 gallons of treated sewage dumping into
Shurger Glen, which has been designated a unique natural area. There is a trail located
near the Glen where people could divert from the trail and enter that waste water.
Mr. Sharpsteen advised Mr. Sullivan the items he has concerns with are between the
Developer who contracts with an Operator who takes care of control and maintenance
of the plant.
A gentleman inquired if there is enough natural gas capacity to supply this project. Mr.
Buhl indicated there are constraints on natural gas. Mr. Buhl states his project will be
starting with propane and hopefully will be able to convert in the future.
A lady inquired if the water supply to this proposal would affect the water pressure or
supply to those residents in the surrounding area or up on the hill. David Herrick, P.E.
for Town indicates it will not.
Dennis Shaw states he has walked a trail near this site for the last 3 years and there’s a
stream that has never dried up. Mr. Shaw was wondering how it can be classified as an
intermittent stream. Also, he requested to know where he can find the Cornell Connect
Traffic Study on the Town’s website. Also concerns of his were stormwater and height
restrictions on the Townhomes.
APPROVED
7
Thomas Ellis again advised all present, the Public Hearings will remain open in order to
allow any future questions/concerns be made to the Planning Consultant, Michael
Long who in turn will bring them to the Planning Board.
Al Fiorille inquired if the Town would require a 20’ wide drainage easement along the
stream in Autumn Ridge, would that Town want to do that with this site?
Tim Buhl indicated they are 50’ from the stream.
Larry Sharpsteen agreed with Al Fiorille. Mr. Sharpsteen feels the Board should require
a drainage easement for the future in case something should fail.
Thomas Ellis inquired if there would be a buffer between the project and Triphammer
Road. Mr. Buhl indicated yes, it will continue the length of the property on
Triphammer Road with planting on top of it.
The extension on the road will be deeded to the Town.
Mr. Buhl states the Arenco Representative is willing to come and give a presentation to
the Board at any time with regards to the treatment plant. Mr. Buhl states just let him
know and he will set it up.
Larry Sharpsteen reminded all that the Unique Natural Area Map provided by the
County does not carry a force of law. They are there for Town Boards and Planning
Boards to help as a tool.
Thomas Ellis inquired from Mr. Buhl as to when they intend on building the portion of
the road that will be turned over to the Town? Tim Buhl states they would like to use
that as their construction entrance. He really does not want to build until the work is
done.
Larry Sharpsteen states the Town should require a bond until such time the road is
built. Mr. Sharpsteen further stated asking for the binder to be put down is not an
unreasonable request.
Gerald Caward felt a base should be put on road, especially if large equipment is going
to be using it. It would also allow for Michaleen’s to move their entrance.
Thomas Ellis inquired if Mr. Buhl has a signed acknowledgement from Michaleen’s
with regards to their parking lot being taken.
Guy Krogh indicated this project concept has been going on for a number of years now.
Michaleen’s is fully aware of the intent to build a road. According to Mr. Buhl, they
APPROVED
8
have not been in contact with the owners of Michaleen’s. Lynn Day states he has
spoken with the owners of Michaleen’s and they don’t have a problem with it.
Thomas Ellis inquired if in the near future, the Town gets Sewer in that location, would
the piping from the Pump Station on private property going to the Town’s sewer be
installed worthy to current standards.
Timothy Buhl states all infrastructures from the town’ sewer back to the Pump Station
will be owned and cared for by the owner.
Thomas Ellis inquired to know if the Meters will be plumbed in such a way that if the
Buildings ever were to be sold as condos there would be a Meter Room.
Timothy Buhl states there will be a Meter Room, and possibly they may do individual
Metering in each apartment. They will be digital, but not to the Town’s standards.
Thomas Ellis inquired as to who would be responsible for the Water system if it should
fail.
Timothy Buhl states The Homeowners Association. Guy Krogh gave a brief overview of
how the Homeowner’s works.
David Herrick, P.E. states the Town’s Water District will be modified to include this
entire parcel. By having the Master Meter connection, the Town’s responsibility ends
there.
The Town will be requiring either a Stormwater Agreement (SOMRA) or Drainage
District. The Stormwater practices within the development are privately owned.
David Herrick states as far as the Engineering goes, they are getting down to the fine
details. Mr. Herrick does have concerns with the existing drainage ditches and their
capacity. With respect to the water, there needs to be a good understanding of what the
fire protection will require. Eventually, we need to know if it will be a 4” or 6”pipe?
Mr. Herrick has reached out to Region 4 of the DEC and spoke with the Engineer who is
familiar with this type of System. They have no experience with this system in the area,
only in the Albany area.
Mr. Buhl states Fred Gillette from the DEC will be providing him with a summary
concept approval. The Health Department will review the overall design plan too.
David Herrick felt it would be very helpful to the Town to have a conceptual summary
from the DEC for SEQR purposes.
APPROVED
9
Mike Long expressed to Tim Buhl that he will need to something more definitive from
the DEC, answers for David Herrick, and also something from the County Health
Department.
It was the consensus of the Board that Mr. Buhl will return for the February 23rd
Meeting for the SEQR completion.
Mike Long, Planning Consultant offered the following update;
Planning Board Project Update: Jan 12, 2015 meeting
Cayuga Farms (102 dwelling Unit Site Plan) –
o Received letter from DEC – Concurrence of Lead Agency Designation
o Additional Information was reviewed by T.G. Miller letter dated Dec 12, 2014
o Tompkins Co. 239 Review completed.
o Requested DEC review of package system – follow up approvals needed.
o Public Hearing – January 12, Meeting
o SEQR / Site Plan approval required.
Novalane – Jack Young
o Preliminary subdivision plan with Hammerhead end
o Received the revised map of the entire parcel from John Anderson.
o Tompkins Co. 239 Review has been completed
o Tentative for the Jan 26, 2015 meeting
o Schedule Public Hearing for the “Flag Lots”
o Final Plat approval
Forest Circle Drive – Major subdivision plan
o Tompkins Co. 239 review has been completed
o Storm water plan revisions requested T.G. Miller
o Will require a variance as 1 lot is less than 150 foot of road frontage.
o Required Public Hearing –
Whispering Pines VI –
o Storm water plan has been reviewed
o Completing County Health Dept. perk testing
o Need 239 Review from Tomkins County?
o Need to establish a public hearing date.
West view Partners, Boris Simkin – Major Subdivision
o Designated a Major subdivision (4 lots and ROW issues)
o Revised Subdivision Plan submitted – updating the Storm Water Plan for 4 lots
o Revised subdivision plan to 239 Review from County
o Need to establish a Public Hearing date…
APPROVED
10
Anne Sheldon – Major subdivision approval (4-7 lots)
o Needs to submit developer’s agreement and fees SEQR Long Form part 1.
o Then can complete the 239 review
o Need to establish a public hearing date…
Comprehensive Plan – Wed. Jan 14th at 7:00 PM
o To review maps, Existing Use Classifications, Housing Construction (by decade),
Economic business locations, and map series
Larry Sharpsteen made a motion to adjourn the Meeting at 8:50 PM. Norman (Lin)
Davidson seconded the motion and it was carried by the following roll call vote:
Vote of Planning Board . . . (Aye) Gerald Caward, Member
Vote of Planning Board . . . (Aye) Norman (Lin) Davidson, Member
Vote of Planning Board . . . (Aye) Ray Farkas, Member
Vote of Planning Board . . . (Aye) Al Fiorille, Member
Vote of Planning Board . . . (Aye) Larry Sharpsteen, Member
Vote of Planning Board . . . (Aye) Thomas Ellis, Member