Loading...
HomeMy WebLinkAbout2006-06-06 96 - 6 - 06 ; 10 : 37AM ; MILLER ENGINEERING ; 6072736322 # 1 / 2 ®• 0 RECEIVE ?) 1 Allen T. Fulkerson, L.S . T. G. MILLER P. C . / David A. Herrick, P. E. i , Lee Dresser, L.S. Engineers and Surveyors Frank L. Santelli, P.E . Andrew J . Sciarabba, P. E . 203 North Aurora Street , Ithaca , New York 14850 Darrin A. Brock, P. E. Website: www.tcimillerpc.com DATE: June 6, 2006 Number of Pages: 2 (including cover sheet) TO: Nancy Loncto, Chair FROM : David A. Herrick, P . E. Company: Town of Lansing T. G . Miller, P. C . Phone Number: (607) 533 -8819 Phone Number: (607) 272-6477 Fax Number: (607) 533-3507 Fax Number: (607) 273 -6322 RE : June Meeting Agenda • REMARKS : Please see attached. Please Reply _ For your use X For review and comment 4 Nr ' • 6 - 6 - 06 ; 10 : 37AM ; MILLER ENGINEERING i w-r 2736322 # 2 / 2 Pla Allen T. Fulkerson , L. S . ( C ; David A . Herrick, P. E . Lee Dresser, L. S . I .LLER .P. Frank L . Santelli, P. E . Andrew J . Sciarabba, P. E . Engineers and Surveyors Darrin A. Brock, L. S . June 6 , 2006 Ms . Nancy Loncto , Chair Town of Lansing Planning Board Box 186 Lansing , NY 14882 Re: June Meeting Agenda Dear Ms . Loncto , I 've reviewed the following project that is on the PlanningBbard Agenda for g the June 12th meeting and offer the following comments : N . Triphammer Multi-Use Subdivision — Sketch Plan • The road configuration of ST-1 (5/29/06) has the potential of introducing three new intersections on N . Triphammer in a relatively short distance should the road extension through the Michaleen's parcel (37 . 1 -6-3. 361 ) be constructed . it is still recommended that this extension be pursued now and then convert " Road B" back to a private driveway with no connection to N . Triphammer Road . • The origin of parcel 37. 1 -6-3 .361 should be researched and made known to the Planning Board . • • As suggested in my previous review letters , the Tompkins County Highway Department will need to be involved in all aspects of the intersection planning and should be consulted early in this design process . Written comments should be received prior to the preparation of preliminary subdivision documents. • The Tompkins County Health Department should complete their soils investigation with the developer and provide the Town a copy of the site suitability report before lot configurations are finalized . • Based on the site topography a stormwater management practice may be necessary for the southern 1 /3rdof the property ( Lots 9- 16). The other; two "retention areas" shown are adjacent to or including existing water courses. Permanent water quality practices for the new development should be segregated from the upstream watershed conveyances. • To reiterate , the development is within the Town's proposed Sewer Benefit District and would be a property to initially receive sewer service once the district is established . If the schedule of this project requires installation of on-site septic systems then we' ll want to negotiate easements for future sanitary sewer main routes on and through this parcel . Feel free to contact me with any questions . Thank you . Sincerely, 4 t� David A. Herrick , P . E. Cc: S . Farkas D . Platt J . French • G . Krogh 203 North Aurora Street • P.O. Box 777 • Ithaca, New York 14851 • (607) 272-6477