Loading...
HomeMy WebLinkAbout2002-09-22 Town of Lansing Planning Board. September 22. 2002 1 n, • T . wn of Lansin • .\ 2 „ 3 Sunday, September 22 , 2002 1 : 00 PM (Working Map Meeting) PLANNING BOARD PLANNING BOARD MEMBERS 6 * Gregg Travis, Chair * Brad Griffin 7 * Larry Sharpsteen * Lin Davidson 8 * Viola Miller David Hatfield 9 * Nancy Loncto 10 11 * Bud Shattuck, Town Councilman 12 * Richard Platt, Zoning and Code Enforcement Officer 13 14 15 Changes to Map 16 17 1 . Changed area bordered by Armstrong, Asbury, Warren, Farrell, Scofield and 500' South of 18 Peruville to R2 . Extend RA 500' South of Peruville Road . (There was discussion about whether area along Peruville should be B2 or RA. If RA, Site Plan approval would still be required for Commercial projects. ) 21 2 . Move RA line to West border of Correctional Facilities on Auburn Road . 22 3 . Extend L1 to 2000 ' from lake from Myers Road to Northern border, leaving Milliken Station 23 in IR zone. 24 4 . Change R3 to R2, and extend zone 500 ' North of Wilson Road . 25 5 . Create B2 zone (a) from Drake Road West (b) All present B1 500' South and west of 34B to 26 E. Shore Drive and long E. Shore to Atwater, and 500' North & East of Atwater to Northern 27 border of R2 along Atwater (c) All present B1 East and South of intersection of-Auburn Road 28 and Peruville Road. Extend B1 zone along Northern border at point North of Drake Road 29 extend East to Conlon Road . This area would include Beach Road in B 1 . Continue North 30 along Conlon Road approximately 1200 ' then East approximately 1200' to meet existing B1 31 border. 32 6 . Extend R2 zone North of Waterwagon to N. Triphammer from Waterwagon Road all the way 33 to border of B1 North of Asbury. 34 7 . R2 area along South end of Lakeshore Drive will be changed to L1 . 35 6 Note : THIS DOCUMENT WAS AMENDED AT THE 09/23 /02 PLANNING BOARD MEETING . REFER TO THOSE MINUTES . 38 1 Town of Lansing Planning Board, September 22, 2002 1 • 2 Town of Lansing 3 Sunday, September 22 , 2002 1 : 00 PM (Working Map Meeting ) PLANNING BOARD 4 PLANNING BOARD MEMBERS 5 (•Denotes present) 6 * Gregg Travis, Chair * Brad Griffin 7 * Larry Sharpsteen * Lin Davidson 8 * Viola Miller David Hatfield 9 * Nancy Loncto 10 11 * Bud Shattuck, Town Councilman 12 * Richard Platt, Zoning and Code Enforcement Officer 13 14 15 Changes to Map 16 17 1 . Changed area bordered by Armstrong, Asbury, Warren, Farrell, Scofield and 500 ' South of 18 Peruville to R2 . Extend RA 500 ' South of Peruville Road. 9 (There was discussion about whether area along Peruville should be B2 or RA. If RA, Site 20 Plan approval would still be required for Commercial projects .) 21 2 . Move RA line to West border of Correctional Facilities on Auburn Road. 22 3 . Extend L1 to 2000 ' from lake from Myers Road to Northern border, leaving Milliken Station 23 in IR zone. 24 4 . Change R3 to R2, and extend zone 500 ' North of Wilson Road. 25 5 . Create B2 zone (a) from Drake Road West (b) All present B1 500 ' South and west of 34B to 26 E. Shore Drive and long E. Shore to Atwater, and 500 ' North & East of Atwater to Northern 27 border of R2 along Atwater (c) All present B1 East and South of intersection of Auburn Road 28 and Peruville Road. Extend B1 zone along Northern border at point North of Drake Road 29 extend East to Conlon Road. This area would include Beach Road in B1 . Continue North 30 along Conlon Road approximately 1200 ' then East approximately 1200 ' to meet existing B1 31 border. 32 6 . Extend R2 zone North of Waterwagon to N. Triphammer from Waterwagon Road all the way 33 to border of Bl North of Asbury. 34 7 . R2 area along South end of Lakeshore Drive will be changed to Ll . 35 6 .i 7 38 1