HomeMy WebLinkAbout1988-09-26 TO'. !N OF LANSING PLANNING BOARD
DATE : September 26 , 1988
• TIME : 7 : 45 PM
PRESENT : Chair Al White , F . Ramin , L . Hirvonen , C . Kammen , " . Hagen
ABSENT : V . li11er , L . `' harpsteen
I . MINUTES
MOTION : R . ; agen moved to approve the minutes of September 12 , 1988 as
amended . Teconded by F . Jamin , carried unanimously .
II , MAHOOL / TALLMAN PROPOSED MAJOR SUBDIVISION - LAKEWATCH
Mike Schwartz , project designer , responded to Town Engineer Miller ' s concerns
as follows :
1 . General layout main difference on the lakefront and has DEC approval .
Density remains almost the same as the multiple units have been replaced
with single family residences .
2 . Proposed North - South connector has been moved 16 feet . The Kim
proposed subdivision could easily adjust their plan to connect .
3 . The 60 ft . Hde dedication is now shown .
4 . Although the connection to E . Thore Circle does not meet subdivision
requirements , this aspect was reviewed with Highway Superintendent
Howard Groat and the Department of Transportation ( NYS ) and was approved
by both . It is felt that since it is an indirect connection with stacking
space that problems will be minimal . They have requested this require -
ment be waived .
5 . Survey will conform to Prelim . Plat requirement of 502 .
6 . Right of Ways are now shown .
7 . All lots now have over 60 ft . of road frontage as requested by the
Planning Board . All lots meet Health Depart . requirements .
8 . Bearing and distances now shown .
9 . Easements for E &G , tel , etc . now shown . ` lanket easement .
10 . No street lighting is planned .
11 . Drainage easements now shown .
12 . Drainage plan now defined . Culverts and swales shown as well as sizes
and locations under railroad ( 24 " ) .
13 . R . O . W . lines and easements for utilities now shown .
• 14 . Valves provided as required .
15 . Profile for watermain now included .
16 . 8 " watermain now rpovided along East Shore Circle .
• 17 . There is a difference of opinion on this point .
18 . Details of " septic system plan " now provided .
19 . Road sections now shown .
20 . Culverts on road profiles and at locations of major fills now shown .
21 . Elevations and lengths of vertical curves now shown .
22 . Cross - sections and grading plans done .
23 . Will conform to same requirements as for Leathers re : horizontal curve .
Discussion :
Drainage - rune - off will be no greater than it is now .
MOTION : Carol Karmen moved to conditionally approve the final plat plan
for the Lakewatch subdivision located off Rt . 34 ( E . Shore Circle ) ,
comprised of 47 residential lots and extending to the lake shore .
This approval is contingent upon the completion of all maps in
accordance with the comments made by The Town Engineer with the
exception of point # 4 which will be waived . The Planning Board
feels the professional input on this point has been diligently
sought and that said input shows no major problem and has the
approval of both Town and State officials . It is also contingent
upon : I . Statement from Town Board re : SEQR
2 . Letter from Town Board re : water .
3 . Letter from Town Attorney re : endorsements .
4 . Approval from Town Engineer .
The Planning Board also states and requires that if , at any time ,
it is deemed that changes in the intersection of E . Shore Circle with
Rt . 34 are necessary , the developers of the Lakewatch subdivision
shall bear the expense .
Seconded by R . Hagen , carried unanimously .
III . Other
Planning Board members expressed concern that the Town Ordinance Officer
no longer attended their meetings .
p
2