HomeMy WebLinkAbout1977-07-11 TOWN OF LANSING PLANNING BOARD
110 Date : 11 July 1977
Time : 7 : 45 P . M .
present : V . Miller , B . Bement , J . Burke9 D , Hardie
I . Correspondence
A . Appalachian Rail Abandonment meeting
1 . Aug . 4 , 19770 10 : 00 A . M . , Binghamton , N . York
2 . A public information meeting re : a study made on
rail abandonment .
II . Guest Speaker o Mr . Tom Brown , engineer , Village Sewer Study
A . Financing
1 . If full financing granted , percentages would be as follows :
a . 75% federal
b . 124 state
c . 121% local
2 . Collector sewers , or branches , may not be funded after
Sept .
3 . State Depart . of Audit & Control won ' t permit a plan
that costs the individual more than $ 300 . to $ 400 . per
year . Cost per individual should be kept below
$ 200 . per year .
B . Local Situation
1 . Cayuga Heights sewage system has volume problems ,
• 2 . Cayuga Heights stipulates only so many gallons of
sewage may come from Town ( Village ) of Lansing per day .
C . Three Alternate Plans Presented
1 . Differences in the plans are in how to get the lines
to the sewage plant . The main trunk line , in Trip-
hammer area remains the same in each .
2 . Alternate A - interceptor lines follow railroad bed ,
go up Oakcrest to Triphammer , and on to Brook Dr. .
3 . Alternate B - Oakcrest line would be eliminated .
Line would come down in fields behind Pyramid . This
plan cuts costs , but loses many customers .
4 . Alternate C - line would follow Rte . 13 - cost
would be same as Alternate B .
5 . Alternate A would be best for future development of
Town of Lansing , but most costly .
D . General Information
1 . Future land use and population growth , in regard to
Town of Lansing , specifically discussed .
2 . Projected flow based on projected future :
a . land use
b . population
3 . Two areas in Town , designated J & Q , projected to
grow in population by 500 in 50 years . The PB
agreed with the concept .
4 . All pipes sized for future development and future
hook ups . This , of course , adds to the cost .
General Information continued , . .„
50 The Town could possibly take a line out
Triphammer Rdo
6 . Construction projected to begin summer of 1979 .
7 . The PB felt the raw data used as a basis for this
study reflected an honest and reasonable approach
as far as the interests of the Torn were concerned .
E . Public hearing will be held in mid -Augusto
F0 A formal recommendation , from the Town , in letter form ,
will be sent to the Village , forwarded to the engineer ,
and will be included in the report to the state .
Adjourned : 9 : 00 P0M0
Addendum : See Linda about your dollar before the meeting .