Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout19-38 Site Plan Approval for MPL 41 Dutch Mill RoadRESOLUTION PB 19-38
RESOLUTION APPROVING MODIFICATION OF SITE PLAN FOR EXPANSION
OF FACILITIES - MPL, INC., 41 DUTCH MILL ROAD, LANSING, NEW YORK
WHEREAS, an application was submitted for Site Plan Review on behalf of MPL, Inc. by
John Shipe, Applicant, Shane French, Owner, for the proposed construction of a new 30'
x 30' (900 square foot) storage building; a new 12' x 14' covered employee patio;
replacement of existing covered patio; a new walkway to existing gazebo; and: addition
of 12 parking spaces to existing 50-space parking lot on a 2.17 ± acre parcel of,land at 41
Dutch Mill Road, Lansing, New York (TPN 39.4-50.12), as located in the Warren Road
Business Park Planned Development Area (PDA) IR - Industrial / Research Zone; and
WHEREAS, this proposed action was classified as a Type II Action under 6 NYCRR § 615
(c)(9) of the State Environmental Quality Review Act ("SEQRA"); and
WHEREAS, this action is exempt from New York State General Municipal Law §239 -1, -
m, and -n referral requirements as there is no change in commercial use in the existing
building and the action does not change in vehicular access on a State or County highway
are excluded per Properties Subject to County Planning Agency Review Under General
Municipal Law Section 239 as of July 2017 issued by the Tompkins County Department
of Planning and Sustainability; and
WHEREAS, the Planning Board previously "reviewed and approved a Site Plan
application prepared by Kasonic Ventures, LLC, dated 9/1/2018 via Resolution 18-14 on
October 22, 2018; and
WHEREAS, the Planning Board has again considered and carefully reviewed the
requirements of the Town of Lansing Land Use Ordinance relative to Modifications of
Site Plans, including in accordance with the provisions of LUO § 701.7 et seq., the unique
needs of the Town due to the topography, the soil types and distribution, and other
natural and man-made features upon and surrounding the area of the proposed site plan,
and the Planning Board has also considered the zoning in the area and the project in light
of the Town "s Comprehensive Plan and compliance therewith, and the Planning Board
has again reviewed and considered the aforementioned amended site plan application
and the fact that the use is permitted at such location within an IR Industrial /Research
Zone and is an already developed site; and
WHEREAS, on November 25, 2019, the Planning Board duly considered the proposed
modified Site Plan in accordance with the provisions of LUO § 701.4 et seq., including
concerns addressing site drainage, lighting, nearby residences, landscaping, parking,
buffering, screening, driveways, and any potential on and off site environmental impacts,
and upon due consideration thereupon and deliberation by the Town of Lansing
Planning Board, now therefore be it
RESOLVED, that the site plan application for the proposed storage building and site area
improvements as submitted in the final Modified Site Plan, prepared by MPL, Inc. dated
11/25/2019, located upon TPN 39.4-50.12, at 41 Dutch Mill Road, Lansing, New York,
be and hereby is granted and approved, subject to the following conditions:
1. Site Plan approvals shall be limited to the improvements as stated above and
included in the application materials.
2. Building Permits will be required to construct the approved storage building and
such plans must meet all code requirements, including the sealing of plans by a
licensed engineer or architect, and such improvements must ,be .constructed in
compliance with all building code requirements.
3. Existing and any new Buffers shall be properly maintained and any dead,
diseased, or dying trees or plants shall be promptly replaced, and any tree or
plants that, whether singularly or in combination, due to lack'of growth, death,
recession, disease or other cause, cease to function as buffers shall be replaced in a
manner as promotes the goal of such buffer as stated in this site plan approval.
4. Lighting must be International Dark -Sky compliant and limited to a color
temperature of 3000K degrees or less.
5. In accordance with LUO § 701.10, this site plan approval is valid for only 36
months from the date hereof.
Dated: November 25, 2019
Motioned by: Lin Davidson
Seconded by: Dean Shea
VOTE AS FOLLOWS:
Sandra Dennis Conlon - Aye
Norman (Lin) Davidson - Aye
Al Fiorille - Aye
Larry Sharpsteen - Aye
Dean Shea - Aye
Deborah Trumbull - Aye
Received and filed in the Lansing Town Clerk's Office on November 26, 2019 -J__ 1
Debbie Munson
Town Clerk
Town of Lansing
Tompkins County, New York