HomeMy WebLinkAboutPB Resolution 26-11 10 Town Barn Rd Immunity Request RESOLUTION PB 26-11
TOWN OF LANSING PLANNING BOARD RESOLUTION
REQUEST FOR IMMUNITY FROM LOCAL LAND USE REVIEW FOR
10 TOWN BARN RD TPN 30.1-16.12
WHEREAS, the Town of Lansing is a municipal corporation duly organized and existing pursuant to
the laws of the State of New York and having such powers and responsibilities pursuant to the
provisions of the New York State Town Law and the Highway Law in conjunction with the Town's
Highway Superintendent to provide for the care and maintenance of the Town's highways and bridges
and to provide suitable places for the housing and storing of vehicles, machinery, tools and equipment
owned by the Town for the effectuation of such purposes; and
WHEREAS, the Town of Lansing is the owner of a parcel of real property (Tax Parcel 311.-1-16.12),
located on Town Barn Road, constituting approximately 18.27 acres of land that has been previously
acquired and utilized by the Town and designated for municipal purposes ("subject premises"); and
WHEREAS, the existing Town of Lansing Department of Public Works Building was constructed in
1968 and is in need of an adequate repair, storage, and administrative, Salt/Sand Storage, and Fuel
Storage facility in order to meet the needs of maintaining the public roadways of the Town of Lansing;
and
WHEREAS, the Town of Lansing, after an extensive multi-year process of selecting a qualified
consultant, examining site selection options for constructing a new Town Public Works facility, and
preparing draft construction materials,was granted approval by the Zoning Board of Appeals to be
considered immune from local land use review for the design and construction of the new Town Public
Works Facility; and
WHEREAS, adequate water services are needed for the regular functioning of municipal facilities, and
local water utilities servicing 10 Town Barn Road only allow for one water meter to be built per parcel
in the Town of Lansing; and
WHEREAS, municipal infrastructure located at 10 Town Barn Road exists on both sides of Town
Barn Road and Verizon Lane, and cannot be feasibly serviced by one water meter, causing a formal
subdivision to be required; and
WHEREAS, pursuant to the decision of the New York State Court of Appeals in the Matter of County of
Monroe, 72 N.Y.2d 338 (1988), a "balancing of public interests analysis" ("Monroe Balancing Test's is required
to determine whether and to what extent,this proposed subdivision shall be exempt from the Town's Zoning
Code and use and bulk regulations and administrative approval from the Town of Lansing Zoning Board of
Appeals; and
WHEREAS, upon due consideration and deliberation by the Town of Lansing Planning Board;and
NOW, THEREFORE,BE IT RESOLVED THAT, that the Town of Lansing Planning Board has
analyzed, considered and discussed the following criteria as required by Matter of County of Monroe in
relation to the subdivision associated with the new Department of Public Works Building Replacement
and Campus Renovation Project on the subject premises, and the Town of Lansing's land use regulations,
and hereby finds as follows with regard to each of the nine Monroe Balancing Test criteria:
Factor#1:Whether there is an expression of legislative intent for the proposed action to be immune from
local zoning oversight.
Page I of 4
The Town of Lansing Town Board is the municipal body solely responsible for the legislative and executive
functions of the Town of Lansing. The Town of Lansing Planning Board and Zoning Board of Appeals are
administrative boards of the Town of Lansing,whose members are appointed by the Lansing Town Board.
This project is to enable a fully governmental task—the operation of the Department of Public Works—
including to fulfill its duties to repair and maintain public highways and municipal building campuses, and
further including the emergency services of snow and ice removal and treatment.The legislative scheme of the
Town Law and the NYS Highway Law make this a core public service that is very much an emergency service
in many aspects. Under NYS statutes, therefore,it is generally understood that these are the very functions that
are considered exempt from local zoning and land use review under the County of Monroe standard.
Further, the town board, by including planners, the town engineer,and many others upon these review
committees, has evinced an intent to fully review and proceed with this project as designed,and not to have a
critical governmental facility project subjected to discretionary review or delays, particularly given that the
proposed subdivision is necessary to construct the public works facilities that were previously declared to be
immune from local land use review by the Zoning Board of Appeals.
Factor #2: The kind of function of land use involved and the extent of the public interest to be served.
The construction associated with the Department of Public Works Building Replacement and Campus
Renovation Project as a repair, storage, and administrative facility for the Town of Lansing Department of
Public Works is a non-proprietary,governmental function which will serve the public interest by ensuring the
continued and improved maintenance of public roadways under the jurisdiction of the Town Lansing's
Department of Public Works for the benefit of members of the public using said public roadways and the
citizens of the Town of Lansing. The proposed subdivision is necessary for the regular functioning of the new
public works facilities. Included services address emergency services, road maintenance, and maintenance and
repair of public utilities like water and sewer. The maintenance of public roadways under the jurisdiction of the
Town Department of Public Works is a statutory govemmental function and obligation of the Town of
Lansing Department of Public Works, and many of the services are emergency and utility services.
Factor#3: The effect local land use regulation would have upon the enterprise concerned and the impact upon
legitimate local interests.
If the Town of Lansing Zoning Code Schedule II was to be applied "as written" to this project, the Town
would be prevented from locating a water meter at the new Public Works Building, and could potentially be
required to seek a variance from the Zoning Board of Appeals to separate buildings on to different parcels.The
formal subdivision and variance process would be time-consuming and would likely delay the opening of the
new facilities,which have already been declared immune from local review and have begun construction. In
addition, the variance process could require project modifications which may not be feasible at this time and
reduce the buildings capacity to serve multiple Town departments, having adverse impacts upon the Town's
ability to maintain and improve their municipal highway systems in accordance with the requirements of New
York State law,and resulting in possible dangers and other adverse impacts to the citizens of the Town and
those travelling on the Town highways.
Factor #4:The applicant's legislative grant of authority.
New York State Town Law and Highway Law authorize and require the Town of Lansing to provide adequate
facilities for the Town of Lansing Department of Public Works in aid of its responsibility to maintain those
public roadways utilized by members of the general public which fall under the jurisdiction of the Town
Department of Public Works. Article 7 of the Highway Law specifically vests the Town Highway
Page 2 of 4
Superintendent with jurisdiction over the care of the town highways.The authority of the town to provide for
these facilities and services is statutorily plenary,including under Town Law Article 4.
Moreover, as noted above, the town also is imbued with substantial experience in project review and siting and
causing redundant reviews by alternate agencies of the town does nothing relative to the governmental
purposes here fulfilled that falls within the exceptions to the County of Monroe test.The town is not the type
of agency that is incapable of undertaking a review, or which has no substantial experience in a land use
planning, as may require additional internal reviews. See,e.g., Matter of County of Monroe, 82 NY2d 338, 343
[19881;Volunteer Fire Ass'n of Tappan, Inc. v.Town of Orangetown,N.Y.L J. May 2,2007, p. 22, col. 3 (Sup.
Ct. Rockland Co. 2007), affd, 54 A.D.3d 850, 863 N.Y.S.2d 502 (2d Dept. 2008) (fire departments have no
intrinsic experience or authority with land use planning and thus may not fall under the County of Monroe
standard when all factors are duly balanced).
Factor #5: Alternate locations for the Department of Public Works facility in less restrictive zoning areas.
The subject premises is the only Town-owned parcel located within the Town of Lansing suitable for the
construction and maintenance of the facility and represents the most reasonable and efficient use of Town
owned property in furtherance of the objectives of providing the Town of Lansing Department of Public
Works with a consolidated highway facility location within the Town. Despite this, and as part of the project
investigation, the Town evaluated several potential alternative sites for a new public works facility. At least 3
other sites were evaluated,and several site configurations considered as to this site. Consultants Bergmann
Associates and the Town RFP Committee determined that there are no feasible alternate locations which meet
the necessary objectives of the Town of Lansing Department of Public Works,and that this layout was the best
overall layout given cost, traffic flow, needs,and available land.
Since the Zoning Board of Appeals granted the Town of Lansing immunity from local review for the siting and
construction of the new Department of Public Works facilities in 2022, the Town has begun and made
substantial progress in constructing the new facility. It is not feasible to relocate a building which has been
approved and substantially constructed, and moving the affected departments would not materially improve
efforts to provide adequate water to the new facilities..
Factor#6: Alternative methods of providing the needed improvement.
The construction of the new Department of Public Works facility as proposed represents the minimal
infrastructure improvements necessary to promote increased use of the subject premises as a centralized
Department of Public Works facility.The proposed subdivision is necessary for providing water to the new
facilities,it is not practical or viable to run a water line from the old highway barn to the new public works
facilities or run water lines from the single meter to every potentially developable area of 10 Town Barn Road.
There are no viable alternative methods of providing these improvements, and there is no way to catch-up with
the past 50 years,including in building design, maintenance, energy efficiency, or fire suppression than to
upgrade and re-use some parts of the existing facility and construct a new operations barn and office space.
The decision to construct a new facility was made based upon thorough examinations of town needs,town
equipment,personnel, operations, and the design and function of the proposed facilities by Bergmann
Associates and the RFP committee,with approval from the Town Board, and thereafter from the Capital
Investment Committee,with further general approval from the Town Board. To re-visit over 5 years of
planning and site design, all at the cost of more time and money,would serve no valid land use purpose.
Indeed, this is the precise point of the County of Monroe test,and why so many core governmental projects
like this are in fact immune from such reviews. A review by a town agency of a town project already reviewed
would be likely to be redundant.
Factor#7: Intergovernmental participation in the project development process.
The past study,locational analyses,and site layout and design were subjected to rigorous review at multiple
Page 3 of 4
levels of the town government,with key personnel serving on both committees.This included the Town Board,
town engineer, town planners, town clerk, Highway Department, Parks and Recreation Department, town
bookkeeper, Planning Board,and town attorney,with additional input from others, such as Bergmann
Associates and Municipal Solutions (finance).Atop this, the construction of the new highway facility has been
overseen by members of the Town Board of the Town of Lansing,its engineers,and other retained
professional consultants. The project has also required the review and approval of several outside jurisdictional
agencies including the New York State Department of Transportation,New York State Department of
Environmental Conservation,Army Corps of Engineers, and Tompkins County Department of Health.
Updated surveys and subdivision plats are being prepared by the town engineer,in coordination with multiple
municipal departments.
In addition, the development of plans for the facility have and will be fully vetted, discussed, and considered by
the members of the Town Board and its legal,planning,and engineering staff and consultants, and Town of
Lansing citizens have been and will be permitted to offer comments and suggestions upon the revew and
development of this project.
RESOLVED, that the Planning Board hereby declares that the proposed subdivision of 10 Town Barn
Road shall be exempt from the subdivision requirements and restrictions of the Town of Lansing Zoning
Code; and be it further
RESOLVED, that the Town of Lansing Schedule I and Schedule II Regulations for the IR Zoning
District to the extent that they may restrict or prohibit the proposed facility shall not apply to this
project.
Dated: 24 August 2026
Motion by: Tom Butler
Seconded by:John Licitra
VOTE AS FOLLOWS:
Tom Butler—Aye
Aimee Caffrey—Not Voting
Sandy Conlon—Aye
John Duthie—Not Voting
Al Fiorille —Ave
Christine Hass —Aye
Danielle Hautaniemi—Absent
John Licitra—Aye
Fredric Villano—Aye
Dean Shea—Aye
Received in the Lansing Town Clerk's Office on
Debbie Munson,Town Clerk
Town of Lansing
Tompkins County,New York